Appendix 2 - Compression Test
Appendix 2 - Compression Test
In this test, the push force applied on both faces of concrete specimen and the maximum compression
that concrete bears without failure is noted.
CURING OF CUBES
1. Once it sets, after 24 hours remove the concrete cube from the mould.
2. Marked the specimens and keep the test specimens submerged underwater for stipulated time.
3. As mentioned, the specimen must be kept in water for 7 or 28 days.
METHOD STATEMENT
FOR CONCRETE TRIAL MIX (REV. 0)