NURICON PETROSERVICES (PTE.) LTD.

NURICON PETROSERVICES (PTE.) LTD.

PROJECT LIST
NURICON PETROSERVICES (PTE.) LTD.

CUSTOMER JOB
Pakistan Petroleum Limited Cathodic Protection of Well casings at Kandhkot
Gas Field:
a) Feasibility Study
b) Detailed Engineering Design
c) Preparation of Tender Documents.
d) Evaluation of Bids
Oil & Gas Development Feasibility Study, Survey, Design and Detailed
Corporation of Pakistan Engineering Design of Cathodic Protection System,
and preparation of Tender Documents for 5 well
casings at Dakhni Gas Field.
Oil & Gas Development Feasibility Study, Survey, Design and Detailed
Corporation of Pakistan Engineering of Cathodic Protection System, and
preparation of Tender Documents for 10 well
casings at Chak Naurang, Fimkassar and Toot
Fields.
Oil & Gas Development Feasibility Study, Survey, Detailed Engineering and
Corporation of Pakistan Design of Cathodic Protection System, and
preparation of Tender Documents for 26 well
casings at Pirkoh Gas Field.
China Metallurgical Corp for Turnkey Supply, Installation and Commissioning as
Saindak Metal (Pte) Ltd subcontractor of CP System for 24” Pipeline 38 Km
water supply pipeline based upon TEG System
Shell Pakistan Limited Turnkey project for the Cathodic Protection of
Installation ‘C’ at Keamari, Storage Tank Bottoms (12.5 m and 17.5 m) by
using Anodeflex.
Mari Gas Co. Limited Feasibility Study, Survey, Detailed Engineering and
Preparation of Tender Documents for the Cathodic
Protection of 59 Well Casings, Mari Field, Daharki.
Oil & Gas Development Design/Engineering, Supply, Installation and
Company of Pakistan Commissioning of Cathodic Protection system for
Ø8” x 2.5 km oil pipeline at Sadqal (impressed
current system) and Ø4” x 2.5 km pipeline (galvanic
anode based system) at Lashari, Hyderabad.
Pakistan State Oil – Shell Turnkey project for the Cathodic Protection of 16”
Pakistan – Caltex Joint dia pipeline from Parco Terminal to Jimco Terminal,
Pipeline. including DCVG survey and installation of
ANODEFLEX based CP system at Mehmood Kot.
NURICON PETROSERVICES (PTE.) LTD.

CUSTOMER JOB
Oil & Gas Development Sampling and analyses of soil specimens to
Company of Pakistan determine presence of sulfate reducing bacteria at
Kunar, Bobi and Mithrao well facilities areas.
Oil & Gas Development Supply, Installation and Commissioning of Cathodic
Company of Pakistan. Protection system for Ø8” x 20 km pipeline at Tando
Alam oil field, Hyderabad designed based on Solar
Powered System

Oil & Gas Development Feasibility study for CP and subsequent


Company of Pakistan. design/engineering of Cathodic Protection System
for Ø8” x 20 km pipeline at Tando Alam oil field,
Hyderabad.
Lasmo Oil Pakistan Installation of Heat Tracing
Union Texas Pakistan Close and Remote Pipe to Structure Potential
Survey, with and without excessive non-insulated
grounding cables, for Laghari Plant Facility.
Oil & Gas Development Feasibility survey and design of Cathodic Protection
Company of Pakistan. System for Ø8” x 2.5 km and long Ø4” x 2.5 km
Lashari, Hyderabad and pipelines.
Sadqal, Rawalpindi
Union Texas of Pakistan Feasibility Study, Survey and Design of Cathodic
Protection Systems for flow-lines, tank bottoms,
plant piping, electrical grounding system, and 05
well casings at (a) Golarchi-Nari Gas Facility (b)
Bukhari Gas Facility (c) Turk Gas Fields.

Shell Pakistan Limited Survey of CP System of 16” pipeline at Jinnah


Terminal-Karachi

Pakistan State Oil Company Design, Supply, Installation & Commissioning of


Limited Cathodic Protection System for Two Filling Stations.
Pakistan State Oil Company Repair & Maintenance of Cathodic Protection
Limited System for 16'’dia. 6.5KM Parco Jimco Link
Pipeline.
NURICON PETROSERVICES (PTE.) LTD.

CUSTOMER JOB
Pakistan State Oil Company Supply, Installation & Commissioning of Cathodic
Limited Protection System for 12” dia. x 2 km F.O. Depot
Lalpir - AES Thermal Power Plant link Pipeline,
Mahmood Kot.

Union Texas Pakistan Limited Pearson & Close Interval Pipe to Soil Potential
Survey of 8.7 km 6” dia. Mazari - Liari link pipeline
at Badin district.
Mari Gas Co. Limited Supply of Material for Cathodic Protection System
of Two Well Casings.
Shell Pakistan Limited Turnkey Project for the Cathodic Protection of
Storage Tank Bottoms dia. 14 m, by using
ANODEFLEX. Installation-C, Keamari, Karachi.
Pakistan State Oil Company Supply, Installation and Commissioning of Cathodic
Limited protection system for Ø8” x 4km long pipeline. From
Parco to PSO FO depot Lalpir Mehmood kot Multan
Engro Asahi Polymer & Design, Supply, Installation and Commissioning of
Chemicals Limited Cathodic Protection System for 11km water supply
line at Bin Qasim Industrial Area.
Pakistan Refinery Limited Installation of Electric Heat Trace Cables of Fuel Oil
Lines
Pakistan State Oil Company Design, Supply, Installation & Commissioning of
Limited Cathodic Protection System for Five Filling Stations.
Siemens Pakistan Engg. Design, Engg. Supply of Material/Equipment and
Company Ltd./Pak Arab Installation Supervision Services of C.P. System for
Refinery Company Ltd. Tank Bottoms at Mahmood Kot for PARCO.
Muhammad Ayub Brothers / Design & Engineering for Cathodic Protection
Capital Development System of 6.5 Km long Water Pipeline, Rawalpindi.
Authority
Pakistan Refinery Limited Installation & Commissioning of Electric Heat Trace
System for Furnace Oil Supply Lines.
OMV Pakistan Feasiblity study and subsequent design and
detailed engineering for Cathodic protection of 6
numbers well casings at Miano and Sawan gas
fields.
NURICON PETROSERVICES (PTE.) LTD.

CUSTOMER JOB
Shell Pakistan Limited Survey of CP System underground Pipes and
Casing at Installation Keamari.

Pakistan State Oil Company Turnkey Design, Supply Installation and


Limited commissioning , Rehabilitation and Maintenance of
CP system on 6” diameter 3.4 km long-PRL KTPS
pipeline
Pakistan Refinery Limited Installation of Heat Trace System for Oil Gentary at
PRL

Rana Enterprises / National Installation of heat shrinkable Insulation jackets


Refinery Limited (Raychem) for 6’’ dia x 1.5 km pipeline for National
Refinery Limited, Karachi.
Al-Tariq Constructors (Pvt.) Design/engineering, Supply, Installation and
Limited / National Refinery Commissioning of Cathodic Protection System
Limited using Anodeflex for 2 numbers dia 41 m tank
bottoms at Keamari Terminal of National Refinery,
Karachi.
Pakistan Refinery Limited Design, Supply, Installation and Commissioning of
Self-Regulating Electrical Heat Trace System for
fuel oil furnaces’ piping network.
Procter & Gamble Pakistan Design, Supply, Installation and Commissioning of
Limited Electrical Self-Regulating Heat Trace System for
Tallow and PKO Process Pipelines at Lasbella
Industrial Development Estate.
Pakistan Petroleum Limited Tubular Inspection for Sui Well-21 (Work Over)
Leak Investigation with the following scope of work:
1. Inspection of Tubing to assess the corrosion
2. Finding out the causes of corrosion
3. Prevention recommendations
Shell Pakistan Limited Design, Supply Installation & commissioning of CP
System for Pipeline and Casing at Installation ,
Keamari
Oil & Gas Development Co. of Feasibility study for the Cathodic Protection of 35
Pakistan. km proposed pipeline ROW at Bobi and Mithrao.
NURICON PETROSERVICES (PTE.) LTD.

CUSTOMER JOB
Rana Enterprises/National Supply and Installation of Insulation Jacket for 6”
Refinery Ltd x1.5 km pipeline for National Refinery
Rana Enterprises / National Design, Supply, Installation and Commissioning of
Refinery Limited Cathodic Protection System for Re-Routed Pipeline
sections of dia 6’’, 8’’& 14’’ x 1550 m long each, for
National Refinery Limited.
Al-Tariq Constructors (Pvt.) Design/Engineer, Supply, Installation and
Limited / Pakistan State Oil Commissioning of Tank bottom Cathodic Protection
Company Limited System for 3 numbers dia 22 m x 4 m high
mounded tanks using Anodeflex and dia 4” x 104 m
jet fuel piping using HSI anodes at new Lahore
International Airport.
BP Pakistan Installation and Commissioning of Sacrificial CP
System at 6 Facilities- Bachal, Dhabi, Khorewah,
Makhdumpur, Rind and South Buzdar
Mari Gas Co. Limited Supply of Hi-Silicon Anodes
Oil & Gas Development Corp Feasibility Study of the Cathodic Protection of 35
km proposed pipeline ROW at Bobi and Mithroa.
Overseas Trading Corp. Installation of Heat Shrink Sleeves on 20” & 24”
Fuel Oil Pipeline
Lasmo Oil Pakistan Ltd Installation and Commissioning for Electrical Heat
Tracing at Kadanwari Gas Field Facilities
Shell Pakistan Limited Engineering design for Cathodic Protection System
for 8 nos Tanks at Keamari
Pakistan Petroleum Ltd Engineering design for Cathodic Protection System
for Adhi Well # 13 Casing
Orient Petroleum Engineering design for Cathodic Protection System
for Ratana-Meyal Pipeline
Khan Mohd Khan Bros Supply and Installation of Heat Shrink Sleeves on
30” & 24” Fuel Oil Pipeline
Pakistan Refinery Ltd Repair of Coating Material and Installation over PRL
JP-1 Pipeline
Petro Coating Systems Installation Supervision of Heat Shrink Sleeves for
( Australia) Gas Pipeline at ZamZama
OMV Pakistan Turnkey Engineering Design, Procurement and
Installation of Cathodic Protection System for 5 nos
Well Casing at Sawan Field
NURICON PETROSERVICES (PTE.) LTD.

CUSTOMER JOB
Pakistan Petroleum Ltd Engineering Design for Cathodic Protection Study of
4 Nos Well Casing at Block 22 Shikarpur Field
Siemens Pakistan Eng Installation of CP System for 2 nos x 17.6 m
Condensate Tanks at ZamZama Gas Plant
Metal & Pipeline Protection / Turnkey supply of material for Pak Arab Pipeline
China Petroleum Engineering Company’s 800km x 26” White Oil Pipeline
& Construction Corp.
Al Prince Engineers Supply and Installation of Cathodic Protection
System for Tank Bottoms at PARCO’s Fazilpur
Station.
Al Tariq Constructors Supply of Galvalum Anodes for BP
Metal & Pipeline Protection Engineering and Supply of AnodeFlex for Storage
Tanks for Caltex
Tyco Adhesives, Belgium Supervisory Services for Installation of Heat Shrink
Sleeves for Pak Arab Pipeline Company’s 26” x 800
km
Pakistan Petroleum Ltd Supply, Installation, Commissioning and Testing of
Complete System for 3 Nos NGL Tanks.
Oil & Gas Development Corp Consultancy Services for Feasibility Study of
Cathodic Protection for 19 Nos Well of KUNNAR,
DARU and BOBI Fields of Well Casing.
OMV Pakistan Turnkey Engineering Design, Procurement and
Installation of Cathodic Protection System for 2 nos
Well Casing at Miano Field ( Well No. 1 & 7 )
Abdul Sattar Faisalabad / Pak Installation of Heat Shrink Sleeves in lieu of caseal
Arab Refinery Company Ltd. on 16” dia. Pipeline on Concrete Tank in/out at
PARCO Shikarpur Terminal.
Abdul Sattar Faisalabad / Pak Turnkey Re-furbishment including Pre-Design
Arab Refinery Company Ltd. Survey, Design & Engineering, Supply, Installation
Test & Commissioning of CP System for Gas
Supply Pipeline PARCO Residential Area Mahmood
Kot, Multan.
China Petroleum Engineering Supply of repair Material for Pipeline coating for
& Construction Corp. PARCO’s 800 Km White Oil Pipeline.
Shashi Steel Mills Supply of repair Material for Pipeline coating for
PARCO’s 800 Km White Oil Pipeline.
Engro Chemical Pakistan Ltd. Evaluation & Assess the Condition of the Existing
Fire Water Line.
NURICON PETROSERVICES (PTE.) LTD.

CUSTOMER JOB
Eni Pakistan Limited Turnkey Engineering Design, Procurement and
Installation of Cathodic Protection Services for
23Km x 10” K-14 Flowline at KADANWARI
Pakistan State Oil Co. Ltd. Fault detection, rectification and Re-Commissioning
of CP System of 8” x 4 Km Pipeline and 10” x 32
Km Pipeline at Lalpir.
Pakistan State Oil Co. Ltd. Fault detection, rectification and Re-Commissioning
of CP System of 16” Dia x 5.5 Km Pipeline at Jimco.
National Refinery Ltd. Design of Cathodic Protection System on Crude
2 Nos x Storage Tank (183-S-4 / 183-S-5 of 160’ /
140’ Dia) at Korangi.
National Refinery Ltd. Design of Cathodic Protection System on Crude
1 Nos x Storage Tank (155-S-42, 180’ Dia) at
Keamari Terminal.
Al Prince Engineers Supply and Installation of Cathodic Protection
System for Tank Bottoms at PARCO’s Bubak
Station.
OMV Pakistan Turnkey Engineering Design, Procurement and
Installation of Cathodic Protection System for Well
Casing at Miano Field ( Well No. 8 )
OMV Pakistan Supply and Installation of Spares for the Cathodic
Protection Solar Unit
OMV Pakistan Turnkey Engineering Design, Procurement and
Installation of Cathodic Protection System for
Sacrificial Fire Water Main at Kadanwari Plant
OMV Pakistan Turnkey Engineering Design, Procurement and
Installation of Cathodic Protection System for 1 No.
Well Casing at Sawan Field ( Well No. 5 )
Orient Petroleum Inc. Engineering Design of Cathodic Protection System
for 26 Km under ground piping and 7 No. Well
Casings.
Oil & Gas Development Corp Audit of the Cathodic Protection System installed for
protection of Plant Piping, Detailed Engineering
Design for the Protection of Oil Sewer Lines,
internal & external Protection of 03 No. condensate
storage Tank and 02 no. Disposal Well Casings.
NURICON PETROSERVICES (PTE.) LTD.

CUSTOMER JOB
Metal & Pipeline Protection Supply of Anodeflex for Bullet Tanks for SHV
Company Pakistan
Shell Pakistan Limited Design & Engineering for Cathodic Protection
System for Underground Fuel Pipeline at Islamabad
Airport.
Sui Northern Gas Pipeline External Corrosion Direct Assessment and CP Audit
Company of 170 km Gas Pipeline
OMV Pakistan Pipe Coating Survey including DCVG and C-Scan
of 10” x 45 Km Gas Pipeline
BHP Petroleum Pakistan Design Engineering Cathodic Protection System for
(Pty) Ltd. 7 nos Well Casings at ZamZama Gas Field

Sui Southern Gas Pipeline Supply of Tubular Mixed Metal Oxide Anodes
Company.
Shell Pakistan Limited Material Supply & Installation for Cathodic
Protection System for Underground Fuel Pipeline at
Islamabad Airport
Pakistan State Oil Cathodic Protection System Audit of various Fuel
Oil Pipelines at Mehmoodkot and Machike
BHP Petroleum/Petrochem Design Engineering of 6” x 28 km Condensate
Engineering Consultants Pipeline from ZamZama to Parco’s Bubak Station
BHP Petroleum/Petrochem Design of CP System for Two Nos Tank at Parco’s
Engineering Consultants Bubak Station based on Anodeflex System
Pakistan State Oil Rehabilitation and Rectification of CP System at
Jimco and Lalpir for 16” x 5.5 km, 8” x 4 km, 10” x
32 km and 12” x 2.5 km
Oil & Gas Development Turnkey Engineering Design, Material Supply and
Installation for 12” x 40 km Bobi-Sinjoro Gas
Pipeline
Petrochem Engineering/GE Designing of CP for underground Fuel Gas Supply
Capital System for Takoradi Thermal Power System at
Ghana, Africa
BHP Petroleum Rectification CP System & Repair of Coatings.
Designing of CP System for 5 x flowlines, 2 x sales
gas lines, condensate tanks & u/g plant piping.
NURICON PETROSERVICES (PTE.) LTD.

CUSTOMER JOB
Oil & Gas Development Corp Turnkey Engineering Design, Material Supply and
Installation & Commissioning of Cathodic Protection
System for 27 nos x Well Casing at Qadirpur based
on ThermoElectric Generators.
Pakistan State Oil Rehabilitation and Rectification of CP System at
Machike for 12” x 1.5 km
BHP Petroleum Material Supply and Installation of Condensate
Pipeline CP System for 6” x 28 km
Oil & Gas Development Corp Supply of Cathodic Protection System Material for
Tando Alam Complex
BP Pakistan Supply of Galvalum-III Anode for Cathodic
Protection System
Sui Southern Gas Co. Ltd. Supply of Mixed Metal Oxide Tubular Titanium
String Anode for Cathodic Protection System
BP Pakistan Supply of Galvalum-III Anode and Magnesium
Anode for Cathodic Protection System
Pakistan State Oil Rehabilitation and Repair works of CP System at
Mehmoodkot for 16” x 5.5 km
Oil & Gas Development Corp Turnkey Engineering Design, Material Supply and
Installation & Commissioning of Cathodic Protection
System for 21 Nos Well Casing based on Thermo
Electric Generators, Flowlines and 8 nos Storage
Tanks at Bobi and Kunnar Field
BHP Petroleum Repair works of Pipeline Coating at Zamzama Gas
Field
BP Pakistan DCVG Survey of 32 km of various pipelines at
Badin Block
Fatima Fertilizer Soil Resistivity Survey for Plant Piping and
Grounding System
Sui Southern Gas Co. Ltd. Supply of HSI Anodes for Cathodic Protection
System
Mari Gas Company Design of 10 nos x Well Casing and Flowlines at
Mari Gas Field based on ThermoElectric
Generators.
BHP Petroleum Commissioning of 2 Nos Storage Tanks based on
Anodeflex.
NURICON PETROSERVICES (PTE.) LTD.

CUSTOMER JOB
National Refinery/AJC Turnkey Engineering Design, Material Supply,
Engineers Installation and Commissioning of 1 Nos x 42.5 m
Storage Tank for both External and Internal
DDFC Design, Material Supply and Installation of Internal
Cathodic Protection of 4 Nos Vessels
Pakistan Petroleum Ltd Commissioning of Solar Power System 528 Watts
for Adhi Well Casing # 18
Presson Descon Engineering, Design, and Installation of Supply and
International / MOL Installation of External and Internal CP System of 8
nos Storage Tanks
Presson Descon Engineering, Design, and Installation of Supply and
International / MOL Installation of External CP System of Plant Piping.
National Refinery/Al Tariq Turnkey Engineering Design, Material Supply,
Constructors Installation and Commissioning of 6 Nos x 60 Ft
Storage Tanks based on Anodeflex System
Pakistan State Oil Company Rectification and Installation of Transformer
Rectifier at Lalpir
BP Pakistan Supply of Junction Boxes
Oil & Gas Development Com Design, Installation and Commissioning Services at
Tando Alam Oil Complex, Chanda, Mela and Bahu
Field for Well Casing, Flowlines and Storage Tanks
- 12 nos Well Casings based on Solar Power Units,
48 nos Storage Tanks and 77 km of various
flowlines
BP Pakistan DCVG Survey of total 9 km Pipeline at Tangri and
Sakhi
OMV Pakistan Repair Works for 3 layer Polypropylene Coating for
Duplex Flowlines at Sawan Gas Field
BP Pakistan CP Audit of Mirpurkhas / Khipro Block facilities and
associated pipelines.
Pakistan Petroleum Ltd Design Engineering of Adam X-1 Well Casing and
Flowline.
China National Chemical Turnkey Engineering Design, Procurement,
Engineering Company/Parco Installation Supervision & Commissioning of all
Refinery Station Piping including Firewater, Oil Water, Close
Drain Piping and 1nos x 52 m Storage Tanks.
NURICON PETROSERVICES (PTE.) LTD.

CUSTOMER JOB
Oil and Gas Development Turnkey Engineering Design, Material Supply and
Company Ltd Installation & Commissioning of Cathodic Protection
System for 8 Nos Well Casing and Flow Lines at
Qadirpur Gas Field based on Thermo Electric
Generators.
Sui Southern Gas Co. Ltd. Supply of 2100 Nos. High Silicon Iron Anodes for
Cathodic Protection System
Shell Pakistan Limited Turnkey Engineering Design, Material Supply,
Installation and Commissioning of 9 Nos Storage
Tanks at Islamabad Airport and 5 Nos. Tanks at
Quetta Airport
Haroon Engineering / Oil and Turnkey Engineering Design, Material Supply,
Gas Development Co. Ltd Installation and Commissioning of 2 Nos x 50 Ft
Storage Tanks at Kunnar and 1 No. x 60 Ft at TOC
based on Anodeflex.
MOL Pakistan/ Jaguar Turnkey Engineering Design, Material Supply,
Pakistan Installation and Commissioning of Cathodic
Protection System for 4” x 15 km Pipeline.
Sui Southern Gas Co. Ltd. Supply of 1350 Nos. High Silicon Iron Anodes for
Cathodic Protection System
Haroon Engineering/Oil and Turnkey Engineering Design, Material Supply,
Gas Development Co Ltd Installation and Commissioning of 2 nos x 60 Ft
Storage Tanks at Mela Oil Field
OMV Pakistan Turnkey Engineering Design, Material Supply,
Installation and Commissioning of Cathodic
Protection System for 2 Wells and Flow lines at
Miano Gas Field
BP Pakistan Ltd DCVG Survey of 104 km Pipeline at MKK
concession
Pakistan State Oil Co. Ltd External Corrosion Direct Assessment and Integrity
of 107 Km Pipeline
MOL Pakistan Detailed Engineering Design of 9 Well Casing at
Mamikhel and Makori
Sui Southern Gas Co. Ltd. Supply of 75 Nos. High Silicon Iron Anodes for
Cathodic Protection System
Pakistan Petroleum Ltd Design and Engineering of Cathodic Protection
System for 3 nos Well Casings and 2 x Fire Water
Lines at Chachar Field
NURICON PETROSERVICES (PTE.) LTD.

CUSTOMER JOB
BP Pakistan Ltd External Corrosion Direct Assessment and Integrity
of 16 km Pipeline at Sono, Dhabi and South Mazari
Pipelines
BP Pakistan Ltd Routine Monitoring of Impressed Current CP
System at Turk Facility.

