You are on page 1of 80

04.02.

08 Ludzuweit
04.02.08
04.02.08 Ludzuweit
04.02.08
26.07.10
13.01.12
13.01.12
A (2 : 5) 89,10
61,20 247 2
Control-Bd. 21,40
102 1 A

40
DVI

30

30
16,05
CL
Option: DC-Connector AC-Connector

20 590,80 ±0,5

02

=
125

act.area=343,80

340
384,40 ±0,5

=
Inside

79,20 ±1
3x M4

310,20 ±2
on both
sides

Conector

CONRAC GMBH
area 389 1 42,50 act.area=550,08

B (2 : 5) Ground M6

Inside
4x M4
ESD-Knob on top and
bottom side
(121)

559 ±1

52,20
75 70,40

170
Optionally with Glass
510
42,50

E-E (1 : 2) E
61,50 ±1

590,80 ±1
116,50 ±1

optionally

NOT TO BE DISCLOSED TO THIRD PARTY WITHOUT PERMISSION FROM


with Glass
E Weight = 14.20 KG 10%

00 18.01.2008 SW_PFLUE EK815-042 Neuanlage


393 1
7,90 REV. DATE DRWN.BY CHKD.BY DOK.-NR. MODIFICATION/DESCRIPTION

FINISH CONRAC GmbH Status: freigegeben


Lindenstrasse 8
Project: E1127
D-97990 Weikersheim
HIGH PERFORMANCE DISPLAYS Germany

MATERIAL DRWG. TITLE TOLERANCES DIN ISO 2768-m


Outline Drawing 6026 SD SURFACES DIN ISO 1302

WUXGA Inp. bottom w. Gl. DRAWING NUMBER

602 1 6026-0008-0001 0000


SCALE 1:4 CAD-NAME: Y:\SOLIDW\SLDDRW06\SW6026-0008-00010000 SHEET OF Blatt1 SIZE ISO A2

2922-0002-0022
17.03.08
03.04.12
19.02.10
14.12.11
18.08.10
26.07.10
26.07.10
18.12.09
18.12.09
24.11.09
19.03.08
17.04.08
14.01.11
11.02.10
18.01.11
11.03.08
01.09.09
01.09.09
14.04.08

You might also like