3. NILAI KERJA DILAKSANAKAN DAN AMAUN-AMAUN LAIN YANG KENA BAYAR * RM 126,621,800.67
………………………………...…….……………
(Pegawai Pengesyor)
Tarikh : ………………………………………….
B PERAKUAN BAYARAN
1. Bayaran Interim
a) Kepada Kontraktor Utama RM -
b) Kepada Subkontraktor/Penerima Hak RM -
(Seperti di Lampiran A)
Jumlah Bayaran Interim RM - RM -
2. Kredit Akaun Deposit Wang Jaminan Perlaksanaan (10% dari Bayaran Disyorkan sehingga 5% harga kontrak) RM 6,277,448.31
JUMLAH RM -
BAYARAN DIPERAKUKAN RM -
(RINGGIT MALAYSIA: )
Adalah disahkan bahawa semua peraturan kewangan dan kehendak di bawah Kontrak telah dipatuhi
SUMMARY
Variation order
APK 1 281,485.00 100% 0% 100% 281,485.00
APK 2 9,239.80 100% 0% 100% 9,239.80
APK 3 74,436.49 100% 0% 100% 74,436.49
APK 4 10,000.00 0% 100% 100% 10,000.00
APK 5 118,360.00 0% 100% 100% 118,360.00
(please refer Lampiran B)
…………………………………………………..
(Signature of Quantity Surveyor )
Date: ……………………
2. Variation Order 2 ADDITIONAL WORK FOR ROAD AND CAR PARK 9,239.80 90% 10% 100%
3. Variation Order 3 SECTION J - TNB SUB-STATION (DOUBLE 74,436.49 90% 10% 100%
CHAMBER) (ALL PROVISIONAL)
281,485.00
9,239.80
74,436.49
10,000.00
118,360.00
493,521.29
PROJECT : CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH KOMPLEKS BELIA DAN SUKAN DAERAH
JOHOR BAHRU, JOHOR DARUL TAKZIM.
MATERIAL ON SITE
Material On Site-5
CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH KOMPLEKS BELIA DAN SUKAN DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM.
5 Performance Bond -
15 Site Office 30,500.00 10,000.00 100% 10,000.00 19,500.00 100% 0% 100% 19,500.00 1,000.00 100% 100% 200% 2,000.00
16 Telephone 14,000.00 3,000.00 100% 3,000.00 8,000.00 100% 0% 100% 8,000.00 3,000.00 100% 100% 200% 6,000.00
17 Facsimile Transceiver 10,500.00 1,000.00 100% 1,000.00 8,500.00 100% 0% 100% 8,500.00 1,000.00 100% 100% 200% 2,000.00
21 Mobile Phone 3,577.00 577.00 100% 577.00 3,000.00 100% 0% 100% 3,000.00
22 Site Vehicles - PROTON WAJA 1.6 (A) 31,577.00 31,577.00 100% 31,577.00 100%
23 Site Vehicles - HONDA EX5 110cc 5,000.00 3,000.00 100% 3,000.00 2,000.00 100% 0% 100% 2,000.00
25 Digital Still Camera and Digital Video Camera 2,423.00 2,423.00 100% 2,423.00
27 Photo Copier Machine 11,500.00 5,000.00 100% 5,000.00 6,500.00 100% 0% 100% 6,500.00
28 Temporary Building 21,577.00 10,000.00 100% 10,000.00 10,577.00 100% 0% 100% 10,577.00 1,000.00 100% 0% 100% 1,000.00
29 Temporary Lighting and Power 290,000.00 10,000.00 100% 10,000.00 273,000.00 100% 0% 100% 273,000.00 7,000.00 100% 0% 100% 7,000.00
30 Temporary Water Supply 290,000.00 10,000.00 100% 10,000.00 273,000.00 100% 0% 100% 273,000.00 7,000.00 100% 0% 100% 7,000.00
31 Plant and Machinery 801,500.00 100,000.00 100% 100,000.00 601,500.00 100% 0% 100% 601,500.00 100,000.00 100% 0% 100% 100,000.00
35 Existing Services, Facilities And Public In The Vicinity 51,500.00 51,500.00 100% 0% 100% 51,500.00
38 Acccess and Temporary Roads 61,577.00 10,000.00 100% 10,000.00 41,577.00 100% 0% 100% 41,577.00 10,000.00 100% 0% 100% 10,000.00
39 Temporary Hoarding and Gantries 880,000.00 100,000.00 100% 100,000.00 680,000.00 100% 0% 100% 680,000.00 100,000.00 100% 0% 100% 100,000.00
40 Temporary Scaffolding and staging 880,000.00 100,000.00 100% 100,000.00 680,000.00 100% 0% 100% 680,000.00 100,000.00 100% 0% 100% 100,000.00
42 First Aid Kit 2,577.00 1,000.00 100% 1,000.00 1,577.00 100% 0% 100% 1,577.00
43 Safety of Site 12,000.00 6,000.00 100% 6,000.00 6,000.00 100% 0% 100% 6,000.00
44 Keeping Site Dry 12,000.00 6,000.00 100% 6,000.00 6,000.00 100% 0% 100% 6,000.00
46 Clearing Away Equipment, Etc. 10,300.00 3,000.00 100% 3,000.00 5,300.00 100% 0% 100% 5,300.00 2,000.00 100% 0% 100% 2,000.00
47 Cleaning up Site 11,500.00 6,500.00 100% 0% 100% 6,500.00 5,000.00 100% 0% 100% 5,000.00
49 Procedure for Inspection Prior to Handover of the Works 13,000.00 13,000.00 100% 0% 100% 13,000.00
51 Mock-Up Unit 1,107,295.00 221,459.00 100% 221,459.00 664,377.00 100% 0% 100% 664,377.00 221,459.00 100% 0% 100% 221,459.00
52 Local And Other Authorities Notices And Fees 13,000.00 6,500.00 100% 6,500.00 6,500.00 100% 0% 100% 6,500.00
TOTAL TO FINAL SUMMARY : 7,105,760.00 2,760,613.00 100% 2,760,613.00 3,727,688.00 100% 3,727,688.00 617,459.00 101% 622,459.00
breakdown/prelim/pda/1/1/12
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QTY RATE AMOUNT prev. Curr. To Date DUE
(RM) (RM)
GENERALLY
A The Contractor shall visit the site to determine the exact condition
and nature of works to be undertaken.
D Prices for piles shall include for casting them either on or of site and
all necessary formwork including forming necessary recess etc.
reinforcement, lifting tongles, pile shoes or extension base plate and
extension cap plates all as described.
F Piling shall commence from platform level. Prices for driving shall
include for moving of pile frames about the site, raising or lowering
them and re-driving of heaved piles.
TO COLLECTION - -
Page 8
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE
PREAMBLES
B The rate for pay length of the pile shall be deemed to include the
initial and extension piles notwithstanding whether the pile is driven
in singly or cluster, labour and materials for jointing between the
initial and extension piles, shoeing, pointing and wastage. The rate
shall also deemed to include for piling on flat or sloping ground
including all necessary modifications to piling frame to
accommodate stiff or any gradient of slope.
E For driving it shall be measured from the toe of the piles when
driven to the cut of level.
G
Preliminary Test Pile shall be part of working piles and shall be
installed all in accordance to the specification and as shown in the
drawing. Pile point for test drive shall be determined by the
Engineer / S.O.
TO COLLECTION - -
Page 9
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE
BRIEF SPECIFICATION
C Maintain load test has to be carried out in Two (2) cycles. The test
load for each cycles has to be maintained for 24 hours. The test
load shall be as follows:
E
All Spun Pile to be 350mm diameter with working capacity of 65tons
and driven to set. All reinforced concrete pile which driven to set
shall have working capacity of 30tons and all friction piles shall have
working capacity 15tons and driven to 24m depth.
