You are on page 1of 4

#3-300 King Street

Centre Square Building


Lower Level
Spruce Grove, Alberta
Phone: (780) 962-3573

SITE INSTRUCTION SI #01R1

ISSUED DATE: April 30th, 2021 HRC FILE NO: 1279


PROJECT: TELUS Peace River Boiler Replacement
PREPARED BY: Ryan Devine, P.Eng. NO. OF PAGES: 4 (including transmittal)

DISTRIBUTION:
Gary Prevost TELUS gary.prevost@telus.com
Alex Robitaille Tribuild Contracting (Calgary) Ltd. alex@tribuild.com
Chris Kalwajtys CBRE Chrystopher.kalwajtys@telus.com
Scott Carlson MP&P Engineering Inc. Scott.Carlson@mppeng.ca
Paul Truong, P.Eng. MP&P Engineering Inc. Paul.Truong@mppeng.ca
Kyle Fuller, P.Eng. HRC Engineering Ltd. kylehrc1@telus.net
Ryan Devine, P.Eng. HRC Engineering Ltd. ryanhrc1@telus.net
Les Kostiuk, P.Eng. HRC Engineering Ltd. hrc1@telusplanet.net

The Contractor Shall Provide A Firm Price Itemized with Respect to Labour and Materials for Each of the
Following:

Item #1 – Boiler Stands:

• Supply and install two (2) new frames to elevate boilers 150mm above housekeeping pad. Frames
to be of I-beam construction with welded steel plate on top. Boilers to be fastened to the frames
and the frames shall be fastened to the pad below. Refer to attached boiler anchor bolt locations.
Refer to attached structural drawings S1 & S2 for more details. Submit shop drawings for review
prior to construction.

Item #2 – Flooring:

• Remove all existing flooring in the new main floor mechanical room. Provide asbestos testing and
abatement as required.
• Remove all glue or other residue left behind by old flooring.
• Supply and install new traffic deck coating to the floor of the new mechanical room including
housekeeping pads. Prepare the surface as per manufacturers recommendations. Standard of
acceptance: Stonhard Stongard MR

Item #3 – Housekeeping Pads:

• Refer to attached structural drawings S1 & S2 for details on new housekeeping pads.

Last Rev: 2021-04-30


Filename: telus peace river boiler replacement - si #01r1.docx
Revisions, Issues
GENERAL 4. CONTRACTOR SHALL HIRE AN INDEPENDENT COMPANY TO CONDUCT A GPR SCAN OF EXISTING SLAB TO
LOCATE REBAR, FLOOR JOISTS AND SERVICE LINES AND SUBMIT RESULTS TO WSP-S FOR VERIFICATION
CUTTING AND CORING
BEFORE CORING AND CUTTING.
1. THIS IS AN IMPERIAL PROJECT. UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET / INCHES; HOWEVER, 1. CARRY A PRICE TO RETAIN AN INDEPENDENT TESTING COMPANY TO LOCATE AND MARK EXISTING
ALL FORCES ARE IN METRIC UNITS (PER TG-ABBR-02). 5. SCHEDULE WORK TO MINIMIZE EFFECT ON THE EXISTING BUILDING OPERATION. USE EQUIPMENT AND REINFORCEMENT, OPEN WEB STEEL JOISTS AND CONDUIT IN THE AREAS OF PROPOSED OPENINGS USING A DRAWING LIST
PROCEDURES TO MINIMIZE NOISE, DUST AND VIBRATIONS. SUBMIT PROPOSED SCHEDULE FOR REVIEW BY THE NON-DESTRUCTIVE METHOD. IF LOCATIONS ARE NOT ACCEPTABLE TO WSP-S, RELOCATE PROPOSED OPENINGS
2. “WSP-S” REFERS TO WSP CANADA STRUCTURAL CONSULTANT. CONSULTANT AND THE OWNER. AND REPEAT PROCESS AT NO EXTRA COST TO THE CONTRACT. DRAWING No DRAWING NAME
S1 GENERAL NOTES
3. PROVIDE ALL MATERIAL AND LABOUR REQUIRED FOR COMPLETION OF THE WORK. 6. ALL DEMOLITION, SHORING, AND OTHER TEMPORARY WORKS TO BE DESIGNED BY A PROFESSIONAL ENGINEER 2. CORING: DO NOT CUT EXISTING REINFORCEMENT OR CONDUIT WHEN CORING EXISTING CONCRETE UNLESS MAIN FLOOR MECHANICAL ROOM BOILER
RETAINED BY THE CONTRACTOR, LICENSED IN THE PLACE WHERE THE PROJECT IS LOCATED. PREPARE APPROVED IN ADVANCE BY WSP-S. SAVE COMPLETE LENGTH OF ALL CORES AND LABEL WITH LOCATION TAKEN. S2
4. PRIOR TO CONSTRUCTION, REVIEW STRUCTURAL DRAWINGS IN CONJUNCTION WITH DRAWINGS PROVIDED BY LAYOUT
ALL OTHER CONSULTANTS, AND WITH EXISTING CONDITIONS. DRAWINGS SIGNED AND SEALED BY THAT ENGINEER SHOWING DEMOLITION PROCEDURE AND SEQUENCE AND MAKE ALL CORES AVAILABLE FOR REVIEW, DO NOT DISPOSE OF CORES WITHOUT WSP-S APPROVAL.
ALL THE NECESSARY SHORING.
5. REPORT DISCREPANCIES TO THE CONSULTANT BEFORE PROCEEDING WITH THE WORK. 3. CUTTING: REFER TO TYPICAL DETAIL TC-SL-71 FOR CONCRETE SAWCUTTING PROCEDURE.
7. UNDERTAKE CHIPPING, CUTTING, CORING, REPAIRS, PATCHING, AND REMOVAL OF DEBRIS. MAKE CUTS WITH
6. VERIFY EXISTING DIMENSIONS AND CONDITIONS ON SITE PRIOR TO CONSTRUCTION. THE PROPER SAWS AND BITS WHEN A CLEAN LINE IS REQUIRED.

