Professional Documents
Culture Documents
2.0QUALITYPOLICYSTATEMENT..........................................................................................................1
3.0DESCRIPTIONOFLEGALSTATUS.....................................................................................................1
4.0PTIORGANIZATION.............................................................................................................................. 2
5.0CERTIFICATIONOFPLANTSPRODUCINGUNBONDEDSINGLESTRANDTENDONS.2
5.1TERMSOFREFERENCE.......................................................................................................................... 2
5.2MANAGEMENTSTRUCTUREANDORGANIZATION........................................................................11
5.2.1CertificationProgramPersonnel...................................................................................................11
5.2.2UnbondedTendonPlantCertificationCommittee(UTPCCommittee).......................................12
5.2.3CertificationAdvisoryBoard(CAB)..............................................................................................13
5.2.4PTIBoardofDirectors...................................................................................................................13
5.2.5PTICertificationStaff....................................................................................................................13
5.2.6IndependentInspectionAgency...................................................................................................18
5.3PROCEDURESFORASSESSING,RECORDINGANDMONITORINGOFPERFORMANCE.............20
5.3.1Reviewofevaluationreports.......................................................................................................20
5.3.2AuditReviewofIndependentInspectionAgency........................................................................20
5.3.3YearͲendPerformanceEvaluation...............................................................................................20
5.4QUALITYMANAGEMENTPROCEDURES..........................................................................................20
5.4.1ManagementofImpartiality.........................................................................................................21
5.4.2MechanismforSafeguardingImpartiality....................................................................................21
5.4.3AdministrativeProceduresincludingDocumentControl............................................................21
5.4.4DueNoticeofChanges..................................................................................................................22
5.4.5ProcedureforEvaluatingaPlant’sQualityControlProcess.........................................................22
5.4.6ConditionsforIssue,Retention&WithdrawalofCertificationDocuments...............................22
5.4.7ProcedureforReviewingChangedConditions.............................................................................22
5.4.8ControlsovertheUseandApplicationofDocumentsusedintheCertificationProgram..........23
5.4.9ProcedureforDealingwithAppeals,ComplaintsandDisputes..................................................23
5.4.10AppealsandDisputes..................................................................................................................23
5.4.11Complaints............................................................................................................................... ....24
5.4.12PoliciesandProceduresforConductingManagementReviews...............................................2ϲ
5.5PROCEDURESFORFINANCIALMANAGEMENTANDBUDGETING...........................................4ϰ
5.5.1ProgramBudgeting.......................................................................................................................4ϰ
5.5.2MemberDuesCredit....................................................................................................................4ϰ
APPENDICES .......................................................................................................................................4ϵ
APPENDIXA:UnbondedTendonPlantCertificationCommitteeRoster......................................ϱϬ
APPENDIXB:CertificationAdvisoryBoardRoster.........................................................................ϱϭ
APPENDIXC:ϮϬϭϲPTIBoardofDirectors......................................................................................5ϱ
APPENDIXD:MinimumQualificationsforPTIUnbondedTendonPlantInspectors....................ϱϯ
APPENDIXE:ResumesofCurrentPTIPlantInspectors.................................................................5ϱ
APPENDIXF:StepͲbyͲStepAdministrativeProceduresforthePTIUnbondedTendonPlant
CertificationProgram......................................................................................................................ϱϵ
APPENDIXG:PTIUnbondedTendonPlantCertificationProgramRecordkeepingOrganization&
Structure...........................................................................................................................................ϲϳ
APPENDIXH:PTICertificationDocumentRetentionandDestructionPolicy...............................ϲϵ
APPENDIXI:ManagingUTPCCompetencies...................................................................................ϳϬ
PTI-CRT20 G2-0816
1.0 INTRODUCTION
The PostͲTensioning Institute (PTI) program for Certification of Plants Producing Unbonded Single
StrandTendonshasbeendevelopedtoprovideindependentcertificationofaplant’sextrusionand/or
fabricationcapabilitytoproducestandardand/orencapsulatedunbondedsinglestrandtendons.This
certificationprogramalsoincludesevaluationofcalibrationpracticesforjacksandgaugesusedfor
stressingsinglestrandtendons.Theprogramisapplicabletoallfacilitieswhetherfixedormobile.
Thecertificationofaplantunderthisprogramindicatesthattheplantandthepersonnelarecapable
of producing unbonded single strand tendons in conformance with the PostͲTensioning Institute
Specification for Unbonded Single Strand Tendons, latest edition, or as specified in contract
document(s)forspecificproject(s).
2.0 QUALITYPOLICYSTATEMENT
The PostͲTensioning Institute is recognized as the worldͲwide authority on postͲtensioning. PTI is
dedicated to expanding postͲtensioning applications through marketing, education, research,
teamwork,andcodedevelopmentwhileadvancingthequality,safety,efficiency,profitability,and
use of postͲtensioning systems. Members of the Institute include major postͲtensioning materials
fabricators,manufacturersofprestressingmaterials,andcompaniessupplyingmaterials,servicesand
equipment used in postͲtensioned construction. In addition, PTI has more than 500 professional
memberswhichincludeengineers,architects,inspectors,buildingcodeofficialsandeducators.
One of the goals of the Institute is to ensure that specifiers and purchasers of postͲtensioning
materialsreceiveproductsandserviceswhichmeetarecognizedstandardofquality.Workingtoward
this goal, PTI has established a certification programs both for manufacturing plants and for field
personnel. One such program is for the Certification of Plants Producing Unbonded Single Strand
Tendons(hereafterreferredtoastheUnbondedTendonPlantCertificationProgram.)
PTIhasestablishedaQualityManagementSystem(QMS)assetforthinthismanualtoensurethe
qualityoftheUnbondedTendonPlantCertificationProgram.SpecificobjectivesoftheQMSareas
follows:
Ensurethatprogramisfair,impartialandnonͲdiscriminatorytoallstakeholders
EnsurethatprogramconformswithANSI,ISOandotherrelevantcertificationstandards
EnsurethatprogramconformstothePTIByͲLawsandestablishedCertificationCommittee
procedures.
Facilitatecontinuousimprovementoftheprogram
3.0 DESCRIPTIONOFLEGALSTATUS
PTIwasestablishedandincorporatedasa501c(6)nonͲprofittradeassociationinthestateofIllinois,
April1976.PTI’sofficeiscurrentlylocatedat:
38800CountryClubDrive
FarmingtonHills,MI48331
Phone:(248)848Ͳ3180
Fax: (248)848Ͳ3181
&RS\ULJKWHG F 3RVW7HQVLRQLQJ,QVWLWXWH
3DJH
$OOULJKWVUHVHUYHG
PTI-CRT20 G2-0816
4.0 PTIORGANIZATION
The bulk of PTI’s work is done through its various committees comprised of volunteer members.
Currently, PTI has eight BoardͲlevel committees, twelve technical committees and six certification
committeesasshownontheorganizationalcharts(Figures1–4)onthefollowingpages.
TheBoardͲLevelcommitteesreportdirectlytothePTIBoardofDirectorsandaregenerallyresponsible
for setting the direction and policy of PTI’s financial, technical, membership, marketing and
certificationactivities.ThelinesofauthorityforstaffareshowninFigures5Ͳ7.
PTI technical committees report to the Technical Advisory Board (TAB) and are responsible for
developingtechnicalguidance,recommendedpracticesandstandardsforthedesign,construction,
maintenanceandrepair/rehabilitationofpostͲtensionedconcretestructures.
PTI’scertificationcommitteesreporttotheCertificationAdvisoryBoard(CAB)andareresponsiblefor
the development, implementation and oversight of PTI’s various plant and personnel certification
programs.
5.0 CERTIFICATIONOFPLANTSPRODUCINGUNBONDEDSINGLESTRAND
TENDONS
TheorganizationandmanagementstructurefortheUnbondedTendonPlantCertificationProgramis
comprisedofseveral parts:the UnbondedTendon PlantCertificationCommittee,theCertification
AdvisoryBoard,thePTIBoardofDirectors,staffandthirdpartycontractors(IndependentInspection
Agency.)asshowninFigure8.
5.1TERMSOFREFERENCE
TheUnbondedTendonPlantCertificationprogramwasfirstauthorizedbythePTIBoardofDirectors
in1989.TheBoardreͲaffirmedthisauthorizationinaccordancewiththerequirementsoutlinedin
thismanualinthePTIByͲLawsapprovedOctober7,2011.Theaforementionedmanagement
structureandorganizationwasalsoestablishedbythePTIByͲLaws.
&RS\ULJKWHG F 3RVW7HQVLRQLQJ,QVWLWXWH
3DJH
$OOULJKWVUHVHUYHG
President: Robert
Sward
EX-105 Executive
Committee&KDLU5REHUW6ZDUG
PM-200
EDC-130 CM-300 Contractor Professional
Education&KDLU Chair: 2SHQ
9DFDQW
Member
Chair: -DPHV&DJOH\
&ŝŐƵƌĞϭʹʹʹWd/ŽĂƌĚ>ĞǀĞůŽŵŵŝƚƚĞĞƐ
&RS\ULJKWHG F 3RVW7HQVLRQLQJ,QVWLWXWH
$OOULJKWVUHVHUYHG 3DJH
'ŝŐƵƌĞϮͲWd/dĞĐŚŶŝĐĂůŽŵŵŝƚƚĞĞƐ
DC-100 Sustainability
3DJH
0DWHULDOV&RPPLWWHHV
'HVLJQ&RQVWUXFWLRQ&RPPLWWHHV
Chair: 0DUF.KRXU\
Figure3–PTICertificationCommittees
&RS\ULJKWHG F 3RVW7HQVLRQLQJ,QVWLWXWH
$OOULJKWVUHVHUYHG 3DJH
37,&57*
Thomas MathewsPrecision-
Hayes International
Industry 8VHUDQG*HQHUDO,QWHUHVW
Representatives 5HSUHVHQWDWLYHV
3DJH
&ŝŐƵƌĞϰʹhŶďŽŶĚĞĚdĞŶĚŽŶWůĂŶƚĞƌƚŝĨŝĐĂƚŝŽŶŽŵŵŝƚƚĞĞƐ
Key: PTI Board of Directors
Chair: Robert Sward
= Direct Reporting
= Indirect Reporting PTI Executive Committee
Chair: Robert Sward
Unbonded PT Engineer
Field Personnel Amy Dowell
Certification
Committee
Certification Program
Bonded PT Field Coordinator
Personnel Charisse Burks
Certification
Committee
Membership Coordinator
Unbonded PT Michelle Stern
Field Repair,
Rehab &
Strengthening Marketing Coordinator
Certification Jackie Heiss
Committee
Figure5–LinesofAuthority:BoardͲLevelandCertificationCommittees Staff
&RS\ULJKWHG F 3RVW7HQVLRQLQJ,QVWLWXWH
3DJH
$OOULJKWVUHVHUYHG
PTI Board of Directors
Key: Chair: Robert Sward
= Direct Reporting
= Indirect Reporting PTI Executive Committee
Chair: Robert Sward
Technical/Certification Director
Miroslav Vejvoda
Technical/Certification Director
Miroslav Vejvoda Director-Human Resources
Lori Purdom
Engineer
Amy Dowell
3DJH
PTI-CRT20 G2-0816
5.2 MANAGEMENTSTRUCTUREANDORGANIZATION
5.2.1CertificationProgramPersonnel
5.2.1.1General
5.2.1.1.1PTIshallemploy,orhaveaccessto,asufficientnumberofpersonneltocover
itsoperationsrelatedtotheUTPCCertificationProgramandtotheapplicablestandards
andothernormativedocuments.Thepersonnelincludeemployeesandcommittee
members,aswellaspersonsworkingunderanindividualcontractoraformal
agreementthatplacesthemwithinthemanagementcontrolandsystems/proceduresof
theUTPCCertificationProgram.