AJC Engineers/Oil and Gas Turnkey Engineering Design, Material Supply,


Development Co Ltd Installation and Commissioning of 4 nos x 60 Ft
Storage Tanks at Nashpa Oil Field
Oil and Gas Development Running Service Contract for External Corrosion
Company Ltd Direct Assessment and repair works of all Flowlines
of OGDCL fields
Procter & Gamble Pakistan Design, Supply, Installation and Commissioning of
Limited Electrical Self-Regulating Heat Trace System for
Dry Laundry Project at Port Qasim
BP Pakistan Ltd External Corrosion Direct Assessment and Integrity
of 36 km Japina Pipelines
BP Pakistan Ltd Routine Monitoring of Impressed Current CP
System at MKK Facility.
Oil and Gas Development Turnkey Engineering Design, Material Supply and
Company Ltd Installation & Commissioning of Cathodic Protection
System for 15 Nos Well Casing, flow lines and plant
piping based on Thermo Electric Generators at
OGDC Sinjhoro.
BP Pakistan Ltd Routine Monitoring of Impressed Current CP
System at Turk Facility.
IKAN Engineering/Oil and Gas Turnkey Engineering Design, Material Supply,
Development Co Ltd Installation and Commissioning of 4 nos x 50 Ft
Storage Tanks at Sinjhoro Field
BHP Petroleum/AKER Supply of Surge Diverters
Solutions
BP Pakistan Ltd DCVG of 5 km 8” Pipeline at Ghungro Field
Pakistan Petroleum Ltd CP Audit of Mazarani Gas Field
Oil & Gas Development Com Design, Installation and Commissioning Services of
7 Well Casings at Dakhni Field
Oil & Gas Development Com Design, Installation and Commissioning Services of
8 Nos. Tanks at Dakhni Field
NURICON PETROSERVICES (PTE.) LTD.

CUSTOMER JOB
Oil & Gas Development Com Design, Installation and Commissioning Services of
1 Well Casings at Nashpa Field and 1 Well Casing
at Sheikhan (in-process)
Oil & Gas Development Com Design, Installation and Commissioning Services of
4 Well Casings and 16 Km Pipeline at Bahu Field

Oil & Gas Development Com Design, Installation and Commissioning Services of
3Well Casings at Chanda Field
Oil & Gas Development Com Design, Installation and Commissioning Services of
5 Nos. Tanks at Chanda Field
Oil & Gas Development Com Design, Installation and Commissioning Services of
2 Well Casings at Mela Field
Oil & Gas Development Com Design, Installation and Commissioning Services of
3 Tanks at Mela Field
Shell Pakistan Ltd Supply and Installation of CP System at Karachi
Airport
IKAN Engineering/MOL Engineering Design, Material Supply of CP System
Pakistan for Knock Out Vessel – ID 5.5 Ft x 16.5 Ft Height
SPEC Energy, UAE/Petronas, Engineering Design, Material Supply and
Iraq Installation Supervision of CP System of 18” Dia
Pipeline and 10” Dia Pipeline
SGS Qatar /ORYX GTL, Qatar Audit of Cathodic Protection System
Pakistan State Oil Co. Ltd Supply and Installation of CP System at PSO
Machike
ENI Pakistan Supply of Cathodic Protection Material
Oil and Gas Development Turnkey Engineering Design, Material Supply and
Company Ltd Installation & Commissioning of Cathodic Protection
System for Well Casing, flow lines and plant piping
based on Thermo Electric Generators at OGDC
Qadirpur Gas Field
Pakistan State Oil Co. Ltd Supply and Installation of CP System at PSO
Sihala, Mehmood Kot and Lalpir
United Energy Pakistan Ltd. DCVG, PCM & CIPS Survey of 80 KM pipelines at
different locations
United Energy Pakistan Ltd. DCVG, 5 KM pipelines at different locations
NURICON PETROSERVICES (PTE.) LTD.

CUSTOMER JOB
IKAN Engineering/Oil and Gas Turnkey Engineering Design, Material Supply,
Development Co Ltd Installation and Commissioning of 5 nos Storage
Tanks for External and 10 Nos. Tanks for Internal at
Sinjhoro Field.
Shell Pakistan Ltd Supply and Installation of CP System at Nawabshah
and Sukkur Airport
CH2M HILL VECO Design of CP System of Flowlines.
Engineering, AbuDhabi /
Petronas, Iraq
AJC Engineers/Oil and Gas Turnkey Engineering Design, Material Supply,
Development Co Ltd Installation and Commissioning of 1 No. x 60 Ft
Storage Tanks at Chanda Oil Field
Haroon Engineering/Oil and Turnkey Engineering Design, Material Supply,
Gas Development Co Ltd Installation and Commissioning of 2 nos x 60 Ft
Storage Tanks at Nashpa Oil Field.
Presson Descon Engineering, Design, and Installation of Supply and
International / MOL Installation of External CP System of 6 nos. Tanks
and 10 Nos. LPG Bullets at Makori Field.

Descon Engineering, Design, and Installation of Supply and


Engineering / MOL Installation of External CP System of 1 no. Tank at
Manzalai Field
Polish Oil & Gas Company Engineering, Design, Supply Installation and
(PGNIG) Pakistan Branch Commissioning of CP System for Flow lines and
Sales Gas Pipeline
Shell Pakistan Ltd CP Audit of Shell Islamabad, Quetta and Karachi
Airports
Presson Descon Engineering, Design, and Installation of Supply and
International / MOL Installation of External CP System of Under Ground
Pipeline Makori Field.
Oil and Gas Development Operation and Maintenance Services of CP System
Company Ltd at Qadirpur and Bobi Field.
OMV Pakistan Exploration Design, Engineering, Supply, Installation and
Commissioning of CP System for Latif 5, 6, 7, 9
Wellhead Casings and Flow lines based on Solar
Power System.
NURICON PETROSERVICES (PTE.) LTD.

CUSTOMER JOB
Shell Pakistan Ltd CP Audit of Shell Sukkur and Nawabshah Airports –
United Energy Pakistan Ltd. DCVG, 13.65 KM pipelines at different locations
United Energy Pakistan Ltd. Routine Monitoring of Impressed Current CP
System at Turk Facility.
United Energy Pakistan Ltd. Routine Monitoring of Impressed Current CP
System at MKK Facility.
Zealcon Engineering/Oil & Gas Turnkey Engineering Design, Material Supply,
Development Co. Ltd Installation and Commissioning of 6 Nos. Storage
Tanks at UCH Gas Field.
Oil and Gas Development Turnkey Engineering Design, Material Supply and
Company Ltd Installation & Commissioning of Cathodic Protection
System for Well Casing, flow lines and plant piping
based on Thermo Electric Generators at OGDC
KPD and TAY Field
Shell Pakistan Ltd CP Audit of Shell Karachi, Quetta and Islamabad
Airports –
Al-Tariq Constructors / Engro Design, Engineering, Supply, Installation and
Chemical. Commissioning of CP system of Pipelines for Chiller
Project at Engro Chemical.
Oil and Gas Development Rectification of Transformer Rectifier at Nandpur
Company Ltd Field.
Oil and Gas Development Turnkey Engineering Design, Material Supply and
Company Ltd Installation & Commissioning of Cathodic Protection
System for Well Casing, flow lines and plant piping
based on Thermo Electric Generators and Solar
Power System at OGDC Different Fields.
IKAN Engineering/Pak-Arab Turnkey Engineering Design, Material Supply,
Refinery Limited Installation and Commissioning of CP System at 1
No. Storage Tanks at PARCO Refinery Multan.
Al-Tariq Constructors / Engro Design, Engineering, Supply, Installation and
Chemical. Commissioning of CP system of Additional Pipeline
for Chiller Project at Engro Chemical
United Energy Pakistan Ltd. DCVG,PCM and CIPS Survey of around 69 KM
pipelines at different locations
United Energy Pakistan Ltd. Design of CP System at Naimat Basal-II facility.
United Energy Pakistan Ltd. Supply of Magnesium Anodes
NURICON PETROSERVICES (PTE.) LTD.

CUSTOMER JOB
OMV Pakistan Exploration Supply and Installation of Test Post at Sawan Field
International Power/Hubco Technical Audit of Hub Power Station Cathodic
Protection System
Fauz Engineering Limited Turnkey Engineering Design, Material Supply,
Installation and Commissioning of CP System at 1
No. Storage Tanks
United Energy Pakistan Ltd. Installation of CP System at Naimat Basal-II facility
OMV Pakistan Exploration DCVG and CIPS Survey of 68 KM pipelines at
Miano Field
Shell Pakistan Ltd CP Audit of Shell Sukkur and Nawabshah Airports
Presson Descon Engineering, Design, and Installation of Supply and
International / PPL Installation of External and Internal CP System of
Tanks and Vessels at PPL Gambhat Field
Presson Descon Engineering, Design, and Installation of Supply and
International / PPL Installation of Plant Piping at PPL Gambhat Field.
Pakistan Refinery Limited Installation of Ground Bed at NRL and PAF Sites.
Pakistan Refinery Limited Supply of Anode Junction Boxes alongwith
Rheostats and Shunts.
United Energy Pakistan Ltd. DCVG,PCM and CIPS Survey of around 26 KM
pipelines at different locations.)
Pakistan Refinery Limited Audit of CP System.
Shell Pakistan Ltd CP Audit of Shell Quetta, Islamabad Sukkur and
Nawabshah Airports
OMV Pakistan Exploration Design, Engineering, Supply, Installation and
Commissioning of CP System for Mehar 1,2,3,
Wellhead Casings. NGM and Flow lines based on
Solar Power System.

AJ Corporation/Attock Design, Engineering, Supply, Installation and


Petroleum Limited Commissioning of External and Internal CP System
for 5 Nos. Tanks

United Energy Pakistan Ltd. DCVG Survey of around 16 KM pipelines at


different locations.)
United Energy Pakistan Ltd. DCVG and CIPS Survey of around 21 KM pipelines
at different locations.
NURICON PETROSERVICES (PTE.) LTD.

CUSTOMER JOB
United Energy Pakistan Ltd. CP Audit of Turk Facility
Mari Petroleum Company Supply, Installation and Commissioning of CP
Limited System of Pipeline and 1 No. Tank at Sajawal Field
(In Progress).

Pakistan Petroleum Limited E log I Survey, Supply, Installation and


Commissioning of CP System at Adhi Well No. 25 &
26 at Adhi Field (In Progress).

Pakistan Petroleum Limited E log I Survey Supply, Installation and


Commissioning of CP System at Adhi Wells Kabir
X-1, Hatim X-1, Faiz X-1 and Fazal X-1 at Gambhat
South & Hala Gas Field. (In Progress).

Polish Oil & Gas Company Design, Engineering, Installation and


Commissioning of CP System at Well Rehman-1,
Hallel X-1, Rizq-1, Rehman-2, Rehman ,5 Nos.
Tanks and Flowlines at Kirthar Concession. (In
Progress).

United Energy Pakistan Ltd. Design Engineering of CP System for Fire Water
Pipeline at Naimat Basal LPG Plant
Pakistan Petroleum Ltd E log I Survey, Material Supply, Installation &
Commissioning of CP System based for 3 nos Well
Casings (Adhi 22, 23 & 24) at Adhi field (In-
Progress)

Al-Prince Engineers/Attock Design, Engineering, Supply, Installation and


Petroleum Limited Commissioning of External and Internal CP System
for 4 Nos. Tanks (In Progress).

Sui Southern Gas Company Supply of HSCI Tubular Anodes- 480 Nos.
Limited.
NURICON PETROSERVICES (PTE.) LTD.

CUSTOMER JOB
Engro Polymers & Chemicals Rehabilitation of CP System of Raw Water Line
(In Progress).

Engro Polymers & Chemicals Design, Supply, Installation and Commissioning of


CP Systems on Cooling Water System /Chilled
Water plant piping network alongwith
troubleshooting and rectification of CP System on
VCM/Ehtylene lines. (In Progress).

National Technical Design, Engineering, Supply, Installation and


Services/Attock Petroleum Commissioning of External and Internal CP System
Limited for 5 Nos. Tanks (In Progress).

AU Engineering/Engro Thar Design, Engineering, Supply, Installation and


Powergen Ltd Commissioning of External CP System for 30” x 36
Km Water Intake Pipeline (In Progress).
CERTIFICATE
January 12, 2018.

To Whom It May Concern

This is to certify that the Re-certification Audit of Nuricon Petroservices (Pte) Ltd, was
carried out re-certification audit, as a result of which, they have been recommended for Re-
certification under the ISO 9001:2015 standard by DNV GL. Their re-certification process
is under way and soon their ISO 9001:2015 certificate will be issued.

DNV GL Business Assurance

MALLICK MUSTAFA IMAM


Country Manager - Pakistan

807, 8th Floor, Anum Estate, Block-7/8, P.E.C.H.S., Shahrah-e-Faisal Karachi, Pakistan. Tel: 92 21 34390026-27 Fax: 92 21 34390028
NURICON PETROSERVICES (PTE.) LTD.

LIST OF CP EQUIPMENT

SR.NO. NAME OF EQUIPMENT

1. Geonics EM34-3 Soil Conductivity Meter


2. C – Scan survey equipment
3. Pearson survey equipment
4. Soil Resistivity Measuring Box
5. Pipe to Soil Potential survey equipment
6. Interference survey equipment
7. Line current survey equipment
8. E-Log I test survey equipment
9. Thickness survey equipment
10. Close Interval survey equipment
11. Ultrasonic Thickness meter
12. Digital Multifunction Meters (Fluke/TES/Others)
13. Analog Multiple Meter
14. Potentio Meter
15. Megger
16. Flange Insulation tester
17. Pipe Insulation Remover
18. Cable Insulation Remover
19. Cable Insulation tester (Analog)
20. Tong tester A/C & D/C
21. Current Interrupter
22. Test Rectifiers 20ADC-20VDC & 25ADC-50VDC
23. Pipe Locator (Local)
24. Portable Generator 2.5 KVA
25. Temporary Ground Beds
26. Distance Measuring Trolley
27. Cable Laying equipment
28. Crimping Tools
29. Drill Machines
30. Set of Drill Bits and Saw cutters
31. Cad Weld Molds and shots
32. Rheostats / Resisters Various Capacities
33. Reference Electrodes (Half Cells) Ag/ AgCl
34. Reference Electrodes (Half Cells) CU/CUSO4
35. Wenner Four Pin Method Soil Resistivity Instrument.
36. Fisher Pipeline Locater
37. Tinker & Rasor Pearson Survey Equipment
38. Tinker & Rasor Pipeline Locator
39. Tinker & Rasor Holiday Detector
40. Direct Current Voltage Gradient(DCVG) Survey Equipment
41. Cables various size 1000 meters
42. Oscilloscope (40 Mhz)
43. Hand Blower
44. Pipeline Current Mapper
45. UT Meter
46. DFT Gauge
47. Load Cell
48. Welding Inspection Kits
RESUMES
NURICON PETROSERVICES (PTE.) LTD.

RESUME

PERSONAL
Name : Maqsood-uz-Zaman
Birth Date : January 17, 1954
National I.D. No. : 42201-2374662-1
Nationality : Pakistani
E-mail : maqsood.temuri@nuricon.com

ACADEMICS
MS Engineering : Southern Illinois University at Carbondale, USA – 1988
Specialization : Materials Science
Thesis : Prevention of Oxidation of Carbon-Carbon Composites
by Oxide Films
BE (Metallurgical) : Dawood College of Engineering & Technology, Karachi,
Pakistan – 1977
Higher Secondary : D. J. Govt. Science College, Karachi – 1972
School Certificate
Secondary School : Central Model School Samanabad, Lahore – 1970
Certificate

AFFILIATIONS
Professional Member : MICorr (Institute of Corrosion, UK)
Professional Engineer : Pakistan Engineering Council
Member : National Association of Corrosion Engineers, Houston

TRAININGS/CERTIFICATES
1. Senior Corrosion Technologist (NACE)
2. Prevention of Corrosion in Chemical Industry, NACE-SOFTEC
3. Control of Corrosion by Coatings, NACE-SOFTEC
4. Finance for Non-Financial Executives – Pakistan Institute of Management Sciences
5. Basic Corrosion Course – NACE
6. Bio Fouling – National Institute of Oceanography, Karachi
NURICON PETROSERVICES (PTE.) LTD.

PROFESSIONAL EXPERTIES
 APART FROM BID PREPARATIONS, PLANNING, PROCUREMENTS AND
GENERAL MANAGEMENT; HAVE DIRECTLY UNDERTAKEN THE
ENGINEERING/DESIGN, INSTALLATION AND COMMISSIONING OF
CATHODIC PROTECTION SYSTEMS FOR PIPELINES, TANKS, WELL
CASINGS, MARINE STRUCTURES, THERMAL POWER PLANTS, AND
CONCRETE RE-BARS. ALSO INCLUDES FAILURE INVESTIGATIONS
AND OPERATION & MAINTENANCE OF CP SYSTEMS
 ECDA
 C-Scan, PCM, DCVG and Pearson Surveys
 Holiday Detection
 (CIPS) Close Interval Survey
 Soil Resistivity Surveys (Wenner 4 Pin and Geonics EM34)
 Design, Engineering, Installation and Commissioning of Electric Heat Trace Systems
for Pipelines and Tanks

POSITIONS HELD
1. Graduate Assistant (Teaching/Research) 2. Instructor (Mechanical)
Sep 1985 - May 1988 Jun 1980 - Jan 1981
Southen Illinois University at Carbondale, Swedish Pakistan Institute of Technology, Karachi,
Carbondale, Illinois, USA. Pakistan
3. Assistant Executive Engineer 4. Sales Engineer/Site Supervisor
Sep 1981 - Aug 1985 and July 1989 - Feb 1993 Oct 1979 – Jun 1980
Pakistan Steel, Karachi, Pakistan
5. Assistant Resident Engineer 6. Resident Engineer
Oct 1991 - Oct 1993 Dec 1989 – Jun 1990
KF Corporation, Karachi, Pakistan ESCON/Pakistan Engineering Services, Karachi,
Pakistan.
Project: Refurbishment of 20” dia.x65 km
Mari-Guddu Gas Pipeline Coating & CP Project: Survey and Design of CP System for 600
System AND Supply, Installation, MW Guddu Thermal Power Plant Piping Network
Test/Commissioning of CP System for 600 and Tanks AND Evaluation/Recommendation for
MW Guddu Thermal Power Plant Piping 20” dia.x65 km Mari-Guddu Gas Pipeline Coating
Network and Tanks. & CP System.
7. Joined as Senior Sales Executive / Corrosion 8. Manager (Corrosion Prevention Services /
Engineer to Nuricon Group of Companies in Sales) - Present Position with Nuricon Group of
Dec 1994 and then promoted to Manager in Companies since 1997-2008.
1997.
Presently, General Manager since July 2008.
Projects: Various – List of some of the
projects is given below.

Page 2 of 5
NURICON PETROSERVICES (PTE.) LTD.

Middle East
Have worked with Abdullah Fuad Impalloy, Saudi Arabia on various projects in 1997 and
similarly worked on various projects with Amran Cathodic Protection Services LLC., Sultanate
of Oman in 2008.

SOME OF THE JOBS CARRIED OUT


1. Internal Cathodic Protection of Oil Coolers (Sea Water) – Survey, Design &
Engineering, 1983 – Pakistan Steel
2. Internal Cathodic Protection of Water Jackets of Condensers (Coolant: Sea
Water), 1982 – Pakistan Steel
3. Internal Cathodic Protection of Oxygen Coolers (Coolant: Sea Water), 1984 –
Pakistan Steel
4. Feasibility Study for the Corrosion Prevention of sea water pipelines Ø1800mm –
9km long, 1983-84 – Pakistan Steel
5. Inspection of (In-situ) Internal Cement Mortar Lining of sea water pipelines
Ø1800mm, 1985 – Pakistan Steel
6. Inspection of (in-situ) Internal Cement Mortar Lining of sea water pipelines for
Oxygen Plant, Ø600mm, 1985 – Pakistan Steel
7. Inspection of Painting for Cooling Towers, 1984 – Pakistan Steel
8. Inspection of Painting/Coating, Billet Mills, 1984 – Pakistan Steel
9. Inspection of Bituminous Coatings of Sea Water Pipelines, 1985 – Pakistan Steel
10. Pearson Survey, Pipe to Soil Potential and C-Scan Survey of Ø20” – 65km long,
Mari-Guddu Gas Pipeline, 1989 – WAPDA
11. Evaluation of the Existing Cathodic Protection System of the Mari-Guddu Gas
Pipeline, 1989 – WAPDA
12. Refurbishment of damaged coatings of Mari-Guddu Gas Pipeline, 1991-93,
WAPDA
13. Revamping of the Cathodic Protection System for Mari-Guddu Gas Pipeline,
1991-93 – WAPDA.
14. Soil Resistivity Survey of 600 MW Thermal Power Plant at Guddu, 1989 –
WAPDA
15. Structure to Soil Potential Survey of the 600 MW Guddu Thermal Power Plant,
1989 – WAPDA
16. Evaluation of Existing Cathodic Protection System for Ø72” Cooling Water
Network at Guddu Thermal Power Plant (having deepwell ground beds, 200 ft
deep), 1989 – WAPDA
17. Evaluation of CP system for Ø16”-9km long Gas Pipeline Sui-Guddu, 1989 –
WAPDA
18. Evaluation of CP System for Ø20”-60 km long Kandhkot-Guddu Gas Pipeline,
1989 – WAPDA

Page 3 of 5
NURICON PETROSERVICES (PTE.) LTD.

19. Design of Cathodic Protection System for 600MW Guddu Thermal Power Plant,
based on (200ft) deepwell groundbeds, 1989 – WAPDA
20. Installation of Cathodic Protection System for Guddu Thermal Power Plant,
1991-93 – WAPDA
21. Installation of Insulating Flanges on Mari-Guddu Gas Pipeline, 1991-93 –
WAPDA
22. Engineering of Cathodic Protection System for Ø6” and Ø8”-20 km Tando Alam-
Pasaki Oil Pipeline, 1995 – OGDC
23. Engineering and Design of Cathodic Protection System for Ø4”-2 ½ km Lashari
flow line, 1996 – OGDC
24. Design & engineering of cathodic protection system for Ø8”-3 ½ km Gas
Pipeline at Sadqal, 1995 – OGDC
25. DCVG Survey of ø16”-6km long PARCO-Jimco White Oil Pipeline, 1996 –
Shell-Caltex-PSO (Joint Owners)
26. Soil resistivity, PSP, E-log I Survey for 59 Well Casings, 1996 – Mari Gas
Company Limited (MGCL)
27. Preparation of Tender Documents for the cathodic protection system for well
casings of Mari Gas Field, 1996 – MGCL
28. Preparation of Feasibility Study Report for Mari gas field well casings’ cathodic
protection, 1996 – MGCL
29. Feasibility study for the cathodic protection of Tank Bottom exteriors (AST’s),
1996 – Shell Pakistan
30. Evaluation of the cathodic protection system for Laghari Facilities, 1996 – Union
Texas Inc.
31. Installation and commissioning of the cathodic protection system for ø6”and 8”-
20 km Pasaki-Tando Alam pipeline, 1996-97 – OGDC
32. Cathodic protection of oil storage tank bottom exteriors (in collaboration with
Raychem Technologies, Inc.). CP system is based on Anodeflex ®, a continuous
impressed current polymeric anode. This system is used for the first time in
Pakistan. 1996-97 – Shell Pakistan
33. Cathodic protection of Ø16”-6 km PARCO-Jimco pipeline. (In collaboration with
Raychem Technologies, Inc.). CP system is based on Anodeflex ®, a continuous
impressed current polymeric anode. This system is used for the first time for a
pipeline in Pakistan. 1996-97 – Shell-Caltex-PSO (Joint Owners)
34. Supply, installation and commissioning of cathodic protection system for Lashari
pipeline, 1997-98 – OGDC
35. Supply, installation and commissioning of cathodic protection system for Sadqal
pipeline, 1997-98 – OGDC
36. Feasibility study for the cathodic protection of flow lines and well casings at
Bobbie and Mithrao fields, 1998 (project in hand) – OGDC
37. Soil resistivity survey, Design and Detailed Engineering of Dia. 36” and 56” x 10
km Water Pipelines for Rawalpindi Development Authority (Owner), Mot

Page 4 of 5
NURICON PETROSERVICES (PTE.) LTD.

