You are on page 1of 69

KERAJAAN MALAYSIA

JABATAN KERJA RAYA


BAYARAN INTERIM NO.14
PERUNTUKAN PEMBANGUNAN: MAKSUD : BUTIRAN :
TAJUK KERJA : : CADANGAN MEREKA, MEMBINA DAN MENYIAPKAN KOMPLEKS BELIA DAN SUKAN DAERAH
JOHOR BAHRU, JOHOR DARUL TAKZIM

NAMA DAN ALAMAT KONTRAKTOR : AP&F CONSTRUCTION


No 258, Jalan Macalistar,
41200 Klang, Selangor Darul Ehsan.
NO. KONTRAK : 2722/2010-2011-1/01
HARGA ASAL KONTRAK : : RM 125,548,966.00
JUMLAH BERSIH TAMBAHAN/POTONGAN RM -
HARGA BARU KONTRAK : RM 125,548,966.00

A. BUTIR-BUTIR BAYARAN DAN POTONGAN


1. TARIKH PENILAIAN :
2. TEMPOH KONTRAK :1st August 2010 - 1st Februari 2012

3. NILAI KERJA DILAKSANAKAN DAN AMAUN-AMAUN LAIN YANG KENA BAYAR * RM 126,621,800.67

4. NILAI BERSIH KERJA SEMASA RM 126,621,800.67


5. POTONGAN
a. Bayaran Balik Wang Pendahuluan
i) Amaun Terkumpul RM - RM 120,344,352.36
ii) Amaun Terdahulu (bayaran 1 - 10 ) RM 120,344,352.36
iii) Amaun Semasa RM 120,344,352.36
b. Akaun Deposit Wang Jaminan Perlaksanaan (Amaun Terdahulu) RM -
c. Gantirugi Tertentu Dan Ditetapkan @ RM 20,700.00/hari RM -

d. Potongan lain jika ada RM -


Jumlah Potongan RM 120,344,352.36 RM 120,344,352.36

BAYARAN YANG DISYORKAN RM 6,277,448.31

………………………………...…….……………
(Pegawai Pengesyor)

Tarikh : ………………………………………….

B PERAKUAN BAYARAN
1. Bayaran Interim
a) Kepada Kontraktor Utama RM -
b) Kepada Subkontraktor/Penerima Hak RM -
(Seperti di Lampiran A)
Jumlah Bayaran Interim RM - RM -
2. Kredit Akaun Deposit Wang Jaminan Perlaksanaan (10% dari Bayaran Disyorkan sehingga 5% harga kontrak) RM 6,277,448.31

JUMLAH RM -

BAYARAN DIPERAKUKAN RM -

(RINGGIT MALAYSIA: )
Adalah disahkan bahawa semua peraturan kewangan dan kehendak di bawah Kontrak telah dipatuhi

Tarikh : ……………………………………………. ………………………………………..……


(Pegawai Penguasa)

1 Jumlah amaun yang dibayar dibawah Perakuan ini ialah


(Untuk diisi oleh Pegawai yang menyediakan baucer.
Sesalinan perakuan hendaklah dikembalikan kepada Jurukur Bahan/Wakil Pegawai Penguasa)
2 Bayaran wang pendahuluan yang telah dikeluarkan (Untuk diisi oleh Jurukur Bahan/Wakil Pegawai Penguasa)
3 Bayaran semula Wang Pendahuluan sehingga kini
4 Jumlah Wang Jaminan Yang Perlu Ditahan
* Termasuk Barang Tak Pasang, Pelarasan Turun Naik Harga, Tuntutan Bayaran Tambahan yang diluluskan
KOMPLEKS BELIA DAN SUKAN DAERAH JOHOR BAHRU, JOHOR.
Interim Payment No. 14
Date of Valuation : % work done
AMOUNT prev. current To date Amount
ITEM DESCRIPTION
(RM) % % %

SUMMARY

1.0 PRELIMINARIES 7,105,760.00 100% 0% 100% 7,105,760.00

2.0 PILING WORKS 5,768,517.00 100% 0% 100% 5,768,517.00

3.0 BUILDING WORKS

3.1 Blok Pentadbiran 4,446,900.00 100% 0% 100% 4,446,900.00

3.2 Blok Akademik 5,929,200.00 100% 0% 100% 5,929,200.00

3.3 Dewan Serbaguna & Astaka 1,536,848.00 100% 0% 100% 1,536,848.00

3.4 Perpustakaan 2,001,105.00 100% 0% 100% 2,001,105.00

3.5 Kantin 533,628.00 100% 0% 100% 533,628.00

3.6 Surau 79,056.00 100% 0% 100% 79,056.00

3.7 Stadium 35,819,133.80 100% 0% 100% 35,819,133.80

3.8 Kolam Renang 91,112.00 100% 0% 100% 91,112.00

4.0 M&E SERVICES 17,063,960.90 100% 0% 100% 17,063,960.90

5.0 EXTERNAL WORKS 45,173,744.70 100% 0% 100% 45,173,744.70

TOTAL BUILDERS WORKS 125,548,965.40 100% 125,548,965.40

MATERIAL ON SITE 579,313.98

Variation order
APK 1 281,485.00 100% 0% 100% 281,485.00
APK 2 9,239.80 100% 0% 100% 9,239.80
APK 3 74,436.49 100% 0% 100% 74,436.49
APK 4 10,000.00 0% 100% 100% 10,000.00
APK 5 118,360.00 0% 100% 100% 118,360.00
(please refer Lampiran B)

TOTAL AMOUNT 126,621,800.67

…………………………………………………..
(Signature of Quantity Surveyor )

Date: ……………………

Kompleks Belia dan Sukan Daerah Johor Bahru, Johor


PROJECT : CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH KOMPLEKS BELIA DAN SUKAN DAERAH
JOHOR BAHRU, JOHOR DARUL TAKZIM.

SUMMARY VARIATION ORDERS


Progress Claim : 13

AP&F V. O. previous current to date


V.O. Description Amount (RM) work done work done

1. Variation Order 1 ADDITIONAL WORK FOR AIR-COND. 281,485.00 100% 0% 100%

2. Variation Order 2 ADDITIONAL WORK FOR ROAD AND CAR PARK 9,239.80 90% 10% 100%

3. Variation Order 3 SECTION J - TNB SUB-STATION (DOUBLE 74,436.49 90% 10% 100%
CHAMBER) (ALL PROVISIONAL)

4. Variation Order 4 FOUNTAIN DESIGN 10,000.00 0% 100% 100%

5 Variation Order 5 GATE 118,360.00 0% 100% 100%

Total Variation Order (RM) = 493,521.29


Certified
Amount (RM)

281,485.00

9,239.80

74,436.49

10,000.00

118,360.00

493,521.29
PROJECT : CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH KOMPLEKS BELIA DAN SUKAN DAERAH
JOHOR BAHRU, JOHOR DARUL TAKZIM.

MATERIAL ON SITE

Item Description Unit Quantity Rate (RM) Total Amount


(RM)

1. Cement bag 200.00 15.00 3,000.00

2. Steel Wire Mesh A9 - 100 pcs m2 1,320 17.00 22,440.00

3. Steel Wire Mesh A7 - 500 pcs m2 6,600 10.05 66,330.00


4. Steel Wire Mesh A6.5 - 200 pcs m2 2,640 9.50 25,080.00
5. Steel Wire Mesh B7 - 150 pcs m2 1,980 15.05 29,799.00
6. Reinforcement Bar - R6 ( 7 tonne) kg 7,000 2.00 14,000.00

7. - 8mm dia. kg 1,000 3.00 3,000.00

8. - 10mm dia kg 1,000 2.70 2,700.00

1. Cement bag 250.00 15.00 3,750.00

2. Steel Wire Mesh A9 - 150 pcs m2 1,980 17.00 33,660.00

3. Steel Wire Mesh A7 - 550 pcs m2 7,260 10.05 72,963.00


4. Steel Wire Mesh A6.5 - 300 pcs m2 3,960 9.50 37,620.00
5. Steel Wire Mesh B7 - 170 pcs m2 2,244 15.05 33,772.20
6. Reinforcement Bar - R6 ( 5 tonne) kg 5,000 2.00 10,000.00

7. - 8mm dia. kg 1,500 3.00 4,500.00

8. - 10mm dia kg 1,500 2.70 4,050.00

1. Cement bag 300.00 15.00 4,500.00

2. Steel Wire Mesh A9 - 150 pcs m2 1,650 17.00 28,050.00

3. Steel Wire Mesh A7 - 550 pcs m2 7,920 10.05 79,596.00


4. Steel Wire Mesh A6.5 - 300 pcs m2 4,620 9.50 43,890.00
5. Steel Wire Mesh B7 - 170 pcs m2 2,640 15.05 39,732.00
6. Reinforcement Bar - R6 ( 5 tonne) kg 5,500 2.00 11,000.00

7. - 8mm dia. kg 2,500 3.00 7,500.00

8. - 10mm dia kg 2,500 2.70 6,750.00

1. Cement bag 500.00 15.00 7,500.00

2. Reinforcement Bar - R6 ( 7 tonne) kg 7,000 2.00 14,000.00

3. - 8mm dia. kg 5,000 3.00 15,000.00

4. - 10mm dia kg 5,000 2.70 13,500.00

1. Cement bag 400.00 15.00 6,000.00

Total Amount (RM) = 643,682.20

Total Amount for 90% Material On Site (RM) = 579,313.98

Total Amount to be paid (RM) = 579,313.98

Material On Site-5
CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH KOMPLEKS BELIA DAN SUKAN DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM.

BILL PART A :PRELIMINARIES INTERIM PAYMENT No.10


Item Description Total Amount COST (RM)
(RM) Total Workdone % % % Total Workdone % % % Total Workdone
Initial % workdone
(RM) Recurring workdone workdone workdone (RM) Completion workdone workdone workdone (RM)

1 Law, Regulation And Requirements 100,000.00 100,000.00 100% 100,000.00


2
Responsibilities of Contractor for NSC and/or Nominated Supplier 150,000.00 150,000.00 100% 0% 100% 150,000.00
3 903,000.00
Insurance againts Personal Injuries and Damages to Property 903,000.00 903,000.00 100%
4 Insurance of works 903,000.00 903,000.00 100% 903,000.00

5 Performance Bond -

6 Site Management Cost 6,500.00 6,500.00 100% 0% 100% 6,500.00

7 Setting Out 47,500.00 47,500.00 100% 0% 100% 47,500.00

8 Planning and Scheduling 6,500.00 6,500.00 100% 6,500.00

9 Progress Report 6,000.00 6,000.00 100% 0% 100% 6,000.00

10 Progress Photograph 7,000.00 7,000.00 100% 0% 100% 7,000.00

11 Project Diary 4,000.00 4,000.00 100% 0% 100% 4,000.00

12 Safeguarding the Works 30,000.00 30,000.00 100% 0% 100% 30,000.00

13 Contractor's Plant 91,000.00 91,000.00 100% 91,000.00

14 Shop Drawing 21,500.00 21,500.00 100% 0% 100% 21,500.00

15 Site Office 30,500.00 10,000.00 100% 10,000.00 19,500.00 100% 0% 100% 19,500.00 1,000.00 100% 100% 200% 2,000.00

16 Telephone 14,000.00 3,000.00 100% 3,000.00 8,000.00 100% 0% 100% 8,000.00 3,000.00 100% 100% 200% 6,000.00

17 Facsimile Transceiver 10,500.00 1,000.00 100% 1,000.00 8,500.00 100% 0% 100% 8,500.00 1,000.00 100% 100% 200% 2,000.00

18 Safety Boots 6,500.00 6,500.00 100% 6,500.00

19 Safety Helmets 6,500.00 6,500.00 100% 6,500.00

20 Raincoats 3,500.00 3,500.00 100% 3,500.00

21 Mobile Phone 3,577.00 577.00 100% 577.00 3,000.00 100% 0% 100% 3,000.00

22 Site Vehicles - PROTON WAJA 1.6 (A) 31,577.00 31,577.00 100% 31,577.00 100%

23 Site Vehicles - HONDA EX5 110cc 5,000.00 3,000.00 100% 3,000.00 2,000.00 100% 0% 100% 2,000.00

24 Provision of Notebook For The S.O 5,500.00 5,500.00 100% 5,500.00

25 Digital Still Camera and Digital Video Camera 2,423.00 2,423.00 100% 2,423.00

26 Desktop/Personal Computer 5,500.00 5,500.00 100% 5,500.00

27 Photo Copier Machine 11,500.00 5,000.00 100% 5,000.00 6,500.00 100% 0% 100% 6,500.00

28 Temporary Building 21,577.00 10,000.00 100% 10,000.00 10,577.00 100% 0% 100% 10,577.00 1,000.00 100% 0% 100% 1,000.00

29 Temporary Lighting and Power 290,000.00 10,000.00 100% 10,000.00 273,000.00 100% 0% 100% 273,000.00 7,000.00 100% 0% 100% 7,000.00

30 Temporary Water Supply 290,000.00 10,000.00 100% 10,000.00 273,000.00 100% 0% 100% 273,000.00 7,000.00 100% 0% 100% 7,000.00

31 Plant and Machinery 801,500.00 100,000.00 100% 100,000.00 601,500.00 100% 0% 100% 601,500.00 100,000.00 100% 0% 100% 100,000.00

32 Project Signboard 2,077.00 2,077.00 100% 2,077.00

33 Wash Trough 32,000.00 32,000.00 100% 32,000.00


CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH KOMPLEKS BELIA DAN SUKAN DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM.

