You are on page 1of 5
Exnpp! PAGE LOFS DATA SHEET CLIENT: ag DATASHEEI No. NO. 3090 | 21 113 -DS- 02 TTEM TAG No. MIR No. AMERYA - ALEXANDRIA PROJECT: MAXIMIZATION OF C2. & C3 FROM 1-V-04A/8 | 3090 - 210- 164- 01-P SUPPLIER WESTERN DESERT GAS FIELDS PACKAGE & PREPARATION FOR SHIPMENT AND STORAGE TOBE 10, f= 108 PACKING & SHIP. INST. 1 SUPPLIER STD, PO.CLAUSE = J0ssPeC EQUIPMEN’ (GRAY FINT ‘SUPPLY OF ITEMS TO THE REQUIREMENTS OF THIS DATASHEET TO COMPLY WITH THE FOLLOWING SPEC(S) AS PER MR ATTACHMENT LIST PRESSURE VESSEL SERVICE: OIL SEPARATOR 27-02-07 ISSUED FOR PURCHASE T.Ismail 15/02/06 ISSUED FOR INQUIRY DATE REVISIONS Exnpp! PAGE 2 OFS 3090-210 - 113 -DS-_ 02 MAXIMIZATION OF C2 & C3 FROM WESTERN DESERT GAS FIELDS. GASCO SITE: "AMERYA - ALEXANDRIA U-V-04 418 QUANTITY: TWO 2260 NOTE(I0) __ mam |TAN. TO TAN: 4000 NOTETO) ‘OIL SEPARATOR OPERATING & DESIGN CONDITIONS _qworrs) ‘ASME VIM DIV (LATEST ED. & ADD) [CODE STAMP: ~ OPER, PRESSURE: 1984 barg_, at INT. OPER. TEMP. 80 [EXT. OPER. PRESSURE: barg_, at EXT. OPER. TEMP. "DESIGN PRESSURE: 3 ‘barg_, at INT.DESIGN TEMP. 461120 ~ DESIGN PRESSURE: FV. arg_, at EXT-DESIGN TEMP. #61120 Ea °C, ai PRESSURE. DESIGN DATA _worrs) 0.85 STATIC HEAD: [SOUR SERVICE: eTHOUAKE: MECHANICAL DATA _ worrs) ‘HORIZONTAL |SUPPORT: (SADDLES. ‘ELL.2:1 LEFT HEAD ELL. 2:1 | IM-H. COVER: WITH DAVIT | [INSULATION SUPPORTS: YES FIRE PROOFING SUPPORTS: [LADDERS : LATFORMS: [PIPE GUIDES: [PIPE SUPPORTS: SA-516 70 TS: ‘SWNAF SA51670 BOLTS: SA-320 GrL7 SA-516 70 NUTS: ‘SA-194 Grd ZZLE NECK: __ SA-333 Gr6 OR SA350 LF2_ [FIXED INT. (GES: SASSO LED [REMOVABLE INT: 32 mm[TiE BOLTS: INTERNAL COATING SYSTEM SURFACE PREP.: COATING: LINING: [CLADDING: CP: INSULATION _ ores) HEAT CONSERVATION [1 VEE MINERAL WOOL THICKNESS: Enpp! PAGE3 OF 5 DATA SHEET No. 3090 - 210 - 113 -DS-_O2 ‘MAXIMIZATION OF C2 & C3 FROM WESTERN DESERT GAS FIELDS GASCO ISITE: AMBRYA - ALEXANDRIA T-V-04 AB QUANTITY: ONE. OIL SEPARATOR WEIGHT _worrs) LIQUID: JOPERATING: TEST: NOZZLES _(wores) = SERVICE | Einpp! PAGE 4 OF 5. 3090 ~ 210 - 113 -DS- 02 ‘MAXIMIZATION OF C2 & C3 FROM WESTERN DESERT GAS FIELDS. GASCO ISITE: "AMERYA - ALEXANDRIA TI-V-04A1B QUANTITY: ONE ‘OIL SEPARATOR SKETCH (notes) EB mpp! PAGE 5 OF 5 3090 - HO - LS -DS- 02 ‘MAXIMIZATION OF C2 & C3 FROM WESTERN DESERT GAS FIELDS GASCO |SITE: “AMERYA - ALEXANDRIA LLD EAB. [QUANTITY: ONE. ‘OIL SEPARATOR NOLES ALL DIMENSIONS ARE IN min UNLESS OTHERWISE NOTED. MANHOLE SHALL BE PROVIDED WITH BLIND COVER, BOLTING, GASKET AND EITHER HINGE OR DAVIT, [AS REQUIRED IN DATASHEET. ALL NOZZLES SHALL BE PROTECTED WITH METAL COVERS DURING SHIPPING. FLANGE FACING SHALL BE 3.2 TO 6.3 1 RA. FOR RF FLANGES. ANY REMOVABLE INTERNALS SHALL PASS THROUGH MANHOLE INNER DIAMETER, ALL MENTIONED THICKNESSES IN DATA SHEET SHALL BE CONSIDERED MINIMUM AND THE SUPPLIER SHALL BE RESPONSIBLE FOR THE CODE VERIFICATION OF SUCH THICKNESSES. INSULATION FOR PERSONNEL PROTECTION IS REQUIRED WHEN OPERATING TEMPERATURE EXCEEDS 60°C ORIS EQUAL TO OR LOWER THAN ZERO °C. ALL MISSING DATA/ SKETCH SHALL BE COMPLETED BY SUPPLIER AND SHALL BE SUBJECT 70 ENPPT REVIEW AND APPROVAL DURING BIDDING PHASE. ‘SPARE PARTS FOR COMMISSIONING AND START UP SHALL BE: ‘THREE COMPLETE SETS OF GASKETS FOR MANHOLES, BLINDED CONNECTIONS AND INTERNALS (IF ANY). 10% OF BOLTING (MIN. 5 PIECES OF EACH SIZE) FOR MANHOLES, BLIND CONNECTIONS AND INTERNALS 10. SIZES SHALL BE VERIFIED DURING DETAILED ENGINEERING.

You might also like