5.2.1.1.2Thepersonnelshallbecompetentforthefunctionstheyperform,including
makingrequiredtechnicaljudgments,definingpoliciesandimplementingthem.
Personnel,includinganycommitteemembers,personnelofexternalbodies,or
personnelactingonthecertificationbody'sbehalf,shallkeepconfidentialall
informationobtainedorcreatedduringtheperformanceofthecertificationactivities,
exceptasrequiredbylaworbythecertificationscheme.
5.2.1.1.3Thepersonnelshallnotbeusedtoreviewormakeacertificationdecisionfora
productforwhichtheyhaveprovidedconsultancyforaperiodoftwoyearsafterthey
haveprovidedsuchconsultancy.
5.2.1.2Managementofcompetenceforpersonnelinvolvedinthecertificationprocess
5.2.1.2.1TheUTPCCommitteeshallimplementandmaintaintheprocedurefor
managementofcompetenciesofpersonnelinvolvedinthecertificationprocessasset
forthinAppendixI.TheprocedureshallrequiretheUTPCCommitteetoannually:
a) Reviewandupdateasneededthecriteriaforthecompetenceofpersonnelforeach
functioninthecertificationprocess,takingintoaccounttherequirementsoftheUTPC
program;
b) Identifytrainingneedsandprovide,asnecessary,trainingprogramsoncertification
processes,requirements,methodologies,activitiesandotherrelevantcertification
requirements;
c) Demonstratethatthepersonnelhavetherequiredcompetenciesforthedutiesand
responsibilitiestheyundertake;
d) Formallyauthorizepersonnelforfunctionsinthecertificationprocess;
e) Monitortheperformanceofthepersonnel.
5.2.1.2.2PTIshallmaintainthefollowingrecordsonthepersonnelinvolvedinthe
certificationprocess:
a) Nameandaddress;
B) Employer(s)andpositionheld(entireworkresumeoftheindividual);
C) Educationalqualificationandprofessionalstatus;
D) Experienceandtraining;
E) Theassessmentofcompetence;
F) Performancemonitoring;
G) Authorizationsforfunctionsheldwithinthecertificationprogram;
H) Dateofmostrecentupdatingofeachrecord.
3DJH
&RS\ULJKWHG F 3RVW7HQVLRQLQJ,QVWLWXWH
$OOULJKWVUHVHUYHG
PTI-CRT20 G2-0816
5.2.2 UnbondedTendonPlantCertificationCommittee(UTPCCommittee)
The Unbonded Tendon Plant Certification Committee (UTPC Committee) is the management
group that is responsible for decisions relating to the granting, maintaining, extending,
suspendingandwithdrawingofcertificationforfacilitiesthatfabricateunbonded,singlestrand
postͲtensioningtendons.TheUTPCCommitteehasoverallresponsibilityforthefollowing:
x Performanceofthetesting,inspectionandevaluationasdefinedintheUnbonded
SingleStrandTendonPlantCertificationManual.
x FormulationofpoliciesandproceduresrelatedtotheUnbondedTendonPlant
CertificationProgram
x Oversightofdecisionsoncertification
x Developmentofthetechnicalbasisforcertification
x Delegationofauthoritytoundertakecertificationactivities
x Oversightofthecertificationprogramimplementation.
Inaddition,theUTPCCommitteeshallberesponsibleforsupervisionoftheUnbondedTendon
Plant Certification Program’s finances and budgeting. As part of this responsibility, the UTPC
Committeeshallannuallysettheprogramfeesinaccordancethepoliciesandproceduressetforth
inSection5.5ofthismanual.
TheUTPCCommitteeshallprepareasemiͲannualreportonthestatusoftheUnbondedTendon
PlantCertificationProgram.Ataminimum,thereportshouldincludethefollowing:
x Summaryofcertificationactionsduringtheperiod(i.e.numberofplantscertified,reͲ
certifiedordeͲcertified)
x Summaryofthedispositionofallappeals,complaintsanddisputesreceivedduringthe
period
x Financialstatus
x IndependentInspectionAgencyObservationsandRecommendations
ThesemiͲannualstatusreportsshallbesubmittedtotheCertificationAdvisoryBoardnolater
thanApril15,andSeptember15ofeachyear.
Membership: As specified in the PTI ByͲLaws, membership in the Unbonded Tendon Plant
Certification Committee is open to any interested party, including but not limited to postͲ
tensioningandassociatecompanyrepresentatives;contractors;engineers;governmentofficials;
andusersofpostͲtensioning.TheCommitteeshallconsistofnomorethaneleven(11)members
selectedfromnominationsreceivedfrominterestedstakeholders.TheCommitteeshallinclude
theChair;aminimumofthree(3)representativesofPostͲTensioningCompanyMembers;one(1)
representativeofanonͲmemberpostͲtensioningcompany;one(1)representativeofAssociate
Members; and a minimum of five (5) general interest or user representatives. Committee
membersshallbeappointedforathree(3)yeartermwithonepossiblereappointment.Current
membersofthecommitteearelistedinAppendixA.
3DJH
&RS\ULJKWHG F 3RVW7HQVLRQLQJ,QVWLWXWH
$OOULJKWVUHVHUYHG
PTI-CRT20 G2-0816
5.2.3 CertificationAdvisoryBoard(CAB)
TheCertificationAdvisoryBoardisaBoardͲlevelcommitteethatisresponsibleforoverseeingall
of PTI’s certification committees. With respect to the Unbonded Tendon Plant Certification
Program,CABshallberesponsibleforthefollowing:
x AppointmentoftheChairandmembersoftheUnbondedTendonPlantCertification
Committee
x ReviewofalldeͲcertificationsandcertificationdenialstoensurecompliancewithPTI
andANSIcertificationrequirementsandprocedures
x OversightofPTI’sQualityManagementSystem,includingtheannualinternalaudit,for
theUnbondedTendonPlantCertificationProgram
x Processingofallappeals,disputesandcomplaintsregardingtheUBTPlantCertification
Program
x Reviewofcertificationdocumentstoensuretechnicalcorrectnessandeditorialquality
CABshallnotberesponsibleforthedevelopmentofthetechnicalbasisforcertification,andthe
formulation of policies and procedures related to the Unbonded Tendon Plant Certification
Program,whicharesolelythepurviewoftheUnbondedTendonPlantCertificationCommittee.
CurrentmembersofCABarelistedinAppendixB.
5.2.4 PTIBoardofDirectors
ThePTIBoardofDirectorsisresponsiblefordirectingandoverseeingallactivitiesofPTI.With
respect to the Unbonded Tendon Plant Certification Program, the Board is responsible for
overseeingtheCertificationAdvisoryBoardandappointingitsmembers.Inaddition,theBoard
shallannuallysetPTI’sfinancialcontributiontotheUBTPlantCertificationProgramasdefinedin
Section5.5.1ofthismanual.
CurrentmembersofthePTIBoardofDirectorsarelistedinAppendixC.
5.2.5 PTICertificationStaff
Inadditiontotheaforementionedgroups,PTIhasstaffthatsupportsthecommitteesandcarries
outtheadministrationanddayͲtoͲdayimplementationofthecertificationprogram.Thesestaff
employeesinclude:
5.2.5.1 ExecutiveDirector
TheExecutiveDirectoristhechiefexecutiveofficeroftheInstitute,responsibletotheBoard
ofDirectorsfortheeffectiveconductoftheaffairsoftheInstitute.Keyresponsibilitiesrelated
totheUnbondedTendonPlantCertificationPrograminclude:
x Financialmanagement
x Staffsupervisionandperformancereviews
x Internalqualitymanagementandaudit
x Legaloversight(inconsultationwithPTI’sLegalCounsel)
x Contractadministration(IndependentInspectionAgencyandother3rdparty
contractors)
x StaffLiaisontotheBoardofDirectors
3DJH
&RS\ULJKWHG F 3RVW7HQVLRQLQJ,QVWLWXWH
$OOULJKWVUHVHUYHG
PTI-CRT20 G2-0816
RequisiteQualifications
Inordertofulfilltheaboveresponsibilities,theExecutiveDirectorshallhavethefollowing
minimumqualifications:
x 5yearsormoreexperienceinmanaginganonͲprofittradeassociation,
x Workingknowledgeofandcompetenceinfinancialmanagementandbudgeting
x Workingknowledgeofandcompetenceinstaffmanagementandsupervision
x Workingknowledgeofassociationandcontractlaw
x Workingknowledgeofandcompetenceincontractadministrationandspecifically
inmanagingprofessionalservicescontracts
CurrentPositionͲHolder
TheodoreL.NeffisthecurrentPTIExecutiveDirector,andhasheldthispositionforthepast
10years.Heisalicensedprofessionalengineerandhasextensiveexperienceinmanaging
certification programs, having developed a certification program for epoxyͲcoated
reinforcementplantsfortheConcreteReinforcingSteelInstitute.
Histrainingincludesnumerouscoursesinassociationmanagement,project andpersonnel
management,contractadministrationandcontractlaw.
AdditionalinformationregardingMr.Neff’sexperienceandtrainingareonfileinPTI’sHuman
Resourcedepartment.