7. USE THESE DRAWINGS ONLY FOR THE PURPOSE IDENTIFIED IN THE REVISIONS COLUMN. DO NOT CONSTRUCT 8. DO NOT ALTER MATERIAL PROPERTIES OF THE STRUCTURAL STEEL WHICH IS TO REMAIN BY CUTTING AND
STRUCTURAL STEEL
FROM THESE DRAWINGS UNLESS MARKED “ISSUED FOR CONSTRUCTION”. DEMOLITION PROCEDURE. 1. CONFORM TO CSA S16 “LIMIT STATES DESIGN OF STEEL STRUCTURES”.
8. DO NOT USE INFORMATION ON THESE DRAWINGS FOR ANY OTHER PROJECT OR WORKS. 9. MAKE GOOD ALL EXISTING WORK DISTURBED BY SHORING OPERATIONS, EXCAVATION AND OTHER 2. FABRICATOR TO BE CERTIFIED BY THE CANADIAN WELDING BUREAU UNDER REQUIREMENTS OF CSA W47.1,
CONSTRUCTION PROCEDURES. DIVISION 1 OR 2, AND/OR CSA W55.3.
9. DO NOT SCALE THESE DRAWINGS.
3. WELDERS TO BE CWB CERTIFIED. WELDING TO BE IN ACCORDANCE WITH CSA W59.
10. ALL SECTIONS, DETAILS, AND STATEMENTS NOTED AS “TYPICAL” APPLY TO LIKE/SIMILAR CONDITIONS IN THE
STRUCTURE.
CONCRETE
4. MATERIALS (TO CSA G40.21 UNLESS NOTED OTHERWISE):
11. SEE ARCHITECTURAL DRAWINGS FOR FIRE RATING AND FIREPROOFING REQUIREMENTS. 1. CONFORM TO CSA A23.1 “CONCRETE MATERIALS AND METHODS OF CONCRETE CONSTRUCTION”. - WIDE FLANGE SECTIONS: GRADE 350W
- PLATES: GRADE 300W
12. DRAWINGS SHOW COMPLETED STRUCTURE ONLY. THEY DO NOT SHOW TEMPORARY WORKS FOR WHICH THE 2. CONCRETE IS SPECIFIED PER ALTERNATIVE 1 - PERFORMANCE SPECIFICATION, AS OUTLINED IN CAN/CSA A23.1.
- WELDING MATERIALS: CSA W48 AND CSA W59
CONTRACTOR IS RESPONSIBLE AND WHICH MAY BE REQUIRED FOR EXECUTION OF THE PROJECT. THE THE CONTRACTOR AND THE CONCRETE SUPPLIER TO MEET ALL CERTIFICATION, DOCUMENTATION, AND
- ZINC-RICH PAINT (ZRP) COATING: SSPC PAINT SPECIFICATION NO. 20
CONTRACTOR TO ESTABLISH CONSTRUCTION PROCEDURE AND SEQUENCE TO ENSURE SAFETY OF THE WHOLE QUALITY CONTROL REQUIREMENTS.
STRUCTURE AND ALL ITS COMPONENTS DURING ERECTION. 5. DO NOT CUT HOLES OR OTHERWISE MODIFY STRUCTURAL MEMBERS ON SITE.
3. THE CONCRETE SUPPLIER TO BE CERTIFIED BY THE ALBERTA READY MIXED CONCRETE ASSOCIATION.
13. MAKE ADEQUATE PROVISIONS FOR ALL LOADS ACTING ON THE STRUCTURE DURING ERECTION. PROVIDE 6. DO NOT OVERSIZE ANCHOR ROD HOLES FOR SITE TOLERANCES. USE HOLE SIZES SUGGESTED IN THE CISC
4. CONCRETE TO BE NORMAL DENSITY (MIN. 2300 kg/m3) UNLESS NOTED OTHERWISE.
TEMPORARY SHORING AND BRACING TO KEEP THE STRUCTURE PLUMB AND IN TRUE ALIGNMENT DURING “HANDBOOK OF STEEL CONSTRUCTION”.
CONSTRUCTION. 5. CEMENT TO BE PORTLAND CEMENT TYPE GU, UNLESS NOTED OTHERWISE OR REQUIRED BY EXPOSURE CLASS. 7. PROTECT COMBUSTIBLE MATERIALS AND FINISHES DURING WELDING OPERATIONS.
14. DESIGN OF ALL TEMPORARY WORKS TO BE CARRIED OUT BY A PROFESSIONAL ENGINEER RETAINED BY THE CEMENT TO CONFORM TO CSA A3000.
CONTRACTOR, LICENSED IN THE PLACE WHERE THE PROJECT IS LOCATED. 8. CLEAN STEEL WHICH WILL RECEIVE ZRP TO SSPC SP10 (NEAR WHITE BLAST CLEANING) AND APPLY ZINC RICH
6. AGGREGATE TO CONFORM TO CSA A23.1 / A23.2. DO NOT USE RECYCLED CONCRETE AS AGGREGATE.
PRIMER.
15. DESIGN OF NON-STRUCTURAL AND SECONDARY STRUCTURAL ELEMENTS (SUCH AS MISCELLANEOUS STEEL 7. CONCRETE ADMIXTURES SHALL NOT CONTAIN CHLORIDES. LOADING ABBREVIATIONS TG-ABBR-02
STAIRS, RAILINGS AND GUARDRAILS, PARTITIONS, CLADDING, BULKHEADS, ETC.) IS THE RESPONSIBILITY OF 9. APPLY TWO COATS OF ZRP PAINT TO BOILER SKID
SPECIALTY PROFESSIONAL ENGINEERS ENGAGED BY THE CONTRACTOR OR THE SUPPLIERS; IT IS NOT WITHIN 8. SUBMIT CONCRETE MIX DESIGNS TO WSP-S FOR REVIEW BEFORE START OF WORK. 2 2021-04-29 ISSUED FOR CONSTRUCTION
THE SCOPE OF SERVICES PROVIDED BY WSP-S AND WILL NOT BE REVIEWED BY WSP-S. 9. INTERIOR APPLICATIONS (HOUSEKEEPING PADS):
- EXPOSURE CLASS: N
REJECTED WORK Af FACTORED AXIAL LOAD IN kN
(+ INDICATES TENSION, - INDICATES COMPRESSION)
1 2021-04-29 ISSUED FOR REVIEW

