PROJECT LIST
NURICON PETROSERVICES (PTE.) LTD.
CUSTOMER JOB
Pakistan Petroleum Limited Cathodic Protection of Well casings at Kandhkot
Gas Field:
a) Feasibility Study
b) Detailed Engineering Design
c) Preparation of Tender Documents.
d) Evaluation of Bids
Oil & Gas Development Feasibility Study, Survey, Design and Detailed
Corporation of Pakistan Engineering Design of Cathodic Protection System,
and preparation of Tender Documents for 5 well
casings at Dakhni Gas Field.
Oil & Gas Development Feasibility Study, Survey, Design and Detailed
Corporation of Pakistan Engineering of Cathodic Protection System, and
preparation of Tender Documents for 10 well
casings at Chak Naurang, Fimkassar and Toot
Fields.
Oil & Gas Development Feasibility Study, Survey, Detailed Engineering and
Corporation of Pakistan Design of Cathodic Protection System, and
preparation of Tender Documents for 26 well
casings at Pirkoh Gas Field.
China Metallurgical Corp for Turnkey Supply, Installation and Commissioning as
Saindak Metal (Pte) Ltd subcontractor of CP System for 24” Pipeline 38 Km
water supply pipeline based upon TEG System
Shell Pakistan Limited Turnkey project for the Cathodic Protection of
Installation ‘C’ at Keamari, Storage Tank Bottoms (12.5 m and 17.5 m) by
using Anodeflex.
Mari Gas Co. Limited Feasibility Study, Survey, Detailed Engineering and
Preparation of Tender Documents for the Cathodic
Protection of 59 Well Casings, Mari Field, Daharki.
Oil & Gas Development Design/Engineering, Supply, Installation and
Company of Pakistan Commissioning of Cathodic Protection system for
Ø8” x 2.5 km oil pipeline at Sadqal (impressed
current system) and Ø4” x 2.5 km pipeline (galvanic
anode based system) at Lashari, Hyderabad.
Pakistan State Oil – Shell Turnkey project for the Cathodic Protection of 16”
Pakistan – Caltex Joint dia pipeline from Parco Terminal to Jimco Terminal,
Pipeline. including DCVG survey and installation of
ANODEFLEX based CP system at Mehmood Kot.
NURICON PETROSERVICES (PTE.) LTD.
CUSTOMER JOB
Oil & Gas Development Sampling and analyses of soil specimens to
Company of Pakistan determine presence of sulfate reducing bacteria at
Kunar, Bobi and Mithrao well facilities areas.
Oil & Gas Development Supply, Installation and Commissioning of Cathodic
Company of Pakistan. Protection system for Ø8” x 20 km pipeline at Tando
Alam oil field, Hyderabad designed based on Solar
Powered System
CUSTOMER JOB
Pakistan State Oil Company Supply, Installation & Commissioning of Cathodic
Limited Protection System for 12” dia. x 2 km F.O. Depot
Lalpir - AES Thermal Power Plant link Pipeline,
Mahmood Kot.
Union Texas Pakistan Limited Pearson & Close Interval Pipe to Soil Potential
Survey of 8.7 km 6” dia. Mazari - Liari link pipeline
at Badin district.
Mari Gas Co. Limited Supply of Material for Cathodic Protection System
of Two Well Casings.
Shell Pakistan Limited Turnkey Project for the Cathodic Protection of
Storage Tank Bottoms dia. 14 m, by using
ANODEFLEX. Installation-C, Keamari, Karachi.
Pakistan State Oil Company Supply, Installation and Commissioning of Cathodic
Limited protection system for Ø8” x 4km long pipeline. From
Parco to PSO FO depot Lalpir Mehmood kot Multan
Engro Asahi Polymer & Design, Supply, Installation and Commissioning of
Chemicals Limited Cathodic Protection System for 11km water supply
line at Bin Qasim Industrial Area.
Pakistan Refinery Limited Installation of Electric Heat Trace Cables of Fuel Oil
Lines
Pakistan State Oil Company Design, Supply, Installation & Commissioning of
Limited Cathodic Protection System for Five Filling Stations.
Siemens Pakistan Engg. Design, Engg. Supply of Material/Equipment and
Company Ltd./Pak Arab Installation Supervision Services of C.P. System for
Refinery Company Ltd. Tank Bottoms at Mahmood Kot for PARCO.
Muhammad Ayub Brothers / Design & Engineering for Cathodic Protection
Capital Development System of 6.5 Km long Water Pipeline, Rawalpindi.
Authority
Pakistan Refinery Limited Installation & Commissioning of Electric Heat Trace
System for Furnace Oil Supply Lines.
OMV Pakistan Feasiblity study and subsequent design and
detailed engineering for Cathodic protection of 6
numbers well casings at Miano and Sawan gas
fields.
NURICON PETROSERVICES (PTE.) LTD.
CUSTOMER JOB
Shell Pakistan Limited Survey of CP System underground Pipes and
Casing at Installation Keamari.
CUSTOMER JOB
Rana Enterprises/National Supply and Installation of Insulation Jacket for 6”
Refinery Ltd x1.5 km pipeline for National Refinery
Rana Enterprises / National Design, Supply, Installation and Commissioning of
Refinery Limited Cathodic Protection System for Re-Routed Pipeline
sections of dia 6’’, 8’’& 14’’ x 1550 m long each, for
National Refinery Limited.
Al-Tariq Constructors (Pvt.) Design/Engineer, Supply, Installation and
Limited / Pakistan State Oil Commissioning of Tank bottom Cathodic Protection
Company Limited System for 3 numbers dia 22 m x 4 m high
mounded tanks using Anodeflex and dia 4” x 104 m
jet fuel piping using HSI anodes at new Lahore
International Airport.
BP Pakistan Installation and Commissioning of Sacrificial CP
System at 6 Facilities- Bachal, Dhabi, Khorewah,
Makhdumpur, Rind and South Buzdar
Mari Gas Co. Limited Supply of Hi-Silicon Anodes
Oil & Gas Development Corp Feasibility Study of the Cathodic Protection of 35
km proposed pipeline ROW at Bobi and Mithroa.
Overseas Trading Corp. Installation of Heat Shrink Sleeves on 20” & 24”
Fuel Oil Pipeline
Lasmo Oil Pakistan Ltd Installation and Commissioning for Electrical Heat
Tracing at Kadanwari Gas Field Facilities
Shell Pakistan Limited Engineering design for Cathodic Protection System
for 8 nos Tanks at Keamari
Pakistan Petroleum Ltd Engineering design for Cathodic Protection System
for Adhi Well # 13 Casing
Orient Petroleum Engineering design for Cathodic Protection System
for Ratana-Meyal Pipeline
Khan Mohd Khan Bros Supply and Installation of Heat Shrink Sleeves on
30” & 24” Fuel Oil Pipeline
Pakistan Refinery Ltd Repair of Coating Material and Installation over PRL
JP-1 Pipeline
Petro Coating Systems Installation Supervision of Heat Shrink Sleeves for
( Australia) Gas Pipeline at ZamZama
OMV Pakistan Turnkey Engineering Design, Procurement and
Installation of Cathodic Protection System for 5 nos
Well Casing at Sawan Field
NURICON PETROSERVICES (PTE.) LTD.
CUSTOMER JOB
Pakistan Petroleum Ltd Engineering Design for Cathodic Protection Study of
4 Nos Well Casing at Block 22 Shikarpur Field
Siemens Pakistan Eng Installation of CP System for 2 nos x 17.6 m
Condensate Tanks at ZamZama Gas Plant
Metal & Pipeline Protection / Turnkey supply of material for Pak Arab Pipeline
China Petroleum Engineering Company’s 800km x 26” White Oil Pipeline
& Construction Corp.
Al Prince Engineers Supply and Installation of Cathodic Protection
System for Tank Bottoms at PARCO’s Fazilpur
Station.
Al Tariq Constructors Supply of Galvalum Anodes for BP
Metal & Pipeline Protection Engineering and Supply of AnodeFlex for Storage
Tanks for Caltex
Tyco Adhesives, Belgium Supervisory Services for Installation of Heat Shrink
Sleeves for Pak Arab Pipeline Company’s 26” x 800
km
Pakistan Petroleum Ltd Supply, Installation, Commissioning and Testing of
Complete System for 3 Nos NGL Tanks.
Oil & Gas Development Corp Consultancy Services for Feasibility Study of
Cathodic Protection for 19 Nos Well of KUNNAR,
DARU and BOBI Fields of Well Casing.
OMV Pakistan Turnkey Engineering Design, Procurement and
Installation of Cathodic Protection System for 2 nos
Well Casing at Miano Field ( Well No. 1 & 7 )
Abdul Sattar Faisalabad / Pak Installation of Heat Shrink Sleeves in lieu of caseal
Arab Refinery Company Ltd. on 16” dia. Pipeline on Concrete Tank in/out at
PARCO Shikarpur Terminal.
Abdul Sattar Faisalabad / Pak Turnkey Re-furbishment including Pre-Design
Arab Refinery Company Ltd. Survey, Design & Engineering, Supply, Installation
Test & Commissioning of CP System for Gas
Supply Pipeline PARCO Residential Area Mahmood
Kot, Multan.
China Petroleum Engineering Supply of repair Material for Pipeline coating for
& Construction Corp. PARCO’s 800 Km White Oil Pipeline.
Shashi Steel Mills Supply of repair Material for Pipeline coating for
PARCO’s 800 Km White Oil Pipeline.
Engro Chemical Pakistan Ltd. Evaluation & Assess the Condition of the Existing
Fire Water Line.
NURICON PETROSERVICES (PTE.) LTD.
CUSTOMER JOB
Eni Pakistan Limited Turnkey Engineering Design, Procurement and
Installation of Cathodic Protection Services for
23Km x 10” K-14 Flowline at KADANWARI
Pakistan State Oil Co. Ltd. Fault detection, rectification and Re-Commissioning
of CP System of 8” x 4 Km Pipeline and 10” x 32
Km Pipeline at Lalpir.