McDonald (Consultant), work done as a Sub-contractor for M/s. Muhammad


Ayub Brothers (Main Contractor), 1999 – RDA
38. Supply, Design & Engineering, Installation, Test and Commissioning of CP
Systems for 4 Nos. Retail Outlets (Filling Stations) of Pakistan State Oil, 1998-99
– PSO
39. Design of CP system and preparation of tender documents for oil handling Steel
Pile Piers at Karachi Sea Port as CP Consultant to Meinhardt, Pakistan Chapter
(Main Consultant), in-hand project, 1999 – Karachi Port Trust
40. Evaluate Cased Piping, Design & Engineer CP System and Prepare BOQ/Tender
Documents for the Pipelines at Installation C, Keamari, Karachi, 2000 – Shell
Pakistan
41. Supply, Installation, Test & Commissioning of the CP System for Cased Piping at
Installation C, Keamari, Karachi, 2001 – Shell Pakistan
42. Application of Heat Shrink Jacketing on PU Foam Insulated Re-routed 1.5 km x
Dia. 10” Hot Fuel Oil Pipeline Section, Karachi, 2000-2001 – National
Refinery/Rana Enterprises
43. Design/Engineering of 3 Parallel Re-routed sections of 1.5 km x Dia. 8” and 6”
White Oil Pipeline Sections, Karachi, 2001 – National Refinery/Rana
Enterprises
44. Design, Engineering, Supply, Installation and Test/Commissioning of CP Systems
for Well Casings at Sawan Field (5 Wells), Installation Work in Progress – OMV
Exploration Gmbh Pakistan

It’s a long list. If further update of corrosion oriented works is required then kindly
advise.

ELECTRIC HEAT TRACE SYSTEMS


45. Engineering and installation and commissioning of Electric Heat Trace system for
Fuel Oil Pipelines, Kot-Addu Thermal Power Plant, 1996-97 – KAPCO
46. Engineering, installation and commissioning of Electric Heat Trace systems for fuel
oil and condensate pipeline networks, 1996 – APL
47. Installation and commissioning of Electric heat Trace systems crude oil piping at
Kandanwari field, 1997 – LASMO
48. Supply, Design & Engineering, Installation, Test and Commissioning of Electric Heat
trace System for Fuel Oil pipelines; about one kilometer of tracer installed, 1999 -
PRL

Page 5 of 5
NURICON PETROSERVICES (PTE.) LTD.

RESUME
PERSONAL
Name : Muhammad Asif Siddiqui
Father Name : Abdul Ghani Siddiqui
Date of Birth : September 18, 1974
Nationality : Pakistan
N.I.C Number : 42101-0878443-7
Home address : R-790 sector 15-A-3 Buffer zone Karachi 75850,
Pakistan
Home Telephone : +92-21-36955363
Cell Number : +92-301-8225075
Email : asif.siddiqui@nuricon.com

ACADMICS : B.Sc (Physics)


: D.A.E Electronics,
G.C.T Karachi.

TRAININGS & COURSES : CP1 (NACE USA)


: Thermo Electric Generator Maintenance
Global Thermoelectric (Calgary, Canada)
: Basic Corrosion Course and corrosion
Control by Coating (Dr. Chris Ringas S.A)
: AutoCAD, Excel, PP, Portal, Orcad etc.

AFFILIATION / MEMBER : NACE (National association of corrosion Engineers)

PROFESSIONAL EXPERTIES : Cathodic protection


: Pipe line integrity survey, ECDA.
: Presently working with (NPSL) Nuricon
Petroservices (Pte.)Limited,
Karachi, Pakistan, as a Corrosion Technologist.

RESPONSIBILITES HELD : Supervise, design and schedule all type of


Survey, CP Installation, maintenance / repair projects.
: Schedule field crew / job to achieve best output
and operations.
: Material, Installation, Test and commissioning of
Cathodic protection systems.
: Pipelines coating integrity survey (DCVG, C-Scan, PCM,
CIPS, Holiday detection, Pearson etc)
: Carrying out PSP, SSP surveys, Soil Resistively, Interference,
Stray Current, Current Drain Test survey and attaining /
resolving of TR and CP System failure jobs.
: Preparing and submission of reports.

Page 1 of 11
Asif Siddiqui
NURICON PETROSERVICES (PTE.) LTD.

PROJECTS SUPERVISED

1. CP Audit.
Following CP System of Pakistan stat Oil installed in
Mehmood kot.

a) 32 Km 10” dia pipe line from LALPIR to KAPCO


b) 5.5 KM 16” dia pipe line from PARCO to JIMCO
c) 2.5 Km 12” dia pipe line from LALPIR to AES
d) 4 Km 8” dia pipe line from PARCO to LALPIR

2. Inspection, Rectification.
Cathodic Protection system failure for jet fuel hydrant and
Piping at new Lahore International Airport

3. CP Audit.
1.5 Km 12” dia pipe line from
PARCO to PSO (MACHIKE)

4. CP Audit.
Following CP Systems of SNGPL (Sui Northern Gas
Pipelines)

a) 25.44 Km 18” and 30” dia pipe lines installed in


UCH Shareef.
b) 22.5 Km 24” dia pipe line in Multan.
c) 25.18 Km 18” 24” dia pipe line in Shorkot.
d) 19.47 Km 16” x2 pipe lines in
Shehopura.
e) 8 Km 6” dia Distribution line in Islamabad.

5. ECDA
External Corrosion Direct Assessment for following SNGPL
pipe line which includes
D.C.V.G, C.I.P.S additionally P.C.M

a) 25.44 Km 18” and 30” dia pipe lines installed in


UCH Shareef.
b) 22.5 Km 24” dia pipe line in Multan.
c) 25.18 Km 18” 24” dia pipe line in Shorkot.
d) 19.47 Km 16” x2 pipe lines in Shehopura.
e) 8 Km 6” dia Distribution line in Islamabad.

Page 2 of 11
Asif Siddiqui
NURICON PETROSERVICES (PTE.) LTD.

PROJECTS SUPERVISED
(Continued)
6. DCVG.
To identify and repair the problems in Anode flex for
rehabilitation of CP System in PSO Mehmood kot for
following lines.

a) 32 Km 10” dia pipe line from LALPIR to KAPCO


b) 5.5 KM 16” dia pipe line from PARCO to JIMCO
c) 2.5 Km 12” dia pipe line from LALPIR to AES
d) 4 Km 8” dia pipe line from PARCO to LALPIR

7. DCVG.
To identify the cause of low potentials level on following
line for PSO Mehmood kot

a) 2.5 Km 12” dia pipe line from LALPIR to AES Power


house.

8. Pre design Survey.


E. Log I & soil resistivity test for design of CP System for
24 Well casing at Qadirpur Gas field
OGDCL (Oil and Gas Development Company limited).

9. Pre design Survey.


E, Log I & soil resistivity test for design of CP system for 7
wells casing at ZAMZAMA gas field of BHP.

10. Pre design Survey.


Pre design survey of 6” dia 28 km long, condensate
pipeline from BHP ZAMZAMA to PARCO (Bobak)

11. CP system
Ground bed installation in PSO Lalpir,
Furnace Oil Depot, Mahmod kot for 32km 10” Dia
KAPCO pipeline.

12. Pre design Survey.


Current drain test and soil resistivity for 42km pipe line from
OGDCL BOBI Oil field to SSGC Tie in point Tando Adam

13. DCVG Survey.


Design and supervise DCVG survey for 47Km pipelines
network for OMV in Sawan Gas field.
Page 3 of 11
Asif Siddiqui
NURICON PETROSERVICES (PTE.) LTD.

PROJECTS SUPERVISED
(Continued)
14. CP System.
Installation and commissioning of secrifitail anode
based CP system for 6” Dia 28 km long condensate
pipeline from BHP ZAMZAMA to PARCO Bobak
station.

15. CP System.
Installation of TEG (thermo electric generator) based CP
system for well casings of X2, QP-12, QP-06 and QP-14 of
OGDCL Qadirpur gas field Ghotki.

16. CP System.
Installation of TEG (thermo electric generator) based CP
system for well casings of QP-01, QP-28 and QP-15 of
OGDCL Qadirpur gas field Ghotki.

17. CP System.
Installation of TEG (thermo electric generator) based CP
system for well casings of QP-10, QP-13 and QP-20 of
OGDCL Qadirpur gas field Ghotki.

18. CP System.
Installation of TEG (thermo electric generator) based CP
system for well casings of QP-11, QP-08 and QP-07 of
OGDCL Qadirpur gas field Ghotki.

19. CP System.
Installation of TEG (thermo electric generator) based CP
system for well casings of QP-21, QP-25 QP-23 and QP-27
of OGDCL Qadirpur gas field Ghotki.

20. CP System.
Installation of TEG (thermo electric generator) based CP
system for well casings of QP-22, QP-26 and QP-24 of
OGDCL Qadirpur gas field Ghotki.

21. CP System.
Installation of TEG (thermo electric generator) based CP
system for well casings of QP-16 and QP-19 of OGDCL
Qadirpur gas field Ghotki.

Page 4 of 11
Asif Siddiqui
NURICON PETROSERVICES (PTE.) LTD.

PROJECTS SUPERVISED
(Continued)
22. CP System.
Anodeflex installation for PSO JIMCO terminal
PARCO to JIMCO pipeline mehmood kot

23. CP System.
Test and commissioning of Solar powered CP
system for well #18 PPL Adhi Gas field Doltala.

24. Pre design survey.


Current drain test and soil resistivity of 7 wells, for
designing of TEG biased CP system for MGCL (Mari Gas
Company Limited) Dharki.

25. CP System.
Test and commissioning of Tank bottom CP system of
BHP installed in PARCO Bubak Pumping station.

26. Well Casing CP system


TEG (thermo electric generator) based CP system
installation and commissioning for well casings (well #
Kunner-05) for OGDCL Kunner Oil Field

27. Well Casing CP system


TEG (thermo electric generator) based CP system
installation and commissioning for well casings (well #
Kunner-02, Kunner-03 and Kunner-06) for OGDCL
Kunner Oil Field

28. Well Casing CP system


TEG (thermo electric generator) based CP system
installation and commissioning for well casings (well #
Kunner-01, Kunner-07, Kunner-Deep-01 Kunner-Deep-
02, Pasaki-Deep-01 and K-08) for OGDCL Kunner Oil
Field.

29. Well Casing CP system


Solar power based CP system Installation and
commissioning for well casing, well # Kunner-04, for
OGDCL Kunner Oil field.

Page 5 of 11
Asif Siddiqui
NURICON PETROSERVICES (PTE.) LTD.

PROJECTS SUPERVISED
(Continued)
30. Tank bottom CP system
Ribbon anode based Tank bottom CP system 7 No. Tanks
for MOL at Manzalai Central processing facility.

31. Well Casing CP system.


TEG (thermo electric generator) based CP system
commissioning of 9 well casings (Well # Bobi-01, Bobi-02,
Bobi-03, Bobi-04, Bobi-08, Bobi-09, Chakdim,
Dhamaraki and Mithrao) for OGDCL Bobi Oil Field.

32. Well Casing CP system.


Solar Power based CP system installation and
commissioning of Bobbi-05 produced water injection well
OGDCL Bobi Oil field.

33. Pre design survey.


Pre design survey for CP system installation for storage
Tank bottom and oil gathering lines at OGDCL Pasaki Oil
field for 5 Tanks.

34. Pre design survey.


Pre design survey for CP system installation for storage
Tank bottom and oil gathering lines at OGDCL Thora Oil
field for 2 Tanks.

35. Pre design survey.


Pre design survey for CP system installation for storage
Tank bottom and oil gathering lines at OGDCL Lashari Oil
field for 4 Tanks.

36. Pre design survey.


Pre design survey for CP system installation for storage
Tank bottom and oil gathering lines at OGDCL Tando
Alam Oil Complex for 13 Tanks.

37. Coating Repair work.


Recoating of faults previously found during DCVG survey
at OMV Sawan Gas field.

Page 6 of 11
Asif Siddiqui
NURICON PETROSERVICES (PTE.) LTD.

PROJECTS SUPERVISED
(Continued)
38. CNCEC.
Tank bottom CP system installation for CNCEC (China
National Chemical Engineering Company) in Parko Mid
Country Refinery at Mehmood kot

39. Tank Bottom CP System


Anodeflex biased CP system for 2 numbers of tanks
constructed by Haroon Engineering at OGDCL Lashari
facility of TOC.

40. Tank Bottom CP System


Anodeflex biased CP system for 2 numbers of tanks
constructed by Haroon Engineering at OGDCL Pasaki
facility of TOC.

41. DCVG.
DCVG survey for BP Pakistan of following lines.

a. 8.9 Km Gas flow line from Siraj South to Naimat Basal


b. 3.5 Km Gas flow line from Bilal-01 to Siraj South
c. 24 Km Gas flow line from Kamal North to Siraj South

42. CP System
Anodeflex biased Tank bottom CP system for NRL.
(National Refinery Limited Karachi.)

43. Well Casing CP System.


Solar Power based CP system installation and
commissioning for OGDCL Dakhni Field for following 8
well casings.

01) Dakhni 01
02) Dakhni 02
03) Dakhni 03
04) Dakhni 04
05) Dakhni 05
06) Dakhni 06
07) Dakhni 07
08) Dakhni 08

Page 7 of 11
Asif Siddiqui
NURICON PETROSERVICES (PTE.) LTD.

PROJECTS SUPERVISED
(Continued)
44. TEG.
Thermoelectric generator performance test after
modification advised by Nuricon and OGDCL in Global
Thermo Electric’s TEG testing facility Basano Canada.

45. ECDA.
External Corrosion Direct Assessment of following pipe
lines for PSO. Which includes D.C.V.G, C.I.P.S additionally
P.C.M and Soil resistivty.

01) 3.30km 20” Oil piers to KMR (HSD-TDL)


02) 2.40km 18” Oil piers to KMR (F.O-TDL)
03) 2.50km 08” Oil piers to KMR (CHMCAL-TDL)
04) 0.95km 12” Oil piers to KMR (NAPTH/PMG)
05) 0.95km 08” Oil piers to KMR (HSD-Bunker)
06) 0.70km 06” Oil piers to KMR (S.S-MEG)
07) 8.50km 24” ZOT to P-1 (HSD-C.O)
08) 8.50km 42” ZOT to P-1 (F.O)
09) 7.50km 24” BOT to P-1 (F.O/C.O)
10) 6.00km 24” PMY-Zero point (F.O)
11) 3.20km 18” BOT to MW1 (F.O)
12) 1.80km 08” Parco to Shikarpur terminal (HSD/SKO)
13) 1.50km 12” Parco to Machike terminal (HSD/SKO)
14) 14.0km 08” ARL to Sihala terminal (White Oil)
15) 0.85km 08” ARL to Morgah (F.O)
16) 4.00km 08” Parco to Lalpir (F.O)
17) 33.0km 10” Lalpir to KAPCO (LSFO/HSD)
18) 2.00km 12” Lalpir to AES power (F.O)
19) 6.00km 16” Parco to mehmood kot (HSD/SKO)

46. CP System
Anodeflex biased CP system for newly constructed 2 tanks
in Kunner Oil field by Haroon Engineering.

47. CP system audit


Low potential cause investigation, identification of shorts/
interference for fuel hydrant system at EJHD Karachi
airport.

48. Pre design survey


Pre design survey to design a new CP system for fuel
hydrant system at EJHD Karachi airport.

Page 8 of 11
Asif Siddiqui
NURICON PETROSERVICES (PTE.) LTD.

PROJECTS SUPERVISED
(Continued)
49. CP system
Tank bottom CP system commissioning at OGDCL Dakhni
field.

50. CP system
Anodeflex based CP system of tank bottom for under
construction storage tank at Kunner field.

51. CP system
Low potential cause investigation for MOL at Manzalai
central processing facility.

52. Pre design survey.


Pre design survey for Nashpa-01 Well casing CP system
installation for OGDCL Nashpa gas field at Nashpa.

53. Pre design survey.


Pre design survey for Shaikhan-01 Well casing CP system
installation for OGDCL Shaikhan gas field at Kohat.

54. Pre design survey.


Pre design survey for CP system of storage tanks in
OGDCL Nashpa plant

55. CP Audit
CP audit of following CP system for BP Pakistan.

01) Kausar plant and associated wells.


02) Umer plant and associated wells.
03) Naimat Bisal plant and associated wells.

56. Well Casing CP system.


TEG (thermo electric generator) based CP system
Installation and commissioning of following 8 well casings

01) QP-31
02) QP-32
03) QP-33
04) QP-35
05) QP-36
06) QP-37
07) HRL-2
08) HRL-3

Page 9 of 11
Asif Siddiqui
NURICON PETROSERVICES (PTE.) LTD.

PROJECTS SUPERVISED
(Continued)
57. Well Casing CP System.
Solar Power based CP system installation and
commissioning for OGDCL Chanda Field for following 3
well casings

01) Chanda-01
02) Chanda-02
03) Chanda Deep-01

58. Well Casing CP System.


Solar Power based CP system installation and
commissioning for OGDCL Mela Field for following 2 well
casings

01) Mela-01
02) Mela-02

59. CP system.
Solar powered CP system rectification at OGDCL Chanda
and Mela Fields.

60. CP system.
TEG and Solar powered CP system rectification for
OGDCL Bobi Oil field.

61. Pre design survey.


Pre design survey of following 15 Wells with flowlines and
plant piping for CP system design at OGDCL Sinjhoro Oil
and Gas field.

01) CHAK-7A
02) CHAK-2-1
03) CHAK-2-2
04) CHAK-2-3
05) CHAK-66-1
06) CHAK-66-NE
07) BALOCH-1
08) RESHAM
09) CHAK-63-1
10) CHAK-63-SE
11) CHAK-63-3
12) HAKEEM DHAO-1
13) HAKEEM DAHO-2
14) CHAK-63-4
15) LALA JAMALI
16) PLANT PIPING

Page 10 of 11
Asif Siddiqui
NURICON PETROSERVICES (PTE.) LTD.

62. CP system.
TEG based CP system installation for OGDCL Sinjhoro Oil
and Gas field for 15 wells.

63. ECDA.
External Corrosion Direct Assessment of following flow lines
for OGDCL. Which includes D.C.V.G, C.I.P.S additionally
P.C.M, Soil resistivity and differential GPS.

1) QP-01 1.450 km
2) QP-x2 1.500 km
3) QP-03 1.750 km
4) QP-06 0.860 km
5) QP-07 1.100 km
6) QP-08 0.675 km
7) QP-09, 33 3.040 km
8) QP-10 0.230 km
9) QP-11 0.600 km
10) QP-12 0.250 km
11) QP-13 0.300 km
12) QP-14 0.660 km
13) QP-15 1.043 km
14) QP-16 0.980 km
15) QP-19 0.560 km
16) QP-21 1.050 km
17) QP-22 2.150 km
18) QP-23 0.165 km
19) QP-24 2.375 km
20) QP-25 0.910 km
21) QP-26 2.100 km
22) QP-27 0.150 km
23) QP-28 1.000 km
24) QP-29 0.500 km
25) QP-30 0.500 km
26) QP-31 2.500 km
27) Northern Header 6.900 km
28) Eastern Header 4.597 km
29) Combine line QP-x2, 12, 31, 37 1.950 km

64. CP system.
TEG based CP system installation of 11 well casings, Gas
transfer flow lines and up-gradation of plant piping CP system
for OGDCL Qadirpur Gas field for 15 wells.
65.

Page 11 of 11
Asif Siddiqui
Nuricon Petroservices (Pte.) Ltd.

RESUME
PERSONAL

NAME : SYED MUHAMMAD ZAKI IBNE HAMZA


FATHER NAME : SYED HAMZA BIN MUHAMMAD
DATE OF BIRTH : 20 September, 1960
NATIONALITY : PAKISTANI
C. N. I. C NUMBER : 42201-0371408-7
PASSPORT NUMBER : AA6214082
PASSPORT ISSUE DATE : 12 July, 2010
PASSPORT EXPIRY DATE : 12 July, 2015
PASSPORT PLACE OF ISSUE : KARACHI
NACE MEMBERSHIP NUMBER : 148907
NACE CERTIFICATION AS SCT : 20074
MICORR PROFESSIONAL NO. : 204926
DRIVING LICENSE : Have a valid LTV driving license
LANGUAGES : English, Urdu and Arabic
MARITAL STATUS : Married.

ACADEMIC QUALIFICATION

: M. Sc (Petroleum Technology)

PROFESSIONAL QUALIFICATION

: Professional Member MICorr of Institute of Corrosion UK.


: Certified Senior Corrosion Technologist NACE USA.

DESIGNATION/DESCIPLINE

: Corrosion Consultant/CP Specialist/HSE Advisor

TRAININGS & COURSES


: Preventive Maintenance and Testing of Electrical
Equipments Training from Petroman.

: On the Job Training regarding Cathodic Protection and


Corrosion Control from NURICON.

: Health, Safety, Environment & Task Risk Assessments


Training from SGS Pakistan.

: ISO Quality Management Systems Training from (SPE)


Society of Petroleum Engineers.

: ISO 9001 System Implementation & Internal Auditing


from Adcotech DNV Training System and services.

: Occupational Health & Safety Assessment Series


OHSAS -18001 Implementation & Internal Auditing from
Adcotech DNV Training System and Services.
Nuricon Petroservices (Pte.) Ltd.
: Specialist Instructor Rescue Service Course from Civil
Defence.

: Emergency Response and First Aid Course from Civil


Defence.

: Fire Prevention, Protection and Fighting Course from


Civil Defence.

: Issuance of work Permit Course by BP Pakistan.

: Health Safety & Environment Safety watch Course by


BP Pakistan.

: NDT Inspector Course for Inspection and Integrity


management from SGS Pakistan.

: Health Safety & Environment Inspector Course by SGS


Pakistan.

PROFESSIONAL EXPERTIES
AND CAPABILITIES

A. Have a Master’s degree in Petroleum Technology with


NACE certification as Senior Corrosion Technologist
and also Professional Member MICorr of Institute of
Corrosion UK have a nice working experience of 23
years on very responsible Posts such as Inspection &
Corrosion Engineer, Senior Corrosion Technologist,
Corrosion Consultant, CP Specialist, Manager CP
Projects and HSE Advisor In Pakistan and Overseas
such as Saudi Arabia with capabilities and expertise of
the following :

B. Have more than 23 years of experience in the field of


Corrosion Prevention & Control Services especially
managing and organizing Cathodic Protection Systems
turnkey projects regarding Pipelines, Storage Tanks,
Well Casings & Concrete CP from its initial pre design
stage to final commissioning stage by doing pre design
survey, Design & Engineering, Material selection,
installation, test, commissioning, monitoring and
maintenance of the CP System according to the
acquired data analysis, soil resistivities, current demand,
safety measures, prescribed standards limits, situation of
the prevailing environment as well as following the
international codes and standards such as NACE, BS,
NFPA, ANSI, ASME, API, ISO 9001, ISO 14001,
OSHAS 18001etc

C. Capable to perform, Manage, organize and supervise all


types of Engineering & Technical needs, all types of
projects and teams of CP Engineers and Technicians for
all CP activities either for installation, test &
commissioning of CP systems, performing all CP
surveys, such as structure to Soil Potential (PSP)
surveys, Pearson Survey, Holiday Detection, Close
Interval Potentials (CIP) Survey, Soil Resistivity survey,
Nuricon Petroservices (Pte.) Ltd.
Interference Survey, Current Drain Test/E-Log I Survey,
ECDA, ICDA, PCM, DCVG Survey as well as Pipeline
integrity management system, corrosion Coupon and
rate monitoring, data interpretation & analysis and
resolving/rectification of all CP failures/problems.