TO COLLECTION - -
Page 10
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE
A
Allow for the provision of all necessary piling equipments, plants,
tools and ancillary equipment and for their transportation to site,
handling, assembling, erecting, dismantling and removal on Lump
completion. Sum 900,000.00 100% 0% 100% 900,000.00
B
Allow for moving and handling Drop Hammer operated piling
equipments about the site as often and whenever necessary for the
execution for the whole piling operations including any excavation Lump
and filling required for moving. Sum 300,000.00 100% 0% 100% 300,000.00
D Allow for submission of four (4) sets of setting out and as-built
drawings from Licensed Surveyor inclusive of one (1) softcopy in Lump
Auto-Cad programme. Sum 30,000.00 90% 10% 100% 30,000.00
E
Allow for the submission of records of all piles in quadruplicate
copies duly signed by the Contractor and Engineer's representative Lump
and delivered to the Engineer as the work proceeds. Sum 35,000.00 80% 20% 100% 35,000.00
J
In the event that deviation from the correct alignment does occur
and eccentricity of any such pile does not confirm to that shown in
the said drawings, the rectification of such pile will have to be
carried out by the Contractor at his own cost and to entire Lump
satisfaction of the Engineer/S.O. Sum -
Page 11
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE
COLLECTION PAGE
Page 12
BILL NO. 2 - BLOK PENTADBIRAN
A 350mm Diameter initial pile in 12.00m length. No 300 900.00 270,000.00 80% 20% 100% 270,000.00
B 350mm Diameter initial preliminary test pile in 12.00m length. No 2 900.00 1,800.00 80% 20% 100% 1,800.00
C 350mm Diameter extension pile in 12.00m length No 521 860.00 448,060.00 80% 20% 100% 448,060.00
E 350mm Diameter extension pile in 9.00m length. No 300 700.00 210,000.00 80% 20% 100% 210,000.00
No - 500.00 - -
350mm Diameter extension preliminary test pile in 6.00m length.
H 350mm Diameter initial preliminary test pile, driving singly / cluster No. 2 12.00 24.00 80% 20% 100% 24.00
in 12.00m length
J 350mm Diameter extension pile, driving singly / cluster in 12.00m No. 521 12.00 6,252.00 80% 20% 100% 6,252.00
length
K 350mm Diameter extension preliminary test pile, driving singly / No. 4 12.00 48.00 80% 20% 100% 48.00
cluster in 12.00m length
Page 13
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE
A 350mm Diameter extension pile, driving singly / cluster in 9.00m No. 300 8.70 2,610.00 80% 20% 100% 2,610.00
length
B 350mm Diameter extension preliminary test pile, driving singly / No. 2 8.70 17.40 80% 20% 100% 17.40
cluster in 9.00m length
No - 7.00 - 0% 0% 0% -
350mm Diameter extension preliminary test pile in 6.00m length.
D 350mm Diameter initial preliminary test pile, driving singly / cluster M 24 8.80 211.20 80% 20% 100% 211.20
in 12.00m length
E 350mm Diameter extension pile, driving singly / cluster in 12.00m M 6,252 8.80 55,017.60 80% 20% 100% 55,017.60
length
F 350mm Diameter extension preliminary test pile, driving singly / M 48 8.80 422.40 80% 20% 100% 422.40
cluster in 12.00m length
G 350mm Diameter extension pile, driving singly / cluster in 9.00m M 2,700 8.80 23,760.00 80% 20% 100% 23,760.00
length
H 350mm Diameter extension preliminary test pile, driving singly / M 18 8.80 158.40 80% 20% 100% 158.40
cluster in 9.00m length
J
1100mm x 20mm (Overall) fillet weld connection between
chamfered edges of head cap and base 1100mm girth including
30mm diameter mild steel centring bar 160mm long, inserting in and
including forming 80mm deep mortices in 'head and base of piles. No. 900 21.40 19,260.00 80% 20% 100% 19,260.00
K Ditto, for preliminary test piles No. 6 21.40 128.40 80% 20% 100% 128.40
Page 14
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE
A
Cutt off head of pile and remove surplus length off site 350mm
precast reinforced concrete spun pile and strip off 1000mm length of
head for and including binding expose reinforcement rods to
reinforcement in pile cap. No. 300 30.00 9,000.00 80% 20% 100% 9,000.00
B
Reinforced conrete Grade 35 cap to cover head of 350mm diameter
precast concrete spun pile all to the approval of Engineer/S.O. and
to include associated excavation works, formwork, mild steel plate
and necessary reinforcements and welding works No. 300 50.00 15,000.00 80% 20% 100% 15,000.00
Testing of Piles
Provide the necessary kentlegde, jack and dial gauges for the
application and release of the Test Load. The rate shall include all
supervision and labour, watching and lighting and removal of
kentledge and equipment on completion for 2 cycles (twice working
load of 130 Tonnes for both Preliminary Test Pile and Working
Piles)
C Test to 350mm diameter spun pile No. 1 7,300.00 7,300.00 80% 20% 100% 7,300.00
PDA Test
Page 15
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE
A 300mm x 300mm initial pile in 12.00m length. No 215 680.00 146,200.00 80% 20% 100% 146,200.00
B 300mm x 300mm initial preliminary test pile in 12.00m length. No 1 680.00 680.00 80% 20% 100% 680.00
C 300mm x 300mm extension pile in 12.00m length No 215 680.00 146,200.00 80% 20% 100% 146,200.00
E 300mm x 300mm initial pile, driving singly / cluster pile in 12.00m No. 215 12.00 2,580.00 80% 20% 100% 2,580.00
length
F 300mm x 300mm initial preliminary test pile, driving singly / cluster No. 1 12.00 12.00 80% 20% 100% 12.00
pile in 12.00m length
G 300mm x 300mm extension pile, driving singly / cluster pile in No. 215 12.00 2,580.00 80% 20% 100% 2,580.00
12.00m length
H 300mm x 300mm extension preliminary test pile, driving singly / No. 1 12.00 12.00 80% 20% 100% 12.00
cluster pile in 12.00m length
Page 16
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE
A 300mm x 300mm initial pile, driving singly / cluster pile in 12.00m M 3,100 8.80 27,280.00 80% 20% 100% 27,280.00
length
B 300mm x 300mm initial preliminary test pile, driving singly / cluster M 24 8.80 211.20 80% 20% 100% 211.20
pile in 12.00m length
C 300mm x 300mm extension, driving singly / cluster pile in 12.00m M 3,100 8.80 27,280.00 80% 20% 100% 27,280.00
length
D 300mm x 300mm extension preliminary test pile, driving singly / M 24 8.80 211.20 80% 20% 100% 211.20
cluster pile in 12.00m length
-------------------------------------------
E
1200mm x 20mm (Overall) fillet weld connection between
chamfered edges of head cap and base 1200mm girth including
30mm diameter mild steel centring bar 160mm long, inserting in and
including forming 80mm deep mortices in head and base of piles. No 215 21.40 4,601.00 80% 20% 100% 4,601.00
F Ditto, preliminary test pile No 1 21.40 21.40 80% 20% 100% 21.40
G
Cutt off head of pile and remove surplus length off site 300mm x
300mm precast reinforced concrete pile and strip off 1000mm
length of head for and including binding exposed reinforcement rods
to reinforcement in pile cap. No. 192 22.30 4,281.60 80% 20% 100% 4,281.60
Page 17
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE
Testing of Piles
Provide the necessary kentlegde, jack and dial gauges for the
application and release of the Test Load. The rate shall include all
supervision and labour, watching and lighting and removal of
kentledge and equipment on completion for 2 cycles (twice working
load of 30 Tonnes for both Preliminary Test Pile and Working Piles)
PDA Test
Page 18
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE
COLLECTION PAGE
Page 19