BILL PART A :PRELIMINARIES INTERIM PAYMENT No.10


Item Description Total Amount COST (RM)
(RM) Total Workdone % % % Total Workdone % % % Total Workdone
Initial % workdone
(RM) Recurring workdone workdone workdone (RM) Completion workdone workdone workdone (RM)

34 Desilting 32,000.00 32,000.00 100% 32,000.00

35 Existing Services, Facilities And Public In The Vicinity 51,500.00 51,500.00 100% 0% 100% 51,500.00

36 Maintenance of Existing Drains 52,000.00 52,000.00 100% 0% 100% 52,000.00

37 Damage to Existing Roads, Paths, Etc. 23,000.00 23,000.00 100% 23,000.00

38 Acccess and Temporary Roads 61,577.00 10,000.00 100% 10,000.00 41,577.00 100% 0% 100% 41,577.00 10,000.00 100% 0% 100% 10,000.00

39 Temporary Hoarding and Gantries 880,000.00 100,000.00 100% 100,000.00 680,000.00 100% 0% 100% 680,000.00 100,000.00 100% 0% 100% 100,000.00

40 Temporary Scaffolding and staging 880,000.00 100,000.00 100% 100,000.00 680,000.00 100% 0% 100% 680,000.00 100,000.00 100% 0% 100% 100,000.00

41 Mosquito prevention 31,500.00 31,500.00 100% 0% 100% 31,500.00

42 First Aid Kit 2,577.00 1,000.00 100% 1,000.00 1,577.00 100% 0% 100% 1,577.00

43 Safety of Site 12,000.00 6,000.00 100% 6,000.00 6,000.00 100% 0% 100% 6,000.00

44 Keeping Site Dry 12,000.00 6,000.00 100% 6,000.00 6,000.00 100% 0% 100% 6,000.00

45 Security 23,280.00 23,280.00 100% 0% 100% 23,280.00

46 Clearing Away Equipment, Etc. 10,300.00 3,000.00 100% 3,000.00 5,300.00 100% 0% 100% 5,300.00 2,000.00 100% 0% 100% 2,000.00

47 Cleaning up Site 11,500.00 6,500.00 100% 0% 100% 6,500.00 5,000.00 100% 0% 100% 5,000.00

48 As Built Drawings 6,500.00 6,500.00 100% 0% 100% 6,500.00

49 Procedure for Inspection Prior to Handover of the Works 13,000.00 13,000.00 100% 0% 100% 13,000.00

50 Final Cleaning 33,000.00 33,000.00 100% 0% 100% 33,000.00

51 Mock-Up Unit 1,107,295.00 221,459.00 100% 221,459.00 664,377.00 100% 0% 100% 664,377.00 221,459.00 100% 0% 100% 221,459.00

52 Local And Other Authorities Notices And Fees 13,000.00 6,500.00 100% 6,500.00 6,500.00 100% 0% 100% 6,500.00

TOTAL TO FINAL SUMMARY : 7,105,760.00 2,760,613.00 100% 2,760,613.00 3,727,688.00 100% 3,727,688.00 617,459.00 101% 622,459.00

Initial Cost : RM 2,760,613.00

Recurring Cost : RM 3,727,688.00

Final Cost : RM 622,459.00


TOTAL PRELIMINARIES TO SUMMARY : RM 7,110,760.00

breakdown/prelim/pda/1/1/12
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QTY RATE AMOUNT prev. Curr. To Date DUE
(RM) (RM)

GENERALLY

A The Contractor shall visit the site to determine the exact condition
and nature of works to be undertaken.

B The Bills Of Quantities shall be read incojointly with the Drawings,


Specification, Preambles and the Conditions of Contract Set in
Tender Documents

C The prices for works shall include all necessary works as


described in Specification, Drawings, Preambles and the
Conditions of Contract. No lack of information shall be
entertained.

D Prices for piles shall include for casting them either on or of site and
all necessary formwork including forming necessary recess etc.
reinforcement, lifting tongles, pile shoes or extension base plate and
extension cap plates all as described.

E Prices for handling, transporting, pitching and driving of piles shall


be deemed to include the provision of all necessary piling
equipment and other plant on site and dismantling and removing the
same on completion of the piling work.

F Piling shall commence from platform level. Prices for driving shall
include for moving of pile frames about the site, raising or lowering
them and re-driving of heaved piles.

G Prices for testing of piles shall be deemed to include the provision of


all pile testing equipment on site and dismantling and removing the
same on completion of the piling work.

H The Contractor shall take note that notwithstanding to term of


Conditions of Contract, the quantities of piling works in this bill are
'PROVISIONAL' and subject to re-measurement unless specified as
Lump Sum or any otherwise stated. The payment shall be based on
quantity of piles driven and valued in accordance to note hereunder.

TO COLLECTION - -

Page 8
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE

DEVIATION FROM THE STANDARD METHOD OF


MEASUREMENT

A The method of measurement for the Piling Works is generally not in


accordance with Clause 39 to 45 in Page 20 to 22 of the SMM.

PREAMBLES

B The rate for pay length of the pile shall be deemed to include the
initial and extension piles notwithstanding whether the pile is driven
in singly or cluster, labour and materials for jointing between the
initial and extension piles, shoeing, pointing and wastage. The rate
shall also deemed to include for piling on flat or sloping ground
including all necessary modifications to piling frame to
accommodate stiff or any gradient of slope.

C The type of pile driving equipment to be used for this buildings is of


the Drop Hammer System all to specialist's design and to the
approval of the Engineer / S.O. and Local Authorities.

D For supply, deliver, handle, unload, transport and pitch shall be


measured for the full approved pitch length.

E For driving it shall be measured from the toe of the piles when
driven to the cut of level.

F The rate of every items of piling works shall include working in


whatever platform levels irrespective of either at ground or formation
or reduce level

G
Preliminary Test Pile shall be part of working piles and shall be
installed all in accordance to the specification and as shown in the
drawing. Pile point for test drive shall be determined by the
Engineer / S.O.

TO COLLECTION - -

Page 9
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE

BRIEF SPECIFICATION

A All piles shall comply the following requirements

B Unless otherwise stated the design, materials and workmanship for


the precast concrete piles shall comply with the relevant Clauses of
BS 8004: 1986 and BS 8110: 1985

C Maintain load test has to be carried out in Two (2) cycles. The test
load for each cycles has to be maintained for 24 hours. The test
load shall be as follows:

a. First cycle = Incremental loading to working load of pile

b. Second cycle = Incremental loading to twice working load of pile

D The Contractor shall provide approved dolly to drive to the required


cut off levels when instructed by the Engineer/S.O

E
All Spun Pile to be 350mm diameter with working capacity of 65tons
and driven to set. All reinforced concrete pile which driven to set
shall have working capacity of 30tons and all friction piles shall have
working capacity 15tons and driven to 24m depth.

TO COLLECTION - -

Page 10
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE

MOBILIZATION AND SITE ORGANISATION

A
Allow for the provision of all necessary piling equipments, plants,
tools and ancillary equipment and for their transportation to site,
handling, assembling, erecting, dismantling and removal on Lump
completion. Sum 900,000.00 100% 0% 100% 900,000.00

B
Allow for moving and handling Drop Hammer operated piling
equipments about the site as often and whenever necessary for the
execution for the whole piling operations including any excavation Lump
and filling required for moving. Sum 300,000.00 100% 0% 100% 300,000.00

It is the obligation of the Contractor before commencement and


after the completion of the Piling Works but before casting the pile
caps, to engage a Licensed Surveyor to set out the correct
alignment and eccentricity of each pile strictly in accordance with
Structural Engineer's Layout Drawings or any other layout drawings
deemed necessary and subsequently issued by the Engineer during Lump
the progress of Piling Works. Sum 50,000.00 90% 10% 100% 50,000.00

D Allow for submission of four (4) sets of setting out and as-built
drawings from Licensed Surveyor inclusive of one (1) softcopy in Lump
Auto-Cad programme. Sum 30,000.00 90% 10% 100% 30,000.00

E
Allow for the submission of records of all piles in quadruplicate
copies duly signed by the Contractor and Engineer's representative Lump
and delivered to the Engineer as the work proceeds. Sum 35,000.00 80% 20% 100% 35,000.00

J
In the event that deviation from the correct alignment does occur
and eccentricity of any such pile does not confirm to that shown in
the said drawings, the rectification of such pile will have to be
carried out by the Contractor at his own cost and to entire Lump
satisfaction of the Engineer/S.O. Sum -

TO COLLECTION 1,315,000.00 1,315,000.00

Page 11
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE

COLLECTION PAGE

From Page No. 1/1/5....................................... - -

From Page No. 1/2/5 ....................................... - -

From Page No. 1/3/5 ....................................... - -

From Page No. 1/4/5 ....................................... 1,315,000.00 1,315,000.00

TOTAL CARRIED TO SUMMARY 1,315,000.00 0% 0% 100% 1,315,000.00

Page 12
BILL NO. 2 - BLOK PENTADBIRAN

WORKDONE (QTY) AMOUNT


ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE

PRECAST REINFORCED CONCRETE 350MM DIAMETER SPUN


PILING

Supply, deliver and unload on site precast reinforced concrete spun


pile (Grade 60) as specified :-

A 350mm Diameter initial pile in 12.00m length. No 300 900.00 270,000.00 80% 20% 100% 270,000.00

B 350mm Diameter initial preliminary test pile in 12.00m length. No 2 900.00 1,800.00 80% 20% 100% 1,800.00

C 350mm Diameter extension pile in 12.00m length No 521 860.00 448,060.00 80% 20% 100% 448,060.00

D No 4 860.00 3,440.00 80% 20% 100% 3,440.00


350mm Diameter extension preliminary test pile in 12.00m length.

E 350mm Diameter extension pile in 9.00m length. No 300 700.00 210,000.00 80% 20% 100% 210,000.00

F No 2 700.00 1,400.00 80% 20% 100% 1,400.00


350mm Diameter extension preliminary test pile in 9.00m length.

No - 500.00 - -
350mm Diameter extension preliminary test pile in 6.00m length.

Handle, transport and pitch for precast conrete spun piles as


described :-

G No. 300 12.00 3,600.00 80% 20% 100% 3,600.00


350mm Diameter initial pile, driving singly / cluster in 12.00m length

H 350mm Diameter initial preliminary test pile, driving singly / cluster No. 2 12.00 24.00 80% 20% 100% 24.00
in 12.00m length

J 350mm Diameter extension pile, driving singly / cluster in 12.00m No. 521 12.00 6,252.00 80% 20% 100% 6,252.00
length

K 350mm Diameter extension preliminary test pile, driving singly / No. 4 12.00 48.00 80% 20% 100% 48.00
cluster in 12.00m length

TO COLLECTION 944,624.00 944,624.00

Page 13
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE

PRECAST REINFORCED CONCRETE 350MM DIAMETER SPUN


PILING (CONT'D)

Handle, transport and pitch for precast conrete spun piles as


described :- (Cont'd)

A 350mm Diameter extension pile, driving singly / cluster in 9.00m No. 300 8.70 2,610.00 80% 20% 100% 2,610.00
length

B 350mm Diameter extension preliminary test pile, driving singly / No. 2 8.70 17.40 80% 20% 100% 17.40
cluster in 9.00m length

No - 7.00 - 0% 0% 0% -
350mm Diameter extension preliminary test pile in 6.00m length.