D. Responsibilities includes consultancy services & advice,


audit and inspection of the existing CP Systems, failure
investigation, analysis, reporting and recommendation of
solutions for the remedies & corrective preventive actions

E. Capable to perform, manage and organize Inspection


and Supervision of Pipelines Coatings and Heat Shrink
Sleeves application on the field girth welds joints as well
as to provide training & demonstration to the crew on
behalf of Tyco Raychem USA for use and application of
Pipe coating/repair Materials, Heat Shrink Sleeves
coating application, repair patch coating and other
related work performances etc.

F. Capable to perform, Manage, organize and supervise all


Inspection related jobs such as implementation of RBI
methods to manage integrity, in NDT visual inspection,
analysis of materials, alloys & defining their metallurgies,
and also able to develop and systematic update
procedures for welding and hydro testing as well as
preparation & implementation of daily inspection
activities reports and coordination with the team work.

HEALTH SAFETY &


ENVIRONMENT MANAGEMENT

G. Specially trained and capable to perform HSEQ Advisor,


Coordinator, Auditor and trainer to successfully complete
the aims & objectives of the organization strictly under
full implementation of Health Safety & Environment
Quality rules and regulations, ensuring full awareness
regarding HSEQ Policies and Facility Manuals by
arrangement of instructions & demonstration of various
activities such as HSE Induction of the persons, HSE
right procedures awareness & enforcement, job safety
analysis, risk assessment, safe job performance &
completion criteria’s, daily tool box meetings, emergency
exit planning, emergency communication numbers,
rescue services, first aid provision, fire fighting, crises
and panic control in case of emergency, guiding the
rescue team to finish the cause of emergency, tackling
and transferring casualties (if any to Hospital), gathering
all at muster points, their head counting and finally
relieving them on declaring end of the emergency.

H. Full investigation, analysis and reporting to find out the


root cause of the incident, defining active & preventive
actions and ensuring their completion before closing the
case for maintaining HSEQ Data base system, also
performing routine quarterly & annually HSEQ audit as
Lead auditor.
Nuricon Petroservices (Pte.) Ltd.

COMUTER & NET SKILL

I. Fully computer literate having good interpersonal


skill of spoken and written English and fully conversant
with standard processing computer software’s such as
MS word, MS excel, MS Power point, MS Project
Management, Project Planner and dealing
communication by using internet.

J. Also capable to understand read, write and little bit


speaking Arabic

K. Fully capable for preparation of tender documents,


quotations, Standard Operating Procedures (SOP’s) all
types of technical writings & materials preparations,
operating manuals writings including Training of the crew
and delivering of lectures, demonstration & other
programming’s.

RESPONSIBILITIES HELD

L. Engineering/Design, Cost estimation, Procurement & supply


of material, Installation, Test and commissioning of cathodic
protection systems for Pipelines, Storage Tanks and Well
Casings and concrete CP.

M. Supervision of Coating on Pipelines on the Ditch and in


the Plant/factory and Heat Shrink Sleeves application on
the field girth weld joints. Also responsible to provide
training & demonstration to the crew on behalf of
Raychem/Tyco USA for use and application of Pipe
coating & repair Materials.

N. Inspection and analysis of corrosion & Environmental


Safety problems and recommendation of their remedies

O. Preparation of Tender documents and all accessories


related to tender.

P. Preparation of competitive quotations for Supply,


installation, test and commissioning of Cathodic
Protection System.

Q. Erection and Maintenance of base camp.

R. Labor handling, Field administration and work


management.

S. Sales and Purchase of CP and other Materials.

T. Schedule field crew /job to achieve best output and


operation.

U. Coordinate / interface with the concerned persons /


matters to carry out the job.

V. Supervise / Monitor all type of C.P. maintenance,


repair/technical schedule
Nuricon Petroservices (Pte.) Ltd.

W. Preparing and submission of reports.

X. Carrying out structure and soil surveys, Pearson Survey,


Holiday Detection, Close Interval Survey, Soil Resistivity
survey, Interference survey, Current Drain Test survey
and attaining/resolving of TR or CP System failure jobs.

PROJECTS SUPERVISED
Completed the following projects successfully.

[01] Supply, installation and commissioning of Cathodic


Protection System (Impressed Current) for 8”dia.20 km
oil Pipeline at Tando Alam Oil complex of (OGDC) Oil
and Gas Development Corporation of Pakistan.

[02] Pre-design Survey, Design, Engineering, Procurement,


Supply, installation and commissioning of Cathodic
Protection System (impressed current) for 16” dia. 6.0
km PARCO-PSO Oil Pipeline at Mahmood Kot Multan.
Continuous Polymeric Anode (Anodeflex of Raychem
Technologies, USA) is laid all along the pipeline. The very
first system of its kind used in Pakistan.

[03] Direct Current Voltage Gradient (DCVG) and Pearson


Survey for 16” dia. 6.0 km PARCO-PSO Oil Pipeline at
Mahmood Kot Multan.

[04] Feasibility & CP Study, Survey and Design of Cathodic


Protection Systems for Flow lines, tank bottoms, plant
piping, electrical grounding system, and 05 no. well
casings for Uion Texas Pakistan.

[05] Pre-design Survey, Design, Engineering, Procurement,


Supply, installation Supply, installation and
commissioning of Cathodic Protection System
(Sacrificial anodes) for 6” dia.3.5 km Lashari pipelines
for (OGDC) Oil and Gas Development Corporation of
Pakistan.

[06] Supervision of Pipeline Coating and field joints Coating


by applying Raychem Heat Shrink Sleeves for PSO 6”
dia. 5Km PSO-PRL Link Pipeline.

[07] Supply, installation and commissioning of Cathodic


Protection System (Impressed Current) for 8” dia. 4.5 km
Sadqal-SNGPL pipeline of (OGDC) Oil and Gas
Development Corporation of Pakistan.

[08] Feasibility & CP Study, Survey and Design of Cathodic


Protection Systems for Flow lines, and 12 numbers well
casings for OGDC.

[09] Pre-design Survey, Design, Engineering, Procurement,


Supply, installation and commissioning of Cathodic
Protection System (impressed current) for 12” dia. 2.0
km AES Power Station-FO Depot,Lalpir Oil Pipeline of
PSO at Mahmood Kot Multan.
Nuricon Petroservices (Pte.) Ltd.
[10] Pre-design Survey, Design, Engineering, Procurement,
Supply, installation and commissioning of Cathodic
Protection System for above surface Tank Bottoms
exterior, for Shell Pakistan Limited utilizing Anodeflex
(Raychem Technologies, USA) under the Tank Bottom.
It was the very first system of its kind used in Pakistan.

[11] Close Interval Potentials (CIP) and Pipe Locating Survey


for 16” dia. 6.0 km PARCO-PSO Oil Pipeline at
Mahmood Kot Multan.

[12] Pre-design Survey, Design, Engineering, Procurement,


Supply, installation and commissioning of Electric Heat
Trace Systems for furnace oil piping for Asia Petroleum
Limited (APL). At their Pepri Oil Terminal, Karachi for
Hubco Power Project.

[13] Pre-design Survey, Design, Engineering, Procurement,


Supply, installation and commissioning of Electric Heat
Trace Systems for (KAPCO) Kot Addu Thermal Power
Plant, Multan.

[14] Pre-design Survey, Design, Engineering, Procurement,


Supply, installation and commissioning of Electric Heat
Trace Systems to the piping of Test Separator & Slug
Catcher at Kadanwari Gas Field of Lasmo Oil Pakistan
Limited.

[15] Pearson, Close Interval and Pipe locating Survey of


Mazari/Liari 6” dia 8.5 KM Pipeline of Union Texas
Pakistan Inc.

[16] Checking of coating integrity and Cathodic Protection


Level of 850 Km cross country Karachi-Mehmood Kot-
Shikhupura Pipeline of Pak Arab Oil Refinery PARCO.

[17] Pre-design Survey, Design, Engineering, Procurement,


Supply, installation and commissioning of Electric Heat
Trace Systems to the piping of fuel oil supply lines of
Pakistan Refinery Limited.

[18] Pre-design Survey, Design, Engineering, Procurement,


Supply, installation and commissioning of Cathodic
Protection System for above surface Tank Bottom
exterior for Shell Pakistan Limited.

[19] Designing and Supply of Material for Cathodic Protection


System for well Casings of Mari Gas Company Limited.

[20] Pre-design Survey, Design, Engineering, Procurement,


Supply, installation and commissioning of Cathodic
Protection System (Impressed Current) for two existing
Retail outlets filling stations of PSO.

[21] Pre-design Survey, Design, Engineering, Procurement,


Supply, installation and commissioning of Cathodic
Protection System by lying of anode (Raychem
Technologies, USA) around the Tank (Impressed
Current) for three new vision Retail outlets filling stations
Nuricon Petroservices (Pte.) Ltd.
of PSO. It was the very first system of its kind used in
Pakistan.

[22] Pre-design Survey, Design, Engineering, Procurement,


Supply, installation and commissioning of Cathodic
Protection System (Impressed Current) for 26” Diaz. 11
KM water Pipeline at Port Bin Qasim Karachi for Engro
Asahi Polymer and Chemicals.

[23] Pre-design Survey, Design, Engineering, Procurement,


Supply, installation and commissioning of Cathodic
Protection System for complete buried fuel tanks at
various PSO filling Stations at Karachi. [24] Detail
Engineering, design, supply, installation and
commissioning of Cathodic Protection System
(Sacrificial Anodes) for 36” and 56” Dia. 10 KM water
Pipeline of (RDA) Rawalpindi Development Authority
through their consultant Mott Mcdonald.

[25] Feasibility study of Cathodic Protection Systems of five


well casings at Miano-1, Miano-2, Sawan-1, Sawan-2
and Khipro-1 of OMV Pakistan Limited.

[26] Supervision of Pipeline Coating and field joints Coating


by applying Raychem Heat Shrink Sleeves for PRL 12”
dia. PRL- Keamari Link Pipeline

[27] Pre-design Survey, Design, Engineering, Procurement,


Supply, installation and commissioning of Cathodic
Protection System for two above surface Naphtha
Storage Tank Bottoms, for (NRL) National Refinery
Limited Kemari Terminal utilizing Anodeflex (Raychem
Technologies, USA) under the Tank Bottom.

[28] Supervision of Coatings, warping and repair of Field grit


weld joints and Holiday Detection for 24” and 30” dial.
Water supply Pipeline from Korangi Pumping station to
DHA Karachi.

[29] Pre-design Survey, Design, Engineering, Procurement,


Supply, installation and commissioning of Cathodic
Protection System for piping and casing net work for
Shell Pakistan Limited at their Keamari Terminal
Karachi.

[30] Coating & wrapping, Insulation and jacketing for (NRL)


National Refinery Limited re-routed 4x 1.5 km link
Pipelines of dia. 2x 6” , 8” and 14 “ near Qayoom abad
crossings Karachi.

[31] Pre-design Survey, Design, Engineering, Procurement,


Supply, installation and commissioning of Cathodic
Protection System for NRL re-routed 4 link Pipelines of
dia. 2x 6” , 8” and 14 “ near Qayoom abad crossings
Karachi.

[32] Supply, installation and commissioning of Cathodic


Protection System for Lahore International Airport PSO
Nuricon Petroservices (Pte.) Ltd.
fuel farm facilities underground Tanks and Piping Net
work.

[33] Inspection, Instructions, Demonstration &Training of Sui


Southern Gas Company (SSGC) Crew regarding
application of Heat Shrink Sleeves applications on girth
weld field joints at Super High Way site on their new 20”
dia. Cross Country Pipeline towards Surjani.

[34] Supervision of Pipeline Coating and field joints Coating


by applying Tyco/Raychem Heat Shrink Sleeves Ray
clad 120 for OMV Pakistan 12” dia. 35KM and 16” dia.
11KM Pipeline for Kadanwari and Miano up grading
project.

[35] Instructions, Demonstration &Training, of OGDC Crew


regarding Holiday Detection prior and after laying a
Pipeline at their Guddu Station.

[36] Supervision of Pipeline field joints Coatings by applying


Raychem Heat Shrink Sleeves for APL dia. 20” and 24”
Pipe through ARA at Port Qasim.

[37] Pre-design Survey, Design, Engineering, Procurement,


Supply, installation and commissioning of Cathodic
Protection System for piping net work for Shell Pakistan
Limited at their C Installation Kemari.

[38] Feasibility & CP Study, Survey and Design of Cathodic


Protection Systems for 05 numbers well casings for
OMV Pakistan.

[39] Installation and commissioning of Cathodic Protection


System for BHP Tanks Bottom at their Zamzama Field
Dadu.

[40] Supply and application Supervision of Pipeline field


joints Coatings by applying Raychem Heat Shrink
Sleeves and its Holiday Detection for Indus Steel Limited
Hyderabad.

[41] Design, engineering, supply, installation and


commissioning of Electric Heat Trace Systems for
Pakistan Refinery Limited.

[42] Design, engineering, supply, installation and


commissioning of Cathodic Protection System for
PARCO’s Tanks Bottom at PARCO Mid Country
Refinery Mehmood Kot Multan.

[43] Recommissioning of CP system for 16 “dia. PARCO –


JIMCO 5.5 KM Pipeline at Mahmood Kot Multan.

[44] Pre-design Survey, Design, Engineering, Procurement,


Supply, installation of Cathodic Protection System for
PARCO Fazil Pur Terminal Tank Bottom CP.
Nuricon Petroservices (Pte.) Ltd.
[45] Feasibility & CP Study, Survey and Design of Cathodic
Protection Systems for Flow lines, and 04 numbers well
casings for Pakistan Petroleum Limited.

[46] Pre-design Survey, Design, Engineering, Procurement,


Supply, installation and commissioning of Cathodic
Protection System for, 05 numbers well casings at
Sawan Gas Field for OMV Pakistan.

[47] Feasibility & CP Study, Survey, Design, Supply and


Installation of Cathodic Protection Systems for 3 Nos.
Tank Bottom CP at Adhi Field Processing Plant for
Pakistan Petroleum Limited.

[48] Pre-design Survey, Design, Engineering, Procurement,


Supply, installation of Cathodic Protection System for
PARCO Bobak Dadu Terminal Tank Bottom CP.

[49] Feasibility & CP Study, Survey and Design of Cathodic


Protection Systems for 21 numbers well casings for
OGDCL Pakistan.

[50] Pre-design Survey, Design, Engineering, Procurement,


Supply, installation and commissioning of Cathodic
Protection System for, 03 numbers well casings at
Kadanwari’s Miano Gas Fields for OMV Pakistan.

[51] Pre-design Survey, Design, Engineering, Procurement,


Supply, installation and commissioning of Cathodic
Protection System for Fire Waterline at Kadanwari Gas
Field for OMV Pakistan.
[52] Feasibility & CP Study, Survey and Design of Cathodic
Protection Systems for 3 Nos. Tank Bottom CP for
National Refinery Limited.

[53] Feasibility & CP Study, Survey, Design, Supply and


installation supervision of Cathodic Protection Systems
for ENI’s 23 KM Kadanwari K-14 link Pipeline for ENI
Pakistan Limited.

[54] Joined ABDULLAH FOUAD IMPALLOY COMPANY


KINGDOM OF SAUDI ARABIA in the same capacity to
do the CP Study and Design of Cathodic Protection
Systems of various Well Casings of SAUDI ARAMCO.

[55] Feasibility & CP Study, Survey and Design of Cathodic


Protection Systems for 30” dia. 206 KM SHY-1
SHDGUM YANBU Loop – 1 Pipeline of SAUDI
ARAMCO.

[56] CP Study and Design of Cathodic Protection Systems


for 2 above surface storage tanks internal and external
for Jeddah Refinery of Saudi Arabian Oil
Company(ARAMCO).

[57] Installation supervision of Cathodic Protection Systems


installation for HARD –III well casing of Saudi Arabian
Oil Company (ARAMCO).
Nuricon Petroservices (Pte.) Ltd.
[58] Preparation of Bid Documentation and Quotation for
supply and Installation of Cathodic Protection Systems
for various projects of various Saudi Clients of
Petrochemical industries including SABIC and Saudi
Arabian Oil Company(ARAMCO).

[59] Rejoined NURICON PETROSERVICES PRIVATE


LIMITED KARACHI PAKISTAN and completed the
Survey, Design, supply and Installation of Cathodic
Protection Systems for PSO’s 10” dia. 32 KM LALPIR
KAPCO KOT ADDU Pipeline.

[60] Survey, Design, supply and Installation of Cathodic


Protection Systems for BHP’s 6” dia. 28 KM BHP
ZAMZAM DADU to PARCO BUBAK Pipeline.

[61] Pre Design Survey, Design, supply and Installation of


Cathodic Protection Systems for OGDCL’s 12”dia. 42
KM Bobi - Tando Pipeline.

[62] Supply and Installation supervision of Heat Shrink


Sleeves Application on girth weld joints of 16”
and 12” dia. MAPAK Oil Terminal’s Pipelines at Port
Qasim Karachi, through Al-Tariq.
NURICON PETROSERVICES (PTE.) LTD.

RESUME

PERSONAL

NAME : Muhammad Adnan


FATHER NAME : Muhammad Jaffar
DATE OF BIRTH : September 07, 1974
NATIONALITY : PAKISTANI
N.I.C Number : 42201-8840701-5

ACADEMICS
: Diploma of Associate Engineer in
Electronics, G.C.T S.I.T.E Karachi.

TRAININGS & COURSES


: Basic Corrosion Course and Corrosion
Control by Coating( Dr. Chris Ringas )
: Health, Safety, Environment and Task Risk
Assessments from SGS
: Computer, MS Word, Excel, PP and Auto-cad etc.
: Quality Management Systems
: ISO 9001 System
: Occupational Health & Safety Assessment Series
OHSAS-18001.
: Thermo Electric Generator Maintenance and
operation
Global Thermoelectric (Calgary, Canada)

PROFESSIONAL EXPERTIES : A. Presently working with (NPSL) Nuricon


Petroservices (Pte.) Limited, Karachi,
Pakistan, as Senior CP Instrument
Technician since last 8 years.

RESPONSIBILITIES HELD
A. Material, Installation, Test and commissioning
of cathodic protection systems for Pipelines,
Storage Tanks and Well Casings.

Page 1 of 6 Muhammad Adnan


NURICON PETROSERVICES (PTE.) LTD.

B. Sales and Purchase of CP and other


Materials.
Schedule field crew /job to achieve best
output and operation.

C. Supervise / Monitor all type of C.P.


maintenance, repair/technical schedule.

D. Preparing and submission of reports.

E. Carrying out structure and soil surveys,


Pearson Survey, Holiday Detection, Close
Interval Survey, Soil Resistivity survey,
Interference survey, Current Drain Test survey
and attaining/resolving of TR and CP System
failure jobs.

PROJECTS SUPERVISED
Completed the following projects successfully.

[01] Installation and commissioning of Cathodic


Protection System (impressed current) for 16”
dia. 6.0 km PARCO-PSO Oil Pipeline at
Mahmood Kot Multan. Continuous Polymeric
Anode (Anodeflex of Raychem
Technologies, USA) is laid all along the pipeline.
The very first system of its kind used in
Pakistan.

[02] Feasibility & CP Study, Survey of Cathodic


Protection Systems for and 21 numbers well
casings for OGDC.

[03] Installation and commissioning of Cathodic


Protection System (impressed current) for 12”
dia. 2.0 km AES Power Station-FO Depot,Lalpir
Oil Pipeline of PSO at Mahmood Kot Multan.

[04] Close Interval and Pipe Locating Survey for 16”


dia. 6.0 km PARCO-PSO Oil Pipeline at
Mahmood Kot Multan.

[05] Feasibility study of Cathodic Protection Systems


of five well casings at Miano-1, Miano-2,
Sawan-1, Sawan-2 and Khipro-1 of OMV
Pakistan Limited.

Page 2 of 6 Muhammad Adnan


NURICON PETROSERVICES (PTE.) LTD.

[06] Feasibility & CP Study, Survey and Design of


Cathodic Protection Systems for 05 numbers
well casings for OMV Pakistan.

[07] Installation and commissioning of Cathodic


Protection System for BHP Tanks Bottom at
their Zamzama Field Dadoo.

[08] Recommissioning of CP system for 16 “ dia.


PARCO –JIMCO 5.5 KM Pipeline at Mahmood
Kot Multan.

[09] Supply and Installation of Cathodic Protection


System for PARCO Fazil Pur Terminal Tank
Bottom CP.

[10] Installation and commissioning of Cathodic


Protection System for, 05 numbers well casings
at Sawan Gas Field for OMV Pakistan.

[11] Installation and commissioning of Cathodic


Protection System for, 02 numbers well casings
at Miano Gas Field for OMV Pakistan.

[12] Installation of Fire Water Line at Kadanwari


Plant for OMV Pakistan.

[13] Fault , rectification and Re-Commissioning of


CP System of 8” x 4 Km Pipeline and 10” x 32
Km Pipeline at Lalpir.

[14] Fault , rectification and Re-Commissioning of


CP System of 16” Dia x 5.5 Km Pipeline at
Jimco.

[15] Design for 19 well casings at KUNNAR, DARU


and BOBI Fields for OGDC.

[16] Re-furbishment including Pre-Design Survey,


Design & Engineering, Installation Test &
Commissioning of CP System for Gas Supply
Pipeline PARCO Residential Area Mahmood
Kot, Multan.

[17] Survey and Installation Solar System &


Commissioning for CP System for 1 Nos
Well Casing Sawan 5 at OMV Sawan Gas
Field.

Page 3 of 6 Muhammad Adnan


NURICON PETROSERVICES (PTE.) LTD.

[18] CP survey for 8 wells, E-Log I test Geonics,


and Soil Resistivity tests ORIENT
PETROLEUM INC.

[19] Survey and E,Log I Test for CP System for


Adhi Well # 14 Casing Pakistan Petroleum
Ltd.

[20] Cathodic Protection Services for 23Km x


10” K-14 Flow line at KADANWARI Eni
Pakistan Limited.

[21] Installation and Commissioning of Tank


Bottom CP System for 3 nos dia 22m x 4m
high mounded Tanks and jet fuel piping at
new Lahore International Airport Al-Tariq
Constructors (Pvt.) Limited / Pakistan State
Oil Company Limited.

[22] Survey and E,Log I Test for CP System for


4 nos Well Casing at Block 22 Shikarpur
Field Pakistan Petroleum Ltd.

[23] Installation and Commissioning of 1.5Km


Pipelines CP System Islamabad AirPort
Shell Pakistan Limited.

[24] Survey and E,Log I Test for CP System for


bhp Zamzama 7 Well Casing.

[25] C-Scan, Close Interval Potential and Direct


Current Voltage Gradient Surveys for Buried
45Km Pipelines
At OMV Kadanwari

[26] Survey and E,Log I & Soil resistivity Test for


CP System for OGDC 24 Well Casing. At
Qadirpur Gas field.

[27] Test and commissioning of Solar powered


CP system for well #18 PPL Adhi Gas field
Doltala.

[28] Installation and commissioning of TEG for


Cathodic Protection System for 24 well Casing
at OGDC Qadirpur

[29] Survey and E,Log I & Soil resistivity Test for


CP System for OGDC 21 Well Casing. At
Bobi and Kunnar Gas field.

Page 4 of 6 Muhammad Adnan


NURICON PETROSERVICES (PTE.) LTD.

[30] Installation and commissioning of Cathodic


Protection System (impressed current) for 16” dia.
6.0 km PARCO-PSO Oil Pipeline at Mahmood Kot
Multan. Continuous Polymeric Anode (Anodeflex of
Raychem
Technologies, USA) is laid all along the pipeline.

[31] Installation and commissioning of TEG for


Cathodic Protection System for 24 well Casing at
OGDC Bobi and Kunnar.