BILL NO. 3 - BLOK AKADEMIK
A 350mm Diameter initial pile in 12.00m length. No 425 900.00 382,500.00 90% 10% 100% 382,500.00
B 350mm Diameter initial preliminary test pile in 12.00m length. No 2 900.00 1,800.00 90% 10% 100% 1,800.00
C 350mm Diameter extension pile in 12.00m length No 425 900.00 382,500.00 90% 10% 100% 382,500.00
E 350mm Diameter extension pile in 9.00m length. No 365 700.00 255,500.00 90% 10% 100% 255,500.00
H 350mm Diameter initial preliminary test pile, driving singly / cluster No. 2 12.00 24.00 90% 10% 100% 24.00
in 12.00m length
J 350mm Diameter extension pile, driving singly / cluster in 12.00m No. 425 12.00 5,100.00 90% 10% 100% 5,100.00
length
K 350mm Diameter extension preliminary test pile, driving singly / No. 4 12.00 48.00 90% 10% 100% 48.00
cluster in 12.00m length
Page 20
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE
A 350mm Diameter extension pile, driving singly / cluster in 9.00m No. 365 8.70 3,175.50 90% 10% 100% 3,175.50
length
B 350mm Diameter extension preliminary test pile, driving singly / No. 2 8.70 17.40 90% 10% 100% 17.40
cluster in 9.00m length
350mm Diameter extension pile in 6.00m length. No - 7.00 - 90% 10% 100% -
D 350mm Diameter initial preliminary test pile, driving singly / cluster M 24 8.80 211.20 90% 10% 100% 211.20
in 12.00m length
E 350mm Diameter extension pile, driving singly / cluster in 12.00m M 5,100 8.80 44,880.00 90% 10% 100% 44,880.00
length
F 350mm Diameter extension preliminary test pile, driving singly / M 48 8.80 422.40 90% 10% 100% 422.40
cluster in 12.00m length
G 350mm Diameter extension pile, driving singly / cluster in 9.00m M 3,285 8.80 28,908.00 90% 10% 100% 28,908.00
length
H 350mm Diameter extension preliminary test pile, driving singly / M 18 8.80 158.40 90% 10% 100% 158.40
cluster in 9.00m length
350mm Diameter extension pile in 6.00m length. No - 8.80 - 90% 10% 100% -
J
1100mm x 20mm (Overall) fillet weld connection between
chamfered edges of head cap and base 1100mm girth including
30mm diameter mild steel centring bar 160mm long, inserting in and
including forming 80mm deep mortices in 'head and base of piles. No. 1,275 21.40 27,285.00 90% 10% 100% 27,285.00
K Ditto, for preliminary test piles No. 6 21.40 128.40 90% 10% 100% 128.40
Page 21
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE
A
Cutt off head of pile and remove surplus length off site 350mm
precast reinforced concrete spun pile and strip off 1000mm length of
head for and including binding expose reinforcement rods to
reinforcement in pile cap. No. 243 30.00 7,290.00 90% 10% 100% 7,290.00
B
Reinforced conrete Grade 35 cap to cover head of 350mm diameter
precast concrete spun pile all to the approval of Engineer/S.O. and
to include associated excavation works, formwork, mild steel plate
and necessary reinforcements and welding works No. 243 50.00 12,150.00 90% 10% 100% 12,150.00
Testing of Piles
Provide the necessary kentlegde, jack and dial gauges for the
application and release of the Test Load. The rate shall include all
supervision and labour, watching and lighting and removal of
kentledge and equipment on completion for 2 cycles (twice working
load of 130 Tonnes for both Preliminary Test Pile and Working
Piles)
C Test to 350mm diameter spun pile No. 1 7,300.00 7,300.00 90% 10% 100% 7,300.00
PDA Test
Page 22
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE
A 300mm x 300mm initial pile in 12.00m length. No 143 680.00 97,240.00 90% 10% 100% 97,240.00
B 300mm x 300mm initial preliminary test pile in 12.00m length. No 1 680.00 680.00 90% 10% 100% 680.00
C 300mm x 300mm extension pile in 12.00m length No 143 648.40 92,721.20 90% 10% 100% 92,721.20
E 300mm x 300mm initial pile, driving singly / cluster pile in 12.00m No. 143 12.00 1,716.00 90% 10% 100% 1,716.00
length
F 300mm x 300mm initial preliminary test pile, driving singly / cluster No. 1 12.00 12.00 90% 10% 100% 12.00
pile in 12.00m length
G 300mm x 300mm extension pile, driving singly / cluster pile in No. 143 12.00 1,716.00 90% 10% 100% 1,716.00
12.00m length
H 300mm x 300mm extension preliminary test pile, driving singly / No. 1 12.00 12.00 90% 10% 100% 12.00
cluster pile in 12.00m length
Page 23
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE
A 300mm x 300mm initial pile, driving singly / cluster pile in 12.00m M 1,716 8.80 15,100.80 90% 10% 100% 15,100.80
length
B 300mm x 300mm initial preliminary test pile, driving singly / cluster M 12 8.80 105.60 90% 10% 100% 105.60
pile in 12.00m length
C 300mm x 300mm extension, driving singly / cluster pile in 12.00m M 1,716 8.80 15,100.80 90% 10% 100% 15,100.80
length
D 300mm x 300mm extension preliminary test pile, driving singly / M 12 8.80 105.60 90% 10% 100% 105.60
cluster pile in 12.00m length
-------------------------------------------
E
1200mm x 20mm (Overall) fillet weld connection between
chamfered edges of head cap and base 1200mm girth including
30mm diameter mild steel centring bar 160mm long, inserting in and
including forming 80mm deep mortices in head and base of piles. No 143 21.40 3,060.20 90% 10% 100% 3,060.20
F Ditto, preliminary test pile No 1 21.40 21.40 90% 10% 100% 21.40
G
Cutt off head of pile and remove surplus length off site 300mm x
300mm precast reinforced concrete pile and strip off 1000mm
length of head for and including binding exposed reinforcement rods
to reinforcement in pile cap. No. 144 22.30 3,211.20 90% 10% 100% 3,211.20
Page 24
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE
Testing of Piles
Provide the necessary kentlegde, jack and dial gauges for the
application and release of the Test Load. The rate shall include all
supervision and labour, watching and lighting and removal of
kentledge and equipment on completion for 2 cycles (twice working
load of 30 Tonnes for both Preliminary Test Pile and Working Piles)
A Test to 300mm x 300mm RC pile No. 1 4,850.00 4,850.00 90% 10% 100% 4,850.00
PDA Test
Page 25
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE
COLLECTION PAGE
Page 26
BILL NO. 4 - DEWAN SERBAGUNA
A 350mm Diameter initial pile in 12.00m length. No 78 900.00 70,200.00 90% 10% 100% 70,200.00
B 350mm Diameter initial preliminary test pile in 12.00m length. No 1 900.00 900.00 90% 10% 100% 900.00
C 350mm Diameter extension pile in 12.00m length No 156 900.00 140,400.00 90% 10% 100% 140,400.00
E 350mm Diameter extension pile in 9.00m length. No 78 700.00 54,600.00 90% 10% 100% 54,600.00
H 350mm Diameter initial preliminary test pile, driving singly / cluster No. 1 12.00 12.00 90% 10% 100% 12.00
in 12.00m length
J 350mm Diameter extension pile, driving singly / cluster in 12.00m No. 156 12.00 1,872.00 90% 10% 100% 1,872.00
length
K 350mm Diameter extension preliminary test pile, driving singly / No. 2 12.00 24.00 90% 10% 100% 24.00
cluster in 12.00m length
Page 27
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE
A 350mm Diameter extension pile, driving singly / cluster in 9.00m No. 78 8.70 678.60 90% 10% 100% 678.60
length
B 350mm Diameter extension preliminary test pile, driving singly / No. 1 8.70 8.70 90% 10% 100% 8.70
cluster in 9.00m length
D 350mm Diameter initial preliminary test pile, driving singly / cluster M 12 8.80 105.60 90% 10% 100% 105.60
in 12.00m length
E 350mm Diameter extension pile, driving singly / cluster in 12.00m M 1,872 8.80 16,473.60 90% 10% 100% 16,473.60
length