Drive only for precast conrete spun piles as described :-

C M 3,600 8.80 31,680.00 80% 20% 100% 31,680.00


350mm Diameter initial pile, driving singly / cluster in 12.00m length

D 350mm Diameter initial preliminary test pile, driving singly / cluster M 24 8.80 211.20 80% 20% 100% 211.20
in 12.00m length

E 350mm Diameter extension pile, driving singly / cluster in 12.00m M 6,252 8.80 55,017.60 80% 20% 100% 55,017.60
length

F 350mm Diameter extension preliminary test pile, driving singly / M 48 8.80 422.40 80% 20% 100% 422.40
cluster in 12.00m length

G 350mm Diameter extension pile, driving singly / cluster in 9.00m M 2,700 8.80 23,760.00 80% 20% 100% 23,760.00
length

H 350mm Diameter extension preliminary test pile, driving singly / M 18 8.80 158.40 80% 20% 100% 158.40
cluster in 9.00m length

No - 8.80 - 80% 20% 100% -


350mm Diameter extension preliminary test pile in 6.00m length.

J
1100mm x 20mm (Overall) fillet weld connection between
chamfered edges of head cap and base 1100mm girth including
30mm diameter mild steel centring bar 160mm long, inserting in and
including forming 80mm deep mortices in 'head and base of piles. No. 900 21.40 19,260.00 80% 20% 100% 19,260.00

K Ditto, for preliminary test piles No. 6 21.40 128.40 80% 20% 100% 128.40

TO COLLECTION 133,265.40 133,265.40

Page 14
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE

PRECAST REINFORCED CONCRETE 350MM DIAMETER SPUN


PILING (CONT'D)

A
Cutt off head of pile and remove surplus length off site 350mm
precast reinforced concrete spun pile and strip off 1000mm length of
head for and including binding expose reinforcement rods to
reinforcement in pile cap. No. 300 30.00 9,000.00 80% 20% 100% 9,000.00

B
Reinforced conrete Grade 35 cap to cover head of 350mm diameter
precast concrete spun pile all to the approval of Engineer/S.O. and
to include associated excavation works, formwork, mild steel plate
and necessary reinforcements and welding works No. 300 50.00 15,000.00 80% 20% 100% 15,000.00

Testing of Piles

Provide the necessary kentlegde, jack and dial gauges for the
application and release of the Test Load. The rate shall include all
supervision and labour, watching and lighting and removal of
kentledge and equipment on completion for 2 cycles (twice working
load of 130 Tonnes for both Preliminary Test Pile and Working
Piles)

C Test to 350mm diameter spun pile No. 1 7,300.00 7,300.00 80% 20% 100% 7,300.00

PDA Test

D Provide all necessary equipments, supervision and labour for


carrying out ''Pile Dynamic Analysis (PDA) Test' all to the Engineer's
/ S.O.'s approval. No. 1 800.00 800.00 80% 20% 100% 800.00

TO COLLECTION 32,100.00 32,100.00

Page 15
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE

PRECAST REINFORCED CONCRETE SQUARE PILING

Supply, deliver and unload on site precast reinforced concrete pile


(Grade 45) as specified :

A 300mm x 300mm initial pile in 12.00m length. No 215 680.00 146,200.00 80% 20% 100% 146,200.00

B 300mm x 300mm initial preliminary test pile in 12.00m length. No 1 680.00 680.00 80% 20% 100% 680.00

C 300mm x 300mm extension pile in 12.00m length No 215 680.00 146,200.00 80% 20% 100% 146,200.00

D No 1 680.00 680.00 80% 20% 100% 680.00


300mm x 300mm extension preliminary test pile in 12.00m length.

Handle, transport and pitch for precast conrete piles as described:

E 300mm x 300mm initial pile, driving singly / cluster pile in 12.00m No. 215 12.00 2,580.00 80% 20% 100% 2,580.00
length

F 300mm x 300mm initial preliminary test pile, driving singly / cluster No. 1 12.00 12.00 80% 20% 100% 12.00
pile in 12.00m length

G 300mm x 300mm extension pile, driving singly / cluster pile in No. 215 12.00 2,580.00 80% 20% 100% 2,580.00
12.00m length

H 300mm x 300mm extension preliminary test pile, driving singly / No. 1 12.00 12.00 80% 20% 100% 12.00
cluster pile in 12.00m length

TO COLLECTION 298,944.00 298,944.00

Page 16
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE

PRECAST REINFORCED CONCRETE SQUARE PILING (CONT'D)

Drive only friction piles to a depth of 24m as described:

A 300mm x 300mm initial pile, driving singly / cluster pile in 12.00m M 3,100 8.80 27,280.00 80% 20% 100% 27,280.00
length

B 300mm x 300mm initial preliminary test pile, driving singly / cluster M 24 8.80 211.20 80% 20% 100% 211.20
pile in 12.00m length

C 300mm x 300mm extension, driving singly / cluster pile in 12.00m M 3,100 8.80 27,280.00 80% 20% 100% 27,280.00
length

D 300mm x 300mm extension preliminary test pile, driving singly / M 24 8.80 211.20 80% 20% 100% 211.20
cluster pile in 12.00m length

-------------------------------------------

E
1200mm x 20mm (Overall) fillet weld connection between
chamfered edges of head cap and base 1200mm girth including
30mm diameter mild steel centring bar 160mm long, inserting in and
including forming 80mm deep mortices in head and base of piles. No 215 21.40 4,601.00 80% 20% 100% 4,601.00

F Ditto, preliminary test pile No 1 21.40 21.40 80% 20% 100% 21.40

G
Cutt off head of pile and remove surplus length off site 300mm x
300mm precast reinforced concrete pile and strip off 1000mm
length of head for and including binding exposed reinforcement rods
to reinforcement in pile cap. No. 192 22.30 4,281.60 80% 20% 100% 4,281.60

TO COLLECTION 63,886.40 63,886.40

Page 17
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE

PRECAST REINFORCED CONCRETE SQUARE PILING (CONT'D)

Testing of Piles

Provide the necessary kentlegde, jack and dial gauges for the
application and release of the Test Load. The rate shall include all
supervision and labour, watching and lighting and removal of
kentledge and equipment on completion for 2 cycles (twice working
load of 30 Tonnes for both Preliminary Test Pile and Working Piles)

A Test to 300mm x 300mm RC pile No. Rate Only

PDA Test

B Provide all necessary equipments, supervision and labour for


carrying out ''Pile Dynamic Analysis (PDA) Test' all to the Engineer's
/ S.O.'s approval. No. 4 800.00 3,200.00 80% 20% 100% 3,200.00

TO COLLECTION 3,200.00 3,200.00

Page 18
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE

COLLECTION PAGE

From Page No. 2/1/7 ....................................... 944,624.00 944,624.00

From Page No. 2/2/7 ....................................... 133,265.40 133,265.40

From Page No. 2/3/7 ....................................... 32,100.00 32,100.00

From Page No. 2/4/7 ....................................... 298,944.00 298,944.00

From Page No. 2/5/7 ....................................... 63,886.40 63,886.40

From Page No. 2/6/7 ....................................... 3,200.00 3,200.00

TOTAL CARRIED TO SUMMARY 1,476,019.80 1,476,019.80

Page 19
BILL NO. 3 - BLOK AKADEMIK

WORKDONE (QTY) AMOUNT


ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE

PRECAST REINFORCED CONCRETE 350MM DIAMETER SPUN


PILING

Supply, deliver and unload on site precast reinforced concrete spun


pile (Grade 60) as specified :-

A 350mm Diameter initial pile in 12.00m length. No 425 900.00 382,500.00 90% 10% 100% 382,500.00

B 350mm Diameter initial preliminary test pile in 12.00m length. No 2 900.00 1,800.00 90% 10% 100% 1,800.00

C 350mm Diameter extension pile in 12.00m length No 425 900.00 382,500.00 90% 10% 100% 382,500.00

D No 4 900.00 3,600.00 90% 10% 100% 3,600.00


350mm Diameter extension preliminary test pile in 12.00m length.

E 350mm Diameter extension pile in 9.00m length. No 365 700.00 255,500.00 90% 10% 100% 255,500.00

F No 2 700.00 1,400.00 90% 10% 100% 1,400.00


350mm Diameter extension preliminary test pile in 9.00m length.

350mm Diameter extension pile in 6.00m length. No - 500.00 - 0% 0% 0% -

Handle, transport and pitch for precast conrete spun piles as


described :-

G No. 425 12.00 5,100.00 90% 10% 100% 5,100.00


350mm Diameter initial pile, driving singly / cluster in 12.00m length

H 350mm Diameter initial preliminary test pile, driving singly / cluster No. 2 12.00 24.00 90% 10% 100% 24.00
in 12.00m length

J 350mm Diameter extension pile, driving singly / cluster in 12.00m No. 425 12.00 5,100.00 90% 10% 100% 5,100.00
length

K 350mm Diameter extension preliminary test pile, driving singly / No. 4 12.00 48.00 90% 10% 100% 48.00
cluster in 12.00m length

TO COLLECTION 1,037,572.00 1,037,572.00

Page 20
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE

PRECAST REINFORCED CONCRETE 350MM DIAMETER SPUN


PILING (CONT'D)

Handle, transport and pitch for precast conrete spun piles as


described :- (Cont'd)

A 350mm Diameter extension pile, driving singly / cluster in 9.00m No. 365 8.70 3,175.50 90% 10% 100% 3,175.50
length

B 350mm Diameter extension preliminary test pile, driving singly / No. 2 8.70 17.40 90% 10% 100% 17.40
cluster in 9.00m length

350mm Diameter extension pile in 6.00m length. No - 7.00 - 90% 10% 100% -

Drive only for precast conrete spun piles as described :-

C M 5,100 8.80 44,880.00 90% 10% 100% 44,880.00


350mm Diameter initial pile, driving singly / cluster in 12.00m length

D 350mm Diameter initial preliminary test pile, driving singly / cluster M 24 8.80 211.20 90% 10% 100% 211.20
in 12.00m length

E 350mm Diameter extension pile, driving singly / cluster in 12.00m M 5,100 8.80 44,880.00 90% 10% 100% 44,880.00
length

F 350mm Diameter extension preliminary test pile, driving singly / M 48 8.80 422.40 90% 10% 100% 422.40
cluster in 12.00m length

G 350mm Diameter extension pile, driving singly / cluster in 9.00m M 3,285 8.80 28,908.00 90% 10% 100% 28,908.00
length

H 350mm Diameter extension preliminary test pile, driving singly / M 18 8.80 158.40 90% 10% 100% 158.40
cluster in 9.00m length

350mm Diameter extension pile in 6.00m length. No - 8.80 - 90% 10% 100% -

J
1100mm x 20mm (Overall) fillet weld connection between
chamfered edges of head cap and base 1100mm girth including
30mm diameter mild steel centring bar 160mm long, inserting in and
including forming 80mm deep mortices in 'head and base of piles. No. 1,275 21.40 27,285.00 90% 10% 100% 27,285.00

K Ditto, for preliminary test piles No. 6 21.40 128.40 90% 10% 100% 128.40

TO COLLECTION 150,066.30 150,066.30

Page 21
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE

PRECAST REINFORCED CONCRETE 350MM DIAMETER SPUN


PILING (CONT'D)

A
Cutt off head of pile and remove surplus length off site 350mm
precast reinforced concrete spun pile and strip off 1000mm length of
head for and including binding expose reinforcement rods to
reinforcement in pile cap. No. 243 30.00 7,290.00 90% 10% 100% 7,290.00

B
Reinforced conrete Grade 35 cap to cover head of 350mm diameter
precast concrete spun pile all to the approval of Engineer/S.O. and
to include associated excavation works, formwork, mild steel plate
and necessary reinforcements and welding works No. 243 50.00 12,150.00 90% 10% 100% 12,150.00

Testing of Piles

Provide the necessary kentlegde, jack and dial gauges for the
application and release of the Test Load. The rate shall include all
supervision and labour, watching and lighting and removal of
kentledge and equipment on completion for 2 cycles (twice working
load of 130 Tonnes for both Preliminary Test Pile and Working
Piles)

C Test to 350mm diameter spun pile No. 1 7,300.00 7,300.00 90% 10% 100% 7,300.00

PDA Test

D Provide all necessary equipments, supervision and labour for


carrying out ''Pile Dynamic Analysis (PDA) Test' all to the Engineer's
/ S.O.'s approval. No. 1 800.00 800.00 90% 10% 100% 800.00

TO COLLECTION 27,540.00 27,540.00

Page 22
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE

PRECAST REINFORCED CONCRETE SQUARE PILING

Supply, deliver and unload on site precast reinforced concrete pile


(Grade 45) as specified :

A 300mm x 300mm initial pile in 12.00m length. No 143 680.00 97,240.00 90% 10% 100% 97,240.00

B 300mm x 300mm initial preliminary test pile in 12.00m length. No 1 680.00 680.00 90% 10% 100% 680.00

C 300mm x 300mm extension pile in 12.00m length No 143 648.40 92,721.20 90% 10% 100% 92,721.20

D No 1 648.40 648.40 90% 10% 100% 648.40


300mm x 300mm extension preliminary test pile in 12.00m length.

