You are on page 1of 5
Einpp! PAGE 1085 DATA SHEET ITEM TAG No. AMERYA - ALEXANDRIA PROJECT: — MAXIMIZATTION OF C2 & C3 FROM 1-V-O1 WESTERN DESERT GAS FIELDS TACKAGHN PREPARATION FOR SHIPMENT AND STORAGE TOBE TO” 1 JOBPACKING & SH. INST 1 SUPPLIER STD. = so8 sre EQUIPMENT: SERVICE: ‘SUPPLY OF ENG To THE REQUIREMENTS OF THIS DATA SHEET TO (COMPLY WITH TH FOLLOWING SPECS) AS PER MIR ATTACHMENT LIST PRESSURE VESSEL, PROPANE REFRIGERANT ACCUMULATOR ISSUED FOR PURCHASE ISSUED FOR INQUIRY REVISIONS Enp pi PAGE 20F 5 3090-210. 113 DS. REV: “MAXIMIZATION OF C2 & C3 FROM WESTERN DESERT GAS FIELDS GASCO SITE: “AMERYA - ALEXANDRIA TEVA (QUANTHIY: OnE 2300 NOTE (10) mam [TAN. 70 TAN T0000 NOTE (0) PROPANE REFRIGERANT ACCUMULATOR OPERATING & DESIGN CONDITIONS _ wore) ASME VIM DIV (LATEST ED. & ADD) _ [CODE STAMP: U-STAMP, "OPER. PRESSURE: 1984 ‘arg , at INT. OPER. TEMP. 57. IEXT, OPER, PRESSURE: barg_, at EXT, OPER. TEMP. ~ DESIGN PRESSURE: 25 barg_, at INT.DESIGN TEMP. 46/120 ~ DESIGN PRESSURE: ml barg_ at BXT._DESIGN TEMP. | 7 °C_ at PRESSURE. | 08 [STATIC HEAD: SOUR SERVICE: PER CODE JOINT EFF: PER CODE PER CODE, IMPACT TEST: PER CODE ‘Km/h EARTHQUAKE: MECHANICAL DATA __ ores) HORIZONTAL __ [SUPPORT: BLL. 2:1 LEFT HEAD. ILIFTING LUGS: [M.H. COVER: WITH DAVIT [LIFTING TRUNION: INSULATION SUPPORTS: YES FIRE PROOFING SUPPORTS: [LADDERS = L PLATFORMS: [PIPE GUIDES: "IPE SUPPORTS: SA-516 70 [GASKETS: ‘SWNAF ‘SA-516 70 [BOLTS: ‘SA-320 Gr L7 SA-516 70 INUIS: ‘SA-194 Grd 'SA-333 Gr6 OR SA350 LF2_ |FIXED INT Sis 350 LED REMOVABLE INT: [TIE BOLTS: EXTERNAL PAINTING SYSTEM TNTERNAL COATING SYSTRNT | SURFACE PREP. SURFACE PREP. JPRIMER: (COATING: t INTER, COAT: LINING: CLADDING: INSULA. Tow (NoTEs) HEAT CONSERVATION [1 ¥PE: [DHICKNESS: Einpp! PAGE3 OF 5 | DATA SHEET No 3090-210 - 113 -DS-_ 02 RE 1 ROJECT: "MAXIMIZATION OF C2 & C3 FROM WESTERN DESERT GAS FIELDS. | SLIENT GASCO [Srre: "AMERYA - ALEXANDRIA TEM TAG: T-V-OL QUANTITY: ONE SERVICE! PROPANE REFRIGERANT ACCUMULATOR WEIGHT _wores) RECTION: kg/ LIQUID: a INTERNALS: Kg|OPERATING: kg} EMPTY: 23000 kg | TEST: 68000 OLUME: 45, m7 NOZZLES __worns) | MARK _[_OTY [RATING] FACING] TYPE SERVICE, REMARKS. Einpp! PAGE 4 OF 5 3090-210 -_113_-DS._@2 "MAXIMIZATION OF C2 & C3 FROM WESTERN DESERT GAS FIELDS. GASCO |SITE: AMERYA - ALEXANDRIA H-V-01 JQUANTITY: ONE “PROPANE REFRIGERANT ACCUMULATOR i SKETCH (notes) Enpp! PAGES OFS DATA SHEET No. 0-210 - ~*Ti3_—DS- PROJECT: ‘MAXIMIZATION OF C2 & C3 FROM WESTERN DESERT GAS FIELDS CLIENT. GASCO ISITE: "AMERYA - ALEXANDRIA ITEM TAG: TPO QUANTITY: OME SERVICE: PROPANE REFRIGERANT ACCUMULATOR ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE NOTED. MANHOLE SHALL BE PROVIDED WITH BLIND COVER, BOLTING, GASKET AND BITHER HINGE OR DAVIT, AS REQUIRED IN DATASHEET. ALL NOZZLES SHALL BE PROTECTED WITH METAL COVERS DURING SHIPPING, FLANGE FACING SHALL BE 32 TO 63 RA, FOR RF FLANGES. ANY REMOVABLE INTERNALS SHALL PASS THROUGH MANHOLE INNER DIAMETER ALL MENTIONED THICKNESSES IN DATA SHEET SHALL BE CONSIDERED MINIMUM AND THE SUPPLIER SHALL BE RESPONSIBLE FOR THE CODE VERIFICATION OF SUCH THICKNESSES. INSULATION FOR PERSONNEL PROTECTION IS REQUIRED WHEN OPERATING TEMPERATURE EXCEEDS 60°C OR IS EQUAL TO OR LOWER THAN ZERO"C. ALL MISSING DATA/ SKETCH SHALL BE COMPLETED BY SUPPLIER AND SHALL BE SUBJECT TO ENPPI REVIEW AND APPROVAL DURING BIDDING PHASE. SPARE PARTS FOR COMMISSIONING AND START UP SHALL BE: THREE COMPLETE SETS OF GASKETS FOR MANHOLES, BLINDED CONNECTIONS AND INTERNALS (IF ANY). 10% OF BOLTING (MIN. 5 PIECES OF EACH SIZE) FOR MANIIOLES, BLIND CONNECTIONS AND INTERNALS SIZES SHALL BE VERIFIED DURING DETAILED ENGINEERING, VESSEL SHALL BE PROVIDED WITH AT LEAST ONE 24" NPS MANHOLE AND 6" NPS HANDHOLE ON THE OPPOSITE SIDE,

You might also like