Pakistan State Oil Co. Ltd. Fault detection, rectification and Re-Commissioning
of CP System of 16” Dia x 5.5 Km Pipeline at Jimco.
National Refinery Ltd. Design of Cathodic Protection System on Crude
2 Nos x Storage Tank (183-S-4 / 183-S-5 of 160’ /
140’ Dia) at Korangi.
National Refinery Ltd. Design of Cathodic Protection System on Crude
1 Nos x Storage Tank (155-S-42, 180’ Dia) at
Keamari Terminal.
Al Prince Engineers Supply and Installation of Cathodic Protection
System for Tank Bottoms at PARCO’s Bubak
Station.
OMV Pakistan Turnkey Engineering Design, Procurement and
Installation of Cathodic Protection System for Well
Casing at Miano Field ( Well No. 8 )
OMV Pakistan Supply and Installation of Spares for the Cathodic
Protection Solar Unit
OMV Pakistan Turnkey Engineering Design, Procurement and
Installation of Cathodic Protection System for
Sacrificial Fire Water Main at Kadanwari Plant
OMV Pakistan Turnkey Engineering Design, Procurement and
Installation of Cathodic Protection System for 1 No.
Well Casing at Sawan Field ( Well No. 5 )
Orient Petroleum Inc. Engineering Design of Cathodic Protection System
for 26 Km under ground piping and 7 No. Well
Casings.
Oil & Gas Development Corp Audit of the Cathodic Protection System installed for
protection of Plant Piping, Detailed Engineering
Design for the Protection of Oil Sewer Lines,
internal & external Protection of 03 No. condensate
storage Tank and 02 no. Disposal Well Casings.
NURICON PETROSERVICES (PTE.) LTD.
CUSTOMER JOB
Metal & Pipeline Protection Supply of Anodeflex for Bullet Tanks for SHV
Company Pakistan
Shell Pakistan Limited Design & Engineering for Cathodic Protection
System for Underground Fuel Pipeline at Islamabad
Airport.
Sui Northern Gas Pipeline External Corrosion Direct Assessment and CP Audit
Company of 170 km Gas Pipeline
OMV Pakistan Pipe Coating Survey including DCVG and C-Scan
of 10” x 45 Km Gas Pipeline
BHP Petroleum Pakistan Design Engineering Cathodic Protection System for
(Pty) Ltd. 7 nos Well Casings at ZamZama Gas Field
Sui Southern Gas Pipeline Supply of Tubular Mixed Metal Oxide Anodes
Company.
Shell Pakistan Limited Material Supply & Installation for Cathodic
Protection System for Underground Fuel Pipeline at
Islamabad Airport
Pakistan State Oil Cathodic Protection System Audit of various Fuel
Oil Pipelines at Mehmoodkot and Machike
BHP Petroleum/Petrochem Design Engineering of 6” x 28 km Condensate
Engineering Consultants Pipeline from ZamZama to Parco’s Bubak Station
BHP Petroleum/Petrochem Design of CP System for Two Nos Tank at Parco’s
Engineering Consultants Bubak Station based on Anodeflex System
Pakistan State Oil Rehabilitation and Rectification of CP System at
Jimco and Lalpir for 16” x 5.5 km, 8” x 4 km, 10” x
32 km and 12” x 2.5 km
Oil & Gas Development Turnkey Engineering Design, Material Supply and
Installation for 12” x 40 km Bobi-Sinjoro Gas
Pipeline
Petrochem Engineering/GE Designing of CP for underground Fuel Gas Supply
Capital System for Takoradi Thermal Power System at
Ghana, Africa
BHP Petroleum Rectification CP System & Repair of Coatings.
Designing of CP System for 5 x flowlines, 2 x sales
gas lines, condensate tanks & u/g plant piping.
NURICON PETROSERVICES (PTE.) LTD.
CUSTOMER JOB
Oil & Gas Development Corp Turnkey Engineering Design, Material Supply and
Installation & Commissioning of Cathodic Protection
System for 27 nos x Well Casing at Qadirpur based
on ThermoElectric Generators.
Pakistan State Oil Rehabilitation and Rectification of CP System at
Machike for 12” x 1.5 km
BHP Petroleum Material Supply and Installation of Condensate
Pipeline CP System for 6” x 28 km
Oil & Gas Development Corp Supply of Cathodic Protection System Material for
Tando Alam Complex
BP Pakistan Supply of Galvalum-III Anode for Cathodic
Protection System
Sui Southern Gas Co. Ltd. Supply of Mixed Metal Oxide Tubular Titanium
String Anode for Cathodic Protection System
BP Pakistan Supply of Galvalum-III Anode and Magnesium
Anode for Cathodic Protection System
Pakistan State Oil Rehabilitation and Repair works of CP System at
Mehmoodkot for 16” x 5.5 km
Oil & Gas Development Corp Turnkey Engineering Design, Material Supply and
Installation & Commissioning of Cathodic Protection
System for 21 Nos Well Casing based on Thermo
Electric Generators, Flowlines and 8 nos Storage
Tanks at Bobi and Kunnar Field
BHP Petroleum Repair works of Pipeline Coating at Zamzama Gas
Field
BP Pakistan DCVG Survey of 32 km of various pipelines at
Badin Block
Fatima Fertilizer Soil Resistivity Survey for Plant Piping and
Grounding System
Sui Southern Gas Co. Ltd. Supply of HSI Anodes for Cathodic Protection
System
Mari Gas Company Design of 10 nos x Well Casing and Flowlines at
Mari Gas Field based on ThermoElectric
Generators.
BHP Petroleum Commissioning of 2 Nos Storage Tanks based on
Anodeflex.
NURICON PETROSERVICES (PTE.) LTD.
CUSTOMER JOB
National Refinery/AJC Turnkey Engineering Design, Material Supply,
Engineers Installation and Commissioning of 1 Nos x 42.5 m
Storage Tank for both External and Internal
DDFC Design, Material Supply and Installation of Internal
Cathodic Protection of 4 Nos Vessels
Pakistan Petroleum Ltd Commissioning of Solar Power System 528 Watts
for Adhi Well Casing # 18
Presson Descon Engineering, Design, and Installation of Supply and
International / MOL Installation of External and Internal CP System of 8
nos Storage Tanks
Presson Descon Engineering, Design, and Installation of Supply and
International / MOL Installation of External CP System of Plant Piping.
National Refinery/Al Tariq Turnkey Engineering Design, Material Supply,
Constructors Installation and Commissioning of 6 Nos x 60 Ft
Storage Tanks based on Anodeflex System
Pakistan State Oil Company Rectification and Installation of Transformer
Rectifier at Lalpir
BP Pakistan Supply of Junction Boxes
Oil & Gas Development Com Design, Installation and Commissioning Services at
Tando Alam Oil Complex, Chanda, Mela and Bahu
Field for Well Casing, Flowlines and Storage Tanks
- 12 nos Well Casings based on Solar Power Units,
48 nos Storage Tanks and 77 km of various
flowlines
BP Pakistan DCVG Survey of total 9 km Pipeline at Tangri and
Sakhi
OMV Pakistan Repair Works for 3 layer Polypropylene Coating for
Duplex Flowlines at Sawan Gas Field
BP Pakistan CP Audit of Mirpurkhas / Khipro Block facilities and
associated pipelines.
Pakistan Petroleum Ltd Design Engineering of Adam X-1 Well Casing and
Flowline.
China National Chemical Turnkey Engineering Design, Procurement,
Engineering Company/Parco Installation Supervision & Commissioning of all
Refinery Station Piping including Firewater, Oil Water, Close
Drain Piping and 1nos x 52 m Storage Tanks.
NURICON PETROSERVICES (PTE.) LTD.
CUSTOMER JOB
Oil and Gas Development Turnkey Engineering Design, Material Supply and
Company Ltd Installation & Commissioning of Cathodic Protection
System for 8 Nos Well Casing and Flow Lines at
Qadirpur Gas Field based on Thermo Electric
Generators.
Sui Southern Gas Co. Ltd. Supply of 2100 Nos. High Silicon Iron Anodes for
Cathodic Protection System
Shell Pakistan Limited Turnkey Engineering Design, Material Supply,
Installation and Commissioning of 9 Nos Storage
Tanks at Islamabad Airport and 5 Nos. Tanks at
Quetta Airport
Haroon Engineering / Oil and Turnkey Engineering Design, Material Supply,
Gas Development Co. Ltd Installation and Commissioning of 2 Nos x 50 Ft
Storage Tanks at Kunnar and 1 No. x 60 Ft at TOC
based on Anodeflex.
MOL Pakistan/ Jaguar Turnkey Engineering Design, Material Supply,
Pakistan Installation and Commissioning of Cathodic
Protection System for 4” x 15 km Pipeline.
Sui Southern Gas Co. Ltd. Supply of 1350 Nos. High Silicon Iron Anodes for
Cathodic Protection System
Haroon Engineering/Oil and Turnkey Engineering Design, Material Supply,
Gas Development Co Ltd Installation and Commissioning of 2 nos x 60 Ft
Storage Tanks at Mela Oil Field
OMV Pakistan Turnkey Engineering Design, Material Supply,
Installation and Commissioning of Cathodic
Protection System for 2 Wells and Flow lines at
Miano Gas Field
BP Pakistan Ltd DCVG Survey of 104 km Pipeline at MKK
concession
Pakistan State Oil Co. Ltd External Corrosion Direct Assessment and Integrity
of 107 Km Pipeline
MOL Pakistan Detailed Engineering Design of 9 Well Casing at
Mamikhel and Makori
Sui Southern Gas Co. Ltd. Supply of 75 Nos. High Silicon Iron Anodes for
Cathodic Protection System
Pakistan Petroleum Ltd Design and Engineering of Cathodic Protection
System for 3 nos Well Casings and 2 x Fire Water
Lines at Chachar Field
NURICON PETROSERVICES (PTE.) LTD.