[32] Installation and Commissioning of Tank Bottom CP


System for 7 nos dia 22m x 4m high mounded
Tanks NRL Karachi, Al-Tariq Constructors (Pvt.)
Limited.

[33] Well Casing CP system TEG (thermo electric


generator) based CP system installation and
commissioning for 11 well casings OGDCL Kunner
Oil Field.

[34] Well Casing CP system TEG (thermo electric


generator) based CP system installation and
commissioning for 10 well casings OGDCL Bobi Oil
Field.

[35] Survey and E,Log I & Soil resistivity Test for


CP System for OGDCL 6 Well Casing and
Tank, Pipe Line. At Chanda/Mela Oil field.

[36] Survey and E,Log I & Soil resistivity Test for


CP System for OGDCL 1 Well Casing. At
Nashpa Oil field.

[37] Survey Soil resistivity Test for CP System


for OGDCL 4 Tank. At Nashpa Oil field.

[38] External Corrosion Direct Assessment for following


PSO pipe line which includes D.C.V.G, C.I.P.S &
P.C.M

a) 8 Km 24” and 42” dia pipe lines installed in


ZOT to BS Port Qasim Karachi.

b) 6.5 Km 24” dia pipe line in BS to BOT Port


Qasim Karachi.

c) 6 Km 24” dia pipe line in ZERO POINT to


PMY Port Qasim Karachi.

Page 5 of 6 Muhammad Adnan


NURICON PETROSERVICES (PTE.) LTD.

d) 3.2 Km 18” pipe lines in BOT to MW1 JETY


Port Qasim Karavhi.

e) 14 Km 8” dia pipe line in Sihala Islamabad.

[39] Survey and Installation Solar System &


Commissioning for CP System for 1 Nos Well
Casing Mino 13 at OMV Kadanwari Gas Field.

[40] Well Casing CP system TEG (thermo electric


generator) based CP system installation and
commissioning for 8 well casings OGDCL Qadirpur
Gas Field.

[41] Installation Solar System &TR Commissioning for


CP System for 5 Nos Well Casing, Tank and Pipe
Line Chanda/Mela Oil Field.

Page 6 of 6 Muhammad Adnan


Page 1 of 3
JAVID IQBAL WAHEED (MI Corr.)
N.A.C.E ‘Senior Corrosion Technologist’

167-C, Bashir House, Samanabad Faisalabad (38070) Pakistan.


Phones: 092 041 2665372, Cell: 092 0300 7200367
E mail javed.waheedcp@gmail.com
IInd: javedcp@hotmail.com
Fluent in English, Urdu, Hindi

CORROSION CONTROL & CATHODIC PROTECTION PROFESSIONAL


OIL / GAS PIPE LINE INDUSTRY
N.A.C.E Recognized/Certified Corrosion professional as’ ’Senior Corrosion Technologist’ and
MI Corr. by Institute of Corrosion Engineers UK, Oil & Gas Industry professional with 35+ years experience,
Corrosion Engineering, Cathodic protection, Integrity surveys E.C.D.A(DCVG,CIPS &PCM), CP designing,
troubleshooting, Failure Analysis & Reporting, C.PTrainer/Instructor, expertise in Quality Control
Inspections, Responds to up-coming Pipeline Industry technology challenges with confidence,

PROFESSIONAL EXPERIENCE:
 CP designing for new Pipelines on Impressed / Sacrificial Anodes system. Up grading of existing CP systems
on Transmission/distribution Line and Facilities/Plants,
 C. Scan Surveys / D.C.V.G Survey/ CIPS &PCM Survey and Interference Surveys.
 Review and interpret corrosion/inspection monitoring data, along with trends and existing mitigation
measures. Recommend changes in the corrosion criticality analysis and monitoring/inspection program where
appropriate.
 Initiate the implementation of corrosion prevention measures in areas of Cathodic Protection, Corrosion, as
well as Insulation Systems.
 Cathodic Protection of Storage Tanks. Well casings. G.O.S.Ps, Oil & gas Transmission / Distribution lines.
 Inspection/Maintenance/Trouble shooting of T/R Units, Teg Units and Solar panels.
 Identify major deterioration threats and ensure that integrity limitations are addressed and consequently
propose suitable mitigation techniques.
 Conducting / developing Corrosion control Training programs at office as well as in field
 HSE awareness /Training of staff according to requirements.
 Participation in the regular review of Corrosion Control root Cause Analysis and failure investigations
mitigation of interference problems.
 Participate in. Coating inspections according to’AWWA’& ‘BS standards’
 Soil resistivity surveys / current drain tests / Designing of Ground beds {Horizontal / Vertical type}.
 Pipe to soil potential (PSP) surveys / Close interval potential surveys (CIPS) / Pearson surveys (Coating
inspections). Inspection/Repair of Insulating Flanges / joints.
 Keep corrosion & erosion mitigation, monitoring and management program updated in line with the changing
production.
 E log I Test on well casings.
 Locating of Hotspots / Coating faults on old lines and direct inspections.
 Preparation of field reports, sketching on computer, Data entries, Graphical representation of field reports /
status & recommendations for upgrading/rehabilitation work of old lines and CP systems.
 Recently, I have completed 6 Projects of “ECDA” Surveys on our Transmission lines (450km) for which I was
selected to obtain ECDA Training at “P.P.T (Pvt) office “Johannesburg South Africa”
Page 2 of 3
EMPLOYMENT HISTRY:
CORROSION tECHNOLOGIST. N.P.S.L Karachi (PAKISTAN) May 2011- to- Till present
Working with an Oil & Gas Inspection company involved in C.P Designing/ Installation of all type of
CP systems/Monitoring & carrying out RBI/ECDA projects in oil & gas fields scattered in various
parts of Pakistan as well as abroad. ECDA Projects completed at Oil Gas Fields of OGDCL & B.P
Pakistan.
EXECUTIVE TECHNICAL OFFICER (CORROSION) 1972 –to- Feb, 2011
Joined “Sui Northern gas Pipelines in 1972 as a’ Sub Engineer (Corrosion) in Transmission & Distribution
network. Promoted up to “Exec-Technical Officer Corrosion/Section Incharge of Transmission (1350 km
Lines of different Dias i.e. 8” to36”including Compressors Stations. As well as Distribution area network. Exp-
to plan program on monthly / quarterly basis for routine jobs and integrity surveys on old pipelines. During
my service with my mother company, I worked on secondment basis with ARAMCO and PDO (Oman) to
improve and to enhance my knowledge & expertise.

COATING INSPECTOR. 1978-79


Worked as a ‘Coating Inspector’ on 16”dia “PARCO “Line WITH “CORROSION Engineering LTD”on
deputation.
C.P TECHNICIAN.
ARAMCO” SAUDI ARABIA 1982-83.
With “ARAMCO” Saudi Arabia in Pipeline maintenance Department on secondment as a CP- Tech,
where I passed ‘Work permit Tests’ (Hot / Cold) successfully.
Cathodic protection of Oil / Gas Pipelines, storage Tanks and Well casings. Installation of Horizontal / Deep
well type groundbeds, Installation of CP test posts, Interference surveys, Monitoring of CP system
Inspection/maintenance of T/R units on AC, Teg units and solar system.
{1983-1985 with, Sui Northern gas Pipelines as a Sr, Associate Engineer (Corrosion)}
Q.C INSPECTOR 1985-1990

With Project-5 of SUI NORTHERN GAS Pipelines as a ’Q.C/QA Inspector on construction / installation of
new Pipelines. Coating inspection (Coal tar based Enamel / 3 LPE coatings) / during construction & lowering
of pipelines. Designing / testing / commissioning of C.P System on new lines of various Dias i.e. 8" to 36"Ø
lines.
{1990-1999 with, Sui Northern gas Pipelines as a Technical Officer (Corrosion)}
Sr.CP TECH.
PETROLEUM DEVELOPMENT OF (OMAN) 1999
With S.T.S as “Senior CP Tech.’ on Cathodic protection of Oil / Gas Lines ,Well casings Storage tanks
/ Gathering stations (GOSP).Inspection/maintenance all kind of CP System i.e. T/R, Teg and solar units,
Where I successfully passed “HSE” tests & Work permit tests.
{1999-Feb, 2011 with, Sui Northern gas Pipelines as a Exec. Technical Officer (Corrosion)

As a Trainer: Provided training to SNGPL staff at SNGTI Lahore and ‘SGS Pakistan’ Engineers at
Karachi regarding Corrosion/Cathodic protection mechanism and related Field surveys.
Page 3 of 3
EDUCATION:
 Post Graduation (Political Sciences & Punjabi Language) University of Punjab. 1995
 Graduation (Major in Journalism From University of Punjab) 1st Class 1988
 HND (3years Diploma of “Associate Electrical Engineer) 1st,Class 1970
 S.S.C EXAM (Science & Technical Drawing) 1st,Class 1966

CERTIFICATION & TRAINING:


 Computer course. MS Word & MS Excel) from “PETROMEN” 1992
 Work Permit Test (Hot & cold)“ARAMCO” Saudi Arabia) 1983
 NTI-HSI Training (P.D.O. Oman ) 1999
 INDUSTRIAL CORROSION CONTROL” CERTIFICATE COURSE 2002
NFC Institute of” Engineering & Technology Multan (Pakistan)
 TRAINING OF “EXTERNAL CORROSION DIRECT ASSESSMENT” 2006
P.P.T (Pvt) Limited Johannesburg. (South Africa)
 INTERNAL AUDIT COURSE OF ISO 14001:2004 &OHSAS 18001:1999 2007
By.Qualitas Training Division. (Pakistan)

PUBLICATION: My case study article”Disbonded coating leads to P/Line Corrosion’ has published in
Material Performance MP, Oct-2010, MP is an official magazine of NACE, International USA,

AFFILIATION:
 Senior Corrosion Technologist Cert-No: 48561 Expire 12/31/2016. 10 years, Recognized professional
affiliation with (N.A.C.E) International} in good standing Membership # 111529 since 2003 {Member
Technical Committee, STG 05-Cathodic Protection 2011-12}
 M.I Corr. Cert- No. 205866 (Institute of Corrosion-U.K)
 Member ‘Society of Corrosion Engineers Pakistan’ Membership No. M-79
TECHNICAL SKILL:

Software: Window, 2000.XP /Microsoft office (Word, Excel. Power Point. Out look) Design / copy
writing. PECIMS software for ECDA analysis.
GENERAL:
LANGUAGES:
Proficient in English Urdu, Hindi and Can understand Arabic spoken.
DRIVING LICENCE:
Holding a valid driving license, having sound health and physique.
PASPORT:
Holding a valid International Passport # BU6172831 valid up to: 3rd,June 2017.
SOCIAL NETWORK: http://pk.linkedin.com/pub/javed-waheed/2b/99a/b4a
http://www.facebook.com/javed.faisalabadii
NURICON PETROSERVICES (PTE.) LTD.

RESUME
PERSONAL
Name : Mazhar Naeem Siddiqui
Father Name : Muhammad Mateem Siddiqui
Date of Birth : January 1st 1970
Nationality : Pakistan
N.I.C Number : 42201-8494445-5

ACADMICS : B.Sc (Mathematics)


: Diploma of Associate Engineer Electronics,
G.C.T Karachi.

TRAININGS & COURSES : Diploma in Computer maintenance


NIDP
: TEG (Thermo Electrical Generators) operation,
installation and maintenance training from Global Thermo
Electrics, Canada.
: Basic Corrosion Course and corrosion
Control by Coating (Dr. Chris Ringas)
: AutoCAD, MS Word, Excel, PP etc.
: Protel circuit designer

PROFESSIONAL EXPERTIES : Cathodic protection


: Presently working with (NPSL) Nuricon
Petroservices (Pte.)Limited,
Karachi, Pakistan, as a Corrosion
Technologist.

RESPONSIBILITES HELD : Supervise, design and schedule all type of


Survey CP Installation, maintenance / repair projects.

: Schedule field crew / job to achieve best output


and operations.

: Material, Installation, Test and commissioning of


Cathodic protection systems for Pipelines,
Storage Tanks, Well Casings and buried structures.

: Carrying out structure and soil surveys, Pearson Survey,


Holiday Detection, Soil Resistivity survey, Interference survey,
Current Drain Test survey and attaining / resolving of TR and
CP System failure jobs.

: Preparing and submission of reports.

: Sales and Purchase of CP and other Materials.

Page 1 of 6
Mazhar Naeem Siddiqui
NURICON PETROSERVICES (PTE.) LTD.

PROJECTS SUPERVISED

1. CIPS Survey
46 Km long Gas Gathering lines of OMV Pakistan at
Sawan.

2. CP System.
Thermo Electric Generator (TEG) based CP system
for well casings of QP-29 of OGDCL Qadirpur gas
field Ghotki.

3. CP System.
Thermo Electric Generator (TEG) based CP system
for well casings of QP-30 of OGDCL Qadirpur gas
field Ghotki.

4. Pre design Survey.


Pre design survey including E Log-I Soil resistivity
survey 4 pin and Geonics.
Well Number QP-30 for OGDCL Qadirpur

5. DCVG
DCVG survey of following lines
a) TAJEDI trunk line 7.5 Km
b) South MAZARI trunk line 7.1 Km
d) DHABI North Trunk line 4.9 Km
e) KHOREWAH TURK flow line 11.7 Km

6. Pre design Survey.


Assist in Current drain test and soil resistivity of 7
wells, for designing of TEG biased CP system for
MGCL (Mari Gas Company Limited) Dharki

7. CP System.
Solar System based CP system for Well casing of six
wells located at OGDCL Dakhni.

8. CP System.
TRU based CP system for tank and Flow line located
at PARCO DHDS.

9. CP System.
CP system for Fire water line located at MOL CPF
situated at Makori gas field.

Page 2 of 6
Mazhar Naeem Siddiqui
NURICON PETROSERVICES (PTE.) LTD.

10. CP System
Pre design survey including E LogI, Geonics and Soil
resistivity survey for eight well casings located in
Manzalai gas field.

11. Pre design Survey.


E,Log I & soil resistivity test for design of CP System
for 09 Well casing at Qadirpur Gas field OGDCL (Oil
and Gas Development Company limited).

12. CP System
CP System for Tanks Bottom, internal and F/W Line
located at MOL Pakistan Manzalai Gas Field.

13. Pre design Survey.


E,Log I & soil resistivity test (Geonics) for design of
CP System for 08 Well casing at MOL Manzalai
Central processing facility Gas Field.

14. CP System.
Installation of TEG (thermo electric generator) based
CP system for well casings of X2, QP-12, QP-06 and
QP-14 of OGDCL Qadirpur gas field Ghotki.

15. CP System.
Anodeflex installation for burried vessels at MOL
Manzalai Central processing facility.

16. CP System.
TRU based CP system with Anodeflex installation for
Tank bottom CP system at NRL (National Refinary)
Karachi.

17. Well Casing CP system


TEG (thermo electric generator) based CP system
installation and commissioning for well casings (well #
K-02, K-03, K-05 and K-06 K-01, K-07, K-Deep-01
and K-08) for OGDCL Kunner Oil Field.

18. Well Casing CP system.


TEG (thermo electric generator) based CP system
commissioning of 9 well casings (Well # Bobi-01,
Bobi-02, Bobi-03, Bobi-04, Bobi-08, Bobi-09,
Chakdim, Dhamaraki and Mithrao) for OGDCL Bobi
Oil Field.

Page 3 of 6
Mazhar Naeem Siddiqui
NURICON PETROSERVICES (PTE.) LTD.

19. Well Casing CP system.


Solar Power based CP system installation and
commissioning of Bobbi-05 produced water injection
well OGDCL Bobi Oil field.

20. Well Casing CP system.


Solar Power based CP system commissioning of 6
well casings (Well # Dakhni-01, Dakhni-03, Dakhni-
04, Dakhni-08, Dakhni-D1, Dakhni-D2 for OGDCL
Dakhni Oil Field District Attock, Punjab.

21. CP System.

a. TR based Tank Bottom CP system using Anode


Flex with Test posts. Supervised pre design
survey, CP system installation and
commissioning.
b. CP system installation for OWS pipe line with
Anode flex and two deep Anode Beds. System
installation and Pre commissioning.

22. CP System.
TRU based CP system for Tank bottom Internal and
External of Four Tanks located at MOL CPF
(Manzalai)

23. CP System.
TRU Based CP System for Fire water line with Test
Posts located inside MOL (Pakistan) CPF, Manzalai
Facility Kohat.

24. CP System.
PCM and DCVG on PSO Pipeline from BOT to PQA
BS1.

25. CP System.
PCM and DCVG on PSO Pipeline from ZOT to PQA
BS1.

Pre Design Survey


E Log-I, Soil Resistivity, Current drain test and
Geonince (Soil Conductivity) in OGDCL Qadirpur Gas
Field for the Wells: QP-31, 32,33, 35, 36, 37, HRL-2,
HRL-3

Page 4 of 6
Mazhar Naeem Siddiqui
NURICON PETROSERVICES (PTE.) LTD.

26. CP System.
TEG Based CP system for Wel casing and Pipe line in
OGDCL Qadirpur Gas Fied.
Well names: QP-31, 32,33, 35, 36, 37, HRL-2, HRL-3.

Pre Design survey

E Log-I, Soil Resistivity, Current drain test and


Geonics (Soil Conductivity) in OGDCL BAHU Field for
the Wells:
BAHU 1, 2, 3 and 4.

Pre Design Survey

Current drain test and ROW survey with Soil


Resistivity and Geonics (Soil Conductivity) in OGDCL
BAHU Field for the Pipe lines of following Wells:
BAHU 1, 2, 3 and 4.

a. TRU based Tank bottom CP system for 20,000


BBL storage tank located at (TOC) Tando Alam
Oil Copmplex, OGDCL.

b. TRU Based Tank bottom CP system 4 Nos


storage tanks of Shell Pakistan located at
Quetta International Airport.

OTHER PROJECTS

1. Pre Design Survey


Shel Pakistan (Shell Aviation Service) Karachi airport
Fuel Supply line CP system pre design survey.

2. CP system
CP system installation for Shel Pakistan (Shell
Aviation Service) for Mounded tanks at Quetta
Internation Airport.

3. ECDA
External Corrosion Direct Assessment for PSO
(Pakistan State Oil) which includes DCVG. PCM, CIS,
Soil resistivity. For following pipe lines,
 BOT to MW1 (3.2 Km)

Page 5 of 6
Mazhar Naeem Siddiqui
NURICON PETROSERVICES (PTE.) LTD.

4. Pre Design Survey


Pre Design survey included Soil Resistivity (4 pin
method), Geonics and E-Log I conducted for the 8
Nos wells in OGDCL Qadirpur Gas Field. Well names
Qp-31, 32, 35, 33, 36, 37, HRL-2 and HRL-3.

5. CP system for Well Cassing and Pipe lines


Thermo Electrical Generator Based ICCP system
installation on 8 Nos wells in in OGDCL Qadirpur Gas
Field. Well names Qp-31, 32, 35, 33, 36, 37, HRL-2
and HRL-3. All the pipelines of the well were also
connected and protected. Test posts are also included
with these pipelines.

6. CP system for Above Ground Storage Tank’s


bottom
ICCP system consist on Anode Flex string
based CP system installation on 9 Nos Tanks located
in OGDCL Sinjhoro Gas Field Plant. CP system was
powered by Transformer Rectifier Unit (TRU).

Page 6 of 6
Mazhar Naeem Siddiqui
NURICON PETROSERVICES (PTE.) LTD.

RESUME

PERSONAL
Name : Kashif Serwer
Father Name : S. Serwer Hussain
Date of Birth : October 28, 1978
Nationality : Pakistan
N.I.C Number : 42401-1885941-1

ACADMICS : Metric Science


: Diploma of Associate Engineer Electronics,
G.C.T Karachi.

COMPUTER SKILLS : Windows 98 / XP


MS Word
MS Excel

PROFESSIONAL EXPERTIES: Cathodic protection


Presently working with (NPSL) Nuricon
Petroservices (Pte.)Limited,
Karachi, Pakistan, as a Corrosion
Technologist.

CATHODIC PROTECTION : BHP.


Sacrificial anode cathodic protection of
Condensate pipeline from BHP Dadu plant to
PARCO Bubak pumping station.

OGDCL.
Impressed current cathodic protection system for
well casings Qadirpur Gas field.

OGDCL.
Pre- Design survey including E-Log I of well
casing and Soil resistivity for Ground bed
installation Bobi Oil Field.

OGDCL.
Pre- Design survey including E-Log I of well
casing and Soil resistivity for Ground bed
installation Kunner Gas Field.

Page 1 of 4
NURICON PETROSERVICES (PTE.) LTD.

National Refinery
Installation and Commissioning of 6 Nos x 60 Ft
Storage Tanks based on Anode flex System.

OGDCL.
Impressed current cathodic protection system for
well casings & Tanks Based Bobi Gas field.

OGDCL.
Impressed current cathodic protection system for
well casings & Tanks Based Kunner Gas field.

PPL.
Pre- Design survey including E-Log I of well
casing and Soil resistivity for Ground bed
installation.

OGDCL.
Pre- Design survey including E-Log I of well
casing Soil resistivity and Geo test for Ground
bed installation.Pipe line current drain test
Qadirpur Gas Field.

OGDCL.
CP system Installation of TEG (thermo electric
generator) based CP system for well casings of
Qadirpur gas field Ghotki.

PROJECTS SUPERVISED
OGDCL.
CP system Installation of TEG (thermo electric
generator) based CP system for well casings of
Bobi gas field.

OGDCL.
CP System Installation of test posts at Bobi gas
plant.

OGDCL.
Solar system based CP system installation for
well casing for Kunner field.

Page 2 of 4
NURICON PETROSERVICES (PTE.) LTD.

PROJECTS SUPERVISED
(Continued)

CP System
Installation of test posts at OGDCL Kunner gas
plant.

CP System
Solar System based CP system for Well casing of
seven wells located at OGDCL Dakhni.

CP System
Tank bottom of 8 storage tanks at OGDCL
Dakhni field.

Solar system
CP system installation at Miano 13 well casing for
OMV Kadanwari gas field.

CP system
Supervised by 28” pipeline F/W line and plant
area under ground piping network at PARCO
Mehmood Kot.

CP System
TRU based CP system for tank bottom at Shell
Aviation Islamabad.

Pre Design Survey


E,Log I & soil resistivity test for design of CP
System for 09 Well casing at Qadirpur Gas
Field OGDCL.

Solar System
CP system for Well casing of five wells located at
OGDCL Chanda /Mela oil field.

CP System
Tanks bottom of 8 storage tanks at OGDCL
Chanda Mela oil field.

CP system
Tank bottom of 4 storage tanks at Ikaan OGDCL
field Sinjhoro.

OGDCL
Soil Resistivity survey for pipe lines at Qadir pur
Gas Field.

Page 3 of 4
NURICON PETROSERVICES (PTE.) LTD.

OGDCL
PCM survey for pipe lines at Qadir pur Gas Field.

OGDCL
DCVG survey for pipe lines at Qadir pur Gas
Field.

OGDCL
CIPS survey for pipe lines at Qadir pur Gas Field.

Pre Design Survey


E-Log-I , Soil resistivity test , Geonics and Pipe
line current drain test for design of CP system 2
well casing at Mela oil field and Nashpa OGDCL
field.

UEPL
Plant & wells and flow line CP system audit at Naimat
Basal, Umer and Kosar field.

SHELL
TRU based CP system for tank bottom at Shell
Aviation Nawab Shah.

OGDCL
C.P System installation of well casing, plant and
flow lines at Qadirpur gas field.

PAKISTAN STATE OIL


PSO pipe line CP system installed at PSO Sihala to
ARL. 14 KM Pipeline.

PAKISTAN STATE OIL


PSO pipe line CP system installed at PSO Lalpir, PSO
Jimco, and AES Pipeline.