Handle, transport and pitch for precast conrete piles as described:

E 300mm x 300mm initial pile, driving singly / cluster pile in 12.00m No. 143 12.00 1,716.00 90% 10% 100% 1,716.00
length

F 300mm x 300mm initial preliminary test pile, driving singly / cluster No. 1 12.00 12.00 90% 10% 100% 12.00
pile in 12.00m length

G 300mm x 300mm extension pile, driving singly / cluster pile in No. 143 12.00 1,716.00 90% 10% 100% 1,716.00
12.00m length

H 300mm x 300mm extension preliminary test pile, driving singly / No. 1 12.00 12.00 90% 10% 100% 12.00
cluster pile in 12.00m length

TO COLLECTION 194,745.60 194,745.60

Page 23
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE

PRECAST REINFORCED CONCRETE SQUARE PILING (CONT'D)

Drive only friction piles to a depth of 24m as described:

A 300mm x 300mm initial pile, driving singly / cluster pile in 12.00m M 1,716 8.80 15,100.80 90% 10% 100% 15,100.80
length

B 300mm x 300mm initial preliminary test pile, driving singly / cluster M 12 8.80 105.60 90% 10% 100% 105.60
pile in 12.00m length

C 300mm x 300mm extension, driving singly / cluster pile in 12.00m M 1,716 8.80 15,100.80 90% 10% 100% 15,100.80
length

D 300mm x 300mm extension preliminary test pile, driving singly / M 12 8.80 105.60 90% 10% 100% 105.60
cluster pile in 12.00m length

-------------------------------------------

E
1200mm x 20mm (Overall) fillet weld connection between
chamfered edges of head cap and base 1200mm girth including
30mm diameter mild steel centring bar 160mm long, inserting in and
including forming 80mm deep mortices in head and base of piles. No 143 21.40 3,060.20 90% 10% 100% 3,060.20

F Ditto, preliminary test pile No 1 21.40 21.40 90% 10% 100% 21.40

G
Cutt off head of pile and remove surplus length off site 300mm x
300mm precast reinforced concrete pile and strip off 1000mm
length of head for and including binding exposed reinforcement rods
to reinforcement in pile cap. No. 144 22.30 3,211.20 90% 10% 100% 3,211.20

TO COLLECTION 36,705.60 36,705.60

Page 24
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE

PRECAST REINFORCED CONCRETE SQUARE PILING (CONT'D)

Testing of Piles

Provide the necessary kentlegde, jack and dial gauges for the
application and release of the Test Load. The rate shall include all
supervision and labour, watching and lighting and removal of
kentledge and equipment on completion for 2 cycles (twice working
load of 30 Tonnes for both Preliminary Test Pile and Working Piles)

A Test to 300mm x 300mm RC pile No. 1 4,850.00 4,850.00 90% 10% 100% 4,850.00

PDA Test

B Provide all necessary equipments, supervision and labour for


carrying out ''Pile Dynamic Analysis (PDA) Test' all to the Engineer's
/ S.O.'s approval. No. 3 800.00 2,400.00 90% 10% 100% 2,400.00

TO COLLECTION 7,250.00 7,250.00

Page 25
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE

COLLECTION PAGE

From Page No. 3/1/7 ....................................... 1,037,572.00 1,037,572.00

From Page No. 3/2/7 ....................................... 150,066.30 150,066.30

From Page No. 3/3/7 ....................................... 27,540.00 27,540.00

From Page No. 3/4/7 ....................................... 194,745.60 194,745.60

From Page No. 3/5/7 ....................................... 36,705.60 36,705.60

From Page No. 3/6/7 ....................................... 7,250.00 7,250.00

TOTAL CARRIED TO SUMMARY 1,453,879.50 1,453,879.50

Page 26
BILL NO. 4 - DEWAN SERBAGUNA

WORKDONE (QTY) AMOUNT


ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE

PRECAST REINFORCED CONCRETE 350MM DIAMETER SPUN


PILING

Supply, deliver and unload on site precast reinforced concrete spun


pile (Grade 60) as specified :-

A 350mm Diameter initial pile in 12.00m length. No 78 900.00 70,200.00 90% 10% 100% 70,200.00

B 350mm Diameter initial preliminary test pile in 12.00m length. No 1 900.00 900.00 90% 10% 100% 900.00

C 350mm Diameter extension pile in 12.00m length No 156 900.00 140,400.00 90% 10% 100% 140,400.00

D No 2 900.00 1,800.00 90% 10% 100% 1,800.00


350mm Diameter extension preliminary test pile in 12.00m length.

E 350mm Diameter extension pile in 9.00m length. No 78 700.00 54,600.00 90% 10% 100% 54,600.00

F No 1 700.00 700.00 90% 10% 100% 700.00


350mm Diameter extension preliminary test pile in 9.00m length.

Handle, transport and pitch for precast conrete spun piles as


described :-

G No. 78 12.00 936.00 90% 10% 100% 936.00


350mm Diameter initial pile, driving singly / cluster in 12.00m length

H 350mm Diameter initial preliminary test pile, driving singly / cluster No. 1 12.00 12.00 90% 10% 100% 12.00
in 12.00m length

J 350mm Diameter extension pile, driving singly / cluster in 12.00m No. 156 12.00 1,872.00 90% 10% 100% 1,872.00
length

K 350mm Diameter extension preliminary test pile, driving singly / No. 2 12.00 24.00 90% 10% 100% 24.00
cluster in 12.00m length

TO COLLECTION 271,444.00 271,444.00

Page 27
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE

PRECAST REINFORCED CONCRETE 350MM DIAMETER SPUN


PILING (CONT'D)

Handle, transport and pitch for precast conrete spun piles as


described :- (Cont'd)

A 350mm Diameter extension pile, driving singly / cluster in 9.00m No. 78 8.70 678.60 90% 10% 100% 678.60
length

B 350mm Diameter extension preliminary test pile, driving singly / No. 1 8.70 8.70 90% 10% 100% 8.70
cluster in 9.00m length

Drive only for precast conrete spun piles as described :-

C M 936 8.80 8,236.80 90% 10% 100% 8,236.80


350mm Diameter initial pile, driving singly / cluster in 12.00m length

D 350mm Diameter initial preliminary test pile, driving singly / cluster M 12 8.80 105.60 90% 10% 100% 105.60
in 12.00m length

E 350mm Diameter extension pile, driving singly / cluster in 12.00m M 1,872 8.80 16,473.60 90% 10% 100% 16,473.60
length

F 350mm Diameter extension preliminary test pile, driving singly / M 24 8.80 211.20 90% 10% 100% 211.20
cluster in 12.00m length

G 350mm Diameter extension pile, driving singly / cluster in 9.00m M 702 8.80 6,177.60 90% 10% 100% 6,177.60
length

H 350mm Diameter extension preliminary test pile, driving singly / M 9 8.80 79.20 90% 10% 100% 79.20
cluster in 9.00m length

J
1100mm x 20mm (Overall) fillet weld connection between
chamfered edges of head cap and base 1100mm girth including
30mm diameter mild steel centring bar 160mm long, inserting in and
including forming 80mm deep mortices in 'head and base of piles. No. 234 21.40 5,007.60 90% 10% 100% 5,007.60

K Ditto, for preliminary test piles No. 3 21.40 64.20 90% 10% 100% 64.20

TO COLLECTION 37,043.10 37,043.10

Page 28
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE

PRECAST REINFORCED CONCRETE 350MM DIAMETER SPUN


PILING (CONT'D)

A
Cutt off head of pile and remove surplus length off site 350mm
precast reinforced concrete spun pile and strip off 1000mm length of
head for and including binding expose reinforcement rods to
reinforcement in pile cap. No. 79 30.00 2,370.00 90% 10% 100% 2,370.00

B
Reinforced conrete Grade 35 cap to cover head of 350mm diameter
precast concrete spun pile all to the approval of Engineer/S.O. and
to include associated excavation works, formwork, mild steel plate
and necessary reinforcements and welding works No. 79 46.00 3,634.00 90% 10% 100% 3,634.00

Testing of Piles

Provide the necessary kentlegde, jack and dial gauges for the
application and release of the Test Load. The rate shall include all
supervision and labour, watching and lighting and removal of
kentledge and equipment on completion for 2 cycles (twice working
load of 130 Tonnes for both Preliminary Test Pile and Working
Piles)

C Test to 350mm diameter spun pile No. Rate Only

PDA Test

D Provide all necessary equipments, supervision and labour for


carrying out ''Pile Dynamic Analysis (PDA) Test' all to the Engineer's
/ S.O.'s approval. No. 1 800.00 800.00 90% 10% 100% 800.00

TO COLLECTION 6,804.00 6,804.00

Page 29
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE

COLLECTION PAGE

From Page No. 4/1/4 ....................................... 271,444.00 271,444.00

From Page No. 4/2/4 ....................................... 37,043.10 37,043.10

From Page No. 4/3/4 ....................................... 6,804.00 6,804.00

TOTAL CARRIED TO SUMMARY 315,291.10 315,291.10

Page 30
BILL NO. 5 - PERPUSTAKAAN

WORKDONE (QTY) AMOUNT


ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE

PRECAST REINFORCED CONCRETE 350MM DIAMETER SPUN


PILING

Supply, deliver and unload on site precast reinforced concrete spun


pile (Grade 60) as specified :-

A 350mm Diameter initial pile in 12.00m length. No 29 900.00 26,100.00 85% 15% 100% 26,100.00

B 350mm Diameter initial preliminary test pile in 12.00m length. No 1 900.00 900.00 85% 15% 100% 900.00

C 350mm Diameter extension pile in 12.00m length No 58 900.00 52,200.00 85% 15% 100% 52,200.00

D No 2 900.00 1,800.00 85% 15% 100% 1,800.00


350mm Diameter extension preliminary test pile in 12.00m length.

E 350mm Diameter extension pile in 9.00m length. No 29 700.00 20,300.00 85% 15% 100% 20,300.00

F No 1 700.00 700.00 85% 15% 100% 700.00


350mm Diameter extension preliminary test pile in 9.00m length.