CUSTOMER JOB
BP Pakistan Ltd External Corrosion Direct Assessment and Integrity
of 16 km Pipeline at Sono, Dhabi and South Mazari
Pipelines
BP Pakistan Ltd Routine Monitoring of Impressed Current CP
System at Turk Facility.
CUSTOMER JOB
Oil & Gas Development Com Design, Installation and Commissioning Services of
1 Well Casings at Nashpa Field and 1 Well Casing
at Sheikhan (in-process)
Oil & Gas Development Com Design, Installation and Commissioning Services of
4 Well Casings and 16 Km Pipeline at Bahu Field
Oil & Gas Development Com Design, Installation and Commissioning Services of
3Well Casings at Chanda Field
Oil & Gas Development Com Design, Installation and Commissioning Services of
5 Nos. Tanks at Chanda Field
Oil & Gas Development Com Design, Installation and Commissioning Services of
2 Well Casings at Mela Field
Oil & Gas Development Com Design, Installation and Commissioning Services of
3 Tanks at Mela Field
Shell Pakistan Ltd Supply and Installation of CP System at Karachi
Airport
IKAN Engineering/MOL Engineering Design, Material Supply of CP System
Pakistan for Knock Out Vessel – ID 5.5 Ft x 16.5 Ft Height
SPEC Energy, UAE/Petronas, Engineering Design, Material Supply and
Iraq Installation Supervision of CP System of 18” Dia
Pipeline and 10” Dia Pipeline
SGS Qatar /ORYX GTL, Qatar Audit of Cathodic Protection System
Pakistan State Oil Co. Ltd Supply and Installation of CP System at PSO
Machike
ENI Pakistan Supply of Cathodic Protection Material
Oil and Gas Development Turnkey Engineering Design, Material Supply and
Company Ltd Installation & Commissioning of Cathodic Protection
System for Well Casing, flow lines and plant piping
based on Thermo Electric Generators at OGDC
Qadirpur Gas Field
Pakistan State Oil Co. Ltd Supply and Installation of CP System at PSO
Sihala, Mehmood Kot and Lalpir
United Energy Pakistan Ltd. DCVG, PCM & CIPS Survey of 80 KM pipelines at
different locations
United Energy Pakistan Ltd. DCVG, 5 KM pipelines at different locations
NURICON PETROSERVICES (PTE.) LTD.
CUSTOMER JOB
IKAN Engineering/Oil and Gas Turnkey Engineering Design, Material Supply,
Development Co Ltd Installation and Commissioning of 5 nos Storage
Tanks for External and 10 Nos. Tanks for Internal at
Sinjhoro Field.
Shell Pakistan Ltd Supply and Installation of CP System at Nawabshah
and Sukkur Airport
CH2M HILL VECO Design of CP System of Flowlines.
Engineering, AbuDhabi /
Petronas, Iraq
AJC Engineers/Oil and Gas Turnkey Engineering Design, Material Supply,
Development Co Ltd Installation and Commissioning of 1 No. x 60 Ft
Storage Tanks at Chanda Oil Field
Haroon Engineering/Oil and Turnkey Engineering Design, Material Supply,
Gas Development Co Ltd Installation and Commissioning of 2 nos x 60 Ft
Storage Tanks at Nashpa Oil Field.
Presson Descon Engineering, Design, and Installation of Supply and
International / MOL Installation of External CP System of 6 nos. Tanks
and 10 Nos. LPG Bullets at Makori Field.
CUSTOMER JOB
Shell Pakistan Ltd CP Audit of Shell Sukkur and Nawabshah Airports –
United Energy Pakistan Ltd. DCVG, 13.65 KM pipelines at different locations
United Energy Pakistan Ltd. Routine Monitoring of Impressed Current CP
System at Turk Facility.
United Energy Pakistan Ltd. Routine Monitoring of Impressed Current CP
System at MKK Facility.
Zealcon Engineering/Oil & Gas Turnkey Engineering Design, Material Supply,
Development Co. Ltd Installation and Commissioning of 6 Nos. Storage
Tanks at UCH Gas Field.
Oil and Gas Development Turnkey Engineering Design, Material Supply and
Company Ltd Installation & Commissioning of Cathodic Protection
System for Well Casing, flow lines and plant piping
based on Thermo Electric Generators at OGDC
KPD and TAY Field
Shell Pakistan Ltd CP Audit of Shell Karachi, Quetta and Islamabad
Airports –
Al-Tariq Constructors / Engro Design, Engineering, Supply, Installation and
Chemical. Commissioning of CP system of Pipelines for Chiller
Project at Engro Chemical.
Oil and Gas Development Rectification of Transformer Rectifier at Nandpur
Company Ltd Field.
Oil and Gas Development Turnkey Engineering Design, Material Supply and
Company Ltd Installation & Commissioning of Cathodic Protection
System for Well Casing, flow lines and plant piping
based on Thermo Electric Generators and Solar
Power System at OGDC Different Fields.
IKAN Engineering/Pak-Arab Turnkey Engineering Design, Material Supply,
Refinery Limited Installation and Commissioning of CP System at 1
No. Storage Tanks at PARCO Refinery Multan.
Al-Tariq Constructors / Engro Design, Engineering, Supply, Installation and
Chemical. Commissioning of CP system of Additional Pipeline
for Chiller Project at Engro Chemical
United Energy Pakistan Ltd. DCVG,PCM and CIPS Survey of around 69 KM
pipelines at different locations
United Energy Pakistan Ltd. Design of CP System at Naimat Basal-II facility.
United Energy Pakistan Ltd. Supply of Magnesium Anodes
NURICON PETROSERVICES (PTE.) LTD.
CUSTOMER JOB
OMV Pakistan Exploration Supply and Installation of Test Post at Sawan Field
International Power/Hubco Technical Audit of Hub Power Station Cathodic
Protection System
Fauz Engineering Limited Turnkey Engineering Design, Material Supply,
Installation and Commissioning of CP System at 1
No. Storage Tanks
United Energy Pakistan Ltd. Installation of CP System at Naimat Basal-II facility
OMV Pakistan Exploration DCVG and CIPS Survey of 68 KM pipelines at
Miano Field
Shell Pakistan Ltd CP Audit of Shell Sukkur and Nawabshah Airports
Presson Descon Engineering, Design, and Installation of Supply and
International / PPL Installation of External and Internal CP System of
Tanks and Vessels at PPL Gambhat Field
Presson Descon Engineering, Design, and Installation of Supply and
International / PPL Installation of Plant Piping at PPL Gambhat Field.
Pakistan Refinery Limited Installation of Ground Bed at NRL and PAF Sites.
Pakistan Refinery Limited Supply of Anode Junction Boxes alongwith
Rheostats and Shunts.
United Energy Pakistan Ltd. DCVG,PCM and CIPS Survey of around 26 KM
pipelines at different locations.)
Pakistan Refinery Limited Audit of CP System.
Shell Pakistan Ltd CP Audit of Shell Quetta, Islamabad Sukkur and
Nawabshah Airports
OMV Pakistan Exploration Design, Engineering, Supply, Installation and
Commissioning of CP System for Mehar 1,2,3,
Wellhead Casings. NGM and Flow lines based on
Solar Power System.
CUSTOMER JOB
United Energy Pakistan Ltd. CP Audit of Turk Facility
Mari Petroleum Company Supply, Installation and Commissioning of CP
Limited System of Pipeline and 1 No. Tank at Sajawal Field
(In Progress).
United Energy Pakistan Ltd. Design Engineering of CP System for Fire Water
Pipeline at Naimat Basal LPG Plant
Pakistan Petroleum Ltd E log I Survey, Material Supply, Installation &
Commissioning of CP System based for 3 nos Well
Casings (Adhi 22, 23 & 24) at Adhi field (In-
Progress)
Sui Southern Gas Company Supply of HSCI Tubular Anodes- 480 Nos.
Limited.
NURICON PETROSERVICES (PTE.) LTD.
CUSTOMER JOB
Engro Polymers & Chemicals Rehabilitation of CP System of Raw Water Line
(In Progress).
This is to certify that the Re-certification Audit of Nuricon Petroservices (Pte) Ltd, was
carried out re-certification audit, as a result of which, they have been recommended for Re-
certification under the ISO 9001:2015 standard by DNV GL. Their re-certification process
is under way and soon their ISO 9001:2015 certificate will be issued.
807, 8th Floor, Anum Estate, Block-7/8, P.E.C.H.S., Shahrah-e-Faisal Karachi, Pakistan. Tel: 92 21 34390026-27 Fax: 92 21 34390028
NURICON PETROSERVICES (PTE.) LTD.
LIST OF CP EQUIPMENT
RESUME
PERSONAL
Name : Maqsood-uz-Zaman
Birth Date : January 17, 1954
National I.D. No. : 42201-2374662-1
Nationality : Pakistani
E-mail : maqsood.temuri@nuricon.com
ACADEMICS
MS Engineering : Southern Illinois University at Carbondale, USA – 1988
Specialization : Materials Science
Thesis : Prevention of Oxidation of Carbon-Carbon Composites
by Oxide Films
BE (Metallurgical) : Dawood College of Engineering & Technology, Karachi,
Pakistan – 1977
Higher Secondary : D. J. Govt. Science College, Karachi – 1972
School Certificate
Secondary School : Central Model School Samanabad, Lahore – 1970
Certificate
AFFILIATIONS
Professional Member : MICorr (Institute of Corrosion, UK)
Professional Engineer : Pakistan Engineering Council
Member : National Association of Corrosion Engineers, Houston
TRAININGS/CERTIFICATES
1. Senior Corrosion Technologist (NACE)
2. Prevention of Corrosion in Chemical Industry, NACE-SOFTEC
3. Control of Corrosion by Coatings, NACE-SOFTEC
4. Finance for Non-Financial Executives – Pakistan Institute of Management Sciences
5. Basic Corrosion Course – NACE
6. Bio Fouling – National Institute of Oceanography, Karachi
NURICON PETROSERVICES (PTE.) LTD.