5.2.5.2 CertificationDirector
TheCertificationDirectorisresponsibleforoverseeingthedayͲtoͲdayadministrationofPTI’s
certification programs. Key responsibilities related to the Unbonded Tendon Plant
CertificationPrograminclude:
x ServingasstaffliaisontoandprovidesupporttotheUnbondedTendonPlant
CertificationCommittee
x Examinationofinspectors,andverificationoftheirqualifications
x Reviewofcertificationapplications
x Issuingnotificationsofcertificationactionstoapplicants/participatingplants
x AuditreviewofIndependentInspectionAgency
x ReviewofIndependentInspectionAgencyevaluationandaplant’scompliancewith
programrequirements
x Decisionsonaplant’scertificationstatus
RequisiteQualifications
Inordertofulfilltheaboveresponsibilities,theCertificationDirectorshallhavethefollowing
minimumqualifications:
x Licensedprofessionalengineer
x ExtensiveknowledgeofpostͲtensionedconcretedesignandconstruction
x Workingknowledgeofandcompetenceincommitteemanagement
x Workingknowledgeofandcompetenceinstandardsandspecificationdevelopment
CurrentPositionͲHolder
MiroslavF.VejvodaisthecurrentPTICertificationDirector,andhasheldthispositionforthe
past six years. He is a licensed professional engineer, has Bachelor of Science in Civil
EngineeringandMastersinBusinessAdministration.Mr.Vejvodahasextensiveexperiencein
developing standards and working with committees. His prior work with the American
ConcreteInstitutegiveshimintimateknowledgeofindustrystandardsandspecifications.He
hasalsoworkedforseveralpostͲtensioningcompanies,bothintheU.S.andoverseasandhas
aninͲdepthknowledgeofpostͲtensioningfabricationandinstallation.
Histrainingincludesnumerousmanagementcoursesandincontractadministration.
Additionalinformationregarding Mr.Vejvoda’sexperienceand trainingareonfileinPTI’s
HumanResourcedepartment.
5.2.5.3Engineer
TheEngineerisresponsibleforassistingtheCertificationDirectorinoverseeingthedayͲtoͲ
dayadministrationofPTI’scertificationprograms.Keyresponsibilitiesrelatedtothe
UnbondedTendonPlantCertificationPrograminclude:
• CheckofIndependentInspectionAgencyevaluationreportsforconformancewith
PTIandANSIrequirements
• Coordinationandprocessingofcommitteeballots
• Monitoringandmaintainingarecordofcorrectiveactionstakenbyplants,bystaff
andbycommittees
Inordertofulfilltheaboveresponsibilities,theEngineershallhavethefollowingminimum
qualifications:
• Licensedprofessionalengineer
• BasicknowledgeofpostͲtensionedconcretedesignandconstruction
• Workingknowledgeofandcompetenceincommitteemanagement,andofPTI’s
certificationcommitteepoliciesandprocedures
• WorkingknowledgeofandcompetenceinapplyingtheUTPCproceduresand
standards
CurrentPositionͲHolder
AmyDowellisthecurrentEngineer,andhasheldthispositionsinceFebruary,2013.Sheisa
licensedprofessionalengineer,andhasBachelorsandMastersofScienceinCivil
Engineering.Ms.Dowellhasexperienceinfieldinvestigationofstructuresandcondition
assessment.InherpriorworkwiththeCTLGroup,shewasaprojectmanagerresponsible
forconstructionobservationandqualitycontrol.AsacoͲopstudent,shedidcooperative
workwithconcretetechnicianstoconductstandardizedconcreteandmasonrytesting
protocols.
AdditionalinformationregardingMs.Dowell’sexperienceandtrainingareonfileinPTI’s
HumanResourcedepartment.
3DJH
&RS\ULJKWHG F 3RVW7HQVLRQLQJ,QVWLWXWH
$OOULJKWVUHVHUYHG
PTI-CRT20 G2-0816
5.2.5.4 CertificationProgramsCoordinator
The Certification Programs Coordinator is responsible for providing the dayͲtoͲday
administrative support of PTI’s certification programs. Key responsibilities related to the
UnbondedTendonPlantCertificationPrograminclude:
x Processingofcertificationapplications
x Filingandrecordkeeping
x Maintenanceofcertificationdatabases
x Maintenanceofcertifiedplantdirectoriesandlistings
x MaintenanceofPTI’scertificationwebpages
x Overseeinggeneraladministrationofthecertificationprogram
x Preparingcorrespondence
RequisiteQualifications
Inordertofulfilltheaboveresponsibilities,theCertificationProgramsCoordinatorshallhave
thefollowingminimumqualifications:
x Workingknowledgeofandcompetenceintheuseofcomputersandadministrative
software(e.g.Word,Excel,Accessetc.)
x Twoyearsexperienceasanadministrativeassistant,orequivalent
x Competenceincomposingandformattingbusinesslettersandreports
CurrentPositionͲHolder
Charisse Burks is the current PTI Certification Programs Coordinator, and has held this
positionforthepast10months.
She has over 15 years’ experience in administrative support and her training includes
numerouscoursesintheuseofcomputersandadministrativesoftware.
AdditionalinformationregardingMs.Burks’experienceandtrainingareonfileinPTI’sHuman
Resourcedepartment.
5.2.5.5 MemberServicesCoordinator
TheMemberServicesCoordinatorisresponsibleforprocessingmembershipapplicationsand
forprovidingsupporttoPTImembers.KeyresponsibilitiesrelatedtotheUnbondedTendon
PlantCertificationPrograminclude:
x Processingofcertificationfeepayments
x Invoicingandfollowinguponaccountsreceivable
RequisiteQualifications
Inordertofulfilltheaboveresponsibilities,theMemberServicesCoordinatorshallhavethe
followingminimumqualifications:
x Workingknowledgeofandcompetenceintheuseofcomputersandadministrative
software(e.g.Word,Excel,Accessetc.)
x High school degree with at least two years experience as an administrative assistant,
orequivalent
x Competenceincomposingandformattingbusinesslettersandreports
CurrentPositionͲHolder
MichelleSternisthecurrentPTIMemberServicesCoordinator,andhasheldthispositionfor
thepastsixyears.
Hertrainingincludesnumerouscoursesintheuseofcomputersandadministrativesoftware,
andinmembershipadministration.
Additional information regarding Ms. Stern’s experience and training are on file in PTI’s
HumanResourcedepartment.
5.2.5.6 PTILeadAccountant
The PTI Lead Accountant is responsible for maintaining PTI’s financial records and other
related bookkeeping tasks. Key responsibilities related to the Unbonded Tendon Plant
CertificationPrograminclude:
x Preparationoffinancialreports
x ProcessingPTIpaymentsofaccountspayable
RequisiteQualifications
In order to fulfill the above responsibilities, the Lead Accountant shall have the following
minimumqualifications:
x Workingknowledgeofandcompetenceintheuseofcomputersandadministrativeand
financialsoftware(e.g.Word,Excel,Access,GreatPlainsetc.)
x Twoyearsexperienceasabookkeeper,orequivalent
x Bachelorsdegreeinaccountingorfinancialmanagement
CurrentPositionͲHolder
StaceyClementisthecurrentPTILeadAccountant,andhasheldthispositionforthepastfive
years.Ms.ClementhasaB.S.inFinanceandhaspriorexperienceasanassistantcontroller
foralocalcorporation.
Hertrainingincludesnumerouscoursesintheuseofcomputersandfinancialmanagement.
AdditionalinformationregardingMs.Clement’sexperienceandtrainingareonfileinPTI’s
HumanResourcedepartment.
5.2.5.7 CertificationStaffSelection&Training
Asrequired,PTIwillhirenewstaffaseitherreplacementsfor,oradditionstotheabovestaff.
Newhireswillbeselectedonthebasisoftheirexperienceandqualifications(keepingthe
aforementionedrequisitequalificationsinmind),performanceinjobinterviewsandpersonal
references.
Trainingwillbeprovidedtoallstaffasneededtostrengthenneededskillsandtoimprove
their overall efficiency and effectiveness. Records of all training will be maintained by PTI
HumanResourcesdepartment.
5.2.5.8 MonitoringofPerformance
Close to the end of each calendar year, an evaluation of all employees is performed. Its
purposeistopinpointstrengthsandweaknesses,andtoagreetoanimprovementprogram
ifnecessary.PerformanceevaluationsarekeptonfilebyPTI’sHumanResourcedepartment.
5.2.6 INDEPENDENTINSPECTIONAGENCY
TheUnbondedTendonPlantCertificationCommitteeshallselectaninspectionfirm(Independent
Inspection Agency) to perform the certification reviews of individual plants, and shall be
responsible for all of the inspection firm’s contracted activities. The Independent Inspection
AgencyshallbeanindependentcontractorandshallnotbeanemployeeofPTI.TheIndependent
Inspection Agency shall be appointed for a minimum initial term of three (3) years. The
IndependentInspectionAgency’sactivitiesshallterminateatthecloseofthecontracttermunless
renewedbymutualagreement.
TheIndependentInspectionAgencyshallbestaffedby competentpersonnel experienced and
familiar with unbonded postͲtensioning materials, components, and production processes; as
wellasunbondedpostͲtensioningdesignandconstruction.TheIndependentInspectionAgency
shallhaveaminimumofonelicensedprofessionalengineeronstaffresponsibleforoverseeing
thefirm’scertificationinspectionactivities.
Unless otherwise approved by the Unbonded Tendon Plant Certification Committee, the
inspectionpersonnelshallindividuallymeettheminimumqualificationssetforthinAppendixD.
Asnotedinthisexhibit,eachinspectorshallpassthePTIPlantCertificationInspectorexamination
asapprovedbytheUTPCCommittee.
The Independent Inspection Agency shall be responsible for conducting plant inspections,
preparing an evaluation report, and sending copies of the evaluation report to the PostͲ
TensioningInstitutewithin15Ͳdaysofanyinspection.Allinspectionreportsshallbesignedbythe
inspectorandalicensedprofessionalengineer(iftheinspectorisnotsoqualified.)
5.2.6.1 ConflictofInterest
TheIndependentInspectionAgencyshallnotbeaffiliatedinanymannerwithanycompany
or individual who has an ownership stake in a facility that participates in, or is eligible to
participate in, the Plant Certification Program. The Independent Inspection Agency and its
employeesshallnotbeemployedbyanycompanyorindividualwhohasanownershipstake
inafacilitythatiseligibletoparticipateintheCertificationProgram.Anindividualwhowas
previouslyemployedbyacompanyeligibletoparticipateintheCertificationProgramshall
not serve in the capacity of an inspector for a period of two (2) years following his/her
separationfromthecompany.
