DATA SHEET
CLIENT:
ag DATASHEEI No.
NO.
3090 | 21 113 -DS- 02
TTEM TAG No. MIR No.
AMERYA - ALEXANDRIA
PROJECT: MAXIMIZATION OF C2. & C3 FROM
1-V-04A/8 | 3090 - 210- 164- 01-P
SUPPLIER
WESTERN DESERT GAS FIELDS
PACKAGE & PREPARATION FOR SHIPMENT AND STORAGE TOBE
10,
f= 108 PACKING & SHIP. INST.
1 SUPPLIER STD, PO.CLAUSE
= J0ssPeC
EQUIPMEN’
(GRAY FINT
‘SUPPLY OF ITEMS TO THE REQUIREMENTS OF THIS DATASHEET TO
COMPLY WITH THE FOLLOWING SPEC(S)
AS PER MR ATTACHMENT LIST
PRESSURE VESSEL
SERVICE: OIL SEPARATOR
27-02-07 ISSUED FOR PURCHASE
T.Ismail
15/02/06 ISSUED FOR INQUIRY
DATE REVISIONSExnpp!
PAGE 2 OFS
3090-210 - 113 -DS-_ 02
MAXIMIZATION OF C2 & C3 FROM WESTERN DESERT GAS FIELDS.
GASCO SITE: "AMERYA - ALEXANDRIA
U-V-04 418 QUANTITY: TWO
2260 NOTE(I0) __ mam |TAN. TO TAN: 4000 NOTETO)
‘OIL SEPARATOR
OPERATING & DESIGN CONDITIONS _qworrs)
‘ASME VIM DIV (LATEST ED. & ADD) [CODE STAMP:
~ OPER, PRESSURE: 1984 barg_, at INT. OPER. TEMP. 80
[EXT. OPER. PRESSURE: barg_, at EXT. OPER. TEMP.
"DESIGN PRESSURE: 3 ‘barg_, at INT.DESIGN TEMP. 461120
~ DESIGN PRESSURE: FV. arg_, at EXT-DESIGN TEMP. #61120
Ea °C, ai PRESSURE.
DESIGN DATA _worrs)
0.85 STATIC HEAD:
[SOUR SERVICE:
eTHOUAKE:
MECHANICAL DATA _ worrs)
‘HORIZONTAL |SUPPORT: (SADDLES.
‘ELL.2:1 LEFT HEAD ELL. 2:1 |
IM-H. COVER: WITH DAVIT |
[INSULATION SUPPORTS: YES
FIRE PROOFING SUPPORTS:
[LADDERS :
LATFORMS:
[PIPE GUIDES:
[PIPE SUPPORTS:
SA-516 70 TS: ‘SWNAF
SA51670 BOLTS: SA-320 GrL7
SA-516 70 NUTS: ‘SA-194 Grd
ZZLE NECK: __ SA-333 Gr6 OR SA350 LF2_ [FIXED INT.
(GES: SASSO LED [REMOVABLE INT:
32 mm[TiE BOLTS:
INTERNAL COATING SYSTEM
SURFACE PREP.:
COATING:
LINING:
[CLADDING:
CP:
INSULATION _ ores)
HEAT CONSERVATION [1 VEE
MINERAL WOOL THICKNESS:Enpp!
PAGE3 OF 5
DATA SHEET No. 3090 - 210 - 113 -DS-_O2
‘MAXIMIZATION OF C2 & C3 FROM WESTERN DESERT GAS FIELDS
GASCO ISITE: AMBRYA - ALEXANDRIA
T-V-04 AB QUANTITY: ONE.
OIL SEPARATOR
WEIGHT _worrs)
LIQUID:
JOPERATING:
TEST:
NOZZLES _(wores)
= SERVICE |Einpp!
PAGE 4 OF 5.
3090 ~ 210 - 113 -DS- 02
‘MAXIMIZATION OF C2 & C3 FROM WESTERN DESERT GAS FIELDS.
GASCO ISITE: "AMERYA - ALEXANDRIA
TI-V-04A1B QUANTITY: ONE
‘OIL SEPARATOR
SKETCH (notes)EB mpp!
PAGE 5 OF 5
3090 - HO - LS -DS- 02
‘MAXIMIZATION OF C2 & C3 FROM WESTERN DESERT GAS FIELDS
GASCO |SITE: “AMERYA - ALEXANDRIA
LLD EAB. [QUANTITY: ONE.
‘OIL SEPARATOR
NOLES
ALL DIMENSIONS ARE IN min UNLESS OTHERWISE NOTED.
MANHOLE SHALL BE PROVIDED WITH BLIND COVER, BOLTING, GASKET AND EITHER HINGE OR DAVIT,
[AS REQUIRED IN DATASHEET.
ALL NOZZLES SHALL BE PROTECTED WITH METAL COVERS DURING SHIPPING.
FLANGE FACING SHALL BE 3.2 TO 6.3 1 RA. FOR RF FLANGES.
ANY REMOVABLE INTERNALS SHALL PASS THROUGH MANHOLE INNER DIAMETER,
ALL MENTIONED THICKNESSES IN DATA SHEET SHALL BE CONSIDERED MINIMUM AND THE SUPPLIER
SHALL BE RESPONSIBLE FOR THE CODE VERIFICATION OF SUCH THICKNESSES.
INSULATION FOR PERSONNEL PROTECTION IS REQUIRED WHEN OPERATING TEMPERATURE EXCEEDS
60°C ORIS EQUAL TO OR LOWER THAN ZERO °C.
ALL MISSING DATA/ SKETCH SHALL BE COMPLETED BY SUPPLIER AND SHALL BE SUBJECT 70 ENPPT
REVIEW AND APPROVAL DURING BIDDING PHASE.
‘SPARE PARTS FOR COMMISSIONING AND START UP SHALL BE:
‘THREE COMPLETE SETS OF GASKETS FOR MANHOLES, BLINDED CONNECTIONS AND INTERNALS (IF ANY).
10% OF BOLTING (MIN. 5 PIECES OF EACH SIZE) FOR MANHOLES, BLIND CONNECTIONS AND INTERNALS
10. SIZES SHALL BE VERIFIED DURING DETAILED ENGINEERING.