PROFESSIONAL EXPERTIES
APART FROM BID PREPARATIONS, PLANNING, PROCUREMENTS AND
GENERAL MANAGEMENT; HAVE DIRECTLY UNDERTAKEN THE
ENGINEERING/DESIGN, INSTALLATION AND COMMISSIONING OF
CATHODIC PROTECTION SYSTEMS FOR PIPELINES, TANKS, WELL
CASINGS, MARINE STRUCTURES, THERMAL POWER PLANTS, AND
CONCRETE RE-BARS. ALSO INCLUDES FAILURE INVESTIGATIONS
AND OPERATION & MAINTENANCE OF CP SYSTEMS
ECDA
C-Scan, PCM, DCVG and Pearson Surveys
Holiday Detection
(CIPS) Close Interval Survey
Soil Resistivity Surveys (Wenner 4 Pin and Geonics EM34)
Design, Engineering, Installation and Commissioning of Electric Heat Trace Systems
for Pipelines and Tanks
POSITIONS HELD
1. Graduate Assistant (Teaching/Research) 2. Instructor (Mechanical)
Sep 1985 - May 1988 Jun 1980 - Jan 1981
Southen Illinois University at Carbondale, Swedish Pakistan Institute of Technology, Karachi,
Carbondale, Illinois, USA. Pakistan
3. Assistant Executive Engineer 4. Sales Engineer/Site Supervisor
Sep 1981 - Aug 1985 and July 1989 - Feb 1993 Oct 1979 – Jun 1980
Pakistan Steel, Karachi, Pakistan
5. Assistant Resident Engineer 6. Resident Engineer
Oct 1991 - Oct 1993 Dec 1989 – Jun 1990
KF Corporation, Karachi, Pakistan ESCON/Pakistan Engineering Services, Karachi,
Pakistan.
Project: Refurbishment of 20” dia.x65 km
Mari-Guddu Gas Pipeline Coating & CP Project: Survey and Design of CP System for 600
System AND Supply, Installation, MW Guddu Thermal Power Plant Piping Network
Test/Commissioning of CP System for 600 and Tanks AND Evaluation/Recommendation for
MW Guddu Thermal Power Plant Piping 20” dia.x65 km Mari-Guddu Gas Pipeline Coating
Network and Tanks. & CP System.
7. Joined as Senior Sales Executive / Corrosion 8. Manager (Corrosion Prevention Services /
Engineer to Nuricon Group of Companies in Sales) - Present Position with Nuricon Group of
Dec 1994 and then promoted to Manager in Companies since 1997-2008.
1997.
Presently, General Manager since July 2008.
Projects: Various – List of some of the
projects is given below.
Page 2 of 5
NURICON PETROSERVICES (PTE.) LTD.
Middle East
Have worked with Abdullah Fuad Impalloy, Saudi Arabia on various projects in 1997 and
similarly worked on various projects with Amran Cathodic Protection Services LLC., Sultanate
of Oman in 2008.
Page 3 of 5
NURICON PETROSERVICES (PTE.) LTD.
19. Design of Cathodic Protection System for 600MW Guddu Thermal Power Plant,
based on (200ft) deepwell groundbeds, 1989 – WAPDA
20. Installation of Cathodic Protection System for Guddu Thermal Power Plant,
1991-93 – WAPDA
21. Installation of Insulating Flanges on Mari-Guddu Gas Pipeline, 1991-93 –
WAPDA
22. Engineering of Cathodic Protection System for Ø6” and Ø8”-20 km Tando Alam-
Pasaki Oil Pipeline, 1995 – OGDC
23. Engineering and Design of Cathodic Protection System for Ø4”-2 ½ km Lashari
flow line, 1996 – OGDC
24. Design & engineering of cathodic protection system for Ø8”-3 ½ km Gas
Pipeline at Sadqal, 1995 – OGDC
25. DCVG Survey of ø16”-6km long PARCO-Jimco White Oil Pipeline, 1996 –
Shell-Caltex-PSO (Joint Owners)
26. Soil resistivity, PSP, E-log I Survey for 59 Well Casings, 1996 – Mari Gas
Company Limited (MGCL)
27. Preparation of Tender Documents for the cathodic protection system for well
casings of Mari Gas Field, 1996 – MGCL
28. Preparation of Feasibility Study Report for Mari gas field well casings’ cathodic
protection, 1996 – MGCL
29. Feasibility study for the cathodic protection of Tank Bottom exteriors (AST’s),
1996 – Shell Pakistan
30. Evaluation of the cathodic protection system for Laghari Facilities, 1996 – Union
Texas Inc.
31. Installation and commissioning of the cathodic protection system for ø6”and 8”-
20 km Pasaki-Tando Alam pipeline, 1996-97 – OGDC
32. Cathodic protection of oil storage tank bottom exteriors (in collaboration with
Raychem Technologies, Inc.). CP system is based on Anodeflex ®, a continuous
impressed current polymeric anode. This system is used for the first time in
Pakistan. 1996-97 – Shell Pakistan
33. Cathodic protection of Ø16”-6 km PARCO-Jimco pipeline. (In collaboration with
Raychem Technologies, Inc.). CP system is based on Anodeflex ®, a continuous
impressed current polymeric anode. This system is used for the first time for a
pipeline in Pakistan. 1996-97 – Shell-Caltex-PSO (Joint Owners)
34. Supply, installation and commissioning of cathodic protection system for Lashari
pipeline, 1997-98 – OGDC
35. Supply, installation and commissioning of cathodic protection system for Sadqal
pipeline, 1997-98 – OGDC
36. Feasibility study for the cathodic protection of flow lines and well casings at
Bobbie and Mithrao fields, 1998 (project in hand) – OGDC
37. Soil resistivity survey, Design and Detailed Engineering of Dia. 36” and 56” x 10
km Water Pipelines for Rawalpindi Development Authority (Owner), Mot
Page 4 of 5
NURICON PETROSERVICES (PTE.) LTD.
It’s a long list. If further update of corrosion oriented works is required then kindly
advise.
Page 5 of 5
NURICON PETROSERVICES (PTE.) LTD.
RESUME
PERSONAL
Name : Muhammad Asif Siddiqui
Father Name : Abdul Ghani Siddiqui
Date of Birth : September 18, 1974
Nationality : Pakistan
N.I.C Number : 42101-0878443-7
Home address : R-790 sector 15-A-3 Buffer zone Karachi 75850,
Pakistan
Home Telephone : +92-21-36955363
Cell Number : +92-301-8225075
Email : asif.siddiqui@nuricon.com
Page 1 of 11
Asif Siddiqui
NURICON PETROSERVICES (PTE.) LTD.
PROJECTS SUPERVISED
1. CP Audit.
Following CP System of Pakistan stat Oil installed in
Mehmood kot.
2. Inspection, Rectification.
Cathodic Protection system failure for jet fuel hydrant and
Piping at new Lahore International Airport
3. CP Audit.
1.5 Km 12” dia pipe line from
PARCO to PSO (MACHIKE)
4. CP Audit.
Following CP Systems of SNGPL (Sui Northern Gas
Pipelines)
5. ECDA
External Corrosion Direct Assessment for following SNGPL
pipe line which includes
D.C.V.G, C.I.P.S additionally P.C.M
Page 2 of 11
Asif Siddiqui
NURICON PETROSERVICES (PTE.) LTD.
PROJECTS SUPERVISED
(Continued)
6. DCVG.
To identify and repair the problems in Anode flex for
rehabilitation of CP System in PSO Mehmood kot for
following lines.
7. DCVG.
To identify the cause of low potentials level on following
line for PSO Mehmood kot
11. CP system
Ground bed installation in PSO Lalpir,
Furnace Oil Depot, Mahmod kot for 32km 10” Dia
KAPCO pipeline.
PROJECTS SUPERVISED
(Continued)
14. CP System.
Installation and commissioning of secrifitail anode
based CP system for 6” Dia 28 km long condensate
pipeline from BHP ZAMZAMA to PARCO Bobak
station.
15. CP System.
Installation of TEG (thermo electric generator) based CP
system for well casings of X2, QP-12, QP-06 and QP-14 of
OGDCL Qadirpur gas field Ghotki.
16. CP System.
Installation of TEG (thermo electric generator) based CP
system for well casings of QP-01, QP-28 and QP-15 of
OGDCL Qadirpur gas field Ghotki.
17. CP System.
Installation of TEG (thermo electric generator) based CP
system for well casings of QP-10, QP-13 and QP-20 of
OGDCL Qadirpur gas field Ghotki.
18. CP System.
Installation of TEG (thermo electric generator) based CP
system for well casings of QP-11, QP-08 and QP-07 of
OGDCL Qadirpur gas field Ghotki.
19. CP System.
Installation of TEG (thermo electric generator) based CP
system for well casings of QP-21, QP-25 QP-23 and QP-27
of OGDCL Qadirpur gas field Ghotki.
20. CP System.
Installation of TEG (thermo electric generator) based CP
system for well casings of QP-22, QP-26 and QP-24 of
OGDCL Qadirpur gas field Ghotki.
21. CP System.
Installation of TEG (thermo electric generator) based CP
system for well casings of QP-16 and QP-19 of OGDCL
Qadirpur gas field Ghotki.
Page 4 of 11
Asif Siddiqui
NURICON PETROSERVICES (PTE.) LTD.