F 350mm Diameter extension preliminary test pile, driving singly / M 24 8.80 211.20 90% 10% 100% 211.20
cluster in 12.00m length
G 350mm Diameter extension pile, driving singly / cluster in 9.00m M 702 8.80 6,177.60 90% 10% 100% 6,177.60
length
H 350mm Diameter extension preliminary test pile, driving singly / M 9 8.80 79.20 90% 10% 100% 79.20
cluster in 9.00m length
J
1100mm x 20mm (Overall) fillet weld connection between
chamfered edges of head cap and base 1100mm girth including
30mm diameter mild steel centring bar 160mm long, inserting in and
including forming 80mm deep mortices in 'head and base of piles. No. 234 21.40 5,007.60 90% 10% 100% 5,007.60
K Ditto, for preliminary test piles No. 3 21.40 64.20 90% 10% 100% 64.20
Page 28
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE
A
Cutt off head of pile and remove surplus length off site 350mm
precast reinforced concrete spun pile and strip off 1000mm length of
head for and including binding expose reinforcement rods to
reinforcement in pile cap. No. 79 30.00 2,370.00 90% 10% 100% 2,370.00
B
Reinforced conrete Grade 35 cap to cover head of 350mm diameter
precast concrete spun pile all to the approval of Engineer/S.O. and
to include associated excavation works, formwork, mild steel plate
and necessary reinforcements and welding works No. 79 46.00 3,634.00 90% 10% 100% 3,634.00
Testing of Piles
Provide the necessary kentlegde, jack and dial gauges for the
application and release of the Test Load. The rate shall include all
supervision and labour, watching and lighting and removal of
kentledge and equipment on completion for 2 cycles (twice working
load of 130 Tonnes for both Preliminary Test Pile and Working
Piles)
PDA Test
Page 29
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE
COLLECTION PAGE
Page 30
BILL NO. 5 - PERPUSTAKAAN
A 350mm Diameter initial pile in 12.00m length. No 29 900.00 26,100.00 85% 15% 100% 26,100.00
B 350mm Diameter initial preliminary test pile in 12.00m length. No 1 900.00 900.00 85% 15% 100% 900.00
C 350mm Diameter extension pile in 12.00m length No 58 900.00 52,200.00 85% 15% 100% 52,200.00
E 350mm Diameter extension pile in 9.00m length. No 29 700.00 20,300.00 85% 15% 100% 20,300.00
H 350mm Diameter initial preliminary test pile, driving singly / cluster No. 1 12.00 12.00 85% 15% 100% 12.00
in 12.00m length
J 350mm Diameter extension pile, driving singly / cluster in 12.00m No. 58 12.00 696.00 85% 15% 100% 696.00
length
K 350mm Diameter extension preliminary test pile, driving singly / No. 2 12.00 24.00 85% 15% 100% 24.00
cluster in 12.00m length
Page 31
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE
A 350mm Diameter extension pile, driving singly / cluster in 9.00m No. 29 8.70 252.30 85% 15% 100% 252.30
length
B 350mm Diameter extension preliminary test pile, driving singly / No. 1 8.70 8.70 85% 15% 100% 8.70
cluster in 9.00m length
D 350mm Diameter initial preliminary test pile, driving singly / cluster M 12 8.80 105.60 85% 15% 100% 105.60
in 12.00m length
E 350mm Diameter extension pile, driving singly / cluster in 12.00m M 696 8.80 6,124.80 85% 15% 100% 6,124.80
length
F 350mm Diameter extension preliminary test pile, driving singly / M 24 8.80 211.20 85% 15% 100% 211.20
cluster in 12.00m length
G 350mm Diameter extension pile, driving singly / cluster in 9.00m M 261 8.80 2,296.80 85% 15% 100% 2,296.80
length
H 350mm Diameter extension preliminary test pile, driving singly / M 9 8.80 79.20 85% 15% 100% 79.20
cluster in 9.00m length
J
1100mm x 20mm (Overall) fillet weld connection between
chamfered edges of head cap and base 1100mm girth including
30mm diameter mild steel centring bar 160mm long, inserting in and
including forming 80mm deep mortices in 'head and base of piles. No. 87 21.40 1,861.80 85% 15% 100% 1,861.80
K Ditto, for preliminary test piles No. 3 21.40 64.20 85% 15% 100% 64.20
Page 32
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE
A
Cutt off head of pile and remove surplus length off site 350mm
precast reinforced concrete spun pile and strip off 1000mm length of
head for and including binding expose reinforcement rods to
reinforcement in pile cap. No. 30 30.00 900.00 85% 15% 100% 900.00
B
Reinforced conrete Grade 35 cap to cover head of 350mm diameter
precast concrete spun pile all to the approval of Engineer/S.O. and
to include associated excavation works, formwork, mild steel plate
and necessary reinforcements and welding works No. 30 50.00 1,500.00 85% 15% 100% 1,500.00
Testing of Piles
Provide the necessary kentlegde, jack and dial gauges for the
application and release of the Test Load. The rate shall include all
supervision and labour, watching and lighting and removal of
kentledge and equipment on completion for 2 cycles (twice working
load of 130 Tonnes for both Preliminary Test Pile and Working
Piles)
PDA Test
Page 33
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE
COLLECTION PAGE
Page 34
BILL NO. 6 - KANTIN
A 350mm Diameter initial pile in 12.00m length. No 86 900.00 77,400.00 85% 15% 100% 77,400.00
B 350mm Diameter initial preliminary test pile in 12.00m length. No 1 900.00 900.00 85% 15% 100% 900.00
C 350mm Diameter extension pile in 12.00m length No 172 900.00 154,800.00 85% 15% 100% 154,800.00
E 350mm Diameter extension pile in 9.00m length. No 86 700.00 60,200.00 85% 15% 100% 60,200.00
H 350mm Diameter initial preliminary test pile, driving singly / cluster No. 1 12.00 12.00 85% 15% 100% 12.00
in 12.00m length
J 350mm Diameter extension pile, driving singly / cluster in 12.00m No. 172 12.00 2,064.00 85% 15% 100% 2,064.00
length
K 350mm Diameter extension preliminary test pile, driving singly / No. 2 12.00 24.00 85% 15% 100% 24.00
cluster in 12.00m length
Page 35
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE
A 350mm Diameter extension pile, driving singly / cluster in 9.00m No. 86 8.70 748.20 85% 15% 100% 748.20
length
B 350mm Diameter extension preliminary test pile, driving singly / No. 1 8.70 8.70 85% 15% 100% 8.70
cluster in 9.00m length
D 350mm Diameter initial preliminary test pile, driving singly / cluster M 12 8.80 105.60 85% 15% 100% 105.60
in 12.00m length
E 350mm Diameter extension pile, driving singly / cluster in 12.00m M 2,064 8.80 18,163.20 85% 15% 100% 18,163.20
length
F 350mm Diameter extension preliminary test pile, driving singly / M 24 8.80 211.20 85% 15% 100% 211.20
cluster in 12.00m length
G 350mm Diameter extension pile, driving singly / cluster in 9.00m M 774 8.80 6,811.20 85% 15% 100% 6,811.20
length
H 350mm Diameter extension preliminary test pile, driving singly / M 9 8.80 79.20 85% 15% 100% 79.20
cluster in 9.00m length
J
1100mm x 20mm (Overall) fillet weld connection between
chamfered edges of head cap and base 1100mm girth including
30mm diameter mild steel centring bar 160mm long, inserting in and
including forming 80mm deep mortices in 'head and base of piles. No. 258 21.40 5,521.20 85% 15% 100% 5,521.20
K Ditto, for preliminary test piles No. 3 21.40 64.20 85% 15% 100% 64.20
Page 36
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE
A
Cutt off head of pile and remove surplus length off site 350mm
precast reinforced concrete spun pile and strip off 1000mm length of
head for and including binding expose reinforcement rods to
reinforcement in pile cap. No. 87 30.00 2,610.00 85% 15% 100% 2,610.00
B
Reinforced conrete Grade 35 cap to cover head of 350mm diameter