POGC
Soil resistivity test, Geonics for design of CP
system Pipeline at POGC field.

OGDCL
ECDA survey at UCH gas field.

OMV
E-Log-I, Soil resistivity test, Geonics for design of
CP system 4 well casing at OMV field.

Page 4 of 4
NURICON PETROSERVICES (PTE.) LTD.

RESUME

PERSONAL

Name : Muhammad Arif Malik


Father Name : Malik Khadim Hussain
Date of Birth : 12th July 1975
Nationality : Pakistan
N.I.C Number : 42501-2526779-1

ACADMICS : F.Sc
: D.A.E Electrical

TRAININGS & COURSES : Basic Corrosion Course and corrosion


Control by Coating (Dr. Chris Ringas)
: AutoCAD, MS Word, Excel, PP etc.

PROFESSIONAL EXPERTIES : Cathodic Protection

: Presently working with Nuricon


Petroservices (Pte.) Ltd. (NPSL) as a
Corrosion Technologist.

RESPONSIBILITES HELD : Supervise, design and schedule all type of


Survey CP Installation, maintenance / repair
projects.

: Schedule field crew / job to achieve best


output and operations.

: Material, Installation, Test and commissioning


of Cathodic protection systems for Pipelines,
Storage Tanks, Well Casings and buried
tructures.

: Carrying out structure and soil surveys,


Pearson Survey, Holiday Detection, Soil
Resistivity survey, Interference survey,
Current Drain Test survey and attaining /
resolving of TR and CP System failure jobs.

: Preparing and submission of reports.


Sales and Purchase of CP and other
Materials.

Muhammad Arif Malik


NURICON PETROSERVICES (PTE.) LTD.

PROJECTS SUPERVISED
1. CP System Installation of test posts at
OGDCL Bobi gas plant.

2. Solar system based CP system installation


for Kunner-05 well casing for OGDCL Kunner
field.

3. Pipe Coating Pipe coating repairing at


Sawan-7 for OMV Sawan Gas field.

4. CP System Installation of test posts at


OGDCL Kunner gas plant.

5. CP System Solar System based CP system


for Well casing of eight wells located at
OGDCL Dakhni.

6. CP System of tank bottom of 8 storage tanks


at OGDCL Dakhni field.

7. Solar system based CP system installation


at Miano 13 well casing for OMV Kadanwari
gas field.

8. CP System TRU based CP system for tank


and Flow line located at Shell Aviation
Islamabad.

OTHER PROJECTS

1. Pre Design Survey


E,Log I & soil resistivity test for design of CP
System for 09 Well casing at Qadirpur Gas
Field OGDCL.

2. DCVG survey of following lines


a) South MAZARI trunk line 7.1 Km
b) DHABI North Trunk line 4.9 Km

Muhammad Arif Malik


NURICON PETROSERVICES (PTE.) LTD.
RESUME

PROPOSED POSITION : Corrosion Technician

NAME : TARIQ JAMEEL

DATE OF BIRTH : July 11, 1972

NATIONALITY : Pakistani

EDUCATION : Diploma of Associate Engineer in


Elecctronics, Aligarh Institute of
Technology, Karachi.

OTHER TRAINING : Certificate in Printed Circuit Design

LANGUAGE AND DEGREE : English and Urdu

EMPLOYMENT RECORD

NURICON PETROSERVICES (PTE.) LIMITED,


AS CORROSION TECHNICIAN : Nov. 1995 to Date

JOBS COMPLETED
SHELL PAKISTAN, AVIATION FUEL
SYSTEM, KARACHI AIR PORT : 1) Took pipe to soil potentials (PSP)
with the energized system.
2) Measurement of natural PSP’s
3) Checking of cathodic protection
system, anode current, performance
of deep-well groundbed.
4) Checking of the insulating flanges.

PAKISTAN STATE OIL COMPANY LTD


MEHMOOD KOT, 16”-6 KM LONG
PARCO-JIMCO PIPELINE : 1) Assisted the Sr. Corrosion Engineer
in detailed engineering of the CP
system, which utilized the
continuous polymeric anode
(Anodeflex of Raychem
Technologies, USA).
2) Assisted in the installation of
complete cathodic protection
system.
3) Taken natural and energized PSP’s
in “on” and “off” modes.
4) Assisted in carrying out DCVG
survey
NURICON PETROSERVICES (PTE.) LTD.

5) Conducted close interval PSP


survey
6) Got test stations fabricated and
installed
7) Installed T/Rs
8) Checking of Insulation flanges

OIL AND GAS DEVELOPMENT


CORPORATION OF PAKISTAN: : Sampling for the determination of SR
bacteria in the soils of Bobi, Kunnar and
Daro fields.

OIL AND GAS DEVELOPMENT


CORPORATION OF PAKISTAN : Assisted in the preparation of Detailed
Engineering and Design report for 8”/6”
dia. buried pipelines for:
1) Tando Aalam
2) Lashari
3) Sadqal

OIL AND GAS DEVELOPMENT


CORPORATION OF PAKISTAN : Actively involved in the installation of
impressed current cathodic protection
system for 20 km-6”/8” dia. buried
pipeline at Tando Aalam field.

MARIGAS CO. LIMITED


DHARKI : Assisted in the Feasibility Study and
Report preparation for 59 well casings
at Marigas field, Daharki. Work
involved:
1) Soil resistivity measurement for 59
wells
2) E-log I tests
3) Line current tests
4) Checking of insulating flanges
5) Interference surveys
6) Data compilation for reporting
7) Maintenance of CP related
instruments and equipment

SHELL PAKISTAN
KEAMARI TERMINAL : Turnkey project for the cathodic
protection of AST bottoms utilizing
continuous polymeric anode (Anodeflex
of Raychem Technologies, USA).
Assistance in conducting soil resistivity
survey, Anodeflex laying, installation of
permanent Cu-CuSO4 reference
electrode, etc.
NURICON PETROSERVICES (PTE.) LTD.

BHP BILLITON
ZAMZAMA GAS PLANT : Installation Testing & Commissioning of
Cathodic Protection System for two
Condensate Tanks at Zamzama Gas
Plant.

OMV (PAKISTAN) EXPLORATION GmbH


SAWAN GAS FIELD : Supply, Installation Testing &
Commissioning of Cathodic Protection
System for Sawan 1, 2,3,4 & 7 Well
Casing
1) Actively involved in the installation of
impressed current cathodic protection
System

PAKISTAN STSTE OIL COMPANY LTD


LAHORE INTERNATIONAL AIRPORT : Installation Testing &
Commissioning of Cathodic Protection
System for 03 nos Jet fule Storage
Tanks.
1) Assisted in the installation of
complete cathodic protection
system.

PAKISTAN PETROLEUM LIMITED


ADHI WELL#13 : Survey and E, Log I Test for Cathodic
Protection System for Adhi Well #13
Well Casing

PAKISTAN PETROLEUM LIMITED


SHIKARPUR BLOCK 22 : Survey and E, Log I Test for Cathodic
Protection System for 04 nos Well
Casing at Block 22 Shikarpur Field.
1) E-log I tests
2) Line current tests
3) Checking of insulating flanges
4) Interference surveys
5) Data compilation for reporting

PAKISTAN REFINERY LIMITED : Installation and Commissioning of


Electrical Heat Tracing Cable for Fule Oil
Lines
1) Assisted in the installation of
Electrical Heat Tracing System
&Junction Box Termination.

PROCTER & GAMBLE PAKISTAN


HUB BALOCHISTAN : Installation and Commissioning of
Electrical Heat Tracing Cable for Tallow
Dosing Loop
NURICON PETROSERVICES (PTE.) LTD.

E&I Pakistan
: Installation Testing &
Commissioning of Cathodic Protection
System for 21 km long pipeline K-14
Kadanwari to well K-14

PAKISTAN STSTE OIL COMPANY LTD


Checking & Audit of pipeline Cathodic
protection system
1.) Parco Jimco terminal Mehmood kot
2.) Parco F.O Depot Lalpir Mehmood
kot terminal
3.) F.O Depot AES Lalpir Mehmoodkot
4.) F.O Depot Lalpir to KAPCO Kot
Addu

OMV (PAKISTAN) EXPLORATION GmbH


: Supply, Installation Testing &
Commissioning of Cathodic Protection
System for Miano 1,& 7 Well Casing

OMV (PAKISTAN) EXPLORATION GmbH


CIS Close Intervail Survey & DCVG
Direct Current voltage gradient survey for
16’’ dia 32km & 10.5 km pipeline.

British Petroleum ( Pakistan)


Golarchi plant : Supply, Installation Testing &
Commissioning of Electrical Heat Tracing
system for Flash separators & Water
bridle at Golarchi plant

OMV (PAKISTAN) EXPLORATION GmbH


Kadanwari Enhancement Project : Supply, Installation Testing &
Commissioning of Electrical Heat Tracing
system for Separators & Oil separator
bridle at Kadanwari Plant

OMV (PAKISTAN) EXPLORATION GmbH


: Supply, Installation Testing &
Commissioning of Cathodic Protection
System for Miano-08 Well Casing project
NURICON PETROSERVICES (PTE.) LTD.

RESUME

PERSONAL

Name : Mohammed Pervaiz Abbasi


Father Name : Muhammed Nizamuddin Abbasi
Date of Birth : December 15, 1956
Nationality : Pakistan
N.I.C Number : 42000-0492056-5

ACADMICS : M.A logistic

TRAININGS & COURSES


: Health, Safety, Environment and Task Risk
Assessments from SGS
: Computer, MS Word, Excel, PP and Auto-cad etc.
: Quality Management Systems
: ISO 9001 System
: Occupational Health & Safety Assessment
Series OHSAS18001.

PROFESSIONAL EXPERTIES
: Presently working with (NPSL) Nuricon
Petroservices (Pte.) Limited, Karachi, Pakistan
as Field coordinator since 1994

RESPONSIBILITIES HELD
: Field coordination
: Sales and Purchase of CP and other Materials.
: Schedule field crew /job to achieve best output and
operation.
: Supervise / Monitor all Operations to help CP crew.
: Preparing and submission of reports.
NURICON PETROSERVICES (PTE.) LTD.

PROJECTS SUPERVISED
Completed the following projects successfully.

[01] Supply, installation and commissioning of Cathodic


Protection System (impressed current) for 16” dia.
6.0 km PARCO-PSO Oil Pipeline at Mahmood Kot
Multan. Continuous Polymeric Anode (Anodeflex of
Raychem
Technologies, USA) is laid all along the pipeline.
The very first system of its kind used in Pakistan.

[02] Feasibility & CP Study, Survey of Cathodic


Protection Systems for and 21 numbers well
casings for OGDC.

[03] Supply, installation and commissioning of Cathodic


Protection System (impressed current) for 12” dia.
2.0 km AES Power Station-FO Depot,Lalpir Oil
Pipeline of PSO at Mahmood Kot Multan.

[04] Close Interval and Pipe Locating Survey for 16” dia.
6.0 km PARCO-PSO Oil Pipeline at Mahmood Kot
Multan.

[05] Feasibility study of Cathodic Protection Systems of


five well casings at Miano-1, Miano-2, Sawan-1,
Sawan-2 and Khipro-1 of OMV Pakistan Limited.

[06] Feasibility & CP Study, Survey and Design of


Cathodic Protection Systems for 05 numbers well
casings for OMV Pakistan.

[07] Installation and commissioning of Cathodic


Protection System for BHP Tanks Bottom at their
Zamzama Field Dadoo.

[08] Recommissioning of CP system for 16 “ dia.


PARCO –JIMCO 5.5 KM Pipeline at Mahmood Kot
Multan.

[09] Supply and Installation of Cathodic Protection


System for PARCO Fazil Pur Terminal Tank Bottom
CP.

[10] Supply, installation and commissioning of Cathodic


Protection System for, 05 numbers well casings at
Sawan Gas Field for OMV Pakistan.

[11] Design & Supply, installation and commissioning of


Cathodic Protection System for, 02 numbers well
casings at Miano Gas Field for OMV Pakistan.
NURICON PETROSERVICES (PTE.) LTD.

[12] Design & Supply, installation of Fire Water Line at


Kadanwari Plant for OMV Pakistan.

[13] Fault , rectification and Re-Commissioning of CP


System of 8” x 4 Km Pipeline and 10” x 32 Km
Pipeline at Lalpir.

[14] Fault , rectification and Re-Commissioning of CP


System of 16” Dia x 5.5 Km Pipeline at Jimco.

[15] Design for 19 well casings at KUNNAR, DARU and


BOBI Fields for OGDC.

[16] Re-furbishment including Pre-Design Survey,


Design & Engineering, Installation Test &
Commissioning of CP System for Gas Supply
Pipeline PARCO Residential Area Mahmood Kot,
Multan.

[17] Survey and Installation Solar System &


Commissioning for CP System for 1 Nos Well
Casing Sawan 5 at OMV Sawan Gas Field.

[18] CP survey for 8 wells, E-Log I test Geonics, and


Soil Resistivity tests ORIENT PETROLEUM
INC.

[19] Survey and E,Log I Test for CP System for


Adhi Well # 14 Casing Pakistan Petroleum Ltd.

[20] Cathodic Protection Services for 23Km x 10” K-


14 Flow line at KADANWARI Eni Pakistan
Limited.

[21] Installation and Commissioning of Tank Bottom


CP System for 3 nos dia 22m x 4m high
mounded Tanks and jet fuel piping at new
Lahore International Airport Al-Tariq
Constructors (Pvt.) Limited / Pakistan State Oil
Company Limited.

[22] Survey and E,Log I Test for CP System for 4


nos Well Casing at Block 22 Shikarpur Field
Pakistan Petroleum Ltd.

[23] Installation and Commissioning of 1.5Km


Pipelines
CP System Islamabad AirPort Shell Pakistan
Limited.
NURICON PETROSERVICES (PTE.) LTD.

[24] Survey and E,Log I Test for CP System for bhp


Zamzama 7 Well Casing.

[25] C-Scan, Close Interval Potential and Direct


Current Voltage Gradient Surveys for Buried
45Km Pipelines At OMV Kadanwari

[26] Rectification of CP System in PSO Mehood kot


For following lines and DCVG Survey.

a) 32 Km 10” dia pipe line from LALPIR to


KAPCO
b) 5.5 KM 16” dia pipe line from PARCO to
JIMCO
c) 2.5 Km 12” dia pipe line from LALPIR to
AES
d) 4 Km 8” dia pipe line from PARCO to
LALPIR

[27] Ground bed Installation in PSO Lalpir Furnace


Oil Depot Mahmod kot for 32km 10”Dia KAPCO
pipe line.
NURICON PETROSERVICES (PTE.) LTD.

RESUME
PERSONAL

Name : MUHAMMAD AJMAL


Father Name : GHULAM SARWAR
Date of Birth : 01 January 1972
Nationality : Pakistani
C. N.I.C Number : 313035-817362-9
Passport Number : AB 1553622
Passport Issue date : 17 June 2010.
Passport Validity date : 17 June 2015.
Place of issue : Karachi.
Marital status : Married
Languages : English, Urdu

ACADMICS : SSC
: D.A.E

TRAININGS & COURSES : General HSE Training from DESCON


ENGINEERING TRAINING CENTER UAE.

: Basic Corrosion Course and corrosion


Control

: OJT Fabricator/Fitter Training with Pakistan


Steel.

: OJT Fabricator & Fitter Training Premier


Extractions Co.

: OJT Fabricator & Fitter Training Continental


Engineering Co.

PROFESSIONAL EXPERTIES : Cathodic Protection & Corrosion Control

: Presently working with Nuricon


Petroservices (Pte.) Ltd. (NPSL) as a
CP Technician.

A. Capable to conduct and perform all CP activities for


installation of CP system its ground bed installation,
its Power System either TR or Solar System or TEG
Thermo Electric Generator System including routine
PSP’s

Muhammad Ajmal
NURICON PETROSERVICES (PTE.) LTD.

B. Carrying out all type of CP Survey, structure to soil


surveys, PSP Survey, DCVG Survey, PCM Survey
Holiday Detection survey, Close Interval Survey,
Soil Resistivity survey, Interference survey, Current
Drain Test survey.

C. Capable for application of Pipe coating & repair


Materials.

D. Well expert of fabrication and Pipe fitting as well as


all type of CP maintenance, repair & technical work.

NPSL PROJECT COMPLETION

E. OMV well casing CP System Installtion Project.

F. Direct Current Voltage Gradient (DCVG) and


Pearson Survey for 16” dia. 6.0 km PARCO-PSO Oil
Pipeline at Mahmood Kot Multan.

G. installation and commissioning of Cathodic


Protection System (Sacrificial anodes) for 6” dia.3.5
km Lashari pipelines for (OGDC) Oil and Gas
Development Corporation of Pakistan

H. Pipeline Coating and field joints Coating by applying


Raychem Heat Shrink Sleeves for PSO 6” dia. 5Km
PSO-PRL Link Pipeline.

I. , installation and commissioning of Cathodic


Protection System (Impressed Current) for 8” dia.
4.5 km Sadqal-SNGPL pipeline of (OGDC) Oil and
Gas Development Corporation of Pakistan

J. installation and commissioning of Cathodic


Protection System for, 02 numbers well casings at
Miano Gas Field for OMV Pakistan

K. Installation of Cathodic Protection System for Tank


Bottoms at PARCO’s Fazilpur Station.

L. Fault , rectification and Re-Commissioning of CP


System of 8” x 4 Km Pipeline and 10” x 32 Km
Pipeline at Lalpir

M. Installation of Heat Shrink Sleeves in lieu of caseal


on 16” dia. Pipeline on Concrete Tank in/out at
PARCO Shikarpur Terminal.

Muhammad Ajmal
NURICON PETROSERVICES (PTE.) LTD.

N. CP Survey for Cathodic Protection Systems for Flow


lines, and 04 numbers well casings for Pakistan
Petroleum Limited

O. CP Survey for BP Pakistan.

OVER ALL EXPERIENCE 1. From 01 – 05 – 2007 to date as CP


Technician with Nuricon Petroservices Private
Limited.

2. From 01 – 08 – 2004 to 30 – 04 – 2007 as


Fabricator with DESCON ENGINEERING
ABU DHABI UNITED ARAB AMARAT.

3. From 09 – 07 – 2004 to 28 – 07 – 2004 as


Fabricator/Fitter with Siemens Pakistan

4. From 19 – 09 – 2003 to 05 – 07 – 2004 as


Fabricator with OGDCL Kunner LPG Plant
and Oil Field.

5. From 01 – 02 – 2000 to 31 – 08 – 2003 as


Technical Assistant with Nuricon
Pertoservices Pte. Limited.

6. From 01 – 06 – 1997 to 23 – 01 – 2000 as


Fabricator with Pakistan Steel Fabricating
Company Private Limited.

7. From 01 – 09 – 1995 to 31 – 05 – 1997 as


Fabricator with PROCON Pipelines Private
Limited.

8. From 20-07-1990 to 31 – 08 – 1995


Mechanical Assistant with OGDCL
Hyderabad.

9. From 02-01-1989 to 18 – 07 - 1990 as


Fabricator and fitter with Premier Extractions
Landhi Industrial Area Karachi.

10. From 18-07-1983 to 31- 12 1988 as


Fabricator and fitter with Continental
Engineering Company Rahim Yar Khan.

Muhammad Ajmal
NURICON PETROSERVICES (PTE.) LTD.

RESUME
PERSONAL
Name : M.Shaan
Father Name : Muhammad Shahban
Date of Birth : Mar 16,1985
Nationality : Pakistan
N.I.C Number : 42101-5036922-9

ACADMICS : DAE Electrical

COPMUTER SKILL : AutoCAD


Ms office

PROFESSIONAL EXPERTIES : Cathodic protection


Presently working with (NPSL) Nuricon
Petroservices (Pte.)Limited,
Karachi, Pakistan, as a Corrosion Technologist.

RESPONSIBILITES HELD : Material, Installation of cathodic protection systems


for Pipelines, Storage Tanks and Well Casings.
: All type of C.P. maintenance, repair.
: Assist the Surveyor to Carrying out structure and soil
surveys, DCVG, C-Scan, PCM, Pearson Survey,
Holiday Detection, Close Interval Survey, Soil
Resistivity survey, Interference survey, Current Drain
Test.

PROJECTS
1. CP Audit of following facilities for BP.

2. Pre Design survey


Pre design survey for Tank bottom CP System of
OGDCL Sinjhoro Plant.

3. CP system
Solar powered CP system installation for OGDCL
Nashpa for following well.

a) Nashpa-01

4. CP system
Anode flex based CP system for Tanks in OGDCL
Sinjhoro Plant.

-1-
Nuricon Petroservices (Pte.) Ltd.

RESUME

PERSONAL

NAME : Burhan ullah khan


FATHER NAME : Rahmat ullah
DATE OF BIRTH : August 06 1982
NATIONALITY : PAKISTANI
N.I.C Number : 42401-2066846-1

ACADEMICS
: Diploma of Associate Engineer DAE (Electrical)

TRAININGS & COURSES


: Basic Corrosion Course and Corrosion
Control by Coating ( Dr. Chris Ringas )
: Health, Safety, Environment and Task Risk
Assessments from SGS
: ISO 9001-2000 System
: Occupational Health & Safety Assessment Series OHSAS-
18001.

PROFESSIONAL EXPERTIES : Presently working with (NPSL) Nuricon Petroservices (Pte.)


Limited, Karachi, Pakistan, as CP Technician since last 4
years.

RESPONSIBILITIES HELD
A. Material, Installation, Test and commissioning of
cathodic protection systems for Pipelines, Storage
Tanks and Well Casings.

B. Sales and Purchase of CP and other Materials.

C. Supervise / Monitor all type of C.P. maintenance,


repair/technical schedule.

D. Carrying out structure and soil surveys, Pearson


Survey, Holiday Detection, Close Interval Survey, Soil
Resistivity survey, Interference survey, Current Drain
Test survey and attaining/resolving of TR and CP
System failure jobs.

-1-
Nuricon Petroservices (Pte.) Ltd.

PROJECTS
Completed the following projects successfully.

[01] Supply, installation and commissioning of Cathodic


Protection System (impressed current) for 16” dia. 6.0
km PARCO-PSO Oil Pipeline at Mahmood Kot Multan.
Continuous Polymeric Anode (Anodeflex of Raychem
Technologies, USA) is laid all along the pipeline. The
very first system of its kind used in Pakistan.

[02] Feasibility & CP Study, Survey of Cathodic Protection


Systems for and 21 numbers well casings for OGDC.

[03] Supply, installation and commissioning of Cathodic


Protection System (impressed current) for 12” dia. 2.0
km AES Power Station-FO Depot,Lalpir Oil Pipeline of
PSO at Mahmood Kot Multan.

[04] Close Interval and Pipe Locating Survey for 16” dia. 6.0
km PARCO-PSO Oil Pipeline at Mahmood Kot Multan.

[05] Feasibility study of Cathodic Protection Systems of five


well casings at Miano-1, Miano-2, Sawan-1, Sawan-2
and Khipro-1 of OMV Pakistan Limited.

[06] Feasibility & CP Study, Survey and Design of Cathodic


Protection Systems for 05 numbers well casings for
OMV Pakistan.

[07] Installation and commissioning of Cathodic Protection


System for BHP Tanks Bottom at their Zamzama Field
Dadoo.

[08] Recommissioning of CP system for 16 “ dia. PARCO –


JIMCO 5.5 KM Pipeline at Mahmood Kot Multan.

[09] Supply and Installation of Cathodic Protection System for


PARCO Fazil Pur Terminal Tank Bottom CP.

[10] Supply, installation and commissioning of Cathodic


Protection System for, 05 numbers well casings at
Sawan Gas Field for OMV Pakistan.