Handle, transport and pitch for precast conrete spun piles as


described :-

G No. 29 12.00 348.00 85% 15% 100% 348.00


350mm Diameter initial pile, driving singly / cluster in 12.00m length

H 350mm Diameter initial preliminary test pile, driving singly / cluster No. 1 12.00 12.00 85% 15% 100% 12.00
in 12.00m length

J 350mm Diameter extension pile, driving singly / cluster in 12.00m No. 58 12.00 696.00 85% 15% 100% 696.00
length

K 350mm Diameter extension preliminary test pile, driving singly / No. 2 12.00 24.00 85% 15% 100% 24.00
cluster in 12.00m length

TO COLLECTION 103,080.00 103,080.00

Page 31
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE

PRECAST REINFORCED CONCRETE 350MM DIAMETER SPUN


PILING (CONT'D)

Handle, transport and pitch for precast conrete spun piles as


described :- (Cont'd)

A 350mm Diameter extension pile, driving singly / cluster in 9.00m No. 29 8.70 252.30 85% 15% 100% 252.30
length

B 350mm Diameter extension preliminary test pile, driving singly / No. 1 8.70 8.70 85% 15% 100% 8.70
cluster in 9.00m length

Drive only for precast conrete spun piles as described :-

C M 348 8.80 3,062.40 85% 15% 100% 3,062.40


350mm Diameter initial pile, driving singly / cluster in 12.00m length

D 350mm Diameter initial preliminary test pile, driving singly / cluster M 12 8.80 105.60 85% 15% 100% 105.60
in 12.00m length

E 350mm Diameter extension pile, driving singly / cluster in 12.00m M 696 8.80 6,124.80 85% 15% 100% 6,124.80
length

F 350mm Diameter extension preliminary test pile, driving singly / M 24 8.80 211.20 85% 15% 100% 211.20
cluster in 12.00m length

G 350mm Diameter extension pile, driving singly / cluster in 9.00m M 261 8.80 2,296.80 85% 15% 100% 2,296.80
length

H 350mm Diameter extension preliminary test pile, driving singly / M 9 8.80 79.20 85% 15% 100% 79.20
cluster in 9.00m length

J
1100mm x 20mm (Overall) fillet weld connection between
chamfered edges of head cap and base 1100mm girth including
30mm diameter mild steel centring bar 160mm long, inserting in and
including forming 80mm deep mortices in 'head and base of piles. No. 87 21.40 1,861.80 85% 15% 100% 1,861.80

K Ditto, for preliminary test piles No. 3 21.40 64.20 85% 15% 100% 64.20

TO COLLECTION 14,067.00 14,067.00

Page 32
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE

PRECAST REINFORCED CONCRETE 350MM DIAMETER SPUN


PILING (CONT'D)

A
Cutt off head of pile and remove surplus length off site 350mm
precast reinforced concrete spun pile and strip off 1000mm length of
head for and including binding expose reinforcement rods to
reinforcement in pile cap. No. 30 30.00 900.00 85% 15% 100% 900.00

B
Reinforced conrete Grade 35 cap to cover head of 350mm diameter
precast concrete spun pile all to the approval of Engineer/S.O. and
to include associated excavation works, formwork, mild steel plate
and necessary reinforcements and welding works No. 30 50.00 1,500.00 85% 15% 100% 1,500.00

Testing of Piles

Provide the necessary kentlegde, jack and dial gauges for the
application and release of the Test Load. The rate shall include all
supervision and labour, watching and lighting and removal of
kentledge and equipment on completion for 2 cycles (twice working
load of 130 Tonnes for both Preliminary Test Pile and Working
Piles)

C Test to 350mm diameter spun pile No. Rate Only

PDA Test

D Provide all necessary equipments, supervision and labour for


carrying out ''Pile Dynamic Analysis (PDA) Test' all to the Engineer's
/ S.O.'s approval. No. 1 800.00 800.00 85% 15% 100% 800.00

TO COLLECTION 3,200.00 3,200.00

Page 33
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE

COLLECTION PAGE

From Page No. 5/1/4 ....................................... 103,080.00 103,080.00

From Page No. 5/2/4 ....................................... 14,067.00 14,067.00

From Page No. 5/3/4 ....................................... 3,200.00 3,200.00

TOTAL CARRIED TO SUMMARY 120,347.00 120,347.00

Page 34
BILL NO. 6 - KANTIN

WORKDONE (QTY) AMOUNT


ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE

PRECAST REINFORCED CONCRETE 350MM DIAMETER SPUN


PILING

Supply, deliver and unload on site precast reinforced concrete spun


pile (Grade 60) as specified :-

A 350mm Diameter initial pile in 12.00m length. No 86 900.00 77,400.00 85% 15% 100% 77,400.00

B 350mm Diameter initial preliminary test pile in 12.00m length. No 1 900.00 900.00 85% 15% 100% 900.00

C 350mm Diameter extension pile in 12.00m length No 172 900.00 154,800.00 85% 15% 100% 154,800.00

D No 2 900.00 1,800.00 85% 15% 100% 1,800.00


350mm Diameter extension preliminary test pile in 12.00m length.

E 350mm Diameter extension pile in 9.00m length. No 86 700.00 60,200.00 85% 15% 100% 60,200.00

F No 1 700.00 700.00 85% 15% 100% 700.00


350mm Diameter extension preliminary test pile in 9.00m length.

350mm Diameter extension pile in 6.00m length. No - 500.00 - 0% 0% 0% -

Handle, transport and pitch for precast conrete spun piles as


described :-

G No. 86 12.00 1,032.00 85% 15% 100% 1,032.00


350mm Diameter initial pile, driving singly / cluster in 12.00m length

H 350mm Diameter initial preliminary test pile, driving singly / cluster No. 1 12.00 12.00 85% 15% 100% 12.00
in 12.00m length

J 350mm Diameter extension pile, driving singly / cluster in 12.00m No. 172 12.00 2,064.00 85% 15% 100% 2,064.00
length

K 350mm Diameter extension preliminary test pile, driving singly / No. 2 12.00 24.00 85% 15% 100% 24.00
cluster in 12.00m length

TO COLLECTION 298,932.00 298,932.00

Page 35
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE

PRECAST REINFORCED CONCRETE 350MM DIAMETER SPUN


PILING (CONT'D)

Handle, transport and pitch for precast conrete spun piles as


described :- (Cont'd)

A 350mm Diameter extension pile, driving singly / cluster in 9.00m No. 86 8.70 748.20 85% 15% 100% 748.20
length

B 350mm Diameter extension preliminary test pile, driving singly / No. 1 8.70 8.70 85% 15% 100% 8.70
cluster in 9.00m length

350mm Diameter extension pile in 6.00m length. No - 7.00 - 0% 0% 0% -

Drive only for precast conrete spun piles as described :-

C M 1,032 8.80 9,081.60 85% 15% 100% 9,081.60


350mm Diameter initial pile, driving singly / cluster in 12.00m length

D 350mm Diameter initial preliminary test pile, driving singly / cluster M 12 8.80 105.60 85% 15% 100% 105.60
in 12.00m length

E 350mm Diameter extension pile, driving singly / cluster in 12.00m M 2,064 8.80 18,163.20 85% 15% 100% 18,163.20
length

F 350mm Diameter extension preliminary test pile, driving singly / M 24 8.80 211.20 85% 15% 100% 211.20
cluster in 12.00m length

G 350mm Diameter extension pile, driving singly / cluster in 9.00m M 774 8.80 6,811.20 85% 15% 100% 6,811.20
length

H 350mm Diameter extension preliminary test pile, driving singly / M 9 8.80 79.20 85% 15% 100% 79.20
cluster in 9.00m length

350mm Diameter extension pile in 6.00m length. No - 8.80 - 0% 0% 0% -

J
1100mm x 20mm (Overall) fillet weld connection between
chamfered edges of head cap and base 1100mm girth including
30mm diameter mild steel centring bar 160mm long, inserting in and
including forming 80mm deep mortices in 'head and base of piles. No. 258 21.40 5,521.20 85% 15% 100% 5,521.20

K Ditto, for preliminary test piles No. 3 21.40 64.20 85% 15% 100% 64.20

TO COLLECTION 40,794.30 40,794.30

Page 36
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE

PRECAST REINFORCED CONCRETE 350MM DIAMETER SPUN


PILING (CONT'D)

A
Cutt off head of pile and remove surplus length off site 350mm
precast reinforced concrete spun pile and strip off 1000mm length of
head for and including binding expose reinforcement rods to
reinforcement in pile cap. No. 87 30.00 2,610.00 85% 15% 100% 2,610.00

B
Reinforced conrete Grade 35 cap to cover head of 350mm diameter
precast concrete spun pile all to the approval of Engineer/S.O. and
to include associated excavation works, formwork, mild steel plate
and necessary reinforcements and welding works No. 87 50.00 4,350.00 85% 15% 100% 4,350.00

Testing of Piles

Provide the necessary kentlegde, jack and dial gauges for the
application and release of the Test Load. The rate shall include all
supervision and labour, watching and lighting and removal of
kentledge and equipment on completion for 2 cycles (twice working
load of 130 Tonnes for both Preliminary Test Pile and Working
Piles)

C Test to 350mm diameter spun pile No. 1 7,300.00 7,300.00 85% 15% 100% 7,300.00

PDA Test

D Provide all necessary equipments, supervision and labour for


carrying out ''Pile Dynamic Analysis (PDA) Test' all to the Engineer's
/ S.O.'s approval. No. 1 800.00 800.00 85% 15% 100% 800.00

TO COLLECTION 15,060.00 15,060.00

Page 37
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE

COLLECTION PAGE

From Page No. 6/1/4 ....................................... 298,932.00 298,932.00

From Page No. 6/2/4 ....................................... 40,794.30 40,794.30

From Page No. 6/3/4 ....................................... 15,060.00 15,060.00

TOTAL CARRIED TO SUMMARY 354,786.30 354,786.30

Page 38
BILL NO. 7 - SURAU

WORKDONE (QTY) AMOUNT


ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE

PRECAST REINFORCED CONCRETE 350MM DIAMETER SPUN


PILING

Supply, deliver and unload on site precast reinforced concrete spun


pile (Grade 60) as specified :-

A 350mm Diameter initial pile in 12.00m length. No 117 900.00 105,300.00 90% 10% 100% 105,300.00

B 350mm Diameter initial preliminary test pile in 12.00m length. No 1 900.00 900.00 90% 10% 100% 900.00

C 350mm Diameter extension pile in 12.00m length No 234 900.00 210,600.00 90% 10% 100% 210,600.00

D No 2 900.00 1,800.00 90% 10% 100% 1,800.00


350mm Diameter extension preliminary test pile in 12.00m length.

E 350mm Diameter extension pile in 9.00m length. No 117 700.00 81,900.00 90% 10% 100% 81,900.00

F No 1 700.00 700.00 90% 10% 100% 700.00


350mm Diameter extension preliminary test pile in 9.00m length.

350mm Diameter extension pile in 6.00m length. No - 500.00 - 90% 10% 100% -

Handle, transport and pitch for precast conrete spun piles as


described :-

G No. 117 12.00 1,404.00 90% 10% 100% 1,404.00


350mm Diameter initial pile, driving singly / cluster in 12.00m length

H 350mm Diameter initial preliminary test pile, driving singly / cluster No. 1 12.00 12.00 90% 10% 100% 12.00
in 12.00m length

J 350mm Diameter extension pile, driving singly / cluster in 12.00m No. 234 12.00 2,808.00 90% 10% 100% 2,808.00
length

K 350mm Diameter extension preliminary test pile, driving singly / No. 2 12.00 24.00 90% 10% 100% 24.00
cluster in 12.00m length

TO COLLECTION 405,448.00 405,448.00

Page 39
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE

PRECAST REINFORCED CONCRETE 350MM DIAMETER SPUN


PILING (CONT'D)

Handle, transport and pitch for precast conrete spun piles as


described :- (Cont'd)

A 350mm Diameter extension pile, driving singly / cluster in 9.00m No. 117 8.70 1,017.90 90% 10% 100% 1,017.90
length

B 350mm Diameter extension preliminary test pile, driving singly / No. 1 8.70 8.70 90% 10% 100% 8.70
cluster in 9.00m length

350mm Diameter extension pile in 6.00m length. No - 7.00 - 90% 10% 100% -

Drive only for precast conrete spun piles as described :-

C M 1,404 8.80 12,355.20 90% 10% 100% 12,355.20


350mm Diameter initial pile, driving singly / cluster in 12.00m length

D 350mm Diameter initial preliminary test pile, driving singly / cluster M 12 8.80 105.60 90% 10% 100% 105.60
in 12.00m length

E 350mm Diameter extension pile, driving singly / cluster in 12.00m M 2,808 8.80 24,710.40 90% 10% 100% 24,710.40
length