PROJECTS SUPERVISED
(Continued)
22. CP System.
Anodeflex installation for PSO JIMCO terminal
PARCO to JIMCO pipeline mehmood kot
23. CP System.
Test and commissioning of Solar powered CP
system for well #18 PPL Adhi Gas field Doltala.
25. CP System.
Test and commissioning of Tank bottom CP system of
BHP installed in PARCO Bubak Pumping station.
Page 5 of 11
Asif Siddiqui
NURICON PETROSERVICES (PTE.) LTD.
PROJECTS SUPERVISED
(Continued)
30. Tank bottom CP system
Ribbon anode based Tank bottom CP system 7 No. Tanks
for MOL at Manzalai Central processing facility.
Page 6 of 11
Asif Siddiqui
NURICON PETROSERVICES (PTE.) LTD.
PROJECTS SUPERVISED
(Continued)
38. CNCEC.
Tank bottom CP system installation for CNCEC (China
National Chemical Engineering Company) in Parko Mid
Country Refinery at Mehmood kot
41. DCVG.
DCVG survey for BP Pakistan of following lines.
42. CP System
Anodeflex biased Tank bottom CP system for NRL.
(National Refinery Limited Karachi.)
01) Dakhni 01
02) Dakhni 02
03) Dakhni 03
04) Dakhni 04
05) Dakhni 05
06) Dakhni 06
07) Dakhni 07
08) Dakhni 08
Page 7 of 11
Asif Siddiqui
NURICON PETROSERVICES (PTE.) LTD.
PROJECTS SUPERVISED
(Continued)
44. TEG.
Thermoelectric generator performance test after
modification advised by Nuricon and OGDCL in Global
Thermo Electric’s TEG testing facility Basano Canada.
45. ECDA.
External Corrosion Direct Assessment of following pipe
lines for PSO. Which includes D.C.V.G, C.I.P.S additionally
P.C.M and Soil resistivty.
46. CP System
Anodeflex biased CP system for newly constructed 2 tanks
in Kunner Oil field by Haroon Engineering.
Page 8 of 11
Asif Siddiqui
NURICON PETROSERVICES (PTE.) LTD.
PROJECTS SUPERVISED
(Continued)
49. CP system
Tank bottom CP system commissioning at OGDCL Dakhni
field.
50. CP system
Anodeflex based CP system of tank bottom for under
construction storage tank at Kunner field.
51. CP system
Low potential cause investigation for MOL at Manzalai
central processing facility.
55. CP Audit
CP audit of following CP system for BP Pakistan.
01) QP-31
02) QP-32
03) QP-33
04) QP-35
05) QP-36
06) QP-37
07) HRL-2
08) HRL-3
Page 9 of 11
Asif Siddiqui
NURICON PETROSERVICES (PTE.) LTD.
PROJECTS SUPERVISED
(Continued)
57. Well Casing CP System.
Solar Power based CP system installation and
commissioning for OGDCL Chanda Field for following 3
well casings
01) Chanda-01
02) Chanda-02
03) Chanda Deep-01
01) Mela-01
02) Mela-02
59. CP system.
Solar powered CP system rectification at OGDCL Chanda
and Mela Fields.
60. CP system.
TEG and Solar powered CP system rectification for
OGDCL Bobi Oil field.
01) CHAK-7A
02) CHAK-2-1
03) CHAK-2-2
04) CHAK-2-3
05) CHAK-66-1
06) CHAK-66-NE
07) BALOCH-1
08) RESHAM
09) CHAK-63-1
10) CHAK-63-SE
11) CHAK-63-3
12) HAKEEM DHAO-1
13) HAKEEM DAHO-2
14) CHAK-63-4
15) LALA JAMALI
16) PLANT PIPING
Page 10 of 11
Asif Siddiqui
NURICON PETROSERVICES (PTE.) LTD.
62. CP system.
TEG based CP system installation for OGDCL Sinjhoro Oil
and Gas field for 15 wells.
63. ECDA.
External Corrosion Direct Assessment of following flow lines
for OGDCL. Which includes D.C.V.G, C.I.P.S additionally
P.C.M, Soil resistivity and differential GPS.
1) QP-01 1.450 km
2) QP-x2 1.500 km
3) QP-03 1.750 km
4) QP-06 0.860 km
5) QP-07 1.100 km
6) QP-08 0.675 km
7) QP-09, 33 3.040 km
8) QP-10 0.230 km
9) QP-11 0.600 km
10) QP-12 0.250 km
11) QP-13 0.300 km
12) QP-14 0.660 km
13) QP-15 1.043 km
14) QP-16 0.980 km
15) QP-19 0.560 km
16) QP-21 1.050 km
17) QP-22 2.150 km
18) QP-23 0.165 km
19) QP-24 2.375 km
20) QP-25 0.910 km
21) QP-26 2.100 km
22) QP-27 0.150 km
23) QP-28 1.000 km
24) QP-29 0.500 km
25) QP-30 0.500 km
26) QP-31 2.500 km
27) Northern Header 6.900 km
28) Eastern Header 4.597 km
29) Combine line QP-x2, 12, 31, 37 1.950 km
64. CP system.
TEG based CP system installation of 11 well casings, Gas
transfer flow lines and up-gradation of plant piping CP system
for OGDCL Qadirpur Gas field for 15 wells.
65.
Page 11 of 11
Asif Siddiqui
Nuricon Petroservices (Pte.) Ltd.
RESUME
PERSONAL
ACADEMIC QUALIFICATION
: M. Sc (Petroleum Technology)
PROFESSIONAL QUALIFICATION
DESIGNATION/DESCIPLINE
PROFESSIONAL EXPERTIES
AND CAPABILITIES
RESPONSIBILITIES HELD
PROJECTS SUPERVISED
Completed the following projects successfully.
RESUME
PERSONAL
ACADEMICS
: Diploma of Associate Engineer in
Electronics, G.C.T S.I.T.E Karachi.
RESPONSIBILITIES HELD
A. Material, Installation, Test and commissioning
of cathodic protection systems for Pipelines,
Storage Tanks and Well Casings.
PROJECTS SUPERVISED
Completed the following projects successfully.
PROFESSIONAL EXPERIENCE:
CP designing for new Pipelines on Impressed / Sacrificial Anodes system. Up grading of existing CP systems
on Transmission/distribution Line and Facilities/Plants,
C. Scan Surveys / D.C.V.G Survey/ CIPS &PCM Survey and Interference Surveys.
Review and interpret corrosion/inspection monitoring data, along with trends and existing mitigation
measures. Recommend changes in the corrosion criticality analysis and monitoring/inspection program where
appropriate.
Initiate the implementation of corrosion prevention measures in areas of Cathodic Protection, Corrosion, as
well as Insulation Systems.
Cathodic Protection of Storage Tanks. Well casings. G.O.S.Ps, Oil & gas Transmission / Distribution lines.
Inspection/Maintenance/Trouble shooting of T/R Units, Teg Units and Solar panels.
Identify major deterioration threats and ensure that integrity limitations are addressed and consequently
propose suitable mitigation techniques.
Conducting / developing Corrosion control Training programs at office as well as in field
HSE awareness /Training of staff according to requirements.
Participation in the regular review of Corrosion Control root Cause Analysis and failure investigations
mitigation of interference problems.
Participate in. Coating inspections according to’AWWA’& ‘BS standards’
Soil resistivity surveys / current drain tests / Designing of Ground beds {Horizontal / Vertical type}.
Pipe to soil potential (PSP) surveys / Close interval potential surveys (CIPS) / Pearson surveys (Coating
inspections). Inspection/Repair of Insulating Flanges / joints.
Keep corrosion & erosion mitigation, monitoring and management program updated in line with the changing
production.
E log I Test on well casings.
Locating of Hotspots / Coating faults on old lines and direct inspections.
Preparation of field reports, sketching on computer, Data entries, Graphical representation of field reports /
status & recommendations for upgrading/rehabilitation work of old lines and CP systems.
Recently, I have completed 6 Projects of “ECDA” Surveys on our Transmission lines (450km) for which I was
selected to obtain ECDA Training at “P.P.T (Pvt) office “Johannesburg South Africa”
Page 2 of 3
EMPLOYMENT HISTRY:
CORROSION tECHNOLOGIST. N.P.S.L Karachi (PAKISTAN) May 2011- to- Till present
Working with an Oil & Gas Inspection company involved in C.P Designing/ Installation of all type of
CP systems/Monitoring & carrying out RBI/ECDA projects in oil & gas fields scattered in various
parts of Pakistan as well as abroad. ECDA Projects completed at Oil Gas Fields of OGDCL & B.P
Pakistan.
EXECUTIVE TECHNICAL OFFICER (CORROSION) 1972 –to- Feb, 2011
Joined “Sui Northern gas Pipelines in 1972 as a’ Sub Engineer (Corrosion) in Transmission & Distribution
network. Promoted up to “Exec-Technical Officer Corrosion/Section Incharge of Transmission (1350 km
Lines of different Dias i.e. 8” to36”including Compressors Stations. As well as Distribution area network. Exp-
to plan program on monthly / quarterly basis for routine jobs and integrity surveys on old pipelines. During
my service with my mother company, I worked on secondment basis with ARAMCO and PDO (Oman) to
improve and to enhance my knowledge & expertise.
With Project-5 of SUI NORTHERN GAS Pipelines as a ’Q.C/QA Inspector on construction / installation of
new Pipelines. Coating inspection (Coal tar based Enamel / 3 LPE coatings) / during construction & lowering
of pipelines. Designing / testing / commissioning of C.P System on new lines of various Dias i.e. 8" to 36"Ø
lines.
{1990-1999 with, Sui Northern gas Pipelines as a Technical Officer (Corrosion)}
Sr.CP TECH.
