750 KVA DG SET TRIAL CHECKLIST

DATE: 02/12/2023

ALTERNATOR
ALTERNATOR O/P VOLTAGE & ALTERNATOR O/P GENERATOR
CURRENTS (AMPS) WNG
FREQUENCY POWER (KW) LOAD
TEMPREATURE
ENGINE DIESEL OIL ENGINE
START RUNNING
SL NO COOLANT LEVEL PRESSURE SPEED P.F
TIME HOURS
TEMP (◦C) (%) (BAR) (RPM)
L-L L-N FREQUEN
R Y B N R Y B R Y B %
(VOLTS) (VOLTS) CY (HZ)

1 14:16 97H/27M 71 C 95 5.39 1503 416 V 240 V 50 HZ 47 38 41 0 … … … O.97 10 9 9 5%

2 15:16 98H/27M 71 C 90 5.17 1503 416 V 240 V 50 HZ 112 102 100 0 … … … 0.8 20 18 18 18%

3 16:16 99H/20M 71 C 85 5.2 1503 416 V 240 V 50 HZ 155 140 138 0 … … … 0.75 20 17 18 14%

4 17:16

DG RUNNING STATUS: WHILE RUNNING (SHIFT GENERAL)

CHECKED BY: DEEPAK SINGH

ABNORMALTIES OBSERVED:- 1)