precast concrete spun pile all to the approval of Engineer/S.O. and
to include associated excavation works, formwork, mild steel plate
and necessary reinforcements and welding works No. 87 50.00 4,350.00 85% 15% 100% 4,350.00
Testing of Piles
Provide the necessary kentlegde, jack and dial gauges for the
application and release of the Test Load. The rate shall include all
supervision and labour, watching and lighting and removal of
kentledge and equipment on completion for 2 cycles (twice working
load of 130 Tonnes for both Preliminary Test Pile and Working
Piles)
C Test to 350mm diameter spun pile No. 1 7,300.00 7,300.00 85% 15% 100% 7,300.00
PDA Test
Page 37
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE
COLLECTION PAGE
Page 38
BILL NO. 7 - SURAU
A 350mm Diameter initial pile in 12.00m length. No 117 900.00 105,300.00 90% 10% 100% 105,300.00
B 350mm Diameter initial preliminary test pile in 12.00m length. No 1 900.00 900.00 90% 10% 100% 900.00
C 350mm Diameter extension pile in 12.00m length No 234 900.00 210,600.00 90% 10% 100% 210,600.00
E 350mm Diameter extension pile in 9.00m length. No 117 700.00 81,900.00 90% 10% 100% 81,900.00
350mm Diameter extension pile in 6.00m length. No - 500.00 - 90% 10% 100% -
H 350mm Diameter initial preliminary test pile, driving singly / cluster No. 1 12.00 12.00 90% 10% 100% 12.00
in 12.00m length
J 350mm Diameter extension pile, driving singly / cluster in 12.00m No. 234 12.00 2,808.00 90% 10% 100% 2,808.00
length
K 350mm Diameter extension preliminary test pile, driving singly / No. 2 12.00 24.00 90% 10% 100% 24.00
cluster in 12.00m length
Page 39
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE
A 350mm Diameter extension pile, driving singly / cluster in 9.00m No. 117 8.70 1,017.90 90% 10% 100% 1,017.90
length
B 350mm Diameter extension preliminary test pile, driving singly / No. 1 8.70 8.70 90% 10% 100% 8.70
cluster in 9.00m length
350mm Diameter extension pile in 6.00m length. No - 7.00 - 90% 10% 100% -
D 350mm Diameter initial preliminary test pile, driving singly / cluster M 12 8.80 105.60 90% 10% 100% 105.60
in 12.00m length
E 350mm Diameter extension pile, driving singly / cluster in 12.00m M 2,808 8.80 24,710.40 90% 10% 100% 24,710.40
length
F 350mm Diameter extension preliminary test pile, driving singly / M 24 8.80 211.20 90% 10% 100% 211.20
cluster in 12.00m length
G 350mm Diameter extension pile, driving singly / cluster in 9.00m M 1,053 8.80 9,266.40 90% 10% 100% 9,266.40
length
H 350mm Diameter extension preliminary test pile, driving singly / M 9 8.80 79.20 90% 10% 100% 79.20
cluster in 9.00m length
350mm Diameter extension pile in 6.00m length. No - 8.80 - 90% 10% 100% -
J
1100mm x 20mm (Overall) fillet weld connection between
chamfered edges of head cap and base 1100mm girth including
30mm diameter mild steel centring bar 160mm long, inserting in and
including forming 80mm deep mortices in 'head and base of piles. No. 351 21.40 7,511.40 90% 10% 100% 7,511.40
K Ditto, for preliminary test piles No. 3 21.40 64.20 90% 10% 100% 64.20
Page 40
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE
A
Cutt off head of pile and remove surplus length off site 350mm
precast reinforced concrete spun pile and strip off 1000mm length of
head for and including binding expose reinforcement rods to
reinforcement in pile cap. No. 118 30.00 3,540.00 90% 10% 100% 3,540.00
B
Reinforced conrete Grade 35 cap to cover head of 350mm diameter
precast concrete spun pile all to the approval of Engineer/S.O. and
to include associated excavation works, formwork, mild steel plate
and necessary reinforcements and welding works No. 118 50.00 5,900.00 90% 10% 100% 5,900.00
Testing of Piles
Provide the necessary kentlegde, jack and dial gauges for the
application and release of the Test Load. The rate shall include all
supervision and labour, watching and lighting and removal of
kentledge and equipment on completion for 2 cycles (twice working
load of 130 Tonnes for both Preliminary Test Pile and Working
Piles)
C Test to 350mm diameter spun pile No. 7,300.00 Rate Only 90% 10% 100% 0.00
PDA Test
Page 41
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE
COLLECTION PAGE
Page 42
BILL NO. 8 -STADIUM
A 300mm x 300mm initial pile in 12.00m length. No 23 680.00 15,640.00 90% 10% 100% 15,640.00
B 300mm x 300mm initial preliminary test pile in 12.00m length. No 1 680.00 680.00 90% 10% 100% 680.00
C 300mm x 300mm extension pile in 12.00m length No 47 648.40 30,474.80 90% 10% 100% 30,474.80
C 300mm x 300mm extension pile in 9.00m length No 23 585.00 13,455.00 90% 10% 100% 13,455.00
E 300mm x 300mm initial pile, driving singly / cluster pile in 12.00m No. 23 12.00 276.00 90% 10% 100% 276.00
length
F 300mm x 300mm initial preliminary test pile, driving singly / cluster No. 1 12.00 12.00 90% 10% 100% 12.00
pile in 12.00m length
G 300mm x 300mm extension pile, driving singly / cluster pile in No. 47 12.00 564.00 90% 10% 100% 564.00
12.00m length
H 300mm x 300mm extension preliminary test pile, driving singly / No. 1 12.00 12.00 90% 10% 100% 12.00
cluster pile in 12.00m length
G 300mm x 300mm extension pile, driving singly / cluster pile in No. 23 10.00 230.00 90% 10% 100% 230.00
9.00m length
H 300mm x 300mm extension preliminary test pile, driving singly / No. 1 10.00 10.00 90% 10% 100% 10.00
cluster pile in 9.00m length
Page 43
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE
A 300mm x 300mm initial pile, driving singly / cluster pile in 12.00m M 276 8.80 2,428.80 90% 10% 100% 2,428.80
length
B 300mm x 300mm initial preliminary test pile, driving singly / cluster M 12 8.80 105.60 90% 10% 100% 105.60
pile in 12.00m length
C 300mm x 300mm extension, driving singly / cluster pile in 12.00m M 564 8.80 4,963.20 90% 10% 100% 4,963.20
length
D 300mm x 300mm extension preliminary test pile, driving singly / M 12 8.80 105.60 90% 10% 100% 105.60
cluster pile in 12.00m length
C 300mm x 300mm extension, driving singly / cluster pile in 9.00m M 207 8.80 1,821.60 90% 10% 100% 1,821.60
length
D 300mm x 300mm extension preliminary test pile, driving singly / M 9 8.80 79.20 90% 10% 100% 79.20
cluster pile in 9.00m length
-------------------------------------------
E
1200mm x 20mm (Overall) fillet weld connection between
chamfered edges of head cap and base 1200mm girth including
30mm diameter mild steel centring bar 160mm long, inserting in and
including forming 80mm deep mortices in head and base of piles. No 23 21.40 492.20 90% 10% 100% 492.20
F Ditto, preliminary test pile No 1 21.40 21.40 90% 10% 100% 21.40
G
Cutt off head of pile and remove surplus length off site 300mm x
300mm precast reinforced concrete pile and strip off 1000mm
length of head for and including binding exposed reinforcement rods
to reinforcement in pile cap. No. 24 22.30 535.20 90% 10% 100% 535.20
Page 44
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE
Testing of Piles
Provide the necessary kentlegde, jack and dial gauges for the
application and release of the Test Load. The rate shall include all
supervision and labour, watching and lighting and removal of
kentledge and equipment on completion for 2 cycles (twice working
load of 60 Tonnes for both Preliminary Test Pile and Working Piles)
PDA Test
Page 45
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE
D No 900.00 - 0% 0% 0% -
350mm Diameter extension preliminary test pile in 12.00m length.