F 350mm Diameter extension preliminary test pile, driving singly / M 24 8.80 211.20 90% 10% 100% 211.20
cluster in 12.00m length

G 350mm Diameter extension pile, driving singly / cluster in 9.00m M 1,053 8.80 9,266.40 90% 10% 100% 9,266.40
length

H 350mm Diameter extension preliminary test pile, driving singly / M 9 8.80 79.20 90% 10% 100% 79.20
cluster in 9.00m length

350mm Diameter extension pile in 6.00m length. No - 8.80 - 90% 10% 100% -

J
1100mm x 20mm (Overall) fillet weld connection between
chamfered edges of head cap and base 1100mm girth including
30mm diameter mild steel centring bar 160mm long, inserting in and
including forming 80mm deep mortices in 'head and base of piles. No. 351 21.40 7,511.40 90% 10% 100% 7,511.40

K Ditto, for preliminary test piles No. 3 21.40 64.20 90% 10% 100% 64.20

TO COLLECTION 55,330.20 55,330.20

Page 40
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE

PRECAST REINFORCED CONCRETE 350MM DIAMETER SPUN


PILING (CONT'D)

A
Cutt off head of pile and remove surplus length off site 350mm
precast reinforced concrete spun pile and strip off 1000mm length of
head for and including binding expose reinforcement rods to
reinforcement in pile cap. No. 118 30.00 3,540.00 90% 10% 100% 3,540.00

B
Reinforced conrete Grade 35 cap to cover head of 350mm diameter
precast concrete spun pile all to the approval of Engineer/S.O. and
to include associated excavation works, formwork, mild steel plate
and necessary reinforcements and welding works No. 118 50.00 5,900.00 90% 10% 100% 5,900.00

Testing of Piles

Provide the necessary kentlegde, jack and dial gauges for the
application and release of the Test Load. The rate shall include all
supervision and labour, watching and lighting and removal of
kentledge and equipment on completion for 2 cycles (twice working
load of 130 Tonnes for both Preliminary Test Pile and Working
Piles)

C Test to 350mm diameter spun pile No. 7,300.00 Rate Only 90% 10% 100% 0.00

PDA Test

D Provide all necessary equipments, supervision and labour for


carrying out ''Pile Dynamic Analysis (PDA) Test' all to the Engineer's
/ S.O.'s approval. No. 1 800.00 800.00 90% 10% 100% 800.00

TO COLLECTION 10,240.00 10,240.00

Page 41
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE

COLLECTION PAGE

From Page No. 7/1/4 ....................................... 405,448.00 405,448.00

From Page No. 7/2/4 ....................................... 55,330.20 55,330.20

From Page No. 7/3/4 ....................................... 10,240.00 10,240.00

TOTAL CARRIED TO SUMMARY 471,018.20 471,018.20

Page 42
BILL NO. 8 -STADIUM

WORKDONE (QTY) AMOUNT


ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE

PRECAST REINFORCED CONCRETE SQUARE PILING

Supply, deliver and unload on site precast reinforced concrete pile


(Grade 45) as specified :

A 300mm x 300mm initial pile in 12.00m length. No 23 680.00 15,640.00 90% 10% 100% 15,640.00

B 300mm x 300mm initial preliminary test pile in 12.00m length. No 1 680.00 680.00 90% 10% 100% 680.00

C 300mm x 300mm extension pile in 12.00m length No 47 648.40 30,474.80 90% 10% 100% 30,474.80

D No 1 648.40 648.40 90% 10% 100% 648.40


300mm x 300mm extension preliminary test pile in 12.00m length.

C 300mm x 300mm extension pile in 9.00m length No 23 585.00 13,455.00 90% 10% 100% 13,455.00

D No 1 585.00 585.00 90% 10% 100% 585.00


300mm x 300mm extension preliminary test pile in 9.00m length.

Handle, transport and pitch for precast conrete piles as described:

E 300mm x 300mm initial pile, driving singly / cluster pile in 12.00m No. 23 12.00 276.00 90% 10% 100% 276.00
length

F 300mm x 300mm initial preliminary test pile, driving singly / cluster No. 1 12.00 12.00 90% 10% 100% 12.00
pile in 12.00m length

G 300mm x 300mm extension pile, driving singly / cluster pile in No. 47 12.00 564.00 90% 10% 100% 564.00
12.00m length

H 300mm x 300mm extension preliminary test pile, driving singly / No. 1 12.00 12.00 90% 10% 100% 12.00
cluster pile in 12.00m length

G 300mm x 300mm extension pile, driving singly / cluster pile in No. 23 10.00 230.00 90% 10% 100% 230.00
9.00m length

H 300mm x 300mm extension preliminary test pile, driving singly / No. 1 10.00 10.00 90% 10% 100% 10.00
cluster pile in 9.00m length

TO COLLECTION 62,587.20 62,587.20

Page 43
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE

PRECAST REINFORCED CONCRETE SQUARE PILING (CONT'D)

Drive only for precast concrete piles as described:

A 300mm x 300mm initial pile, driving singly / cluster pile in 12.00m M 276 8.80 2,428.80 90% 10% 100% 2,428.80
length

B 300mm x 300mm initial preliminary test pile, driving singly / cluster M 12 8.80 105.60 90% 10% 100% 105.60
pile in 12.00m length

C 300mm x 300mm extension, driving singly / cluster pile in 12.00m M 564 8.80 4,963.20 90% 10% 100% 4,963.20
length

D 300mm x 300mm extension preliminary test pile, driving singly / M 12 8.80 105.60 90% 10% 100% 105.60
cluster pile in 12.00m length

C 300mm x 300mm extension, driving singly / cluster pile in 9.00m M 207 8.80 1,821.60 90% 10% 100% 1,821.60
length

D 300mm x 300mm extension preliminary test pile, driving singly / M 9 8.80 79.20 90% 10% 100% 79.20
cluster pile in 9.00m length

-------------------------------------------

E
1200mm x 20mm (Overall) fillet weld connection between
chamfered edges of head cap and base 1200mm girth including
30mm diameter mild steel centring bar 160mm long, inserting in and
including forming 80mm deep mortices in head and base of piles. No 23 21.40 492.20 90% 10% 100% 492.20

F Ditto, preliminary test pile No 1 21.40 21.40 90% 10% 100% 21.40

G
Cutt off head of pile and remove surplus length off site 300mm x
300mm precast reinforced concrete pile and strip off 1000mm
length of head for and including binding exposed reinforcement rods
to reinforcement in pile cap. No. 24 22.30 535.20 90% 10% 100% 535.20

TO COLLECTION 10,552.80 10,552.80

Page 44
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE

PRECAST REINFORCED CONCRETE SQUARE PILING (CONT'D)

Testing of Piles

Provide the necessary kentlegde, jack and dial gauges for the
application and release of the Test Load. The rate shall include all
supervision and labour, watching and lighting and removal of
kentledge and equipment on completion for 2 cycles (twice working
load of 60 Tonnes for both Preliminary Test Pile and Working Piles)

A Test to 300mm x 300mm RC pile No. Rate Only

PDA Test

B Provide all necessary equipments, supervision and labour for


carrying out ''Pile Dynamic Analysis (PDA) Test' all to the Engineer's
/ S.O.'s approval. No. 1 800.00 800.00 90% 10% 100% 800.00

TO COLLECTION 800.00 800.00

Page 45
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE

PRECAST REINFORCED CONCRETE 350MM DIAMETER SPUN


PILING

Supply, deliver and unload on site precast reinforced concrete spun


pile (Grade 60) as specified :-

A 350mm Diameter initial pile in 12.00m length. No 900.00 - 0% 0% 0% -

B 350mm Diameter initial preliminary test pile in 12.00m length. No 900.00 - 0% 0% 0% -

C 350mm Diameter extension pile in 12.00m length No 900.00 - 0% 0% 0% -

D No 900.00 - 0% 0% 0% -
350mm Diameter extension preliminary test pile in 12.00m length.

E 350mm Diameter extension pile in 9.00m length. No 700.00 - 0% 0% 0% -

F No 700.00 - 0% 0% 0% -
350mm Diameter extension preliminary test pile in 9.00m length.

Handle, transport and pitch for precast conrete spun piles as


described :-

G No. 12.00 - 0% 0% 0% -
350mm Diameter initial pile, driving singly / cluster in 12.00m length

H 350mm Diameter initial preliminary test pile, driving singly / cluster No. 12.00 - 0% 0% 0% -
in 12.00m length

J 350mm Diameter extension pile, driving singly / cluster in 12.00m No. 12.00 - 0% 0% 0% -
length

K 350mm Diameter extension preliminary test pile, driving singly / No. 12.00 - 0% 0% 0% -
cluster in 12.00m length

TO COLLECTION - -

Page 46
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE

PRECAST REINFORCED CONCRETE 350MM DIAMETER SPUN


PILING (CONT'D)

Handle, transport and pitch for precast conrete spun piles as


described :- (Cont'd)

A 350mm Diameter extension pile, driving singly / cluster in 9.00m No. 8.70 - 0% 0% 0% -
length

B 350mm Diameter extension preliminary test pile, driving singly / No. 8.70 - 0% 0% 0% -
cluster in 9.00m length

Drive only for precast conrete spun piles as described :-

C M 8.80 - 0% 0% 0% -
350mm Diameter initial pile, driving singly / cluster in 12.00m length

D 350mm Diameter initial preliminary test pile, driving singly / cluster M 8.80 - 0% 0% 0% -
in 12.00m length

E 350mm Diameter extension pile, driving singly / cluster in 12.00m M 8.80 - 0% 0% 0% -


length

F 350mm Diameter extension preliminary test pile, driving singly / M 8.80 - 0% 0% 0% -


cluster in 12.00m length

G 350mm Diameter extension pile, driving singly / cluster in 9.00m M 8.80 - 0% 0% 0% -


length

H 350mm Diameter extension preliminary test pile, driving singly / M 8.80 - 0% 0% 0% -


cluster in 9.00m length

J
1100mm x 20mm (Overall) fillet weld connection between
chamfered edges of head cap and base 1100mm girth including
30mm diameter mild steel centring bar 160mm long, inserting in and
including forming 80mm deep mortices in 'head and base of piles. No. 21.40 - 0% 0% 0% -

K Ditto, for preliminary test piles No. 21.40 - 0% 0% 0% -

TO COLLECTION - -

Page 47
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE

PRECAST REINFORCED CONCRETE 350MM DIAMETER SPUN


PILING (CONT'D)

A
Cutt off head of pile and remove surplus length off site 350mm
precast reinforced concrete spun pile and strip off 1000mm length of
head for and including binding expose reinforcement rods to
reinforcement in pile cap. No. 30.00 - 0% 0% 0% -

B
Reinforced conrete Grade 35 cap to cover head of 350mm diameter
precast concrete spun pile all to the approval of Engineer/S.O. and
to include associated excavation works, formwork, mild steel plate
and necessary reinforcements and welding works No. 50.00 - 0% 0% 0% -

Testing of Piles

Provide the necessary kentlegde, jack and dial gauges for the
application and release of the Test Load. The rate shall include all
supervision and labour, watching and lighting and removal of
kentledge and equipment on completion for 2 cycles (twice working
load of 130 Tonnes for both Preliminary Test Pile and Working
Piles)

C Test to 350mm diameter spun pile No. 7,300.00 - 100% 0% 100% -

PDA Test

D Provide all necessary equipments, supervision and labour for


carrying out ''Pile Dynamic Analysis (PDA) Test' all to the Engineer's
/ S.O.'s approval. No. 800.00 - 0% 0% 0% -

TO COLLECTION - -

Page 48
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE

COLLECTION PAGE

From Page No. 8/1/4 ....................................... 62,587.20 62,587.20

From Page No. 8/2/4 ....................................... 10,552.80 10,552.80

From Page No. 8/3/4 ....................................... 800.00 800.00

- -

- -

- -

TOTAL CARRIED TO SUMMARY 73,940.00 73,940.00

Page 49
BILL NO. 9 - KOLAM RENANG

WORKDONE (QTY) AMOUNT


ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE

PRECAST REINFORCED CONCRETE 350MM DIAMETER SPUN


PILING

Supply, deliver and unload on site precast reinforced concrete spun


pile (Grade 60) as specified :-

A 350mm Diameter initial pile in 12.00m length. No 47 900.00 42,300.00 90% 10% 100% 42,300.00

B 350mm Diameter initial preliminary test pile in 12.00m length. No 1 900.00 900.00 90% 10% 100% 900.00

C 350mm Diameter extension pile in 12.00m length No 94 860.00 80,840.00 90% 10% 100% 80,840.00

D No 2 860.00 1,720.00 90% 10% 100% 1,720.00


350mm Diameter extension preliminary test pile in 12.00m length.