PETROLEUM DEVELOPMENT OF (OMAN) 1999
With S.T.S as “Senior CP Tech.’ on Cathodic protection of Oil / Gas Lines ,Well casings Storage tanks
/ Gathering stations (GOSP).Inspection/maintenance all kind of CP System i.e. T/R, Teg and solar units,
Where I successfully passed “HSE” tests & Work permit tests.
{1999-Feb, 2011 with, Sui Northern gas Pipelines as a Exec. Technical Officer (Corrosion)
As a Trainer: Provided training to SNGPL staff at SNGTI Lahore and ‘SGS Pakistan’ Engineers at
Karachi regarding Corrosion/Cathodic protection mechanism and related Field surveys.
Page 3 of 3
EDUCATION:
Post Graduation (Political Sciences & Punjabi Language) University of Punjab. 1995
Graduation (Major in Journalism From University of Punjab) 1st Class 1988
HND (3years Diploma of “Associate Electrical Engineer) 1st,Class 1970
S.S.C EXAM (Science & Technical Drawing) 1st,Class 1966
PUBLICATION: My case study article”Disbonded coating leads to P/Line Corrosion’ has published in
Material Performance MP, Oct-2010, MP is an official magazine of NACE, International USA,
AFFILIATION:
Senior Corrosion Technologist Cert-No: 48561 Expire 12/31/2016. 10 years, Recognized professional
affiliation with (N.A.C.E) International} in good standing Membership # 111529 since 2003 {Member
Technical Committee, STG 05-Cathodic Protection 2011-12}
M.I Corr. Cert- No. 205866 (Institute of Corrosion-U.K)
Member ‘Society of Corrosion Engineers Pakistan’ Membership No. M-79
TECHNICAL SKILL:
Software: Window, 2000.XP /Microsoft office (Word, Excel. Power Point. Out look) Design / copy
writing. PECIMS software for ECDA analysis.
GENERAL:
LANGUAGES:
Proficient in English Urdu, Hindi and Can understand Arabic spoken.
DRIVING LICENCE:
Holding a valid driving license, having sound health and physique.
PASPORT:
Holding a valid International Passport # BU6172831 valid up to: 3rd,June 2017.
SOCIAL NETWORK: http://pk.linkedin.com/pub/javed-waheed/2b/99a/b4a
http://www.facebook.com/javed.faisalabadii
NURICON PETROSERVICES (PTE.) LTD.
RESUME
PERSONAL
Name : Mazhar Naeem Siddiqui
Father Name : Muhammad Mateem Siddiqui
Date of Birth : January 1st 1970
Nationality : Pakistan
N.I.C Number : 42201-8494445-5
Page 1 of 6
Mazhar Naeem Siddiqui
NURICON PETROSERVICES (PTE.) LTD.
PROJECTS SUPERVISED
1. CIPS Survey
46 Km long Gas Gathering lines of OMV Pakistan at
Sawan.
2. CP System.
Thermo Electric Generator (TEG) based CP system
for well casings of QP-29 of OGDCL Qadirpur gas
field Ghotki.
3. CP System.
Thermo Electric Generator (TEG) based CP system
for well casings of QP-30 of OGDCL Qadirpur gas
field Ghotki.
5. DCVG
DCVG survey of following lines
a) TAJEDI trunk line 7.5 Km
b) South MAZARI trunk line 7.1 Km
d) DHABI North Trunk line 4.9 Km
e) KHOREWAH TURK flow line 11.7 Km
7. CP System.
Solar System based CP system for Well casing of six
wells located at OGDCL Dakhni.
8. CP System.
TRU based CP system for tank and Flow line located
at PARCO DHDS.
9. CP System.
CP system for Fire water line located at MOL CPF
situated at Makori gas field.
Page 2 of 6
Mazhar Naeem Siddiqui
NURICON PETROSERVICES (PTE.) LTD.
10. CP System
Pre design survey including E LogI, Geonics and Soil
resistivity survey for eight well casings located in
Manzalai gas field.
12. CP System
CP System for Tanks Bottom, internal and F/W Line
located at MOL Pakistan Manzalai Gas Field.
14. CP System.
Installation of TEG (thermo electric generator) based
CP system for well casings of X2, QP-12, QP-06 and
QP-14 of OGDCL Qadirpur gas field Ghotki.
15. CP System.
Anodeflex installation for burried vessels at MOL
Manzalai Central processing facility.
16. CP System.
TRU based CP system with Anodeflex installation for
Tank bottom CP system at NRL (National Refinary)
Karachi.
Page 3 of 6
Mazhar Naeem Siddiqui
NURICON PETROSERVICES (PTE.) LTD.
21. CP System.
22. CP System.
TRU based CP system for Tank bottom Internal and
External of Four Tanks located at MOL CPF
(Manzalai)
23. CP System.
TRU Based CP System for Fire water line with Test
Posts located inside MOL (Pakistan) CPF, Manzalai
Facility Kohat.
24. CP System.
PCM and DCVG on PSO Pipeline from BOT to PQA
BS1.
25. CP System.
PCM and DCVG on PSO Pipeline from ZOT to PQA
BS1.
Page 4 of 6
Mazhar Naeem Siddiqui
NURICON PETROSERVICES (PTE.) LTD.
26. CP System.
TEG Based CP system for Wel casing and Pipe line in
OGDCL Qadirpur Gas Fied.
Well names: QP-31, 32,33, 35, 36, 37, HRL-2, HRL-3.
OTHER PROJECTS
2. CP system
CP system installation for Shel Pakistan (Shell
Aviation Service) for Mounded tanks at Quetta
Internation Airport.
3. ECDA
External Corrosion Direct Assessment for PSO
(Pakistan State Oil) which includes DCVG. PCM, CIS,
Soil resistivity. For following pipe lines,
BOT to MW1 (3.2 Km)
Page 5 of 6
Mazhar Naeem Siddiqui
NURICON PETROSERVICES (PTE.) LTD.
Page 6 of 6
Mazhar Naeem Siddiqui
NURICON PETROSERVICES (PTE.) LTD.
RESUME
PERSONAL
Name : Kashif Serwer
Father Name : S. Serwer Hussain
Date of Birth : October 28, 1978
Nationality : Pakistan
N.I.C Number : 42401-1885941-1
OGDCL.
Impressed current cathodic protection system for
well casings Qadirpur Gas field.
OGDCL.
Pre- Design survey including E-Log I of well
casing and Soil resistivity for Ground bed
installation Bobi Oil Field.
OGDCL.
Pre- Design survey including E-Log I of well
casing and Soil resistivity for Ground bed
installation Kunner Gas Field.
Page 1 of 4
NURICON PETROSERVICES (PTE.) LTD.
National Refinery
Installation and Commissioning of 6 Nos x 60 Ft
Storage Tanks based on Anode flex System.
OGDCL.
Impressed current cathodic protection system for
well casings & Tanks Based Bobi Gas field.
OGDCL.
Impressed current cathodic protection system for
well casings & Tanks Based Kunner Gas field.
PPL.
Pre- Design survey including E-Log I of well
casing and Soil resistivity for Ground bed
installation.
OGDCL.
Pre- Design survey including E-Log I of well
casing Soil resistivity and Geo test for Ground
bed installation.Pipe line current drain test
Qadirpur Gas Field.
OGDCL.
CP system Installation of TEG (thermo electric
generator) based CP system for well casings of
Qadirpur gas field Ghotki.
PROJECTS SUPERVISED
OGDCL.
CP system Installation of TEG (thermo electric
generator) based CP system for well casings of
Bobi gas field.
OGDCL.
CP System Installation of test posts at Bobi gas
plant.
OGDCL.
Solar system based CP system installation for
well casing for Kunner field.
Page 2 of 4
NURICON PETROSERVICES (PTE.) LTD.
PROJECTS SUPERVISED
(Continued)
CP System
Installation of test posts at OGDCL Kunner gas
plant.
CP System
Solar System based CP system for Well casing of
seven wells located at OGDCL Dakhni.
CP System
Tank bottom of 8 storage tanks at OGDCL
Dakhni field.
Solar system
CP system installation at Miano 13 well casing for
OMV Kadanwari gas field.
CP system
Supervised by 28” pipeline F/W line and plant
area under ground piping network at PARCO
Mehmood Kot.
CP System
TRU based CP system for tank bottom at Shell
Aviation Islamabad.
Solar System
CP system for Well casing of five wells located at
OGDCL Chanda /Mela oil field.
CP System
Tanks bottom of 8 storage tanks at OGDCL
Chanda Mela oil field.
CP system
Tank bottom of 4 storage tanks at Ikaan OGDCL
field Sinjhoro.
OGDCL
Soil Resistivity survey for pipe lines at Qadir pur
Gas Field.
Page 3 of 4
NURICON PETROSERVICES (PTE.) LTD.
OGDCL
PCM survey for pipe lines at Qadir pur Gas Field.
OGDCL
DCVG survey for pipe lines at Qadir pur Gas
Field.
OGDCL
CIPS survey for pipe lines at Qadir pur Gas Field.
UEPL
Plant & wells and flow line CP system audit at Naimat
Basal, Umer and Kosar field.
SHELL
TRU based CP system for tank bottom at Shell
Aviation Nawab Shah.
OGDCL
C.P System installation of well casing, plant and
flow lines at Qadirpur gas field.
POGC
Soil resistivity test, Geonics for design of CP
system Pipeline at POGC field.
OGDCL
ECDA survey at UCH gas field.
OMV
E-Log-I, Soil resistivity test, Geonics for design of
CP system 4 well casing at OMV field.
Page 4 of 4
NURICON PETROSERVICES (PTE.) LTD.
RESUME
PERSONAL
ACADMICS : F.Sc
: D.A.E Electrical
PROJECTS SUPERVISED
1. CP System Installation of test posts at
OGDCL Bobi gas plant.
OTHER PROJECTS
NATIONALITY : Pakistani
EMPLOYMENT RECORD
JOBS COMPLETED
SHELL PAKISTAN, AVIATION FUEL
SYSTEM, KARACHI AIR PORT : 1) Took pipe to soil potentials (PSP)
with the energized system.