[11] Design & Supply, installation and commissioning of


Cathodic Protection System for, 02 numbers well casings
at Miano Gas Field for OMV Pakistan.

[12] Design & Supply, installation of Fire Water Line at


Kadanwari Plant for OMV Pakistan.

[13] Fault , rectification and Re-Commissioning of CP System


of 8” x 4 Km Pipeline and 10” x 32 Km Pipeline at Lalpir.

-2-
Nuricon Petroservices (Pte.) Ltd.

[14] Fault , rectification and Re-Commissioning of CP System


of 16” Dia x 5.5 Km Pipeline at Jimco.

[15] Design for 19 well casings at KUNNAR, DARU and BOBI


Fields for OGDC.

[16] Re-furbishment including Pre-Design Survey, Design &


Engineering, Installation Test & Commissioning of CP
System for Gas Supply Pipeline PARCO Residential
Area Mahmood Kot, Multan.

[17] Survey and Installation Solar System &


Commissioning for CP System for 1 Nos Well Casing
Sawan 5 at OMV Sawan Gas Field.

[18] CP survey for 8 wells, E-Log I test Geonics, and Soil


Resistivity tests ORIENT PETROLEUM INC.

[19] Survey and E,Log I Test for CP System for Adhi


Well # 14 Casing Pakistan Petroleum Ltd.

[20] Cathodic Protection Services for 23Km x 10” K-14


Flow line at KADANWARI Eni Pakistan Limited.

[21] Installation and Commissioning of Tank Bottom CP


System for 3 nos dia 22m x 4m high mounded Tanks
and jet fuel piping at new Lahore International Airport
Al-Tariq Constructors (Pvt.) Limited / Pakistan State
Oil Company Limited.

[22] Survey and E,Log I Test for CP System for 4 nos


Well Casing at Block 22 Shikarpur Field Pakistan
Petroleum Ltd.

[23] Installation and Commissioning of 1.5Km Pipelines


CP System Islamabad AirPort Shell Pakistan
Limited.

[24] Survey and E,Log I Test for CP System for bhp


Zamzama 7 Well Casing.

[25] CP Audit of following CP System of


Pakistan stat Oil installed in Mehmood kot.

a) 32 Km 10” dia pipe line from LALPIR to KAPCO


b) 5.5 KM 16” dia pipe line from PARCO to JIMCO
c) 2.5 Km 12” dia pipe line from LALPIR to AES
d) 4 Km 8” dia pipe line from PARCO to LALPIR

[26] C-Scan, Close Interval Potential and Direct Current


Voltage Gradient Surveys for Buried 45Km Pipelines
At OMV Kadanwari

-3-
Nuricon Petroservices (Pte.) Ltd.

[27] ECDA (External Corrosion Direct Assessment) for


following SNGPL pipe line witch includes
D.C.V.G, C.I.P.S and P.C.M

a) 25.44 Km 18” and 30” dia pipe lines installed in


UCH Shareef.
b) 22.5 Km 24” dia pipe line in Multan.
c) 25.18 Km 18” 24” dia pipe line in Shorkot.
d) 19.47 Km 16” x2 pipe lines in Shehopura.
e) 8 Km 6” dia Distribution line in Islamabad.

[28] Rectification of CP System in PSO Mehood kot


For following lines and DCVG Survey.

a) 32 Km 10” dia pipe line from LALPIR to KAPCO


b) 5.5 KM 16” dia pipe line from PARCO to JIMCO
c) 2.5 Km 12” dia pipe line from LALPIR to AES
d) 4 Km 8” dia pipe line from PARCO to LALPIR

[29] Survey and E,Log I & Soil resistivity Test for CP


System for OGDC 24 Well Casing. At Qadirpur Gas
field.

[30] Machike
Ground bed installaion for 1.5 pipe line from PARCO
to PSO Machike

[31] Survey and E,Log I & Soil resistivity Test for CP


System for OGDC 24 Well Casing. At Qadirpur Gas
field.

[32] Soil resistivity survey for pipeline BHP to PARCO

[33] Ground bed installation for KAPCO 32 km pipeline


From PSO Lalpir to KAPCO

-4-
NURICON PETROSERVICES (PTE.) LTD.

RESUME
PERSONAL
Name : Sajid Ahmed
Father Name : Muhammad Islam
Date of Birth : July 30, 1977
Nationality : Pakistan
N.I.C Number : 43303-7853301-5

ACADMICS : F Sc

PROFESSIONAL EXPERTIES : Presently working with (NPSL) Nuricon


Petroservices (Pte.) Limited,
Karachi, Pakistan, as technical assistant

RESPONSIBILITES HELD : Material, Installation of cathodic protection systems


for Pipelines, Storage Tanks and Well Casings.
: All type of C.P. maintenance, repair.
: Assist the Surveyor to Carrying out structure and soil
surveys, DCVG, C-Scan, PCM, Pearson Survey,
Holiday Detection, Close Interval Survey, Soil
Resistivity survey, Interference survey, Current Drain
Test.

PROJECTS
1. E Log-I Test for installation of CP system of 7 well
casing at BHP ZAMZAMA Gas field

2. Rectification of CP System in PSO Mehood kot


For following lines and DCVG Survey.

a) 32 Km 10” dia pipe line from LALPIR to


KAPCO
b) 5.5 KM 16” dia pipe line from PARCO to
JIMCO
c) 2.5 Km 12” dia pipe line from LALPIR to AES
d) 4 Km 8” dia pipe line from PARCO to LALPIR

3. E,Log I & Soil resistivity Test for CP System of


OGDC 24 Well Casing at Qadirpur Gas field.

4. Installation of Ground bed for KAPCO 32km


pipeline from Lalpir to KAPCO

-1-
HSE MANUAL
Author: HSE RD No :1/2K
NURICON PETROSERVICES (PTE.) LTD.
S.Niazi Page No: 1of 34

HSE MANUAL Date: 20/06/2007


Rev No: 1

HSE REGULATIONS

FOR

NURICON PETROSERVICES (PTE.) LTD.

Document No: NPSL HSE/MAN

This document is intended for use by all NPSL employees.


Author: HSE RD No :1/2K
NURICON PETROSERVICES (PTE.) LTD.
S.Niazi Page No: 2 of 34

HSE MANUAL Date: 20/06/2007


Rev No: 1

PREFACE

HSE Reference Documents contain information pertaining to HSE that are either
used repeatedly, or that are retained for current or future references.
The documents are intended to be used to:
 Publish guidelines or codes of practice
 Set company standards
 Form a basis of safety specifications for the procurement of contract services
 Disseminate and record safety information, experience and standard procedures.

The objective of the NPSL HSE Regulations is to specify NPSL mandatory


requirements for HSE concerning physical conditions, actions and omission. The
HSE Regulations are to be used by all employees of NPSL, its contractors and
others who may be concerned in any way with the operations or work of the
Company, its property and/or premises.

In addition to these HSE Regulations, the Company’s HSE Manual lays down
comprehensive guidelines for HSE, which should be followed by all personnel.
Responsibility for the technical content of this document rests with Head of HSE
Department. When relevant, reference is made for the need to observe the
requirements of national and local regulations.
Author: HSE RD No :1/2K
NURICON PETROSERVICES (PTE.) LTD.
S.Niazi Page No: 3 of 34

HSE MANUAL Date: 20/06/2007


Rev No: 1

USER GUIDELINES

It is the responsibility of the user to ensure he/she is using the latest revision of this
document by referring to ‘Index for NPSL HSE Documents’.
Any user of this document who encounters an inaccuracy or ambiguity is requested
to notify at the end of this document and report to the concerned personnel.
Author: HSE RD No :1/2K
NURICON PETROSERVICES (PTE.) LTD.
S.Niazi Page No: 4 of 34

HSE MANUAL Date: 20/06/2007


Rev No: 1

HSE REGULATIONS
TABLE OF CONTENTS

PREFACE
USER GUIDELINES
TABLE OF CONTENTS

1.1 SCOPE
1.2 HSE REGULATIONS AND COMPLIANCE

2.1 DEFINITIONS

3.1 NPSL RESPONSIBILITIES

4.1 REVISION AND ADDITIONS TO NPSL HSE REGULATIONS

5.1 ACCIDENT INVESTIGATION AND REPORTING


5.2 EMERGENCY RESPONSE PLAN
5.3 DEFINITIONS OF ACCIDENTS
5.4 ACCIDENT CATEGORIES

6.1 SCOPE CONTRACTOR HEALTH, SAFETY AND ENVIRONMENTAL POLICY


6.2 GENERAL REQUIREMENT
6.3 KEY RESPONSIBILITIES

7.1 VEHICLES AND DRIVING


7.2 DRIVERS OF NPSL VEHICLES
7.3 DRIVERS OF CONTRACTOR’S VEHICLES
7.4 DRIVING REGULATIONS
7.5 RECOMMENDED DRIVERS HOURS WORK
7.6 DRIVING BETWEEN COAST AND INTERIOR
7.7 VEHICLES SPECIFICATION, FITTINGS AND EQUIPMENT
7.8 CONTRACTOR’S VEHICLES
7.9 VEHICLES OPERATION AND USE
7.10 DRIVING IN THE INTERIOR
Author: HSE RD No :1/2K
NURICON PETROSERVICES (PTE.) LTD.
S.Niazi Page No: 5 of 34

HSE MANUAL Date: 20/06/2007


Rev No: 1

7.11 NIGHT TIME DRIVING


7.12 VEHICLE CONDITION AND CARE

8.1 FIRE PROTECTION AND SITE CLEANLINESS

9.1 RESTRICTED ARTICLES


9.2 PROTECTIVE EQUIPMENT
9.3 SAFETY HELMET AND SAFETY FOOTWEAR
9.4 STANDARD AND SPECIFICATIONS
9.5 LIFTING EQUIPMENT

10.1 TOOLS AND EQUIPMENT STANDARDS


10.2 ELECTRICAL SYSTEMS AND EQUIPMENT
10.3 PNEUMATIC AND HYDRAULIC POWERED TOOLS AND EQUIPMENT
10.4 ROTATING EQUIPMENT

11.1 HAZARDOUS IDENTIFICATION


11.2 HAZARDOUS ATMOSPHERES
11.3 HYDROCARBON GASES
11.4 HYDROGEN SULPHIDE

12.1 ENVIRONMENTAL PROTECTION

13.1 PERMIT TO WORK SYSTEMS


13.2 REQUEST FOR A WORK PERMIT
13.3 VALIDITY OF THE WORK PERMIT

14.1 SAFETY INDUCTION FOR NEWLY HIRED EMPLOYEES


Author: HSE RD No :1/2K
NURICON PETROSERVICES (PTE.) LTD.
S.Niazi Page No: 6 of 34

HSE MANUAL Date: 20/06/2007


Rev No: 1

1.1 SCOPE

This document states NPSL mandatory requirements for safe working


conditions, practices, manufacturing, maintenance and testing and/or
inspection standards for vehicles, plant protective and other equipment,
operational HSE requirements and other specific rules as defined by NPSL .
Author: HSE RD No :1/2K
NURICON PETROSERVICES (PTE.) LTD.
S.Niazi Page No: 7 of 34

HSE MANUAL Date: 20/06/2007


Rev No: 1

1.2 HSE REGULATIONS AND COMPLIANCE

These HSE Regulations shall be used by employees of NPSL, its


consultants, contractors, sub-contractors and others when employed on work
for NPSL or associated with NPSL activities.
Compliance with the Company’s HSE Regulations shall not relieve
employees of NPSL, its consultants, contractors and others who may be
concerned in any way with the operations or work of the customer, its
property or premises, of the obligation to follow sound HSE practice
throughout.
For any deviation from these regulations, prior written agreement shall be
obtained from Head of HSE Department.
Head of HSE Department shall be notified immediately when more stringent
national or local regulation prevail over the requirements of these HSE
regulations and the standards, specifications and codes referred to herein.
Author: HSE RD No :1/2K
NURICON PETROSERVICES (PTE.) LTD.
S.Niazi Page No: 8 of 34

HSE MANUAL Date: 20/06/2007


Rev No: 1

2.1 DEFINITIONS

For the purpose of this document the following definitions shall hold:

Shall - The word ‘shall’ is to be understood as mandatory.


Should - The word ‘should’ is to be understood as strongly
recommended.
May - The word ‘may’ is to be understood as indicating a possible
course of action
Company - Customer
User - The NPSL employee, consultant, contractor or others to
whom this HSE regulations applies
Contractor - The party to a contract with the company or its
contractors, responsible for providing:
* equipment
* material
* services (including consulting services)
* manpower
The Company
Representative - The person employed by the company who is authorized to
act generally in respect of a contract on behalf of the
company. The company representative may from time to
time delegate some or all of his authority to the company site
representative.
Site
Representative - To act as its representative on a site and to supervise work
on that site on behalf of the company, and be responsible
and accountable for that work. In particular the HSE of all
person and equipment.
Author: HSE RD No :1/2K
NURICON PETROSERVICES (PTE.) LTD.
S.Niazi Page No: 9 of 34

HSE MANUAL Date: 20/06/2007


Rev No: 1

3.1 NPSL RESPONSIBILITIES

NPSL shall provide a safe working environment and ensure that work is
carried out safely, in a manner so as to obey the entire of the NPSL HSE
regulations.
 Carry out the work safely in a manner so as to eliminate hazard and
minimize risk of death or injury to its own personnel, company personnel
and third parties, on or off the work site; and damage to the works,
facilities or equipment.
 Eliminate any risk of long term injury to health caused by work related
hazards.
 Remain fully and exclusively responsible for ensuring that work is carried
out in a safe manner inclusive of duties undertaken on their behalf by
their sub contractors and suppliers.
 Consult HSE Department before bringing on site and fire/safety
equipment.
 Keep regular contact with the HSE Department and shall always seek
advice when in doubt on any particular matter.
 Set up and maintain a HSE administration acceptable to the Company
 Report to Company all accidents and dangerous occurrence and provide
such other data as required by the Company for the compilation of HSE
statistics.
 Protect all works and facilities from risk fire.
 Obey the company’s own HSE regulations where they provide protection
further to NPSL HSE regulations and where Company’s HSE regulations
are necessary as part of any specialist work carried out by NPSL.
 Operate under the general authority of the Company Representative. The
Company Representative may delegate all part of his authority to the
Company Site Representative, whose function shall include, but not be
limited to, supervision of the Contractor’s work.
 Resolve with the Company Representative any anomalies between the
NPSL HSE Regulations and the Company’s HSE regulations so that the
safe conduct of the work can be carried out.
 Shall communicate to its sub contractors and visitors to the works
sufficient HSE information so as to enable them to operate safely and in
compliance with the requirement of NPSL HSE regulations
Author: HSE RD No :1/2K
NURICON PETROSERVICES (PTE.) LTD.
S.Niazi Page No: 10 of 34

HSE MANUAL Date: 20/06/2007


Rev No: 1

4.1 REVISIONS AND ADDITIONS TO NPSL HSE REGULATIONS

The NPSL HSE regulations may be revised from time to time in the light of
experience, changing environmental conditions, new legislation or industrial
regulations. Any revision or additions to the NPSL HSE regulations will be
issued to the company under a change order and it is the shall be the
responsibility of the HSE Head to ensure its compliance.
Author: HSE RD No :1/2K
NURICON PETROSERVICES (PTE.) LTD.
S.Niazi Page No: 11 of 34

HSE MANUAL Date: 20/06/2007


Rev No: 1

5.1 ACCIDENT INVESTIGATION AND REPORTING

All accidents shall be immediately reported and investigated in accordance


with the Company’s Accident Investigation/Reporting Procedures. Examples
of reportable accidents are: -
- Personal Injuries - Material Loss
- Occupational Illness - Vehicle Accidents
- Explosion/Fire - Security
- Spill/Release - Man Lost
- Equipment Failure - Near Miss
- Equipment Damage - Acts.of Nature, etc.
- Property Damage

Accidents are categorized as Category I, II and III according to the


seriousness of the consequences.
For all accidents (all categories) an immediate verbal report shall be made to
the NPSL Supervisor who shall immediately inform the Section Head, Head
of HSE Dept. Senior Staff and/or Contractor Management. This shall be
followed by a NPSL accident report form which shall be filled out

NPSL shall immediately report an accident to the Company’s Representative


on site and/or the NPSL Supervisor who shall then follow the reporting
procedure which shall be to have the NPSL Accident Report filled out by the
Supervisor and presented to the HSE Head as soon as possible. This shall
then be submitted to NPSL Management with detailed analysis of
circumstances of the accident/potential accident. This report shall be the
base for following up prevention and corrective actions by NPSL.
Author: HSE RD No :1/2K
NURICON PETROSERVICES (PTE.) LTD.
S.Niazi Page No: 12 of 34

HSE MANUAL Date: 20/06/2007


Rev No: 1

Report shall contain the following:

 Location and accident type


 Date and time of occurrence
 Name of injured ( if any)
 Function and activity of injured
 Status of injured
 Description of damaged circumstances and type of damage
 Treatment given
 Expected number of days lost

This shall be distributed as following:

Original : To be kept at Work Site


First Copy : HSE office
Second Copy : Management
Third Copy : Company

All accidents shall also be investigated without delay in accordance with the
Company’s Accident Investigation/Reporting Procedure.

5.2 EMERGENCY RESPONSE PLAN

There shall be a Emergency Response Plan at all Company’s worksite. The


Emergency Response Plan shall cover all the various scenerios resulting in
critical and the course of action needed.. It is mandatory for NPSL and its
contractors to have this Emergency Response Plan which shall be made
available by the Company.
Author: HSE RD No :1/2K
NURICON PETROSERVICES (PTE.) LTD.
S.Niazi Page No: 13 of 34

HSE MANUAL Date: 20/06/2007


Rev No: 1

5.3 DEFINITIONS OF ACCIDENT

For the purpose of this section of HSE Reference Document, the following
definitions shall hold:
ACCIDENT: any event which has or could have caused injury of illness.
such an event may also involve damage, product loss or interruption or work.
FATALITY: a fatality is a death resulting from a work injury, regardless of
the time intervening between injury and death.
LOST WORKDAY CASE (LWC): a lost workday case is any work injury
other than a permanent partial disability which renders the injured person
temporarily unable to perform any regular job or restricted work on any day
after the day on which the injury was received.
LOST WORKDAYS: the number of lost workdays is the total number of
calendar days on which the injured person was temporarily unable to work as
a result of lost workday case or permanent partial disability.
MEDICAL TREATMENT CASE (MTC): a medical treatment case is any
work injury that involves neither lost workdays nor restricted workdays but
which requires treatment by a physician.
NEAR MISS: a near miss is an accident which did not result in injury,
illness, damage or product loss.
OCCUPATIONAL ILLNESS: an occupational illness is any illness resulting
from or aggravated by employment.
PERMANENT PARTIAL DISABILITY (PPD): permanent partial disability is
my work injury which results in the complete loss, or permanent impairment
of functions of parts of the body, regardless of any pre-existing disability of
the injured member or impaired body function.
PERMANENT TOTAL DISABILITY (PTD): permanent total disability is any
work injury which incapacitates an employee permanently and results in
termination of employment.
RESTRICTED WORKDAYS: the number of restricted workdays is the total
number of calendar days counted from the day of starting restricted work
until the person returns to his regular job.
WORK INJURY: a work injury is an injury or illness, regardless of severity,
which arises from a single event (or a number of events close together in
time) in the course of employment.
Author: HSE RD No :1/2K
NURICON PETROSERVICES (PTE.) LTD.
S.Niazi Page No: 14 of 34

HSE MANUAL Date: 20/06/2007


Rev No: 1

5.4 ACCIDENT CATEGORIES

Category No. I
Fatalities, damage in excess or Rs. 500,000 (inclusive)

Category No. II
Serious injuries that result or may result in Permanent Partial/Total
Disabilities. Lost Workday Cases, damage more than Rs. 5, 000 (inclusive)
but less than Rs. 500,000.

Category No. III


Restricted Work Cases, Medical Treatment Cases (no lost time) Near
Misses, damage less than Rs. 50,000.
Author: HSE RD No :1/2K
NURICON PETROSERVICES (PTE.) LTD.
S.Niazi Page No: 15 of 34

HSE MANUAL Date: 20/06/2007


Rev No: 1

6.1 SCOPE CONTRACTOR HEALTH, SAFETY AND ENVIRONMENTAL POLICY

NPSL will provide advice to all of its contractors on how best to achieve the
required standards. It is however a condition of working with NPSL that the
standards laid out in this document are adhered to.
It is the policy of NPSL to conduct all operations and to handle all materials
safely, without creating unacceptable safety and environmental risks.
Contractor will also demonstrate compliance with the applicable NPSL site-
specific requirement and the relevant rules and regulations of Pakistan.

6.2 GENERAL REQUIREMENTS

Site specific health, safety and environmental requirements are not intended
to control the manner in which you accomplish a specific job task, but rather
to determine that NPSL interests with respect to protected and compliance
with applicable regulations is accomplished. Contractors/subcontractors must
inform all of their supervisors and employees of applicable NPSL site-specific
health, safety and environmental rules, policies and conditions that might be
encountered while working on NPSL premises.
Elements of NPSL HSE Management System Framework are to be
addressed by the contractors as minimum to meet NPSL HSE expectations.
We expect that contractor/subcontractor communicate to their employees,
safe work procedures and programs to be followed as laid in the NPSL HSE
policy.
Furthermore, we strongly encourage contractors to conduct regular safety
and environmental inspections on their equipment as well as monitor the
work practices of their employees. The use of safety meetings, training, risk
assessments and job safety analysis are also to be utilized to review the safe
work practices to be implemented prior to starting a new any non-standard or
dangerous job. New employees must be apprised of the applicable safe work
practices and regulations prior to beginning work on NPSL premises.

6.3 KEY RESPONSIBILITIES

 NPSL Contract Requestors/Users are responsible for ensuring


contractors are in compliance with job site HSE regulations
 NPSL Contract Sponsors are responsible for ensuring respective
contractors understand and can deliver the expectations of this policy.
 Contractor Management is responsible for the necessary implementation
of a Safety Management system for their organization.
 Contractor on-site supervisor is responsible for assuring all contractor
employees follow the requirements of this policy.
Author: HSE RD No :1/2K
NURICON PETROSERVICES (PTE.) LTD.
S.Niazi Page No: 16 of 34

HSE MANUAL Date: 20/06/2007


Rev No: 1

7.1 VEHICLES AND DRIVING


NPSL requires that all its employees, consultants, contractors and others
who drive vehicles on company business shall give special attention to all
matters of road HSE with the aim of reducing road traffic accidents and
eliminating injuries.

7.2 DRIVERS OF NPSL VEHICLES


All drivers of NPSL vehicles shall hold, for the type(s) of vehicle they intend
to drive:
 A NPSL driving permit (It is mandatory to complete the HSE induction
course before being accepted for NPSL driving permit test).
 A valid driving licence issued by the relevant authorities unless they are
a national of a country in which case a valid international driving licence
from that country shall be acceptable.
The only exception to the above shall be that the holder of a driving
licence acceptable to the relevant authorities for the type vehicle he
intends to drive, may drive a NPSL vehicle for the purpose of
familiarization with that vehicle providing he is accompanied at all times
by a person who shall hold:
o A NPSL driving permit
o A valid driving licence for the type of vehicle being driven.

7.3 DRIVERS OF CONTRACTOR’S VEHICLES


Drivers of contractor’s vehicles shall hold for the type(s) of vehicle they
intend to drive, a valid driving licence issued by the relevant authorities
unless they are a national of a country in which case a valid international
driving licence from that country shall be acceptable.