F No 700.00 - 0% 0% 0% -
350mm Diameter extension preliminary test pile in 9.00m length.
G No. 12.00 - 0% 0% 0% -
350mm Diameter initial pile, driving singly / cluster in 12.00m length
H 350mm Diameter initial preliminary test pile, driving singly / cluster No. 12.00 - 0% 0% 0% -
in 12.00m length
J 350mm Diameter extension pile, driving singly / cluster in 12.00m No. 12.00 - 0% 0% 0% -
length
K 350mm Diameter extension preliminary test pile, driving singly / No. 12.00 - 0% 0% 0% -
cluster in 12.00m length
TO COLLECTION - -
Page 46
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE
A 350mm Diameter extension pile, driving singly / cluster in 9.00m No. 8.70 - 0% 0% 0% -
length
B 350mm Diameter extension preliminary test pile, driving singly / No. 8.70 - 0% 0% 0% -
cluster in 9.00m length
C M 8.80 - 0% 0% 0% -
350mm Diameter initial pile, driving singly / cluster in 12.00m length
D 350mm Diameter initial preliminary test pile, driving singly / cluster M 8.80 - 0% 0% 0% -
in 12.00m length
J
1100mm x 20mm (Overall) fillet weld connection between
chamfered edges of head cap and base 1100mm girth including
30mm diameter mild steel centring bar 160mm long, inserting in and
including forming 80mm deep mortices in 'head and base of piles. No. 21.40 - 0% 0% 0% -
TO COLLECTION - -
Page 47
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE
A
Cutt off head of pile and remove surplus length off site 350mm
precast reinforced concrete spun pile and strip off 1000mm length of
head for and including binding expose reinforcement rods to
reinforcement in pile cap. No. 30.00 - 0% 0% 0% -
B
Reinforced conrete Grade 35 cap to cover head of 350mm diameter
precast concrete spun pile all to the approval of Engineer/S.O. and
to include associated excavation works, formwork, mild steel plate
and necessary reinforcements and welding works No. 50.00 - 0% 0% 0% -
Testing of Piles
Provide the necessary kentlegde, jack and dial gauges for the
application and release of the Test Load. The rate shall include all
supervision and labour, watching and lighting and removal of
kentledge and equipment on completion for 2 cycles (twice working
load of 130 Tonnes for both Preliminary Test Pile and Working
Piles)
PDA Test
TO COLLECTION - -
Page 48
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE
COLLECTION PAGE
- -
- -
- -
Page 49
BILL NO. 9 - KOLAM RENANG
A 350mm Diameter initial pile in 12.00m length. No 47 900.00 42,300.00 90% 10% 100% 42,300.00
B 350mm Diameter initial preliminary test pile in 12.00m length. No 1 900.00 900.00 90% 10% 100% 900.00
C 350mm Diameter extension pile in 12.00m length No 94 860.00 80,840.00 90% 10% 100% 80,840.00
E 350mm Diameter extension pile in 9.00m length. No 47 700.00 32,900.00 90% 10% 100% 32,900.00
H 350mm Diameter initial preliminary test pile, driving singly / cluster No. 1 12.00 12.00 90% 10% 100% 12.00
in 12.00m length
J 350mm Diameter extension pile, driving singly / cluster in 12.00m No. 94 12.00 1,128.00 90% 10% 100% 1,128.00
length
K 350mm Diameter extension preliminary test pile, driving singly / No. 2 12.00 24.00 90% 10% 100% 24.00
cluster in 12.00m length
Page 50
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE
A 350mm Diameter extension pile, driving singly / cluster in 9.00m No. 47 8.70 408.90 90% 10% 100% 408.90
length
B 350mm Diameter extension preliminary test pile, driving singly / No. 1 8.70 8.70 90% 10% 100% 8.70
cluster in 9.00m length
D 350mm Diameter initial preliminary test pile, driving singly / cluster M 12 8.80 105.60 90% 10% 100% 105.60
in 12.00m length
E 350mm Diameter extension pile, driving singly / cluster in 12.00m M 1,128 8.80 9,926.40 90% 10% 100% 9,926.40
length
F 350mm Diameter extension preliminary test pile, driving singly / M 24 8.80 211.20 90% 10% 100% 211.20
cluster in 12.00m length
G 350mm Diameter extension pile, driving singly / cluster in 9.00m M 423 8.80 3,722.40 90% 10% 100% 3,722.40
length
H 350mm Diameter extension preliminary test pile, driving singly / M 9 8.80 79.20 90% 10% 100% 79.20
cluster in 9.00m length
J
1100mm x 20mm (Overall) fillet weld connection between
chamfered edges of head cap and base 1100mm girth including
30mm diameter mild steel centring bar 160mm long, inserting in and
including forming 80mm deep mortices in 'head and base of piles. No. 141 21.40 3,017.40 90% 10% 100% 3,017.40
K Ditto, for preliminary test piles No. 3 21.40 64.20 90% 10% 100% 64.20
Page 51
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE
A
Cutt off head of pile and remove surplus length off site 350mm
precast reinforced concrete spun pile and strip off 1000mm length of
head for and including binding expose reinforcement rods to
reinforcement in pile cap. No. 48 30.00 1,440.00 90% 10% 100% 1,440.00
B
Reinforced conrete Grade 35 cap to cover head of 350mm diameter
precast concrete spun pile all to the approval of Engineer/S.O. and
to include associated excavation works, formwork, mild steel plate
and necessary reinforcements and welding works No. 48 50.00 2,400.00 90% 10% 100% 2,400.00
Testing of Piles
Provide the necessary kentlegde, jack and dial gauges for the
application and release of the Test Load. The rate shall include all
supervision and labour, watching and lighting and removal of
kentledge and equipment on completion for 2 cycles (twice working
load of 130 Tonnes for both Preliminary Test Pile and Working
Piles)
PDA Test
Page 52
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE
COLLECTION PAGE
Page 53
A.FINAL SUMMARY
:: ::
::