2) Measurement of natural PSP’s
3) Checking of cathodic protection
system, anode current, performance
of deep-well groundbed.
4) Checking of the insulating flanges.
SHELL PAKISTAN
KEAMARI TERMINAL : Turnkey project for the cathodic
protection of AST bottoms utilizing
continuous polymeric anode (Anodeflex
of Raychem Technologies, USA).
Assistance in conducting soil resistivity
survey, Anodeflex laying, installation of
permanent Cu-CuSO4 reference
electrode, etc.
NURICON PETROSERVICES (PTE.) LTD.
BHP BILLITON
ZAMZAMA GAS PLANT : Installation Testing & Commissioning of
Cathodic Protection System for two
Condensate Tanks at Zamzama Gas
Plant.
E&I Pakistan
: Installation Testing &
Commissioning of Cathodic Protection
System for 21 km long pipeline K-14
Kadanwari to well K-14
RESUME
PERSONAL
PROFESSIONAL EXPERTIES
: Presently working with (NPSL) Nuricon
Petroservices (Pte.) Limited, Karachi, Pakistan
as Field coordinator since 1994
RESPONSIBILITIES HELD
: Field coordination
: Sales and Purchase of CP and other Materials.
: Schedule field crew /job to achieve best output and
operation.
: Supervise / Monitor all Operations to help CP crew.
: Preparing and submission of reports.
NURICON PETROSERVICES (PTE.) LTD.
PROJECTS SUPERVISED
Completed the following projects successfully.
[04] Close Interval and Pipe Locating Survey for 16” dia.
6.0 km PARCO-PSO Oil Pipeline at Mahmood Kot
Multan.
RESUME
PERSONAL
ACADMICS : SSC
: D.A.E
Muhammad Ajmal
NURICON PETROSERVICES (PTE.) LTD.
Muhammad Ajmal
NURICON PETROSERVICES (PTE.) LTD.
Muhammad Ajmal
NURICON PETROSERVICES (PTE.) LTD.
RESUME
PERSONAL
Name : M.Shaan
Father Name : Muhammad Shahban
Date of Birth : Mar 16,1985
Nationality : Pakistan
N.I.C Number : 42101-5036922-9
PROJECTS
1. CP Audit of following facilities for BP.
3. CP system
Solar powered CP system installation for OGDCL
Nashpa for following well.
a) Nashpa-01
4. CP system
Anode flex based CP system for Tanks in OGDCL
Sinjhoro Plant.
-1-
Nuricon Petroservices (Pte.) Ltd.
RESUME
PERSONAL
ACADEMICS
: Diploma of Associate Engineer DAE (Electrical)
RESPONSIBILITIES HELD
A. Material, Installation, Test and commissioning of
cathodic protection systems for Pipelines, Storage
Tanks and Well Casings.
-1-
Nuricon Petroservices (Pte.) Ltd.
PROJECTS
Completed the following projects successfully.
[04] Close Interval and Pipe Locating Survey for 16” dia. 6.0
km PARCO-PSO Oil Pipeline at Mahmood Kot Multan.
-2-
Nuricon Petroservices (Pte.) Ltd.
-3-
Nuricon Petroservices (Pte.) Ltd.
[30] Machike
Ground bed installaion for 1.5 pipe line from PARCO
to PSO Machike
-4-
NURICON PETROSERVICES (PTE.) LTD.
RESUME
PERSONAL
Name : Sajid Ahmed
Father Name : Muhammad Islam
Date of Birth : July 30, 1977
Nationality : Pakistan
N.I.C Number : 43303-7853301-5
ACADMICS : F Sc
PROJECTS
1. E Log-I Test for installation of CP system of 7 well
casing at BHP ZAMZAMA Gas field
-1-
HSE MANUAL
Author: HSE RD No :1/2K
NURICON PETROSERVICES (PTE.) LTD.
S.Niazi Page No: 1of 34
HSE REGULATIONS
FOR
PREFACE
HSE Reference Documents contain information pertaining to HSE that are either
used repeatedly, or that are retained for current or future references.
The documents are intended to be used to:
Publish guidelines or codes of practice
Set company standards
Form a basis of safety specifications for the procurement of contract services
Disseminate and record safety information, experience and standard procedures.
In addition to these HSE Regulations, the Company’s HSE Manual lays down
comprehensive guidelines for HSE, which should be followed by all personnel.
Responsibility for the technical content of this document rests with Head of HSE
Department. When relevant, reference is made for the need to observe the
requirements of national and local regulations.
Author: HSE RD No :1/2K
NURICON PETROSERVICES (PTE.) LTD.
S.Niazi Page No: 3 of 34
USER GUIDELINES
It is the responsibility of the user to ensure he/she is using the latest revision of this
document by referring to ‘Index for NPSL HSE Documents’.
Any user of this document who encounters an inaccuracy or ambiguity is requested
to notify at the end of this document and report to the concerned personnel.
Author: HSE RD No :1/2K
NURICON PETROSERVICES (PTE.) LTD.
S.Niazi Page No: 4 of 34
HSE REGULATIONS
TABLE OF CONTENTS
PREFACE
USER GUIDELINES
TABLE OF CONTENTS
1.1 SCOPE
1.2 HSE REGULATIONS AND COMPLIANCE
2.1 DEFINITIONS
1.1 SCOPE
2.1 DEFINITIONS
For the purpose of this document the following definitions shall hold:
NPSL shall provide a safe working environment and ensure that work is
carried out safely, in a manner so as to obey the entire of the NPSL HSE
regulations.
Carry out the work safely in a manner so as to eliminate hazard and
minimize risk of death or injury to its own personnel, company personnel
and third parties, on or off the work site; and damage to the works,
facilities or equipment.
Eliminate any risk of long term injury to health caused by work related
hazards.
Remain fully and exclusively responsible for ensuring that work is carried
out in a safe manner inclusive of duties undertaken on their behalf by
their sub contractors and suppliers.
Consult HSE Department before bringing on site and fire/safety
equipment.
Keep regular contact with the HSE Department and shall always seek
advice when in doubt on any particular matter.
Set up and maintain a HSE administration acceptable to the Company
Report to Company all accidents and dangerous occurrence and provide
such other data as required by the Company for the compilation of HSE
statistics.
Protect all works and facilities from risk fire.
Obey the company’s own HSE regulations where they provide protection
further to NPSL HSE regulations and where Company’s HSE regulations
are necessary as part of any specialist work carried out by NPSL.
Operate under the general authority of the Company Representative. The
Company Representative may delegate all part of his authority to the
Company Site Representative, whose function shall include, but not be
limited to, supervision of the Contractor’s work.
Resolve with the Company Representative any anomalies between the
NPSL HSE Regulations and the Company’s HSE regulations so that the
safe conduct of the work can be carried out.
Shall communicate to its sub contractors and visitors to the works
sufficient HSE information so as to enable them to operate safely and in
compliance with the requirement of NPSL HSE regulations
Author: HSE RD No :1/2K
NURICON PETROSERVICES (PTE.) LTD.
S.Niazi Page No: 10 of 34
The NPSL HSE regulations may be revised from time to time in the light of
experience, changing environmental conditions, new legislation or industrial
regulations. Any revision or additions to the NPSL HSE regulations will be
issued to the company under a change order and it is the shall be the
responsibility of the HSE Head to ensure its compliance.
Author: HSE RD No :1/2K
NURICON PETROSERVICES (PTE.) LTD.
S.Niazi Page No: 11 of 34
All accidents shall also be investigated without delay in accordance with the
Company’s Accident Investigation/Reporting Procedure.
For the purpose of this section of HSE Reference Document, the following
definitions shall hold:
ACCIDENT: any event which has or could have caused injury of illness.
such an event may also involve damage, product loss or interruption or work.
FATALITY: a fatality is a death resulting from a work injury, regardless of
the time intervening between injury and death.
LOST WORKDAY CASE (LWC): a lost workday case is any work injury
other than a permanent partial disability which renders the injured person
temporarily unable to perform any regular job or restricted work on any day
after the day on which the injury was received.
LOST WORKDAYS: the number of lost workdays is the total number of
calendar days on which the injured person was temporarily unable to work as
a result of lost workday case or permanent partial disability.
MEDICAL TREATMENT CASE (MTC): a medical treatment case is any
work injury that involves neither lost workdays nor restricted workdays but
which requires treatment by a physician.
NEAR MISS: a near miss is an accident which did not result in injury,
illness, damage or product loss.
OCCUPATIONAL ILLNESS: an occupational illness is any illness resulting
from or aggravated by employment.
PERMANENT PARTIAL DISABILITY (PPD): permanent partial disability is
my work injury which results in the complete loss, or permanent impairment
of functions of parts of the body, regardless of any pre-existing disability of
the injured member or impaired body function.
PERMANENT TOTAL DISABILITY (PTD): permanent total disability is any
work injury which incapacitates an employee permanently and results in
termination of employment.
RESTRICTED WORKDAYS: the number of restricted workdays is the total
number of calendar days counted from the day of starting restricted work
until the person returns to his regular job.
WORK INJURY: a work injury is an injury or illness, regardless of severity,
which arises from a single event (or a number of events close together in
time) in the course of employment.
Author: HSE RD No :1/2K
NURICON PETROSERVICES (PTE.) LTD.
S.Niazi Page No: 14 of 34
Category No. I
Fatalities, damage in excess or Rs. 500,000 (inclusive)
Category No. II
Serious injuries that result or may result in Permanent Partial/Total
Disabilities. Lost Workday Cases, damage more than Rs. 5, 000 (inclusive)
but less than Rs. 500,000.
NPSL will provide advice to all of its contractors on how best to achieve the
required standards. It is however a condition of working with NPSL that the
standards laid out in this document are adhered to.