E 350mm Diameter extension pile in 9.00m length. No 47 700.00 32,900.00 90% 10% 100% 32,900.00

F No 1 700.00 700.00 90% 10% 100% 700.00


350mm Diameter extension preliminary test pile in 9.00m length.

Handle, transport and pitch for precast conrete spun piles as


described :-

G No. 47 12.00 564.00 90% 10% 100% 564.00


350mm Diameter initial pile, driving singly / cluster in 12.00m length

H 350mm Diameter initial preliminary test pile, driving singly / cluster No. 1 12.00 12.00 90% 10% 100% 12.00
in 12.00m length

J 350mm Diameter extension pile, driving singly / cluster in 12.00m No. 94 12.00 1,128.00 90% 10% 100% 1,128.00
length

K 350mm Diameter extension preliminary test pile, driving singly / No. 2 12.00 24.00 90% 10% 100% 24.00
cluster in 12.00m length

TO COLLECTION 161,088.00 161,088.00

Page 50
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE

PRECAST REINFORCED CONCRETE 350MM DIAMETER SPUN


PILING (CONT'D)

Handle, transport and pitch for precast conrete spun piles as


described :- (Cont'd)

A 350mm Diameter extension pile, driving singly / cluster in 9.00m No. 47 8.70 408.90 90% 10% 100% 408.90
length

B 350mm Diameter extension preliminary test pile, driving singly / No. 1 8.70 8.70 90% 10% 100% 8.70
cluster in 9.00m length

Drive only for precast conrete spun piles as described :-

C M 564 8.80 4,963.20 90% 10% 100% 4,963.20


350mm Diameter initial pile, driving singly / cluster in 12.00m length

D 350mm Diameter initial preliminary test pile, driving singly / cluster M 12 8.80 105.60 90% 10% 100% 105.60
in 12.00m length

E 350mm Diameter extension pile, driving singly / cluster in 12.00m M 1,128 8.80 9,926.40 90% 10% 100% 9,926.40
length

F 350mm Diameter extension preliminary test pile, driving singly / M 24 8.80 211.20 90% 10% 100% 211.20
cluster in 12.00m length

G 350mm Diameter extension pile, driving singly / cluster in 9.00m M 423 8.80 3,722.40 90% 10% 100% 3,722.40
length

H 350mm Diameter extension preliminary test pile, driving singly / M 9 8.80 79.20 90% 10% 100% 79.20
cluster in 9.00m length

J
1100mm x 20mm (Overall) fillet weld connection between
chamfered edges of head cap and base 1100mm girth including
30mm diameter mild steel centring bar 160mm long, inserting in and
including forming 80mm deep mortices in 'head and base of piles. No. 141 21.40 3,017.40 90% 10% 100% 3,017.40

K Ditto, for preliminary test piles No. 3 21.40 64.20 90% 10% 100% 64.20

TO COLLECTION 22,507.20 22,507.20

Page 51
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE

PRECAST REINFORCED CONCRETE 350MM DIAMETER SPUN


PILING (CONT'D)

A
Cutt off head of pile and remove surplus length off site 350mm
precast reinforced concrete spun pile and strip off 1000mm length of
head for and including binding expose reinforcement rods to
reinforcement in pile cap. No. 48 30.00 1,440.00 90% 10% 100% 1,440.00

B
Reinforced conrete Grade 35 cap to cover head of 350mm diameter
precast concrete spun pile all to the approval of Engineer/S.O. and
to include associated excavation works, formwork, mild steel plate
and necessary reinforcements and welding works No. 48 50.00 2,400.00 90% 10% 100% 2,400.00

Testing of Piles

Provide the necessary kentlegde, jack and dial gauges for the
application and release of the Test Load. The rate shall include all
supervision and labour, watching and lighting and removal of
kentledge and equipment on completion for 2 cycles (twice working
load of 130 Tonnes for both Preliminary Test Pile and Working
Piles)

C Test to 350mm diameter spun pile No. Rate Only

PDA Test

D Provide all necessary equipments, supervision and labour for


carrying out ''Pile Dynamic Analysis (PDA) Test' all to the Engineer's
/ S.O.'s approval. No. 1 800.00 800.00 90% 10% 100% 800.00

TO COLLECTION 4,640.00 4,640.00

Page 52
WORKDONE (QTY) AMOUNT
ITEM DESCRIPTION UNIT QUANTITYRATE (RM) AMOUNT(RM) prev. Current To Date DUE

COLLECTION PAGE

From Page No. 9/1/4 ....................................... 161,088.00 161,088.00

From Page No. 9/2/4 ....................................... 22,507.20 22,507.20

From Page No. 9/3/4 ....................................... 4,640.00 4,640.00

TOTAL CARRIED TO SUMMARY 188,235.20 188,235.20

Page 53
A.FINAL SUMMARY

WORKDONE (QTY) AMOUNT


BILL NO. DESCRIPTION PAGE
RATE (RM) AMOUNT(RM) prev. Current To Date DUE

1.0 PRELIMINARIES AND PREAMBLES 1/5/5 1,315,000.00 0% 0% 100% 1,315,000.00

2.0 BLOK PENTADBIRAN 2/7/7 1,476,019.80 0% 0% 100% 1,476,019.80

3.0 BLOK AKADEMIK 3/7/7 1,453,879.50 0% 0% 100% 1,453,879.50

4.0 DEWAN SERBAGUNA 4/4/4 315,291.10 0% 0% 100% 315,291.10

5.0 PERPUSTAKAAN 5/4/4 120,347.00 0% 0% 100% 120,347.00

6.0 KANTIN 6/4/4 354,786.30 0% 0% 100% 354,786.30

7.0 SURAU 7/4/4 471,018.20 0% 0% 100% 471,018.20

8.0 STADIUM 8/4/4 73,940.00 0% 0% 100% 73,940.00

9.0 KOLAM RENANG 9/4/4 188,235.20 0% 0% 100% 188,235.20

TOTAL TENDER SUM CARRIED TO FORM OF TENDER 5,768,517.10 100% 5,768,517.10

:: ::

::

Page 54
BREAKDOWN FOR BLOK PENTADBIRAN

work done %
ITEM DESCRIPTION UNIT QTY RATE AMOUNT % % % Total Workdone
(RM) (RM) prev. current to date (RM)

1 Substructure
Work Below Lowest Floor Finish L/S 1,001,900.00 100% 0% 100% 1,001,900.00

2 Superstructure
Frame L/S 299,900.00 100% 0% 100% 299,900.00
Upper Floors L/S 349,000.00 100% 0% 100% 349,000.00
Roof L/S 201,000.00 100% 0% 100% 201,000.00
Stairs L/S 245,500.00 100% 0% 100% 245,500.00
External Walls L/S 340,500.00 100% 0% 100% 340,500.00
Windows & External Doors L/S 300,600.00 100% 0% 100% 300,600.00
Internal Walls & Partitions L/S 203,400.00 100% 0% 100% 203,400.00
Internal Doors L/S 179,550.00 100% 0% 100% 179,550.00

3 Finishes
Internal Wall Finishes L/S 59,550.00 100% 0% 100% 59,550.00
Internal Floor Finishes L/S 50,000.00 100% 0% 100% 50,000.00
Internal Ceiling Finishes L/S 85,000.00 100% 0% 100% 85,000.00
External Finishes L/S 49,781.00 100% 0% 100% 49,781.00
Roof Finishes L/S 1,081,219.00 100% 0% 100% 1,081,219.00

Total Carried to FINAL SUMMARY 4,446,900.00 100% 4,446,900.00

breakdown/admin/pda/3(a)/3/12

3/1
BREAKDOWN FOR BLOK AKADEMIK

WORK DONE %
ITEM DESCRIPTION UNIT QTY RATE AMOUNT(RM) % % % AMOUNT(RM)
prev current to date

1 Substructure
Work Below Lowest Floor Finish L/S 1,705,560.00 100% 0% 100% 1,705,560.00

2 Superstructure
Frame L/S 545,780.00 100% 0% 100% 545,780.00
Upper Floors L/S 395,380.00 100% 0% 100% 395,380.00
Roof L/S 345,880.00 100% 0% 100% 345,880.00
Stairs L/S 793,280.00 100% 0% 100% 793,280.00
External Walls L/S 492,280.00 100% 0% 100% 492,280.00
Windows & External Doors L/S 198,280.00 100% 0% 100% 198,280.00
Internal Walls & Partitions L/S 349,080.00 100% 0% 100% 349,080.00
Internal Doors L/S 495,200.00 100% 0% 100% 495,200.00

3 Finishes
Internal Wall Finishes L/S 100,200.00 100% 0% 100% 100,200.00
Internal Floor Finishes L/S 92,580.00 100% 0% 100% 92,580.00
Internal Ceiling Finishes L/S 115,280.00 100% 0% 100% 115,280.00
External Finishes L/S 205,280.00 100% 0% 100% 205,280.00
Roof Finishes L/S 95,140.00 100% 0% 100% 95,140.00

Total Carried to FINAL SUMMARY 5,929,200.00 100% 5,929,200.00

breakdown/academic/pda/3(b)/4/12

4/1
BREAKDOWN FOR DEWAN SERBAGUNA & ASTAKA

WORK DONE %
ITEM DESCRIPTION UNIT QTY RATE AMOUNT(RM) % % %
prev current to date

1 Substructure
Work Below Lowest Floor Finish L/S 600,000.00 100% 0% 100%

2 Superstructure
Frame L/S 105,200.00 100% 0% 100%
Upper Floors L/S 90,000.00 100% 0% 100%
Roof L/S 80,000.00 100% 0% 100%
Stairs L/S 50,000.00 100% 0% 100%
External Walls L/S 100,000.00 100% 0% 100%
Windows & External Doors L/S 35,000.00 100% 0% 100%
Internal Walls & Partitions L/S 15,000.00 100% 0% 100%
Internal Doors L/S 20,000.00 100% 0% 100%

3 Finishes
Internal Wall Finishes L/S 30,000.00 100% 0% 100%
Internal Floor Finishes L/S 70,000.00 100% 0% 100%
Internal Ceiling Finishes L/S 60,000.00 100% 0% 100%
External Finishes L/S 181,648.60 100% 0% 100%
Roof Finishes L/S 100,000.00 100% 0% 100%

Total Carried to FINAL SUMMARY 1,536,848.60 100%

breakdown/hall/pda/3(c)/5/12

5/1
AMOUNT(RM)

600,000.00

105,200.00
90,000.00
80,000.00
50,000.00
100,000.00
35,000.00
15,000.00
20,000.00

30,000.00
70,000.00
60,000.00
181,648.60
100,000.00

1,536,848.60

5/1
BREAKDOWN FOR PERPUSTAKAAN

WORK DONE %
ITEM DESCRIPTION UNIT QTY RATE AMOUNT(RM) % % % AMOUNT(RM)
prev current to date

1 Substructure
Work Below Lowest Floor Finish L/S 1,131,814.00 100% 0% 100% 1,131,814.00

2 Superstructure
Frame L/S 98,407.00 100% 0% 100% 98,407.00
Upper Floors L/S 90,000.00 100% 0% 100% 90,000.00
Roof L/S 70,000.00 100% 0% 100% 70,000.00
Stairs L/S 30,000.00 100% 0% 100% 30,000.00
External Walls L/S 60,000.00 100% 0% 100% 60,000.00
Windows & External Doors L/S 40,000.00 100% 0% 100% 40,000.00
Internal Walls & Partitions L/S 48,407.00 100% 0% 100% 48,407.00
Internal Doors L/S 20,000.00 100% 0% 100% 20,000.00