Page 54
BREAKDOWN FOR BLOK PENTADBIRAN
work done %
ITEM DESCRIPTION UNIT QTY RATE AMOUNT % % % Total Workdone
(RM) (RM) prev. current to date (RM)
1 Substructure
Work Below Lowest Floor Finish L/S 1,001,900.00 100% 0% 100% 1,001,900.00
2 Superstructure
Frame L/S 299,900.00 100% 0% 100% 299,900.00
Upper Floors L/S 349,000.00 100% 0% 100% 349,000.00
Roof L/S 201,000.00 100% 0% 100% 201,000.00
Stairs L/S 245,500.00 100% 0% 100% 245,500.00
External Walls L/S 340,500.00 100% 0% 100% 340,500.00
Windows & External Doors L/S 300,600.00 100% 0% 100% 300,600.00
Internal Walls & Partitions L/S 203,400.00 100% 0% 100% 203,400.00
Internal Doors L/S 179,550.00 100% 0% 100% 179,550.00
3 Finishes
Internal Wall Finishes L/S 59,550.00 100% 0% 100% 59,550.00
Internal Floor Finishes L/S 50,000.00 100% 0% 100% 50,000.00
Internal Ceiling Finishes L/S 85,000.00 100% 0% 100% 85,000.00
External Finishes L/S 49,781.00 100% 0% 100% 49,781.00
Roof Finishes L/S 1,081,219.00 100% 0% 100% 1,081,219.00
breakdown/admin/pda/3(a)/3/12
3/1
BREAKDOWN FOR BLOK AKADEMIK
WORK DONE %
ITEM DESCRIPTION UNIT QTY RATE AMOUNT(RM) % % % AMOUNT(RM)
prev current to date
1 Substructure
Work Below Lowest Floor Finish L/S 1,705,560.00 100% 0% 100% 1,705,560.00
2 Superstructure
Frame L/S 545,780.00 100% 0% 100% 545,780.00
Upper Floors L/S 395,380.00 100% 0% 100% 395,380.00
Roof L/S 345,880.00 100% 0% 100% 345,880.00
Stairs L/S 793,280.00 100% 0% 100% 793,280.00
External Walls L/S 492,280.00 100% 0% 100% 492,280.00
Windows & External Doors L/S 198,280.00 100% 0% 100% 198,280.00
Internal Walls & Partitions L/S 349,080.00 100% 0% 100% 349,080.00
Internal Doors L/S 495,200.00 100% 0% 100% 495,200.00
3 Finishes
Internal Wall Finishes L/S 100,200.00 100% 0% 100% 100,200.00
Internal Floor Finishes L/S 92,580.00 100% 0% 100% 92,580.00
Internal Ceiling Finishes L/S 115,280.00 100% 0% 100% 115,280.00
External Finishes L/S 205,280.00 100% 0% 100% 205,280.00
Roof Finishes L/S 95,140.00 100% 0% 100% 95,140.00
breakdown/academic/pda/3(b)/4/12
4/1
BREAKDOWN FOR DEWAN SERBAGUNA & ASTAKA
WORK DONE %
ITEM DESCRIPTION UNIT QTY RATE AMOUNT(RM) % % %
prev current to date
1 Substructure
Work Below Lowest Floor Finish L/S 600,000.00 100% 0% 100%
2 Superstructure
Frame L/S 105,200.00 100% 0% 100%
Upper Floors L/S 90,000.00 100% 0% 100%
Roof L/S 80,000.00 100% 0% 100%
Stairs L/S 50,000.00 100% 0% 100%
External Walls L/S 100,000.00 100% 0% 100%
Windows & External Doors L/S 35,000.00 100% 0% 100%
Internal Walls & Partitions L/S 15,000.00 100% 0% 100%
Internal Doors L/S 20,000.00 100% 0% 100%
3 Finishes
Internal Wall Finishes L/S 30,000.00 100% 0% 100%
Internal Floor Finishes L/S 70,000.00 100% 0% 100%
Internal Ceiling Finishes L/S 60,000.00 100% 0% 100%
External Finishes L/S 181,648.60 100% 0% 100%
Roof Finishes L/S 100,000.00 100% 0% 100%
breakdown/hall/pda/3(c)/5/12
5/1
AMOUNT(RM)
600,000.00
105,200.00
90,000.00
80,000.00
50,000.00
100,000.00
35,000.00
15,000.00
20,000.00
30,000.00
70,000.00
60,000.00
181,648.60
100,000.00
1,536,848.60
5/1
BREAKDOWN FOR PERPUSTAKAAN
WORK DONE %
ITEM DESCRIPTION UNIT QTY RATE AMOUNT(RM) % % % AMOUNT(RM)
prev current to date
1 Substructure
Work Below Lowest Floor Finish L/S 1,131,814.00 100% 0% 100% 1,131,814.00
2 Superstructure
Frame L/S 98,407.00 100% 0% 100% 98,407.00
Upper Floors L/S 90,000.00 100% 0% 100% 90,000.00
Roof L/S 70,000.00 100% 0% 100% 70,000.00
Stairs L/S 30,000.00 100% 0% 100% 30,000.00
External Walls L/S 60,000.00 100% 0% 100% 60,000.00
Windows & External Doors L/S 40,000.00 100% 0% 100% 40,000.00
Internal Walls & Partitions L/S 48,407.00 100% 0% 100% 48,407.00
Internal Doors L/S 20,000.00 100% 0% 100% 20,000.00
3 Finishes
Internal Wall Finishes L/S 141,238.50 100% 0% 100% 141,238.50
Internal Floor Finishes L/S 91,238.50 100% 0% 100% 91,238.50
Internal Ceiling Finishes L/S 70,000.00 100% 0% 100% 70,000.00
External Finishes L/S 90,000.00 100% 0% 100% 90,000.00
Roof Finishes L/S 20,000.00 100% 0% 100% 20,000.00
breakdown/library/pda/3(d)/6/12
6/1
BREAKDOWN FOR KANTIN
WORK DONE %
ITEM DESCRIPTION UNIT QTY RATE AMOUNT(RM) % % % AMOUNT(RM)
prev current to date
1 Substructure
Work Below Lowest Floor Finish L/S 233,628.00 100% 0% 100% 233,628.00
2 Superstructure
Frame L/S 95,000.00 100% 0% 100% 95,000.00
Upper Floors L/S - 0.00
Roof L/S 20,000.00 100% 0% 100% 20,000.00
Stairs L/S - 0.00
External Walls L/S 45,000.00 100% 0% 100% 45,000.00
Windows & External Doors L/S 9,500.00 100% 0% 100% 9,500.00
Internal Walls & Partitions L/S 10,000.00 100% 0% 100% 10,000.00
Internal Doors L/S 7,500.00 100% 0% 100% 7,500.00
3 Finishes
Internal Wall Finishes L/S 30,000.00 100% 0% 100% 30,000.00
Internal Floor Finishes L/S 10,000.00 100% 0% 100% 10,000.00
Internal Ceiling Finishes L/S 15,000.00 100% 0% 100% 15,000.00
External Finishes L/S 33,000.00 100% 0% 100% 33,000.00
Roof Finishes L/S 25,000.00 100% 0% 100% 25,000.00
breakdown/canteen/pda/3(e)/7/12
7/1
BREAKDOWN FOR SURAU
WORK DONE %
ITEM DESCRIPTION UNIT QTY RATE AMOUNT(RM) % % % AMOUNT(RM)
prev current to date
1 Substructure
Work Below Lowest Floor Finish L/S 24,056.00 100% 0% 100% 24,056.00
2 Superstructure
Frame L/S 7,000.00 100% 0% 100% 7,000.00
Upper Floors L/S - 0.00
Roof L/S 6,000.00 100% 0% 100% 6,000.00
Stairs L/S - 0.00
External Walls L/S 5,700.00 100% 0% 100% 5,700.00
Windows & External Doors L/S 4,900.00 100% 0% 100% 4,900.00
Internal Walls & Partitions L/S 4,500.00 100% 0% 100% 4,500.00
Internal Doors L/S 3,700.00 100% 0% 100% 3,700.00
3 Finishes
Internal Wall Finishes L/S 5,000.00 100% 0% 100% 5,000.00