It is the policy of NPSL to conduct all operations and to handle all materials
safely, without creating unacceptable safety and environmental risks.
Contractor will also demonstrate compliance with the applicable NPSL site-
specific requirement and the relevant rules and regulations of Pakistan.
Site specific health, safety and environmental requirements are not intended
to control the manner in which you accomplish a specific job task, but rather
to determine that NPSL interests with respect to protected and compliance
with applicable regulations is accomplished. Contractors/subcontractors must
inform all of their supervisors and employees of applicable NPSL site-specific
health, safety and environmental rules, policies and conditions that might be
encountered while working on NPSL premises.
Elements of NPSL HSE Management System Framework are to be
addressed by the contractors as minimum to meet NPSL HSE expectations.
We expect that contractor/subcontractor communicate to their employees,
safe work procedures and programs to be followed as laid in the NPSL HSE
policy.
Furthermore, we strongly encourage contractors to conduct regular safety
and environmental inspections on their equipment as well as monitor the
work practices of their employees. The use of safety meetings, training, risk
assessments and job safety analysis are also to be utilized to review the safe
work practices to be implemented prior to starting a new any non-standard or
dangerous job. New employees must be apprised of the applicable safe work
practices and regulations prior to beginning work on NPSL premises.
Contractor’s vehicles shall comply in all respects with these HSE regulations.
In addition all contractor’s vehicles shall be identified with the contractor’s
serial number and name is both Urdu and English.
No motor vehicle designated by the manufacturer as a load carrying vehicle
shall be modified to carry passengers unless approved by department
(regardless of whether the owner has certificate of authorization to carry
passengers).
Author: HSE RD No :1/2K
NURICON PETROSERVICES (PTE.) LTD.
S.Niazi Page No: 20 of 34
When a journey by vehicle must be made away from the graded roads, the
vehicle shall carry adequate emergency equipment, survival equipment and
voice radio transmitter/receiver or portable distress radio beacon.
Adequate water, salt and spare fuel shall be carried for each journey. Extra
fuel shall be carried in a properly designed container, adequately secured to
the outside of the vehicle. Containers shall be painted:
White for water
Red for Fuel ( Diesel / Petrol )
All drivers shall be aware of their routes and be provided with adequate maps
and directions.
Before leaving, a driver shall agree with his supervisor his destination,
overland route and expected time of arrival. Immediately on arrival at his
destination he shall ensure that his supervisor knows of his safe arrival.
Should not such report be received by the supervisor a check shall be made
to ensure that the driver(s) and any passengers have reached their
destination safely. Should the check mail to establish the whereabouts and
well being of the driver(s) and passengers, the Interior operations ‘Man Lost’
Procedures shall be initiated in accordance with emergency procedures.
In order to reduce the risk involved in driving at night and to prevent any
potential incidents, there should be no night time driving. The only
circumstance where driving shall be allowed would be if there is any
operational emergency or for medical emergency transfer though driving still
shall not be encouraged. Operational planning shall be done in such a way
that all logistics and personnel movement should be completed before
darkness.
Author: HSE RD No :1/2K
NURICON PETROSERVICES (PTE.) LTD.
S.Niazi Page No: 22 of 34
All works, vehicles, stores, camps and other facilities, and in particular
personnel, shall be protected from the danger of fire and each personnel
shall be instructed in the use of fire fighting equipment
A sufficient number of fire extinguishers of adequate capacity and of type
shall be provided.
Other fire fighting facilities such as fire mains of a type and capacity
suitable for the intended purpose shall be provided as required.
Fire alarm systems shall be provided in all camps and living quarters and in
other facilities as required.
Procedures shall be set up to cover:
o fire prevention
o fire fighting
o building evacuation
o test/maintenance of fire fighting equipment and alarms.
All sites, facilities and camps shall be kept clear of unnecessary flammable
and other surplus material. Sufficient waste bins with lids shall be provided.
All scrap and rubbish shall be disposed of at a location and in a manner
approved by the company.
Safe storage shall be provided for all flammable substances within
structure of fire resistant construction.
Oil grades with a low flash point (below 37.8 degree C/100 degree F) such
as petroleum shall not be used for cleaning purposes.
Smoking shall take place only in places approved by the company. No
smoking signs shall be obeyed at all times.
All temporary and portable buildings shall be located so that the space
between them forms an adequate fire break.
Author: HSE RD No :1/2K
NURICON PETROSERVICES (PTE.) LTD.
S.Niazi Page No: 24 of 34
Personal shall not take dangerous items onto company premises without
approval. Such items include, but are not limited to:
Alcohol
Drugs
Firearms
Knives and other offensive weapons
Gas cigarette lighters and non safety matches
Explosive devices
Radio active, corrosive, poisonous or toxic materials.
All personnel shall have provided by his employer, for use where appropriate,
protective clothing and equipment suited to the hazard(s) or environment to
which he may be exposed when working.
These hazards and the appropriate minimum standard of protective clothing
and equipment shall include, but not be limited to, those stated below:
All personnel shall do the following:
Engaged in welding, burning and grinding shall wear adequate eye, face
and body protection, e.g. face shield, goggles, aprons, etc.
Required to enter tanks or vessels, which may be deficient in oxygen or
contain poisonous vapours shall wear breathing apparatus as required
by the work permit procedure.
Likely to be exposed to the hazard of toxic or explosive gas shall utilize
appropriate gas detection equipment as directed by the Work Permit
procedures.
Engaged in spray painting shall wear respiratory masks.
Engaged in grit blasting shall wear an air supplied hood.
When erecting steel above first floor level or where adequate scaffolding
cannot be provided shall wear a safety belt.
Handling (loading/unloading, decanting, pumping) corrosive substances
shall wear safety helmet, safety type PVC gloves, full length PCV apron
rubber knee length safety boots and adequate eye and face protection.
In addition, eye wash fountains shall be readily available at the site. In
remote locations, eye wash bottles may be substituted.
Author: HSE RD No :1/2K
NURICON PETROSERVICES (PTE.) LTD.
S.Niazi Page No: 25 of 34
Safety helmets, which shall not be of the metal type, and safety footwear,
shall be worn at all time by all personnel when within any industrial facility or
work site. In addition, overalls should also be worn at all times in the
specified areas of work and outside accommodation and offices. All facilities
and sites include, but are not limited to:
Whenever notices are displayed stating protective equipment shall be
worn.
Any production facility including gathering stations.
Well locations
Any construction area.
Blasting operations
Whenever in the vicinity of cranes and other lifting equipment when they
are in use.
Excavation work
All Drilling rigs.
Pipeline operations in the vicinity of side booms and cranes.
Factory built and certified lifting equipment when ever appropriate will be
used at worksites and shall have safe working load shall be marked on
all equipment.
Lifting equipment shall be inspected thoroughly by an approved person
every 6 months.
Non factory built or certified lifting equipment shall be tested 2 times the
safe working load
Author: HSE RD No :1/2K
NURICON PETROSERVICES (PTE.) LTD.
S.Niazi Page No: 28 of 34
All tools and equipment shall be maintained in a safe condition. Users of plant,
tools and equipment shall be adequately trained and experienced and where
necessary licensed or certified to use that equipment.
All persons who may be concerned with the operation of any electrical
systems shall be conversant with the treatment for electrical shock.
All electrical equipment shall be installed, used and maintained in safe
condition. Special attention shall be given to ensure that flexible cables
and equipment, such as relays and switches that may cause sparks, are
maintained in good and safe condition. Taped joints in cables shall not
be permitted.
All portable electrical equipment shall be isolated from the supply when
not use.
Where a temporary installation is to be connected to the Company’s
power supply, the installation shall be tested, inspected and approved by
the Company Representative before being connected to the power
supply.
Particular attention shall be given to the provision of adequate earthing.
No extension to the electrical system wiring shall be made without
authorization from company’s representative.
Only electrical equipment certified for use in hazardous areas shall be
used in hazardous area.
All electrical operations to be carried out in accordance with Electrical
HSE Operational Procedures.
Author: HSE RD No :1/2K
NURICON PETROSERVICES (PTE.) LTD.
S.Niazi Page No: 29 of 34
All Hazardous or restricted areas shall clearly have signs posted, clearly
identifying restricted areas. Use of pictograms type signs are recommended
to identify hazards within restricted areas.
All personnel shall be made aware that when working on or close to existing
oil and gas facilities, a danger of fire or explosion exists due to the presence
of hydrocarbon fluids.
The lighting of fires and the introduction of matches, lighted cigarettes,
lighters and other sources of ignition are strictly forbidden.
All leaks or other malfunctions observed on any facility shall be reported to
the site supervisor immediately.
Safework Permit
Following are tasks which fall under Safe Work Permit Category but not
limited to :
o Working over water
o Confined spaces
o Working in unguarded
Maintenance operations that disable critical safety systems such as fire &
gas detection system, emergency devices, fire fighting equipment etc.
o Hot Work of any type ( welding cutting, burning ) outside the Hot
Work Area
o Any work generating ignition inside hazardous area
o Any of the above work in any part of the worksite whereas potentially
hazardous situation could be anticipated because of the work being
conducted.
All work permits shall be requested by the NPSL personnel responsible for
the work to be performed and shall be approved by the Company
representative.
Permits shall not be carried over from one operating crew to another and
shall not be valid when ever a change occurs in :
Once the work is completed, necessary checks shall be made by the NPSL
supervisor in charge of the work. The permit shall then be signed of by the
Company representative which shall close the work permit
Author: HSE RD No :1/2K
NURICON PETROSERVICES (PTE.) LTD.
S.Niazi Page No: 34 of 34
Each new hired employee shall be given a safety induction briefing in order
to carry out his duties
During the safety induction briefing, the HSE handbook listing the company
policies shall be given to the new employee, with receipt of
acknowledgement and instruction to read and follow the company policies.