Piping Guide-1-75

You might also like

You are on page 1of 1
PIPING DRAWINGS 528 Process equipment and iping systems have priority. Drawings listed on the preceding page must be reviewed for compatibility with the developing piping design Pertinent background details (drawn faintly) from these drawings help to ‘void interferences. Omission of such detail from the piping drawing often leads to the subsequont discovery that pipe fas boon routed thru a brace, siainwey, doorway, foundation, duct, mechanical equipment, motar contro! conter, irefighting equipment, otc, Completed pining crawines will also show spool numbers, if this part of the job is not subcontracted — see 5.29. Electrical snd instrument cables are not shown on piging drevdngs, but trays to hold the cebles are indicated for exemple, se figure 6.3, point (). It is not slways possible for the piping drawing to fallow axactly the logical ferangement of the P&4D. Sometimes lis must be routed with diffrent junction sequence, and line numbers may be changed. During the preliminary Piping studies, economies end practicable improvements may befound, and the PID may be modifad to take these into account. Hotmver, itis not the Ping designer's ob to seek ways to chenge the P&ID. SCALE Piping is errangedin plan view, usully to 3/8 inf scale ALLOGATING SPACE ON THE SHEET © Obtain the drawing eumber and fill in the title block at the bottom Fight corner of the sheat ALLOCATING SPACE OW A DRAWING SHEET Figure s9 TITLE BLOCK © On nonstandard shoots, leave @ 1% to 2-inch margin at the left edge of the sheet, to allow filing ona ‘sik’, Standard drawing shoots usually have this margin © On drawings showing a plan view, place a north arrow at the top left ‘corner of the sheet ta indicate plant north—see figure 6.11 8 Do not draw in the area above the title block, as this spas is allocated 10 the bill of material, or to general notes, brief descriptions of changes, and the titles end nurabers of reference drawings ‘8 If plans and elevations are small enough to go on the same sheot, draw the plen at the upper left side of the sheet and elovetions to the right ‘and bottom of i, as shown in figure 8:9 BACKGROUND DETAIL, © Show background detail 2s discusted in 5.2.6 under ‘Piping drawings, It is sometimes conveniant to draw outlines on tha rovers side of the ‘rawing sheet © After background details heve been determined, itis best to make a print on which nozzles on vessels, pumps, etc, to be piped can bo ‘marked in red pencil. Unity stations can also be established. This will indicate ateas of major usage and the most convoniont locations for the headers. Obviously, at times there will be number of alternate routes offering comparable edventages PROCESS & SERVICE LINES ON PIPING DRAWINGS (¢ Take tine numbers from the P&ID. Refer to 6.2.4 under ‘Flaw lines on PAID's for information on numbering lines. inelude line numbers on all viens, and erroweads showing direction of flow © Draw all pipa ‘single line’ unless specie instructions have been given for drawing ‘doubie line’, Chart 6.1 gives line thicknesses (ful size) © Line nurbers are shovm aginst ines, thus: [ssn '© Take fines continued on another sheet to a matching, and thare code with tine numbers only. Shovr the continuation sheet numbers on ‘matehiines-see figure 5.8 ‘© Show where changes in ine material specification occur. The change is usually indicated immediatly downstream of a flenge of a valve or equipment Showa definite break ina line crosing behind another fine—see ‘Rolled al, under ‘Plan view piping drawing, this section

You might also like