7.4 DRIVING REGULATIONS


All drivers shall obey the following:
 The maximum speed limit of 70 km/hour for all company, contractor of
other vehicles used on company property or company business.
 The lower speed limits in force in camps and some other areas.
 Any temporary speed restrictions or other signs at road works.
 Where adverse conditions prevail drivers shall reduce speed accordingly.
 No person shall drive any vehicle on company business unless fit to do
so.
Author: HSE RD No :1/2K
NURICON PETROSERVICES (PTE.) LTD.
S.Niazi Page No: 17 of 34

HSE MANUAL Date: 20/06/2007


Rev No: 1

7.5 RECOMMENDED DRIVERS HOURS OF WORK


 No driver should work more than a 12 hour per work period.
 No driver should drive a vehicle for a total of more than 10 hours in any
one working period.
 Eight clear hours of uninterrupted rest should be taken on completion of
the driver’s working period.
 Drivers of light vehicles should take at least 5 minutes rest break after 1
hour period driving.
 Drivers of heavy vehicles and buses should take at least one hour rest
break after a 4 hour period of driving.
 NO person employed in the capacity of driver should undertake any
other major task as follows.
o Before, during or after their work period.
o During their rest break(s)
 Any driver who experiences tiredness or fatigue to take minimum of 10
minutes rest and if this condition persist any further, the driver shall halt
and inform relevant authorities immediately.
 Under NO CIRCUMSTANCES shall the driver continue to drive if he
experience any sort of illness including tiredness or fatigue.

7.6 DRIVING BETWEEN COAST AND INTERIOR


For individuals to undertake the coast-interior journey by road, the following
rules are to apply for essential journeys:
 NPSL employees wishing to drive from the coast to the interior seek
permission of their department head.
 NPSL employees wishing to drive from the interior to the coast seek
permission of the Operations Superintendent.
 Contract holders should endeavour to minimize road journeys made by
contractor employees.
 Anyone making a long journey by vehicle into the interior of Pakistan
should either:
 Start at dawn or as soon as appropriate thereafter to ensure arrival at
their proposed destination before dusk the same day, or
 If the journey cannot be completed in one day the driver’s supervisor
shall be responsible for arranging overnight rest with adequate facilities
for doing so including accommodation, food and water.
Author: HSE RD No :1/2K
NURICON PETROSERVICES (PTE.) LTD.
S.Niazi Page No: 18 of 34

HSE MANUAL Date: 20/06/2007


Rev No: 1

7.7 VEHICLES SPECIFICATION, FITTINGS AND EQUIPMENT


 Vehicles shall be of adequate capacity and of a design suitable for the
work to which they are allocated.
 All light vehicles shall have metal roofed cabs.
 All pick up and station wagon type vehicles shall be fitted with roll bars.
The design of roll bars on vehicles so fitted shall be to a standard
approved by vehicle manufacturer.
 Where a vehicle is used for carrying goods/freight in the compartment
which forms part of the passenger carrying section of the vehicle, a HSE
cage shall be fitted to form separate goods and passenger
compartments.
 All passenger vehicles shall be fitted with a seat belt for each seat other
than passenger carrying vehicles with a single passenger entry door and
center aisle for passenger movement where seat belts shall be fitted to
the driver’s and front passenger seat only.
 Seat belts shall be 3 point fixing only and of the inertia type in the front
seats of all vehicles.
 Point fixing seat belts are acceptable in commercial vehicles only where
it is impossible to fit 3 point fixing belts.
 For private vehicles 2 point fixing belts are acceptable in rear seats, but
is strongly recommended that 3 point fixing belts are fitted to the outer
seats.
 Radial ply tyres shall under no circumstances by mixed with cross ply
tyres including the spare wheel(s) on any vehicle. All tyres fitted to a
vehicle shall be of the same size.
 All vehicles shall be equipped with a spare wheel, and for interior travel,
and BCF extinguishers of quantity and capacity suited to the size and
purpose of the vehicles.
 For light vehicles at the size and purpose of the vehicles. For light
vehicles at the BCF extinguisher of 1.5 kg shall be fitted.
 Inward facing seats shall not be fitted to any vehicle.
 All heavy goods, passenger service and plant equipment vehicles shall
be fitted with audible alarms for reversing. Articulated vehicles shall have
alarms fitted to the prime mover only.
 All fuel bowers shall be fitted with anti static bars and bonding strips.
Author: HSE RD No :1/2K
NURICON PETROSERVICES (PTE.) LTD.
S.Niazi Page No: 19 of 34

HSE MANUAL Date: 20/06/2007


Rev No: 1

7.8 CONTRACTOR’S VEHICLES

Contractor’s vehicles shall comply in all respects with these HSE regulations.
In addition all contractor’s vehicles shall be identified with the contractor’s
serial number and name is both Urdu and English.
No motor vehicle designated by the manufacturer as a load carrying vehicle
shall be modified to carry passengers unless approved by department
(regardless of whether the owner has certificate of authorization to carry
passengers).
Author: HSE RD No :1/2K
NURICON PETROSERVICES (PTE.) LTD.
S.Niazi Page No: 20 of 34

HSE MANUAL Date: 20/06/2007


Rev No: 1

7.9 VEHICLES OPERATION AND USE

 Passengers and/or material shall be transported in a safe and legal


manner in accordance with the requirements of these HSE regulations.
 No vehicle shall be driven unless the driver holds the appropriate driving
licence.
 Drivers and all passengers shall wear seat belts at all times.
 All travel shall be on the designated road, except where otherwise
required for operations purposes.
 Passengers shall only be carried in the passenger compartment of
vehicle.
 Only two persons shall use the front seats of a vehicle unless it is proven
that the third person can be accommodated with an inertial seat belt and
in no way interferes with the safe operation of the vehicle. This shall
apply irrespective of the number of seats shown in the vehicle
registration document.
 Passenger shall not be conveyed on the body of any motor vehicles or
plant equipment.
 Passengers shall not be carried in the load carrying section of heavy
good vehicle.
 All vehicle loads shall be properly secured as appropriate to
transportation in desert conditions.
 Loose articles shall not be carried and heavy items such as tools and
water cans shall be tied down.
 Where operations cause significant extra traffic over company’s roads, in
particular in residential areas, arrangements shall be made to control
traffic by scheduling it and by flag men or other means so as not to
endanger or inconvenience other road users and residents
Author: HSE RD No :1/2K
NURICON PETROSERVICES (PTE.) LTD.
S.Niazi Page No: 21 of 34

HSE MANUAL Date: 20/06/2007


Rev No: 1

7.10 DRIVING IN THE INTERIOR

When a journey by vehicle must be made away from the graded roads, the
vehicle shall carry adequate emergency equipment, survival equipment and
voice radio transmitter/receiver or portable distress radio beacon.
Adequate water, salt and spare fuel shall be carried for each journey. Extra
fuel shall be carried in a properly designed container, adequately secured to
the outside of the vehicle. Containers shall be painted:
 White for water
 Red for Fuel ( Diesel / Petrol )
All drivers shall be aware of their routes and be provided with adequate maps
and directions.
Before leaving, a driver shall agree with his supervisor his destination,
overland route and expected time of arrival. Immediately on arrival at his
destination he shall ensure that his supervisor knows of his safe arrival.
Should not such report be received by the supervisor a check shall be made
to ensure that the driver(s) and any passengers have reached their
destination safely. Should the check mail to establish the whereabouts and
well being of the driver(s) and passengers, the Interior operations ‘Man Lost’
Procedures shall be initiated in accordance with emergency procedures.

7.11 NIGHT TIME DRIVING

In order to reduce the risk involved in driving at night and to prevent any
potential incidents, there should be no night time driving. The only
circumstance where driving shall be allowed would be if there is any
operational emergency or for medical emergency transfer though driving still
shall not be encouraged. Operational planning shall be done in such a way
that all logistics and personnel movement should be completed before
darkness.
Author: HSE RD No :1/2K
NURICON PETROSERVICES (PTE.) LTD.
S.Niazi Page No: 22 of 34

HSE MANUAL Date: 20/06/2007


Rev No: 1

7.12 VEHICLES CONDITIONS AND CARE

All vehicles shall be maintained to a high standard by the appropriate service


checks at a frequency of at least those recommended by the manufacturer.
Any fault which may effect the roadworthiness of a vehicle or the safety of its
driver, passengers and/or load shall be rectified before the vehicle is used.
All vehicles shall be maintained in a safe condition. Repairs shall be carried
out only by a reputable agency. Temporary repairs shall only be carried out
to allow a vehicle to be moved to a workshop. Temporary repairs shall not
effect the safety of the vehicle. A vehicle shall be checked after every repair
before releasing it to the user.
All company and leased vehicles shall be inspected each month to ensure
that they are safe and the necessary repair before releasing it to the user.
The driver of any vehicle shall before any journey ensure that the vehicle is in
good mechanical condition. In particular the following shall be free from
damage and excessive wear, operating correctly or at the correct level (as
appropriate): -
 Steering
 Foot and Parking Brakes
 Tyres, including spare(s)
 Seat Belts
 Horns
 Headlight, Tail Lights, Stop Lights and Turn Indicators.
 Rear View Mirror
 Windshield Wipers and Washers
 Windshield and all Windows
 Fluid levels in engine, battery, radiator, and brake/clutch reservoir(s).
In addition, a check shall be made of the fire extinguisher(s) to ensure that
each items is at the correct pressure, is securely located in the vehicle and
has the safety pin correctly fitted. Any defects shall be reported immediately.
Author: HSE RD No :1/2K
NURICON PETROSERVICES (PTE.) LTD.
S.Niazi Page No: 23 of 34

HSE MANUAL Date: 20/06/2007


Rev No: 1

8.1 FIRE PROTECTION AND SITE CLEANLINESS

 All works, vehicles, stores, camps and other facilities, and in particular
personnel, shall be protected from the danger of fire and each personnel
shall be instructed in the use of fire fighting equipment
 A sufficient number of fire extinguishers of adequate capacity and of type
shall be provided.
 Other fire fighting facilities such as fire mains of a type and capacity
suitable for the intended purpose shall be provided as required.
 Fire alarm systems shall be provided in all camps and living quarters and in
other facilities as required.
 Procedures shall be set up to cover:
o fire prevention
o fire fighting
o building evacuation
o test/maintenance of fire fighting equipment and alarms.
 All sites, facilities and camps shall be kept clear of unnecessary flammable
and other surplus material. Sufficient waste bins with lids shall be provided.
 All scrap and rubbish shall be disposed of at a location and in a manner
approved by the company.
 Safe storage shall be provided for all flammable substances within
structure of fire resistant construction.
 Oil grades with a low flash point (below 37.8 degree C/100 degree F) such
as petroleum shall not be used for cleaning purposes.
 Smoking shall take place only in places approved by the company. No
smoking signs shall be obeyed at all times.
 All temporary and portable buildings shall be located so that the space
between them forms an adequate fire break.
Author: HSE RD No :1/2K
NURICON PETROSERVICES (PTE.) LTD.
S.Niazi Page No: 24 of 34

HSE MANUAL Date: 20/06/2007


Rev No: 1

9.1 RESTRICTED ARTICLES

Personal shall not take dangerous items onto company premises without
approval. Such items include, but are not limited to:
 Alcohol
 Drugs
 Firearms
 Knives and other offensive weapons
 Gas cigarette lighters and non safety matches
 Explosive devices
 Radio active, corrosive, poisonous or toxic materials.

9.2 PROTECTIVE EQUIPMENT

All personnel shall have provided by his employer, for use where appropriate,
protective clothing and equipment suited to the hazard(s) or environment to
which he may be exposed when working.
These hazards and the appropriate minimum standard of protective clothing
and equipment shall include, but not be limited to, those stated below:
All personnel shall do the following:
 Engaged in welding, burning and grinding shall wear adequate eye, face
and body protection, e.g. face shield, goggles, aprons, etc.
 Required to enter tanks or vessels, which may be deficient in oxygen or
contain poisonous vapours shall wear breathing apparatus as required
by the work permit procedure.
 Likely to be exposed to the hazard of toxic or explosive gas shall utilize
appropriate gas detection equipment as directed by the Work Permit
procedures.
 Engaged in spray painting shall wear respiratory masks.
 Engaged in grit blasting shall wear an air supplied hood.
 When erecting steel above first floor level or where adequate scaffolding
cannot be provided shall wear a safety belt.
 Handling (loading/unloading, decanting, pumping) corrosive substances
shall wear safety helmet, safety type PVC gloves, full length PCV apron
rubber knee length safety boots and adequate eye and face protection.
 In addition, eye wash fountains shall be readily available at the site. In
remote locations, eye wash bottles may be substituted.
Author: HSE RD No :1/2K
NURICON PETROSERVICES (PTE.) LTD.
S.Niazi Page No: 25 of 34

HSE MANUAL Date: 20/06/2007


Rev No: 1

 When working with asbestos, shall wear respiratory equipment approved


for use with asbestos and overalls of a material, which does not allow
penetration by, or retain, dust and which should be a close fit at
neck/wrists/ankles, having external pockets or pleats and fitted with an
integral head cover. Head cover should be close fitting and of the same
material as the overalls, Footwear of a design so as not to retain dust in
the crevices shall also be worn.
 When climbing on high metallic structures shall be equipped with a
safety belt approved alternative fitted with tool receptacle and bolt bad.
The belt fittings shall be sufficient to enable the climber to carry all loose
equipment and have two hands free for climbing. A safety rope and clips
shall be utilized. In addition, climbing shoes shall be laced up (minimum
of 4 holes), have non-slip soles and be chosen to enable the climber to
‘feel’ his footing. (Safety boots do not allow this and may work loose
during climbing).
 Working in areas subjected to excessive noise (above 85 db (A) shall
wear ear protection and ‘Ear Protection’ signs shall be displayed.
 When working over water, on jetties, buoy moorings and other as
facilities on the coast or at sea, life jackets and other equipment as
appropriate shall be worn by all personnel.
 Life buoys fitted with at least 27 m of buoyant rope shall be positioned at
edge of the water at intervals not exceeding 46 m. If a person can fall
more than 5 m into exceeding 46 m. if a person can fall more than 5 m
into the water, the length of buoyant rope shall be increased as
appropriate to compensate for the additional height.
 On platforms and walkways where adequate guarding cannot be
provided, safety nets shall be positioned in such a way to ensure that
persons cannot fall more than 2 m.
 The supervisor on site shall ensure that all personnel, including visitors,
wear protective clothing and use protective equipment as required by the
HSE Regulations or, as appropriate, where a provided for by, the HSE
Regulations.
 The supervisor is also responsible for adherence and compliance on site.
Author: HSE RD No :1/2K
NURICON PETROSERVICES (PTE.) LTD.
S.Niazi Page No: 26 of 34

HSE MANUAL Date: 20/06/2007


Rev No: 1

9.3 SAFETY HELMETS AND SAFETY FOOTWEAR

Safety helmets, which shall not be of the metal type, and safety footwear,
shall be worn at all time by all personnel when within any industrial facility or
work site. In addition, overalls should also be worn at all times in the
specified areas of work and outside accommodation and offices. All facilities
and sites include, but are not limited to:
 Whenever notices are displayed stating protective equipment shall be
worn.
 Any production facility including gathering stations.
 Well locations
 Any construction area.
 Blasting operations
 Whenever in the vicinity of cranes and other lifting equipment when they
are in use.
 Excavation work
 All Drilling rigs.
 Pipeline operations in the vicinity of side booms and cranes.

9.4 STANDARDS AND SPECIFICATIONS

All HSE and personnel protective equipment shall conform to international


standards relevant to their intended use.
Advice shall be sought whenever doubt exists about the suitability of clothing
and equipment or where a hazard is recognized that requires protection
additional to, or not covered by, the HSE regulations.
Author: HSE RD No :1/2K
NURICON PETROSERVICES (PTE.) LTD.
S.Niazi Page No: 27 of 34

HSE MANUAL Date: 20/06/2007


Rev No: 1

9.5 LIFTING EQUIPMENT

 Factory built and certified lifting equipment when ever appropriate will be
used at worksites and shall have safe working load shall be marked on
all equipment.
 Lifting equipment shall be inspected thoroughly by an approved person
every 6 months.
 Non factory built or certified lifting equipment shall be tested 2 times the
safe working load
Author: HSE RD No :1/2K
NURICON PETROSERVICES (PTE.) LTD.
S.Niazi Page No: 28 of 34

HSE MANUAL Date: 20/06/2007


Rev No: 1

10.1 TOOLS AND EQUIPMENT STANDARDS

All tools and equipment shall be maintained in a safe condition. Users of plant,
tools and equipment shall be adequately trained and experienced and where
necessary licensed or certified to use that equipment.

10.2 ELECTRICAL SYSTEMS AND EQUIPMENT

 All persons who may be concerned with the operation of any electrical
systems shall be conversant with the treatment for electrical shock.
 All electrical equipment shall be installed, used and maintained in safe
condition. Special attention shall be given to ensure that flexible cables
and equipment, such as relays and switches that may cause sparks, are
maintained in good and safe condition. Taped joints in cables shall not
be permitted.
 All portable electrical equipment shall be isolated from the supply when
not use.
 Where a temporary installation is to be connected to the Company’s
power supply, the installation shall be tested, inspected and approved by
the Company Representative before being connected to the power
supply.
 Particular attention shall be given to the provision of adequate earthing.
 No extension to the electrical system wiring shall be made without
authorization from company’s representative.
 Only electrical equipment certified for use in hazardous areas shall be
used in hazardous area.
 All electrical operations to be carried out in accordance with Electrical
HSE Operational Procedures.
Author: HSE RD No :1/2K
NURICON PETROSERVICES (PTE.) LTD.
S.Niazi Page No: 29 of 34

HSE MANUAL Date: 20/06/2007


Rev No: 1

10.3 PNEUMATIC HYDRAULIC POWERED TOOLS AND EQUIPMENT

 All pneumatic hydraulic tools shall be of a type approved by the


company.
 All pneumatic and hydraulic powered tools shall be checked before use.
Only tools in safe and serviceable condition shall be used.
 All pneumatic and hydraulic powered tools shall have a fail safe device
such that they stop automatically when the operator releases his hold.
 No adjustment of repair shall be made to tools unless disconnected from
the supply.
 Where sparking or heat generated by the use of a tool could represent a
hazard, a coolant shall be used to disperse the heat and reduce the
possibility of sparks.
 Pneumatic and hydraulic power lines shall be so positioned so as not to
be liable to damage or present a tripping hazard.
 All workers shall be warned against disconnecting the air hose from the
tools and using it for machines or removing dust from clothing.
 Air shall be shut off before attempting to disconnect the air hose from the
air line. Any air pressure inside the line shall also be released before
disconnecting.
 All compressed air lines shall have outlets directed away from an
operator-preferably downwards the floor.

10.4 ROTATING EQUIPMENT

 All rotating equipment shall be maintained in a safe condition and without


risk to health.
 All rotating parts shall be adequately guarded from accidental contact by
personnel.
 Exhaust systems shall be sound, free from leaks and insulated from
accidental contract by personnel.
 Rotating equipment shall only be used/located in areas where it cannot
give rise to a fire risk.
 Only trained, authorized and supervised personnel may perform
operational adjustment and maintenance functions on equipment.
 All tools and equipment shall be inspected and measures shall be taken
to ensure that the equipment is safe to use before being put into
operation.
Author: HSE RD No :1/2K
NURICON PETROSERVICES (PTE.) LTD.
S.Niazi Page No: 30 of 34

HSE MANUAL Date: 20/06/2007


Rev No: 1

11.1 HAZARD IDENTIFICATION

All Hazardous or restricted areas shall clearly have signs posted, clearly
identifying restricted areas. Use of pictograms type signs are recommended
to identify hazards within restricted areas.

11.2 HAZARDOUS ATMOSPHERES

All personnel shall be made aware of the extreme danger to life of


atmospheres deficient in oxygen, contaminated by exhaust and hydrocarbon
gases and especially by hydrogen sulphide (sour gas). No personnel shall
sleep or eat in the area designated as hazardous areas in any facility.

11.3 HYDROCARBON GASES

All personnel shall be made aware that when working on or close to existing
oil and gas facilities, a danger of fire or explosion exists due to the presence
of hydrocarbon fluids.
The lighting of fires and the introduction of matches, lighted cigarettes,
lighters and other sources of ignition are strictly forbidden.
All leaks or other malfunctions observed on any facility shall be reported to
the site supervisor immediately.

11.4 HYDROGEN SULPHIDE

Certain areas known to be contaminated with hydrogen sulphide (H2S) shall


be specially designated as hydrogen sulphide areas (or sour gas/H2S areas).
The personnel shall be aware of the designated H2S areas and shall take
appropriate precautions as laid out in this HSE
Author: HSE RD No :1/2K
NURICON PETROSERVICES (PTE.) LTD.
S.Niazi Page No: 31 of 34

HSE MANUAL Date: 20/06/2007


Rev No: 1

12.1 ENVIRONMENTAL PROTECTION

Protection of the environment shall be given due care and consideration


while conducting operation on work sites.

Each work site of company should have an environmental emergency


response plan and it is the responsibility of NPSL personnel to ensure that
they are made aware of the plan

Waste minimization including lost products and spilled products shall be


monitored at three different level

 Natural Resources/Energy Consumption


 Chemical Usage
 Generation of Waste
Author: HSE RD No :1/2K
NURICON PETROSERVICES (PTE.) LTD.
S.Niazi Page No: 32 of 34

HSE MANUAL Date: 20/06/2007


Rev No: 1

13.1 PERMIT TO WORK SYSTEMS

A permit shall be a formal written authorization by the company/client used to


control certain types of work which are identified as potentially hazardous.
The types of permits which shall be hazardous and shall require work permits
are as following:

 Safe Work Permit


 Hot Work Permit
 Electrical Work Permit

Safework Permit
Following are tasks which fall under Safe Work Permit Category but not
limited to :
o Working over water
o Confined spaces
o Working in unguarded

Maintenance operations that disable critical safety systems such as fire &
gas detection system, emergency devices, fire fighting equipment etc.

Hot Work Permit


Following are tasks which fall under Hot Work Permit Category but not
limited to :

o Hot Work of any type ( welding cutting, burning ) outside the Hot
Work Area
o Any work generating ignition inside hazardous area
o Any of the above work in any part of the worksite whereas potentially
hazardous situation could be anticipated because of the work being
conducted.

Electrical Work Permit


Following are tasks which fall under Hot Work Permit Category but not
limited to :

o Any electrical work that may hazardous because of being able to


isolate the equipment.
Author: HSE RD No :1/2K
NURICON PETROSERVICES (PTE.) LTD.
S.Niazi Page No: 33 of 34

HSE MANUAL Date: 20/06/2007


Rev No: 1

13.2 REQUEST FOR A WORK PERMIT

All work permits shall be requested by the NPSL personnel responsible for
the work to be performed and shall be approved by the Company
representative.

13.3 VALIDITY OF THE WORK PERMIT

Permits shall not be carried over from one operating crew to another and
shall not be valid when ever a change occurs in :

 Personnel carrying out the work


 Change in working conditions
 When the permit is suspended

Once the work is completed, necessary checks shall be made by the NPSL
supervisor in charge of the work. The permit shall then be signed of by the
Company representative which shall close the work permit
Author: HSE RD No :1/2K
NURICON PETROSERVICES (PTE.) LTD.
S.Niazi Page No: 34 of 34

HSE MANUAL Date: 20/06/2007


Rev No: 1

14.1 SAFETY INDUCTION FOR NEWLY HIRED EMPLOYEES

Each new hired employee shall be given a safety induction briefing in order
to carry out his duties

The safety induction briefing shall be administered by the HSE Head

The safety induction briefing shall cover the following:

 Corporate Statement of Policy


 Chain of Command
 Introduction to the HSE Manual

During the safety induction briefing, the HSE handbook listing the company
policies shall be given to the new employee, with receipt of
acknowledgement and instruction to read and follow the company policies.