5.2.6.2 Confidentiality
Independent Inspection Agency will not at any time or in any manner, either directly or
indirectly,useforitspersonalbenefit,ordivulge,disclose,orcommunicateinanymanner
anyinformationthatisproprietarytoPTIorparticipatingplants.TheIndependentInspection
Agencywillprotectsuchinformationandtreatitasstrictlyconfidential.
TheIndependentInspectionAgencyshallberequiredtosignaconfidentialityagreementwith
eachparticipatingplanttoprotectallconfidential,proprietaryortradesecretinformationof
the participating plants. In addition, all project records, communications and committee
deliberationsshallalsobeconsideredstrictlyconfidentialandshallnotbereleasedtoanyone
3DJH
&RS\ULJKWHG F 3RVW7HQVLRQLQJ,QVWLWXWH
$OOULJKWVUHVHUYHG
PTI-CRT20 G2-0816
withouttheexpresswrittenapprovalofPTI.Further,theIndependentInspectionAgencyshall
maintaintheanonymityoftheparticipants,whilekeepinganaccurateconfidentialrecord.
UponterminationofitsagreementwithPTI,theIndependentInspectionAgencywillreturn
to PTI all records, notes, documentation and other items that were used, created, or
controlledbytheIndependentInspectionAgencyduringthetermoftheagreement.
5.2.6.3 Impartiality
The Independent Inspection Agency, and the personnel that it uses, shall not be involved,
eitherdirectlyorthroughanyotheremployer,insuchawaythatthecredibilityoftheresults
oftheUnbondedTendonPlantCertificationProgramcouldbecompromised.
5.2.6.4 CorrectiveAction
ShouldtheIndependentInspectionAgencyfailtocomplywithitscontractualagreementwith
PTIorotherrequirementsof5.2.6,theUnbondedTendonPlantCertificationCommitteeand
PTIshalltakeappropriatecorrectiveactions.
5.2.6.5 CurrentIndependentInspectionAgency/Personnel
CharlesR.Adams&Associates,Inc.,820E.10thAvenue,NewSmyrnaBeach,Florida32169is
thecurrentIndependentInspectionAgencyforthePTIUnbondedTendonPlantCertification
Program.Thefirmhasservedinthiscapacitysince2005.Presently,thecompanyhasthree
employeeswhoarequalifiedandhavebeenapprovedtobeinspectors:
x CHARLESR.ADAMS,P.E.
KeyQualifications:
ConsultingStructuralEngineerspecializinginpostͲtensionedconstructionͲͲ
licensedinthestatesofCalifornia,Florida,NewJersey,Marylandand
Massachusetts
Over40yearsexperienceinpostͲtensioningindustry
WorkedassoutheastregionalmanagerforAtlasPrestressingfrom1969–1977
PastownerofapostͲtensioningfabricationcompany(PTSI)1977–1993
HasprovidedengineeringoversightofPTIUnbondedTendonProgram
inspectionssince2005.
x CHARLESSKARBREVIK
KeyQualifications:
Over30yearsexperienceinthepostͲtensioningindustry
PreviouslyworkedforPostTensioningSystems,Inc.ͲͲapostͲtensioning
fabricationcompany.Inthiscapacity,hetrainedandmanagedpersonnelfor
unbondedtendonfabricationatfourfabricationfacilities.
HasservedasaPTIUnbondedTendonPrograminspectorsince2001.
x RICKD.COOLER
KeyQualifications:
Over20yearsexperienceintheconstructionindustry
3DJH
&RS\ULJKWHG F 3RVW7HQVLRQLQJ,QVWLWXWH
$OOULJKWVUHVHUYHG
PTI-CRT20 G2-0816
Inhispreviouspositions,workedasaqualitycontrolmanager,andasa
consultantresponsibleforensuringISO9000andITILcertificationcompliance.
HasservedasaPTIUnbondedTendonPrograminspectorsince2006.
More detailed information regarding the qualifications and experience of the above
inspectorscanbefoundinAppendixE.
5.3PROCEDURESFORASSESSING,RECORDINGANDMONITORINGOFPERFORMANCE
ThePTIUnbondedTendonPlantCertificationProgramisbasedonareviewofmaterials,testdata,
and fabrication procedures during two or more plant inspections by the Independent Inspection
Agencyeachyearthattheplantisinvolvedintheprogram.Duringtheplant’sfirstyearintheprogram,
therewillbeoneinͲdepthannouncedinspectionandoneunannouncedinspection.Duringthesecond
andfollowingyears,aminimumoftwounannouncedinspectionswillbemadeofeachplant.
InspectionsbytheIndependentInspectionAgencyshallincludedetailedreviewofrecords,previously
reported nonconformities, test data, fabrication procedures, materials, equipment, and Quality
ControlProgramasoutlinedinthePTIUnbondedTendonPlantCertificationProgramManual.
5.3.1 Reviewofevaluationreports
EachevaluationreportpreparedandsubmittedbytheIndependentInspectionAgencyshallbe
reviewedforcompliancewithestablishedprogramstandardsandcriteriabythePTICertification
Director.AreasofnonͲcomplianceshallbeidentifiedandreportedtotheIndependentInspection
AgencyandtheUnbondedTendonPlantCertificationCommittee.
5.3.2 AuditReviewofIndependentInspectionAgency
InaccordancewithSection5.4.12.2.3ofthismanual,aninternalauditreviewoftheIndependent
InspectionAgency’sactivitiesshallbeconductedaminimumofonceperyear.
5.3.3 YearͲendPerformanceEvaluation
Attheendofeachyear,theChairoftheUnbondedTendonPlantCertificationCommitteeandthe
PTI Certification Director shall meet with the Independent Inspection Agency to discuss any
identifiednonͲconformities,andotherrecommendedimprovementstoenhancethequalityand
efficiencyoftheprogram.Minutesofthemeetingshallbepreparedanddistributedtothefull
committeeandtheChairoftheCertificationAdvisoryBoard.Within30daysofthismeeting,the
IndependentInspectionAgencyshallformallyrespondinwritingtotherecommendationsand
documentwhatactionhas,orwillbetaken.
5.4QUALITYMANAGEMENTPROCEDURES
PTI’sQualityManagementSystemfortheUnbondedTendonPlantCertificationProgramiscomprised
ofseveralinterͲrelated policiesandproceduresdesigned toprovidemultiplelevelsofreview,and
checksandbalancestofacilitateandensuretheeffectivenessandcontinuousimprovementofthe
program.
3DJH
&RS\ULJKWHG F 3RVW7HQVLRQLQJ,QVWLWXWH
$OOULJKWVUHVHUYHG
PTI-CRT20 G2-0816
5.4.1ManagementofImpartiality
5.4.1.1 All certification activities shall be undertaken impartially. The PTI CRT20 UTPC
Committee shall be responsible for the impartiality of the UTPC Certification Program
activities and shall not allow commercial, financial or other pressures to compromise
impartiality.Allcertificationbodypersonnel(eitherinternalorexternal)orcommitteeswho
couldinfluencethecertificationactivitiesshallactimpartially.
5.4.1.2 The UTPC Committee shall identify risks to impartiality on an ongoing basis in
accordancewiththeproceduresetforthinAppendixJ.ThePTICRT20UTPCCommitteeshall
takeactiontorespondtoanyriskstotheimpartialityoftheUTPCProgram,arisingfromthe
actions of other persons, bodies or organizations, of which it becomes aware. If a risk to
impartialityisidentified,thePTICRT20UTPCCommitteeshallbeabletodemonstratehowit
eliminatesorminimizessuchrisk.ThisinformationshallbemadeavailabletotheCertification
AdvisoryBoardasspecifiedin5.4.2.
5.4.2MechanismforSafeguardingImpartiality
5.4.2.1 The Certification Advisory Board (CAB) shall be responsible for safeguarding the
impartialityoftheUTPCProgram.CABshallprovideinputtotheUTPCCommitteeandthePTI
BoardofDirectorsonthefollowing:
a)thepoliciesandprinciplesrelatingtotheimpartialityoftheUTPCcertificationactivities;
b) any tendency on the part of the UTPC Committee to allow commercial or other
considerationstopreventtheconsistentimpartialprovisionofcertificationactivities;
c) mattersaffectingimpartialityandconfidenceincertification,includingopenness.
CABshallbeprovidedaccesstoalltheinformationnecessarytoenableittofulfillitsriskͲ
safeguardingfunctions.RiskstoimpartialitythathavebeenidentifiedbytheUTPCCommittee
along with any corrective actions taken shall be reported to CAB and incorporated in the
AnnualQualityManagementReviewreport.
5.4.2.2IfPTIdoesnotfollowtherecommendationsofCAB,CABshallhavetherighttotake
independentaction(e.g.informingauthorities,accreditationbodies,stakeholders).Intaking
appropriateaction,theconfidentialityrequirementsoftheUTPCProgramshallberespected.
PTI management shall document the reasoning behind the decision to not follow the
recommendations of CAB and shall maintain the document for review by appropriate
personnel.
5.4.3 AdministrativeProceduresincludingDocumentControl
Appendix F includes figures that outline the stepͲbyͲstep procedures for key administrative
processes of the program. Additional information regarding PTI certification administrative
procedurescanbefoundinthePTIͲCRT20G4CertificationAdministrationandOperationsGuide.
AppendixGliststheUTPCProgramrecordͲkeepingorganizationandstructure.Themanagement
reviewteam(s)willexaminearepresentativesamplingofvariousstaffandcommitteeactionsto
check for conformance with these procedures and to verify that the required
records/documentationhasbeengeneratedandfiled.Recordsshallberetainedinaccordance
with the PTIͲCRT20 P2 Certification Document Retention and Destruction Policy included as
AppendixH.
5.4.4 DueNoticeofChanges
PTIshallgiveduenoticeofanychangesitintendstomakeintherequirementsforcertification.
Allproposedchangesandcertificationdocumentswillbeavailabletothegeneralpublicforreview
andcommentatthePTIWebsite.Discussionsareopenfor45days.Inaddition,PTIwilldistribute
proposed documents to interested stakeholders for review and comment. PTI will maintain a
databaseofinterestedpartiesforreviewanddistribution.Anypersoninterestedinbeingincluded
onthisdistributionlist,maycontactPTIatanytime.
Comments returned to PTI staff within the discussion period shall be considered by the UTPC
CommitteeforclosureinaccordancewiththePTIͲCRT140G3CertificationCommitteeManual.
5.4.5 ProcedureforEvaluatingaPlant’sQualityControlProcess
A minimum of two inspections will be performed by the Independent Inspection Agency in
accordance with the procedures and criteria set forth in the PTI Unbonded Tendon Plant
CertificationManual.Inaplant’sfirstyearintheprogram,thefirstinspectionwillbescheduled
at a mutually convenient time. However, all subsequent inspections will be random and
unannounced.