3 Finishes
Internal Wall Finishes L/S 141,238.50 100% 0% 100% 141,238.50
Internal Floor Finishes L/S 91,238.50 100% 0% 100% 91,238.50
Internal Ceiling Finishes L/S 70,000.00 100% 0% 100% 70,000.00
External Finishes L/S 90,000.00 100% 0% 100% 90,000.00
Roof Finishes L/S 20,000.00 100% 0% 100% 20,000.00

Total Carried to FINAL SUMMARY 2,001,105.00 100% 2,001,105.00

breakdown/library/pda/3(d)/6/12

6/1
BREAKDOWN FOR KANTIN

WORK DONE %
ITEM DESCRIPTION UNIT QTY RATE AMOUNT(RM) % % % AMOUNT(RM)
prev current to date

1 Substructure
Work Below Lowest Floor Finish L/S 233,628.00 100% 0% 100% 233,628.00

2 Superstructure
Frame L/S 95,000.00 100% 0% 100% 95,000.00
Upper Floors L/S - 0.00
Roof L/S 20,000.00 100% 0% 100% 20,000.00
Stairs L/S - 0.00
External Walls L/S 45,000.00 100% 0% 100% 45,000.00
Windows & External Doors L/S 9,500.00 100% 0% 100% 9,500.00
Internal Walls & Partitions L/S 10,000.00 100% 0% 100% 10,000.00
Internal Doors L/S 7,500.00 100% 0% 100% 7,500.00

3 Finishes
Internal Wall Finishes L/S 30,000.00 100% 0% 100% 30,000.00
Internal Floor Finishes L/S 10,000.00 100% 0% 100% 10,000.00
Internal Ceiling Finishes L/S 15,000.00 100% 0% 100% 15,000.00
External Finishes L/S 33,000.00 100% 0% 100% 33,000.00
Roof Finishes L/S 25,000.00 100% 0% 100% 25,000.00

Total Carried to FINAL SUMMARY 533,628.00 100% 533,628.00

breakdown/canteen/pda/3(e)/7/12

7/1
BREAKDOWN FOR SURAU

WORK DONE %
ITEM DESCRIPTION UNIT QTY RATE AMOUNT(RM) % % % AMOUNT(RM)
prev current to date

1 Substructure
Work Below Lowest Floor Finish L/S 24,056.00 100% 0% 100% 24,056.00

2 Superstructure
Frame L/S 7,000.00 100% 0% 100% 7,000.00
Upper Floors L/S - 0.00
Roof L/S 6,000.00 100% 0% 100% 6,000.00
Stairs L/S - 0.00
External Walls L/S 5,700.00 100% 0% 100% 5,700.00
Windows & External Doors L/S 4,900.00 100% 0% 100% 4,900.00
Internal Walls & Partitions L/S 4,500.00 100% 0% 100% 4,500.00
Internal Doors L/S 3,700.00 100% 0% 100% 3,700.00

3 Finishes
Internal Wall Finishes L/S 5,000.00 100% 0% 100% 5,000.00
Internal Floor Finishes L/S 4,700.00 100% 0% 100% 4,700.00
Internal Ceiling Finishes L/S 4,000.00 100% 0% 100% 4,000.00
External Finishes L/S 5,500.00 100% 0% 100% 5,500.00
Roof Finishes L/S 4,000.00 100% 0% 100% 4,000.00

Total Carried to FINAL SUMMARY 79,056.00 100% 79,056.00

breakdown/surau/pda/3(f)/8/12

8/1
BREAKDOWN FOR STADIUM

WORK DONE %
ITEM DESCRIPTION UNIT QTY RATE AMOUNT(RM) % % % AMOUNT(RM)
prev current to date

1 Substructure
Work Below Lowest Floor Finish L/S 7,757,520.00 100% 0% 100% 7,757,520.00

2 Superstructure
Frame L/S 7,457,520.00 100% 0% 100% 7,457,520.00
Upper Floors L/S 3,671,680.00 100% 0% 100% 3,671,680.00
Roof L/S 2,271,680.00 100% 0% 100% 2,271,680.00
Stairs L/S 1,671,680.00 100% 0% 100% 1,671,680.00
External Walls L/S 2,421,680.00 100% 0% 100% 2,421,680.00
Windows & External Doors L/S 871,680.00 100% 0% 100% 871,680.00
Internal Walls & Partitions L/S 71,680.00 100% 0% 100% 71,680.00
Internal Doors L/S 471,680.00 100% 0% 100% 471,680.00

3 Finishes
Internal Wall Finishes L/S 1,520,466.76 100% 0% 100% 1,520,466.76
Internal Floor Finishes L/S 2,020,466.76 100% 0% 100% 2,020,466.76
Internal Ceiling Finishes L/S 1,020,466.76 100% 0% 100% 1,020,466.76
External Finishes L/S 3,620,466.76 100% 0% 100% 3,620,466.76
Roof Finishes L/S 970,466.76 100% 0% 100% 970,466.76

Total Carried to FINAL SUMMARY 35,819,133.80 100% 35,819,133.80

breakdown/stadium/pda/3(g)/9/12

9/1
BREAKDOWN FOR KOLAM RENANG

WORK DONE %
ITEM DESCRIPTION UNIT QTY RATE AMOUNT(RM) % % %
prev current to date

1 Substructure
Work Below Lowest Floor Finish L/S 19,501.00 100% 0% 100%

2 Superstructure
Frame L/S 7,476.00 100% 0% 100%
Upper Floors L/S -
Roof L/S 6,976.00 100% 0% 100%
Stairs L/S -
External Walls L/S 6,520.00 100% 0% 100%
Windows & External Doors L/S 6,520.00 100% 0% 100%
Internal Walls & Partitions L/S 9,020.00 100% 0% 100%
Internal Doors L/S 6,020.00 100% 0% 100%

3 Finishes
Internal Wall Finishes L/S 7,520.00 100% 0% 100%
Internal Floor Finishes L/S 9,020.00 100% 0% 100%
Internal Ceiling Finishes L/S -
External Finishes L/S 6,520.00 100% 0% 100%
Roof Finishes L/S 6,020.00 100% 0% 100%

Total Carried to FINAL SUMMARY 91,113.00 100%

breakdown/pool/pda/3(h)/10/12

10/1
AMOUNT(RM)

19,501.00

7,476.00
0.00
6,976.00
0.00
6,520.00
6,520.00
9,020.00
6,020.00

7,520.00
9,020.00
0.00
6,520.00
6,020.00

91,113.00

10/1
BREAKDOWN FOR M&E SERVICES

WORK DONE %
ITEM DESCRIPTION UNIT QTY RATE AMOUNT(RM) % % % AMOUNT(RM)
prev current to date

1 Services
Sanitary Appliances L/S 179,624.09 100% 0% 100% 179,624.09
Plumbing Installation L/S 359,624.09 100% 0% 100% 359,624.09
Refuse Disposal L/S 288,624.09 100% 0% 100% 288,624.09
Air-cond & Ventilation System L/S 3,656,167.80 100% 0% 100% 3,656,167.80
Electrical Installation L/S 4,071,315.69 100% 0% 100% 4,071,315.69
Fire Protection Installation L/S 2,000,000.00 100% 0% 100% 2,000,000.00
Lift & Conveyor Installation L/S 721,000.00 100% 0% 100% 721,000.00
Communication Installation L/S 1,571,315.69 100% 0% 100% 1,571,315.69
Special Installation L/S 3,470,935.05 100% 0% 100% 3,470,935.05
Builder's Profit & Attendance on Services L/S 345,354.40 100% 0% 100% 345,354.40
Builder's Work in Connection With Services L/S 400,000.00 100% 0% 100% 400,000.00

Total Carried to FINAL SUMMARY 17,063,960.90 100% 17,063,960.90

breakdown/services/pda/4(a-c)/11/12

11/1
BREAKDOWN FOR EXTERNAL WORKS

WORK DONE %
ITEM DESCRIPTION UNIT QTY RATE AMOUNT(RM) % % % AMOUNT(RM)
prev current to date

1 External Works
Earthworks L/S 9,885,079.85 100% 0% 100% 9,885,079.85
Road Works and Carparks L/S 2,542,257.50 100% 0% 100% 2,542,257.50
Drainage Works L/S 1,527,253.50 100% 0% 100% 1,527,253.50
Sewerage Works including septic tank L/S 2,288,506.50 100% 0% 100% 2,288,506.50
Water Recticulation Works L/S 3,811,012.50 100% 0% 100% 3,811,012.50
Fencing and Gates L/S 1,781,004.50 100% 0% 100% 1,781,004.50
Landscape L/S 3,033,802.85 100% 0% 100% 3,033,802.85
Built-in Furniture L/S 20,304,827.50 100% 0% 100% 20,304,827.50

Total Carried to FINAL SUMMARY 45,173,744.70 100% 45,173,744.70

breakdown/ext.works/pda/5(a-h)/12/12

12/1
KOMPLEKS BELIA DAN SUKAN DAERAH JOHOR
BAHRU, JOHOR DARUL TAKZIM

MATERIALS ON SITE
Interim Payment No : 06 Valuation Date : 7-Februari-11
KERAJAAN MALAYSIA
JABATAN KERJA RAYA
PERAKUAN BAYARAN INTERIM NO 6

TAJUK KERJA : KOMPLEKS BELIA DAN SUKAN DAERAH JOHOR BAHRU, JOHOR.

NAMA DAN ALAMAT : AP&F CONSTRUCTION


KONTRAKTOR No 258 , Jalan Macalister,
41200 Klang,
Selangor Darul Ehsan.

NO. KONTRAK : 2722/2010-2011-1/01

PERAKUAN PERUNDING

Kami dengan ini mengesahkan bahawa semua kerja - kerja yang telah disiapkan oleh kontraktor seperti
yang dinyatakan di dalam Perakuan Bayaran Interim ini adalah mengikut dan mematuhi kehendak Kontrak,
Lukisan dan Spesifikasi.

Arkitek - Architects Quotes Jurukur Bahan - V-Build Properties Sdn. Bhd.

_____________________________________________
_____________________________________________
COP & TANDATANGAN PERUNDING COP & TANDATANGAN PERUNDING

Tarikh: Tarikh:

Sivil & Struktur - SCIA Engineer Mekanikal & Elektrikal - Asia M&E
Consultants Sdn. Bhd.

_____________________________________________
_____________________________________________
COP & TANDATANGAN PERUNDING COP & TANDATANGAN PERUNDING

Tarikh: Tarikh:
78350039.xls.ms_office Attachment A

UNIVERSITI MALAYSIA PAHANG (UMP) - FASA 1B


KONTRAKTOR UTAMA: PEMBINAAN JAYA ZIRA SDN. BHD.
SUMMARY OF CERTIFIED PROGRESS CLAIM.
A B C=B-A D E=D-B
No of Days
Claim Amount Certified Amount No of Days Paid Amount Payments
Item Particulars Valuation Claim For Remarks
(RM) (RM) To Certified (RM) Received
Date Certified Date Payments
Claims Date
Made

1 Progress Claim No. 1 4,681,570.00 25-Nov-09 4,681,570.00 26-Nov-09 1 4,213,413.00 9-Dec-09 13 Retention RM 468,157.00

2 Progress Claim No. 2 6,971,912.94 23-Dec-09 6,971,912.94 24-Dec-09 1 6,274,721.65 18-Jan-10 25 Retention RM 679,191.29

3 Progress Claim No. 3 2,848,745.39 25-Jan-10 2,848,745.39 29-Jan-10 4 2,563,870.85 19-Feb-10 21 Retention RM 284,874.54

4 Progress Claim No. 4 3,232,576.46 20-Feb-10 3,232,576.46 25-Feb-10 4 2,909,318.82 24-Mar-10 29 Retention RM 323,257.64

5 Progress Claim No. 5 2,713,741.56 25-Mar-10 2,713,741.56 30-Mar-09 1 2,442,367.40 8-Apr-10 8 Retention RM 271,374.16

6 Progress Claim No. 6 2,349,001.10 29-Apr-10 2,349,001.10 30-Apr-10 1 2,114,100.99 17-May-10 17 Retention RM 234,900.11

Total Amount: 22,797,547.45 - 22,797,547.45 - - 20,517,792.71 - -

Page 69 of 69