Internal Floor Finishes L/S 4,700.00 100% 0% 100% 4,700.00
Internal Ceiling Finishes L/S 4,000.00 100% 0% 100% 4,000.00
External Finishes L/S 5,500.00 100% 0% 100% 5,500.00
Roof Finishes L/S 4,000.00 100% 0% 100% 4,000.00
breakdown/surau/pda/3(f)/8/12
8/1
BREAKDOWN FOR STADIUM
WORK DONE %
ITEM DESCRIPTION UNIT QTY RATE AMOUNT(RM) % % % AMOUNT(RM)
prev current to date
1 Substructure
Work Below Lowest Floor Finish L/S 7,757,520.00 100% 0% 100% 7,757,520.00
2 Superstructure
Frame L/S 7,457,520.00 100% 0% 100% 7,457,520.00
Upper Floors L/S 3,671,680.00 100% 0% 100% 3,671,680.00
Roof L/S 2,271,680.00 100% 0% 100% 2,271,680.00
Stairs L/S 1,671,680.00 100% 0% 100% 1,671,680.00
External Walls L/S 2,421,680.00 100% 0% 100% 2,421,680.00
Windows & External Doors L/S 871,680.00 100% 0% 100% 871,680.00
Internal Walls & Partitions L/S 71,680.00 100% 0% 100% 71,680.00
Internal Doors L/S 471,680.00 100% 0% 100% 471,680.00
3 Finishes
Internal Wall Finishes L/S 1,520,466.76 100% 0% 100% 1,520,466.76
Internal Floor Finishes L/S 2,020,466.76 100% 0% 100% 2,020,466.76
Internal Ceiling Finishes L/S 1,020,466.76 100% 0% 100% 1,020,466.76
External Finishes L/S 3,620,466.76 100% 0% 100% 3,620,466.76
Roof Finishes L/S 970,466.76 100% 0% 100% 970,466.76
breakdown/stadium/pda/3(g)/9/12
9/1
BREAKDOWN FOR KOLAM RENANG
WORK DONE %
ITEM DESCRIPTION UNIT QTY RATE AMOUNT(RM) % % %
prev current to date
1 Substructure
Work Below Lowest Floor Finish L/S 19,501.00 100% 0% 100%
2 Superstructure
Frame L/S 7,476.00 100% 0% 100%
Upper Floors L/S -
Roof L/S 6,976.00 100% 0% 100%
Stairs L/S -
External Walls L/S 6,520.00 100% 0% 100%
Windows & External Doors L/S 6,520.00 100% 0% 100%
Internal Walls & Partitions L/S 9,020.00 100% 0% 100%
Internal Doors L/S 6,020.00 100% 0% 100%
3 Finishes
Internal Wall Finishes L/S 7,520.00 100% 0% 100%
Internal Floor Finishes L/S 9,020.00 100% 0% 100%
Internal Ceiling Finishes L/S -
External Finishes L/S 6,520.00 100% 0% 100%
Roof Finishes L/S 6,020.00 100% 0% 100%
breakdown/pool/pda/3(h)/10/12
10/1
AMOUNT(RM)
19,501.00
7,476.00
0.00
6,976.00
0.00
6,520.00
6,520.00
9,020.00
6,020.00
7,520.00
9,020.00
0.00
6,520.00
6,020.00
91,113.00
10/1
BREAKDOWN FOR M&E SERVICES
WORK DONE %
ITEM DESCRIPTION UNIT QTY RATE AMOUNT(RM) % % % AMOUNT(RM)
prev current to date
1 Services
Sanitary Appliances L/S 179,624.09 100% 0% 100% 179,624.09
Plumbing Installation L/S 359,624.09 100% 0% 100% 359,624.09
Refuse Disposal L/S 288,624.09 100% 0% 100% 288,624.09
Air-cond & Ventilation System L/S 3,656,167.80 100% 0% 100% 3,656,167.80
Electrical Installation L/S 4,071,315.69 100% 0% 100% 4,071,315.69
Fire Protection Installation L/S 2,000,000.00 100% 0% 100% 2,000,000.00
Lift & Conveyor Installation L/S 721,000.00 100% 0% 100% 721,000.00
Communication Installation L/S 1,571,315.69 100% 0% 100% 1,571,315.69
Special Installation L/S 3,470,935.05 100% 0% 100% 3,470,935.05
Builder's Profit & Attendance on Services L/S 345,354.40 100% 0% 100% 345,354.40
Builder's Work in Connection With Services L/S 400,000.00 100% 0% 100% 400,000.00
breakdown/services/pda/4(a-c)/11/12
11/1
BREAKDOWN FOR EXTERNAL WORKS
WORK DONE %
ITEM DESCRIPTION UNIT QTY RATE AMOUNT(RM) % % % AMOUNT(RM)
prev current to date
1 External Works
Earthworks L/S 9,885,079.85 100% 0% 100% 9,885,079.85
Road Works and Carparks L/S 2,542,257.50 100% 0% 100% 2,542,257.50
Drainage Works L/S 1,527,253.50 100% 0% 100% 1,527,253.50
Sewerage Works including septic tank L/S 2,288,506.50 100% 0% 100% 2,288,506.50
Water Recticulation Works L/S 3,811,012.50 100% 0% 100% 3,811,012.50
Fencing and Gates L/S 1,781,004.50 100% 0% 100% 1,781,004.50
Landscape L/S 3,033,802.85 100% 0% 100% 3,033,802.85
Built-in Furniture L/S 20,304,827.50 100% 0% 100% 20,304,827.50
breakdown/ext.works/pda/5(a-h)/12/12
12/1
KOMPLEKS BELIA DAN SUKAN DAERAH JOHOR
BAHRU, JOHOR DARUL TAKZIM
MATERIALS ON SITE
Interim Payment No : 06 Valuation Date : 7-Februari-11
KERAJAAN MALAYSIA
JABATAN KERJA RAYA
PERAKUAN BAYARAN INTERIM NO 6
TAJUK KERJA : KOMPLEKS BELIA DAN SUKAN DAERAH JOHOR BAHRU, JOHOR.
PERAKUAN PERUNDING
Kami dengan ini mengesahkan bahawa semua kerja - kerja yang telah disiapkan oleh kontraktor seperti
yang dinyatakan di dalam Perakuan Bayaran Interim ini adalah mengikut dan mematuhi kehendak Kontrak,
Lukisan dan Spesifikasi.
_____________________________________________
_____________________________________________
COP & TANDATANGAN PERUNDING COP & TANDATANGAN PERUNDING
Tarikh: Tarikh:
Sivil & Struktur - SCIA Engineer Mekanikal & Elektrikal - Asia M&E
Consultants Sdn. Bhd.
_____________________________________________
_____________________________________________
COP & TANDATANGAN PERUNDING COP & TANDATANGAN PERUNDING
Tarikh: Tarikh:
78350039.xls.ms_office Attachment A
1 Progress Claim No. 1 4,681,570.00 25-Nov-09 4,681,570.00 26-Nov-09 1 4,213,413.00 9-Dec-09 13 Retention RM 468,157.00
2 Progress Claim No. 2 6,971,912.94 23-Dec-09 6,971,912.94 24-Dec-09 1 6,274,721.65 18-Jan-10 25 Retention RM 679,191.29
3 Progress Claim No. 3 2,848,745.39 25-Jan-10 2,848,745.39 29-Jan-10 4 2,563,870.85 19-Feb-10 21 Retention RM 284,874.54
4 Progress Claim No. 4 3,232,576.46 20-Feb-10 3,232,576.46 25-Feb-10 4 2,909,318.82 24-Mar-10 29 Retention RM 323,257.64
5 Progress Claim No. 5 2,713,741.56 25-Mar-10 2,713,741.56 30-Mar-09 1 2,442,367.40 8-Apr-10 8 Retention RM 271,374.16
6 Progress Claim No. 6 2,349,001.10 29-Apr-10 2,349,001.10 30-Apr-10 1 2,114,100.99 17-May-10 17 Retention RM 234,900.11
Page 69 of 69