5.4.6 ConditionsforIssue,Retention&WithdrawalofCertificationDocuments
Inordertobecomeandremaincertified,aplantmustsatisfyallofthefollowingrequirementsas
setforthinthePTIUnbondedTendonPlantCertificationManualandthePTIPlantCertification
Contract:
Receive a grade score of 75% or greater on the Independent Inspection Agency’s
evaluationoftheplant
BeingoodfinancialstandingwithPTI
AbidebythetermsandconditionsofthePTICertificationContractatalltimes
Haveallofitsfacilitieseithercertified,orintheprocessofbeingcertified
NotifyPTIofanymateriallyͲchangedconditionwithin30daysofthechange
Failure to comply with any of these obligations will result in withdrawal of the
certification.
5.4.7 ProcedureforReviewingChangedConditions
Upon receipt of a notification from a certified plant of a material change in their ownership,
operations,manufacturingprocess,equipment,etc.,thePTIstaffwillforwardthenotificationto
theUTPCCommitteeforreview,whereupontheCommitteewilldeterminewhetheranadditional
inspection is warranted to ensure the plant’s conformance with program requirements. This
determinationshallbemadeasquicklyaspossible,butnomorethan21daysafterPTI’sreceipt
ofthenotification.
Ifanadditionalinspectionisdeemednecessary,PTIstaffwillnotifytheIndependentInspection
Agency,whointurnwillscheduleanunannouncedinspectionoftheplant.
5.4.8 ControlsovertheUseandApplicationofDocumentsusedintheCertification
Program
AssetforthinSection3.7ofthePTIͲCRT20G1UnbondedTendonCertificationProgramManual,
qualifyingplantsareregisteredwithPTIandareawardedtherighttodisplaythePTICertification
CertificatedesignatingthemasPTICertifiedPlantsandareaddedtothePTI’spublishedlistof
certifiedplants.Inaddition,PTIwillprovideeachplantwithamountablewallplaquesuitablefor
officedisplay.
Plantsmayreferencetheircertifiedstatusincompanyliteratureandcorrespondenceforaslong
asthecertificationisineffectandprovidedthereferenceistothespecificplant(s)certifiedand
notthecompanyasawhole.
Plantswhichfailtopassfutureinspectionsorwhichchoosetodiscontinuetheirparticipationin
theCertificationProgramshallnotbepermittedtodisplayanypreviouslyawardedcertifiedplant
plaques or certificates. Additionally, they may not reference prior certified plant status in
companyliteratureorcorrespondenceincludingtheuseofPTICertifiedPlantTagsonshipments.
Intheeventofachangeincertificationsuchasthefollowing:
x Achangeintheplant’stypeand/orcategoryofcertification
x Achangeintheplant’scertificationstatus(e.g.fully,conditional,orsuspended)
x Achangeinlocationoftheplant
x Achangeinthecompanynameoftheplant
PTI will notify the plant in writing that it must discontinue the use of any previously awarded
certifiedplantplaquesorcertificates,andnotreferencepriorcertifiedplantstatusincompany
literature,advertisingmaterialsorcorrespondenceincludingtheuseofPTICertifiedPlantTags
onshipments.Inaddition,PTIshallissueanewcertifiedplantplaqueandcertificatereflecting
thechange.
5.4.9 ProcedureforDealingwithAppeals,ComplaintsandDisputes
An applicant may file an appeal, dispute or complaint with PTI within the guidelines set forth
within.Typicallyanappealordisputewillrelatetotheevaluationandinspectionoftheplantby
theIndependentInspectionAgency.Complaintstypicallywillrelatetoproceduralmattersorthe
conductofinspectorsorPTIstaff.Apartywishingtofileeithershouldclearlydefinewhetherthe
matter relates to an evaluation and PTI’s subsequent certification decision (i.e. an
Appeal/Dispute),orwhetheritrelatestoanotherissue.
5.4.10 AppealsandDisputes
IntheeventadisputearisesbetweenanapplicantandPTIconcerningtheapplicant’sevaluation
report, applicant may appeal the decision. An appeal shall be made in writing to the PostͲ
Tensioning Institute and received by the PTI within 21 days of receiving the PTI’s Certification
decisionandtheIndependentInspectionAgency’sevaluationreport.Theapplicantshallstatein
writingitspositiontoPTI.
Anappealshallbesentbycertifiedmailorotherdeliverymethodssuchthatthetimeanddateof
deliverycanbeverified.IftheappealisnotreceivedbyPTIwithintherequired21Ͳdayperiod,the
plantlosesitsabilitytoappealandtheapplicant’sevaluationreportstands.
Uponreceipt,thePTIstaffshallacknowledgereceiptoftheappealinwriting,andshallreferthe
mattertotheCertificationAdvisoryBoard(CAB).CABwillthenestablishanAppealBoardto
reviewthematter.
3DJH
&RS\ULJKWHG F 3RVW7HQVLRQLQJ,QVWLWXWH
$OOULJKWVUHVHUYHG
PTI-CRT20 G2-0816
5.4.10.1 AppealBoard
TheAppealBoardshallconsistoffivemembers.TheCABChairshallserveasChairofAppeal
Board;ifCABChairhasaconflictofinterestonthematter,thentheViceͲChairofCABshall
serveasChair.IftheViceͲChairofCABhasaconflictofinterestonthismatter,theCABChair
shallappointanotherCABmemberwithoutaconflictofinterestasChairoftheAppeal
Board.TheCABChairwillappointthreemembersoftheAppealBoardselectedfromthe
currentUnbondedTendonPlantCertificationCommitteeasfollows:
x Two(2)GeneralInterest/Userrepresentatives
x One(1)PostͲTensioningCompanyrepresentative
TheApplicantshalldesignateone(1)representativewhoisnotanofficer,employee,oris
otherwiseaffiliatedwiththeApplicantasthefifthmemberoftheAppealBoard.Any
personwhohasbeeninvolvedinthecertificationevaluationanddecisionthatisbeing
appealedshallnotbeeligibletoserveontheAppealBoard.
5.4.10.2 AppealBoardReview
TheAppealBoardwillforwardtheApplicant’swrittenappealtotheIndependentInspection
Agency for review and comment. The Independent Inspection Agency will then submit a
writtenstatementeitherreͲaffirmingand/orclarifyingitspositiononthematterwithin7days
to the Appeal Board, with a copy to the applicant. Based on the Independent Inspection
Agency’sresponse,theApplicantmaythendecidewhetheraformalmeetingwiththeAppeal
Boardisdesired.Ifso,theApplicantmustsubmitaformalmeetingrequestinwritingtoPTI.
Thiswrittenrequestmustbeaccompaniedbyanappealboardmeetingfeedepositof$7,500,
whichwillberefundedtotheApplicantiftheAppealBoarddecidesthattheApplicantshould
becertified.Ifnot,PTIwillretainthedeposittodefraythecostofthemeeting.
ThemeetingwillbescheduledbyPTIwithinthenexttwotofourweeks,withthemeetingto
be held at PTI’s office in Farmington Hills, Michigan. The Applicant shall be afforded a full
opportunity,inpersonandbycounselifdesired,tobeheardbyandtopresentanyrelevant
additionalevidence to theAppealBoard.Inaddition,arepresentativeof theIndependent
InspectionAgencyshallalsoattendifsodirectedbytheAppealBoard.
5.4.10.3 AppealBoardDecision
The Appeal Board will review the testimony, written statements and other supporting
documentationanddecidethematterwithin14days.TheApplicantwillbenotifiedinwriting
oftheAppealBoard’sdecision.TheAppealBoard’sdecisionshallbefinal,andbindingupon
bothparties.
5.4.11 Complaints
AnapplicantorotherinterestedpartymayalsofileacomplaintwithPTI.Acomplaintwilltypically
involve an administrative matter of some sort. Examples of instances that might generate a
complaintinclude:aninspectornotfollowinggoodsafetypractices,staffnotrespondingtoan
inquiryinatimelymanner,acompetitormisusingthePTIcertificationmark,etc.
PTIstaffshallacknowledgereceiptofthecomplaintinwriting,andwillforwardthecomplaintto
theCertificationAdvisoryBoardforreviewwithin7daysofreceipt.Ifapersonfilesacomplaint
bytelephone,theywillbeaskedtosubmitawrittensummaryofthecomplaint(i.e.byletter,fax
oreͲmail).Asneeded,CABwillrequestadditionalinformationfromthesubmitter,staffand/or
theIndependentInspectionAgency.Basedontheinformationprovided,CABwilldecide what
action,ifany,iswarranted.
ThesubmitterwillbenotifiedinwritingofCAB’sdecisionaswellasanyfollowͲupactionthatis
directed. FollowͲup actions will be documented in PTI’s certification files; the effectiveness of
thoseactionswillbeevaluatedaspartoffuturequalitymanagementreviewsasprovidedforin
Section5.4.12ofthismanual.
3DJH
&RS\ULJKWHG F 3RVW7HQVLRQLQJ,QVWLWXWH
$OOULJKWVUHVHUYHG
PTI-CRT20 G2-0816
5.4.12 PoliciesandProceduresforConductingManagementReviews
TheCertificationAdvisoryBoardandthePTIExecutiveDirectorshallbejointlyresponsiblefor
implementingthequalitymanagementreview.Thereviewshallbeperformedatleastonceper
yearandshouldincludethefollowingelements:
InternalAuditof:
o Committeeoperations
o Staffadministration
o IndependentInspectionAgency
Reviewofexternalaudits(ANSI)
Reviewofallappeals,complaintsanddisputesreceivedduringthereviewperiod
Reviewandassessmentofpubliccommentsreceivedduringthereviewperiod
Performancereviewsofstaff
Reviewofnonconformitiespreviouslyidentifiedinpastqualitymanagement
reviews,andtherelatedstatusofpreventiveandcorrectiveactionstaken
ReviewofriskstoimpartialityasidentifiedbytheUTPCCommittee
ReviewandtheevaluationoftheeffectivenessoffollowͲupactionsfromprevious
managementreviews
Reviewofchangesthatcouldaffectthemanagementsystem
Assessmentofthefulfilmentofprogramobjectives
Specificproceduresforeachqualityreviewelementaredetailedbelow.Thegeneralprocessto
befollowedinamanagementreviewisdetailedinFigures9Ͳ20.
5.4.12.1 InternalAudits
PTIshallconductinternalauditsofitscertificationprocessestoensurethatthequality
managementsystemisimplementedandiseffective.(SeeFigure10.)Theprincipalobjectivesof
theseauditsareto:
Meetrequirementsforcertificationtoamanagementsystemstandard;
VerifyconformancewithPTIandANSIrequirements;
Contributetotheimprovementofthemanagementsystem.
5.4.12.1.1 Selection&TrainingofAuditors
Auditorsforinternalmanagementreviewsshallbeselectedper5.4.12.1.3.1,5.4.12.1.3.2
and5.4.12.1.3.3,andasshownonFigure11.Trainingshallbeprovidedfortheauditorsas
needed.Ataminimum,awebinarshallbeheldpresentingthepertinentrequirementsof
theUTPCProgramandISO/IEC17065.
5.4.12.1.2 Timing&FrequencyofReviews
Internalauditreviewshallbeperformedaminimumofonceperyear.Ifwarrantedbythe
findings of the previousͲyear audit, CAB may elect to direct that an additional audit be
performed.
Thecommitteeauditreviewshallbeinitiatedpriortothecommittee’snormallyscheduled
fallmeeting(typicallyinOctober.)TheHeadquarters/StaffandInspectionAgencyauditsshall
beconductedduringNovemberorDecemberofeachyear.
5.4.12.1.3 Responsibilities&Procedures
5.4.12.1.3.1 CommitteeReview&Assessment
PTI’s annual internal audit shall assess the operations of the Unbonded Tendon Plant
Certification Committee. Figure 12 illustrates the process that shall be followed in
performingthecommitteeaudit.
The Certification Advisory Board will designate a representative to work with the PTI
Executive Director who together will serve as the committee audit team. The CAB
representative shall not be the Chair or a member of the Unbonded Tendon Plant
CertificationCommittee,andshouldhaveknowledgeofANSIcriteriaforaccreditation,
dueprocessandconsensusprocedures.
Thecommitteeauditwillbecomprisedofthreeparts:
1. Telephone interviews of committee members to assess their knowledge of
procedures and certification requirements, and to obtain their observations
regardingcommitteeoperations.
2. CommitteemeetingobservationtoevaluateconformancewithCCM
3. Review of committee documents and records to determine completeness and
accuracyofminutes,votingsummaries,ballotresolutions,etc.
Thecommitteeauditteamwillprepareafinalreportoutliningitsfindingsand
recommendations. The report shall be submitted to CAB for inclusion in the
overallannualqualitymanagementreview.CABwillreviewthereportandmake
recommendationsforimprovingUTPCCommitteeoperations.
A copy of the committee audit report and CAB’s recommendations will be
providedtotheUTPCCommitteeforimplementation.
5.4.12.1.3.2 PTIStaff/HeadquartersReview&Assessment
PTI’s annual internal audit shall also assess the administrative activities of the PTI
certificationstaff.Figure13illustratestheprocessthatshallbefollowedinperforming
thestaffaudit.
The Certification Advisory Board and the UTPC Committee will each designate a
representativetoserveasthestaffauditteam.Theauditwillbecomprisedofthreeparts:
1. Interviewsofcertificationstaffmemberstoassesstheirknowledgeofprocedures
and certification requirements, and to obtain their observations regarding
implementationoftheprogram.
5.4.12.1.3.3 IndependentInspectionAgencyReview&Assessment
ThefinalcomponentofPTI’sannualinternalauditshallbeareviewandassessmentof
the Independent Inspection Agency. Figure 14 illustrates the process that shall be
followedinperformingtheIndependentInspectionAgencyaudit.
TheUTPCCommitteewilldesignatearepresentativetoworkwiththePTICertification
DirectorwhotogetherwillserveastheIndependentInspectionAgencyauditteam.The
UTPCCommitteerepresentativeshallnotbeapostͲtensioningcompanymemberofthe
UnbondedTendonPlantCertificationCommittee,andshouldnothavearealorapparent
conflictofinterest.Therepresentativeshouldbeexperiencedinandhaveknowledgeof
PTI’stechnicalcertificationcriteriaandprocedures.
TheIndependentInspectionAgencyauditwillbecomprisedoffourparts:
1. Interviews of certified plant personnel to obtain their observations and views
regardingrecentinspectionsperformedbytheIndependentInspectionAgency.
2. Interviewsofinspectorstoassesstheirknowledgeofprogramrequirementsand
toevaluatetheirrespectiveinspectionpractices.
3. OnͲsitevisitsaccompanyinganinspectoron1–2plantinspectionstoevaluate
theadequacyofinspectionprocedures
4. Review of inspection documents and records to determine completeness and
accuracy.
Theauditteamwillprepareafinalreportoutliningitsfindingsandrecommendations.The
reportshall besubmittedtoCABand theUTPCCommitteeforinclusionin theoverall
annualqualitymanagementreview.UTPCCommitteewillreviewthereportandmake
recommendationsforimprovingtheIndependentInspectionAgency’soperations.
AcopyoftheIndependentInspectionAgencyauditreportandCAB’srecommendations
will be provided to the Independent Inspection Agency and the UTPC Committee for
implementation.
5.4.12.1.3.4AuditCriteria
Theinternalauditsshallusethefollowingreferencesasthecriteriafortheevaluation:
x ANSIAccreditationCriteriaassetforthinISO/IEC17065andANSIFormPROͲFRͲ
105
3DJH
&RS\ULJKWHG F 3RVW7HQVLRQLQJ,QVWLWXWH
$OOULJKWVUHVHUYHG
PTI-CRT20 G2-0816
x Approved PTI certification policies and procedures in effect at the time of the
auditassetforthinthismanual(AppendicesF,G,andH).
x PTIͲCRT20G1PTIUnbondedTendonPlantCertificationManual
x ApprovedcommitteeproceduresassetforthinthePTIͲCRT140G3Certification
CommitteeManual
x PTIByͲLaws
AnyconflictbetweenthesereferencesshallbereferredtothePTICRT20UTPCCommitteefor
consideration.
5.4.12.1.3.5 Reporting
The audit teams shall each prepare an audit report outlining their findings and
recommendations.ThereportshallbesubmittedtoCABnolaterthanDecember31stofeach
year.Ataminimum,thereportsshallidentify:
x Neededcorrectiveactionand/orsuggestedImprovements
x Areaswherepoliciesandproceduresarenotinconformancewithspecifiedaudit
standards.
CABwillincorporatethevariousauditreportsintotheoverallqualitymanagementreview
report.CopiesofthereportshallbemadeavailabletothePTIBoardofDirectors,theUTPC
CommitteeandthePTIExecutiveDirector.
5.4.12.1.3.6 AuditorConfidentiality
Auditors shall reͲaffirm in writing their agreement to comply with PTI’s confidentiality
provisionspriortoconductingtheaudit.ThesewrittencommitmentsshallberetainedinPTI’s
certification files and included in the final audit report. In addition, the identity of plants
visitedaspartoftheonͲsiteassessmentoftheIndependentInspectionAgencyshallnotbe
revealedandshallbekeptconfidential.
5.12.1.3.7 ReimbursementforTravelandotherRelatedExpenses
PTIwillreimburseauditorsforreasonabletravelandotherrelatedexpensesassociatedwith
theperformanceofinternalqualityauditsinaccordancewithapprovedPTITravelpoliciesin
effectatthetime.
5.12.1.3.9 EvaluatetheEffectivenessoftheAudits
As the final component of the annual quality management review, CAB shall evaluate the
effectivenessoftheinternalauditsanddeveloprecommendationsforimprovingtheaudit
program.Theserecommendationsshouldbeimplementedinsubsequentaudits.
5.4.12.2ReviewofExternalAudits
TheCertificationAdvisoryBoardshallreviewthefindingsofexternalaudits(ANSIandothersif
applicable)alongwithanypreventiveorcorrectiveactionstaken.CABshallevaluatetheprogress
andeffectivenessoftheseactions,andshalldocumentitsassessmentintheAnnualManagement
ReviewReport.(SeeFigure10.)
5.4.12.3 ReviewProcedureforHandlingofPublicComments,Appeals,Complaints
andDisputes
FortheannualQualityManagementReview,staffwillcompilerecordsofthefollowing:
• All public comments received along with documentation of the PTI CRT20 UTPC
Committee’sresolutionofthosecomments
• All appeals, complaints and disputes along with documentation of corrective and/or
preventativeactiontaken
TheCertificationAdvisoryBoardwilldesignateateam,whoalongwiththeExecutiveDirectorwill
reviewtheextent,natureandvalidityofcomments,appeals,complaintsanddisputesreceived.
The team will also evaluate the sufficiency of PTI’s followͲup actions. The review team will
summarizeitsfindingsinareporttobesubmittedtoCAB.(SeeFigure15.)
5.4.12.4 PerformanceReviewsofStaff
Eachyear,therespectivesupervisorsshallconductperformanceevaluationsforeachcertification
staff member to determine if they are competent to perform their respective certification
functions. The employee evaluations shall be maintained on file in PTI’s Human Resources
department.Inaddition,thesupervisorshallprovideanaffidavitattestingthatthestaffperson
hastherequiredcompetenciesforthecertificationdutiesandresponsibilitiestheyundertake.If
theemployeeisnotdeemedtobefullycompetent,thesupervisorshallidentifyrequiredtraining
and/or corrective action necessary to bring the employee to a full competence level. The
supervisor affidavits and any identified training needs should be included in the Annual
ManagementReviewReport.(SeeFigure16.)
5.4.12.5 ProcedureforHandlingNonͲconformities
CAB’sfinalmanagementreviewreportshallidentifyanyareasthatdonotconformtoestablished
PTIproceduresandstandards.ThePTICRT20UTPCCommittee shallformallyrespondto each
identified nonͲconformity and propose corrective or preventative action if appropriate. (See
Figure17.)
5.4.12.6 ReviewofRiskstoImpartiality
TheCertificationAdvisoryBoardshallreviewriskstoimpartialitythathavebeenidentifiedbythe
PTI CRT20 UTPC Committee along with any corrective actions taken. CAB shall evaluate the
progress and effectiveness of these actions, and shall provide input to the PTI CRT20 UTPC
Committee and the PTI Board of Directors in accordance with 5.4.12.1.3.5 CAB’s review and
relatedinputshallbenotedintheAnnualManagementReviewReport.(SeeFigure16.)
5.4.12.7 ProcedureforAssuringEffectivenessofCorrective/PreventativeActions
Inthesubsequentyear,themanagementreviewwillexaminethepreviouslyͲidentifiedareasof
nonconformityandriskstoimpartialitytoverifythatappropriateactionwastaken.Findingswill
bereportedinthesubsequentyearmanagementreviewreportalongwiththeteam’sassessment
regarding the effectiveness of the action. Figure FͲ7 in Appendix F outlines the stepͲbyͲstep
procedureforevaluatingactionstakentoprevent/correctnonͲconformities.(SeeFigure17.)
5.4.12.8 ReviewofFollowͲupActionsfromPreviousManagementReviews
The Certification Advisory Board shall be responsible for reviewing the findings and
recommendationsoftheannualqualitymanagementreview(includinginternalaudits).Onthe
basis of this review, CAB will identify the need for corrective and preventative actions, and
opportunitiesforimprovement,anddeterminerecommendedfollowͲup.
CABwillforwardtheserecommendationstotheUnbondedTendonPlantCertificationCommittee
for consideration and implementation. The UTPC Committee shall consider and document its
actions(orreasonsfornottakingaction)withrespecttoeachCABrecommendation.(SeeFigure
18.)
5.4.12.9 ReviewofChangesthatcouldaffecttheManagementSystem
The Certification Advisory Board should identify changes in personnel, the industry, related
standards,governmentregulationsandlaws,andotherdevelopmentsthatcouldaffecttheUTPC
QualityManagementSystem.Thesechangesandanyrelatedrecommendationsshouldbenoted
in the Annual Management Review Report for the consideration of the PTI CRT20 Unbonded
TendonCommitteeandthePTIBoardofDirectors.(SeeFigure18.)
5.4.12.10 AssessmentoftheFulfillmentofProgramObjectives
Basedontheabovereviews,theCertificationAdvisoryBoardshouldmakeanassessmentasto
whethertheUnbondedTendonPlantCertificationProgramhasfulfilleditsprogramobjectives
over the past year. CAB’s findings and recommendations in this regards shall be noted in the
AnnualManagementReviewReport.(SeeFigure19.)
5.4.12.11 AnnualManagementReviewReport
ThePTIExecutiveDirectorshallcompiletheinputsfromtheaforementionedreviewsandshall
draft the annual management review report for the Certification Advisory Board’s review and
approval.ThedraftshallbesubmittedtoCABnolaterthanFebruary28ofeachyear.CABshall
approve the report and provide recommendations for followͲup action to the PTI CRT20
UnbondedTendonPlantCertification(UTPC)CommitteeandthePTIBoardofDirectors.(Figure
20)
The UTPC Committee shall review the CAB recommendations and shall decide on appropriate
followͲupaction.
Internal Audits
Staff combines input from the above reviews and drafts the annual management
review report, which is to be submitted to CAB no later than February 28
CAB reviews management review report and determines appropriate follow-up action
CAB notified of
UTPC Committee reviews CAB recommendations and determines
whether follow-up action is warranted Committee
decision
Yes
Program Implementation
)LJXUH²4XDOLW\0DQDJHPHQW5HYLHZ3URFHVV 3DJH
&RS\ULJKWHG F 3RVW7HQVLRQLQJ,QVWLWXWH
$OOULJKWVUHVHUYHG
Quality Management Review
Audit team prepares Audit team prepares Audit team prepares Staff records findings and
findings & findings & findings & proposed preventive/
recommendations recommendations recommendations corrective actions in PTI CRT
20 F32 UTPC Corrective
Action Log
Management Report
)LJXUH²$XGLWRU6HOHFWLRQDQG7UDLQLQJ3URFHVV 3DJH
Inspection Agency Audit
&RS\ULJKWHG F 3RVW7HQVLRQLQJ,QVWLWXWH
$OOULJKWVUHVHUYHG
Figure 12 – Committee Audit Procedure 3DJH
Committee Audit
CAB designates a review team, who along with the CAB designates a review team, who along with the
Executive Director review the extent, nature and Executive Director review the comments and the
validity of AC&Ds and the sufficiency of follow-up sufficiency of follow-up
Review team formulates findings and Review team formulates findings and
recommendations; submits to CAB and UTPC recommendations; submits to CAB and UTPC
Committee Committee
Management Report
)LJXUH²3URFHVVIRU5HYLHZRI$SSHDOV'LVSXWHV&RPSODLQWVDQG3XEOLF&RPPHQWV
&RS\ULJKWHG F 3RVW7HQVLRQLQJ,QVWLWXWH
$OOULJKWVUHVHUYHG
37,&57*
Performance appraisals
Staff supervisors conduct performance appraisals
kept on file in Human
for each certification staff member.
Resources Department
No Supervisor identifies
Has required
recommended training to
competencies?
achieve competency
Yes
Management Report
&RS\ULJKWHG F 3RVW7HQVLRQLQJ,QVWLWXWH
$OOULJKWVUHVHUYHG
)LJXUH²6WDII5HYLHZ3URFHVV 3DJH
37,&57*
No
Log up to date? Update log
Yes
Executive Director attaches PTI CRT 20 F32 UTPC Corrective
Action Logto Annual Management Review Report
Management Report
)LJXUH²3URFHVVIRU5HYLHZRI1RQFRQIRUPLWLHV5LVNVWR,PSDUWLDOLW\DQG
5HODWHG3UHYHQWLYHDQG&RUUHFWLYH$FWLRQV 3DJH
Quality Management Review
Technical Government
Staffing Technology Other
Standards Regulations/ Law
Management Report
)LJXUH²3URFHVVIRU5HYLHZRI&KDQJHVWKDWFRXOG$IIHFWWKH0DQDJHPHQW6\VWHP
Survey the UTPC Committee re. the Survey CAB re. the effectiveness of
effectiveness of the program and the program and fulfillment of its
fulfillment of its objectives objectives
Management Report
)LJXUH²3URFHVVIRU$VVHVVPHQWRIWKH)XOILOOPHQWRI3URJUDP2EMHFWLYHV
3DJH
&RS\ULJKWHG F 3RVW7HQVLRQLQJ,QVWLWXWH
$OOULJKWVUHVHUYHG
37,&57*
Review of changes that could affect the management CAB completes review and
system recommends follow-up
action
Assessment of the fulfilment of program objectives
Implementation
)LJXUH²0DQDJHPHQW5HYLHZ5HSRUW3URFHVV
3DJH
&RS\ULJKWHG F 3RVW7HQVLRQLQJ,QVWLWXWH
$OOULJKWVUHVHUYHG
37,&57*
5.5 PROCEDURESFORFINANCIALMANAGEMENTANDBUDGETING
The Unbonded Tendon Plant Certification Program shall be managed as an independent cost
centerwithinPTI.TheUTPCCommitteeshallberesponsibleforthedirectfinancialmanagement
andbudgetingoftheprogramincooperationwiththePTIBoardofDirectorsandthePTIFinance
AdvisoryCommittee.
5.5.1 ProgramBudgeting
AsshowninFigure21,eachyearpriortothePTIFallBoardmeeting,thePTIFinanceAdvisory
Committee (FAC) will develop cost estimates for the certification program. Based on these
estimates,thePTIBoardofDirectorswillestablishPTI’sfinancialcontributiontotheUnbonded
Tendon Plant Certification Program for the following fiscal year (Jan. 1 – December 31.) This
contribution will cover PTI’s anticipated administrative expenses (e.g. staff salary, overhead,
meetingspace,storageandshipping,traveletc.),legalservices,insurance,websiteandmarketing
associated with the program. In addition, the contribution will include a research and
developmentchargetoreflectPTI’songoingeffortstodeveloptechnicalstandardsusedbythe
UnbondedTendonPlantCertificationProgram.
The UTPC Committee will be notified of PTI’s annual contribution following the Board’s Fall
meeting(typicallyinOctober.)TheUTPCCommitteewillthensettheprogramfeesandbudgetto
resultinabreakͲevenposition(i.e.nosignificantlossorsurplus)atyearͲendbasedonanticipated
plantparticipation.
IftheactualyearͲendfinancialperformanceshouldvarysignificantlyfromthebudget,thenthe
subsequentyear’sbudgetandfeesshouldbeadjustedtomovetheprogrambacktoabreakͲeven
basis.
5.5.2 MemberDuesCredit
Throughpaymentofmembershipduesandothermemberassessments,PTImembercompanies
help finance PTI’s annual financial contribution to the Unbonded Tendon Plant Certification
Program.Inaddition,PTImembercompanieshavefinancedthedevelopmentoftheprogramfor
thelast22years.Toreflectthesecontributionstotheprogramandtoavoidmembercompanies
havingtomakeduplicatecontributions,PTImemberplantswillreceiveanannualcreditontheir
plantcertificationfees.ThecreditwillbesetbytheUTPCCommitteeandwillbebasedonthe
sumofthePTIannualcontributionandtheannualdevelopmentrecoverychargedividedbythe
estimatednumberofmemberplantsparticipatingintheprogram.
Thecreditwillbepaidatthebeginningofeachyear.Onlycompaniesthataremembersandare
ingoodfinancialstandingwillbeeligibletoreceivethecredit.CompaniesthatjoinPTIduringthe
yearandthatmaintaintheirmembershipthroughtheendoftheyearwillalsobeeligibleforthe
credit.Anycompanywhobeginstheyearasamemberbutlaterdropsitmembershipwillhaveto
reͲpaytoPTItheproͲratedshareoftheannualmembercreditforthebalanceoftheyear,inorder
tomaintainitscertification(s).
Figures22and23containtheanalysesofthecurrentyearPTIannualcontribution,andthePTI
CertificationFees,respectively.
StaffSalaries&Overhead $ 124,000
Office&warehousespace $ 4,800
Legaloversight $ 1,000
Insurance $ 1,000
OfficeExpense $ 2,400
Website $ 1,100
Postage&Shipping $ 1,000
Meetings $ 2,100
StaffTravel $ 2,400
Marketing $ 1,000
InspectorMeetingattendance $ 3,800
InternalQualityAudits $ 5,000
AnnualPTIContributionͲ2016 $ 149,600
IndividualPlantAllocation(55memberplants) $ 2,720.00
MemberCreditforPTIContribution(Rounded)= $2,700
Figure22–2016PTIContributiontotheUnbondedTendonPlantCertificationProgram
3DJH
&RS\ULJKWHG F 3RVW7HQVLRQLQJ,QVWLWXWH
$OOULJKWVUHVHUYHG
3DJH
APPENDICES
** The combined number of General Interest and User members must be five (5) or
greater.
Chair: DĂƌĐ<ŚŽƵƌLJ,>h^͕/ŶĐ͘
ŚĂŝƌƐŽĨ͗
UnbondedTendonPlantCertificationCommittee–ThomasMathews,WƌĞĐŝƐŝŽŶͲ
,ĂLJĞƐ/ŶƚĞƌŶĂƚŝŽŶĂů
PrestressingSteelPlantCertificationCommitteeͲͲZĂŶĚLJWůŝƚƚ͕/ŶƐƚĞĞůtŝƌĞWƌŽĚƵĐƚƐ
UnbondedPTFieldPersonnelCommittee–NeelKhosa,AMSYSCO
BondedPTFieldPersonnelCommittee–GregoryHunsicker,VSL
^ůĂďͲŽŶͲ'ƌŽƵŶĚ'ĞŽƚĞĐŚŶŝĐĂůŶŐŝŶĞĞƌƐĞƌƚŝĨŝĐĂƚŝŽŶCommittee–ZLJŶĞ^ƚŽŬĞƌ,
'ĞŽƚĞŬ͕/ŶĐ͘
TechnicalAdvisoryBoardRepresentative
:ĂŵĞƐĞŝĐŬĞƌ,:>ĞŝĐŬĞƌŽ
PCStrandSupplierRepresentative
ZĂŶĚLJWůŝƚƚ,InsteelCorp.
PostͲTensioningCompanyRepresentatives:
HarleyNethken,TechͲConSystems,Inc.
AssociateRepresentative:
NorrisHayes,WƌĞĐŝƐŝŽŶͲ,ĂLJĞƐ/ŶƚĞƌŶĂƚŝŽŶĂů
ContractorRepresentative
sĂĐĂŶƚ
BoardLiaison:
>ĂƌƌLJ<ƌĂƵƐĞƌ,'ĞŶĞƌĂůdĞĐŚŶŽůŽŐŝĞƐ͕/ŶĐ͘
I. Experience
UnlessotherwiseapprovedbythePTIUnbondedTendonPlantCertificationCommittee,
aninspectorshallpossessthefollowingminimumexperience:
a. OneyearofworkinginormanaginganunbondedpostͲtensioningfabrication
facility,or
b. Threeyearsworkingasaqualityassuranceinspectorofmanufacturing
processes,preferablyinarelatedfield.
II. ConflictofInterest
Theinspectorshallnotbeaffiliatedinanymannerwithanycompanyorindividualwho
hasanownershipstakeinafacilitythatparticipatesin,oriseligibletoparticipatein,the
PlantCertificationProgram.Theinspectorshallnotbeemployedbyanycompanyor
individualwhohasanownershipstakeinafacilitythatiseligibletoparticipateinthe
CertificationProgram.
Aninspectormustdiscloseallpastaffiliationsandrelationshipswithanycompanyor
individualwhohasanownershipstakeinafacilitythatparticipatesin,oriseligibleto
participatein,thePlantCertificationProgram.Forexample,ifaninspectorwas
previouslyemployedbyacompanyparticipatingintheprogram,thisinformationmust
bedisclosedtoPTI.
III. Licensing/Certifications
UnlessotherwiseapprovedbytheUnbondedTendonPlantCertificationCommittee,a
PTIPlantinspectorshallpossessoneormoreofthefollowingprofessionallicensesor
certifications
x LicensedProfessionalEngineer,or
x QualityInspectorCertificationͲCQIorequivalent
Inadditiontheinspectorshallhavefieldexperienceand/orknowledgeofunbonded
postͲtensioningconstruction.Eitherofthefollowingwouldsatisfythisrequirement:
x PTICertificationasaLevel2UnbondedPTInspector,or
x PTICertificationasaLevel2UnbondedTendonFieldSpecialist,or
x 500hoursdocumentedexperienceworkingonpostͲtensionedconstruction.For
thisoption,submissionofanAffidavitofWorkExperienceisrequired.
V. TrialInspections
IftheproposedinspectorhashadnopreviousexperienceasaninspectorinPTI’s
UnbondedTendonPlantCertificationProgram,he/sheshallfulfilloneofthefollowing
priortoconductinganactualplantinspection:
a. Accompanyacurrentlyapprovedinspectoronaminimumof2plantinspections,
or
b. Ifnocurrentinspectorisavailable,accompanyPTIstaffontwo“mock”
inspections.
AppendixFincludesflowchartsthatoutlinethestepͲbyͲstepproceduresforthe
followingkeyadministrativeprocessesoftheprogram:
x Applications
x InitialEvaluationofPlants
x UnannouncedInspections
x CertificationofPlants
x Appeals,Disputes&Complaints
x DeͲCertification
AdditionalinformationregardingtheseandotherPTIcertificationadministrative
procedurescanbefoundinPTI’sCertificationAdministrationandOperations
Guide(separatecover).
Yes
Request missing
Complete? No
information
Yes
Contract signed by
Return to applicant for
authorized rep. & No
signature
notarized
Yes
Application
Certification Assistant give
package meet Return to applicant for
application package to No
program revision
Certification Director for review requirements?
Yes
)LJXUH)37,$GPLQLVWUDWLYH3URFHGXUHIRU3URFHVVLQJ&HUWLILFDWLRQ$SSOLFDWLRQV
&RS\ULJKWHG F 3RVW7HQVLRQLQJ,QVWLWXWH 3DJH
$OOULJKWVUHVHUYHG
Initial Evaluation
No
Meet Program
Return to Inspection Agency Appeal/
No for Revision and/or Dispute
Standards?
corrective action findings
Yes Dispute
Process
Yes
Yes
Certification
No
Meet Program Return to Inspection Agency for
No
Standards? Revision and/or corrective action Appeal/
Dispute
findings
Yes Dispute
Yes Process
Send applicant copy of report and
notify that they failed the evaluation; Applicant
Passing Score? No advise re. the option to request reviews report
reinspection
Certification Non-conformities
Required
Return to Applicant or Inspection
documentation No
Agency for revision
okay?
Yes
Engineer notifies Certification Director that Applicant’s plant has received
a passing grade on its inspection, and that all required paperwork has been
received and is on file.
No
Advise Inspection Agency that Applicant has been certified and that future
unannounced inspections may be performed as required
Unannounced Evaluation
Appeal,
complaint or Yes Appeal/Dispute Process
dispute?
No
Re-inspection
requested?
Yes Unannounced Evaluation
No
Engineer notifies Certification Director that Applicant’s plant has received a falling
grade on its inspection, and that all required paperwork has been received and is on
file.
More info.
Yes Staff provides requested info.
needed?
No
PTI staff:
Removes plant from Certified plant listing (web and printed)
Add plant to List of Certification Actions published monthly
Advise Inspection Agency that Applicant has been de-certified and that future
unannounced inspections should not be performed until otherwise advised
Applicant decides whether a formal meeting with the Appeal Board is desired; if so,
a formal request must be submitted in writing with the meeting deposit fee to PTI Certification status revised in
within 7 days. (Deposit will be refunded if Appeal Board decides matter in favor of accordance with decision;
Applicant) meeting deposit returned to
Applicant
Yes
Yes No
)LJXUH)ӡ37,$GPLQLVWUDWLYH3URFHGXUHWKH$SSHDO'LVSXWHDQG&RPSODLQW3URFHVV
Upon receipt of the inspection report from PTI, the Plant must formally
respond to all cited deficiencies and areas of nonconformance. This
response must document what preventive and/or corrective action has
been taken, and what additional steps will be taken in the future to ensure
conformance with Certification Program requirements.
All deficiencies
PTI advises plant that
addressed in some No
response is incomplete
manner?
Yes
Yes
Figure F͈7: PTI Procedure for Evaluating Actions Taken to Prevent/Correct Non-conformities
3DJH
&RS\ULJKWHG F 3RVW7HQVLRQLQJ,QVWLWXWH
$OOULJKWVUHVHUYHG
Appendix G 37,&57*
I. General
a. Program Requirements
i. Plant Certification Manual
ii. Related References
b. Certified Plant Listing
c. Monthly Summary of Certification Actions
d. ANSI Accreditation
i. Application
ii. Supporting Documentation
iii. ANSI Reviews & Audits
iv. ANSI Communications & Correspondence
II. Committees
a. Certification Advisory Board
i. Roster
ii. Committee member bios
iii. Meetings
1. Agendas
2. Minutes
iv. Ballots
1. Item Description
2. Vote Summary
3. Resolution of Negatives
v. Reports
b. Unbonded Tendon Plant Certification Committee
i. Roster
ii. Committee member bios
iii. Meetings
1. Agendas
2. Minutes
iv. Ballots
1. Item Description
2. Vote Summary
3. Resolution of Negatives
v. Reports
&RS\ULJKWHG F 3RVW7HQVLRQLQJ,QVWLWXWH
$OOULJKWVUHVHUYHG 3DJH
Appendix G
37,&57*
III. Plants
a. Companies
i. Year
1. Application-Renewal Forms
2. Supporting documentation
3. Contract
4. Correspondence
5. Evaluations & Inspections
6. Plaques-Certificates
7. Miscellaneous (e.g. company literature, etc.)
IV. Inspection Agency
a. Contracts/RFPs
b. Inspectors
i. Qualifications/Bios
ii. Exams
V. PTI Staff
a. Job Descriptions
b. Work History & Qualifications
c. Performance Reviews
VI. Public Comments
a. Notices
b. Comments Received
c. Resolution & Follow-up Action
VII. Appeals, Complaints & Disputes
VIII. Quality Management System
a. Quality Management Manual
b. Internal Audits
i. Committee
ii. Staff
iii. Inspection Agency
IX. Financial
a. Annual Budget
b. Analysis of PTI Fee Contribution
c. Plant Invoices
d. Payment records
1. Rules. The Executive Director’s staff, volunteers, members of the Board of Directors and outsiders
(i.e., independent contractors via agreements with them) are required to honor these rules: (a) paper or
electronic documents indicated under the terms for retention below will be transferred and maintained by
the Human Resources, Legal or Administrative staffs/departments or their equivalents; (b) all other paper
documents will be destroyed after three years; (c) all other electronic documents will be deleted from all
individual computers, data bases, networks, and back-up storage after three years; and (d) no paper or
electronic documents will be destroyed or deleted if pertinent to any ongoing or anticipated
government investigation or proceeding or private litigation.
3. Exceptions. Exceptions to these rules and terms for retention may be granted only by the Executive
DirectRr or the President of tKH Board 3DJH
&RS\ULJKWHG F 3RVW7HQVLRQLQJ,QVWLWXWH
$OOULJKWVUHVHUYHG
Appendix I - Managing UTPC Competencies
37,&57*
September/October
November/December
3DJH
38800 Country Club Drive
Farmington Hills, MI 48331
(248) 848-3180