16. CONSTRUCTION LOADS ON COMPLETED STRUCTURE NOT TO EXCEED DESIGN LOADS INDICATED ON
DRAWINGS. FULL DESIGN LOADS MAY ONLY BE APPLIED AFTER THE CONCRETE REACHES ITS DESIGN - MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS: 25 MPa. 1. DO NOT DELIVER MATERIALS WHICH ARE KNOWN NOT TO MEET THE REQUIREMENTS OF THE SPECIFICATIONS.
STRENGTH. - NOMINAL SIZE OF COARSE AGGREGATE: 14 (9/16”) Cf FACTORED COMPRESSION IN kN
IF REJECTED AFTER DELIVERY, REMOVE IMMEDIATELY FROM SITE.
f'c COMPRESSIVE STRENGTH OF CONCRETE, IN MPa
DESIGN CRITERIA 10. PROTECT CONCRETE FROM EXCESSIVE HEAT AND DRYING. USE HOT WEATHER CONCRETING METHODS IN
fy YIELD STRENGTH IN MPa
ACCORDANCE WITH CAN/CSA-A23.1 WHENEVER THE OUTDOOR TEMPERATURE IS GREATER THAN 27°C.
1. STRUCTURAL DESIGN IS IN ACCORDANCE WITH THE 2019 NATIONAL BUILDING CODE - ALBERTA EDITION Mf FACTORED MOMENT IN kN.m
11. PROTECT CONCRETE FROM FREEZING. USE COLD WEATHER CONCRETING METHODS IN ACCORDANCE WITH
(NBC-AE), SUPPLEMENTED BY THE 2015 NATIONAL BUILDING CODE OF CANADA STRUCTURAL COMMENTARY. Mfx FACTORED MOMENT ABOUT X-X (STRONG) AXES IN kN.m
CAN/CSA-A23.1 WHENEVER OUTDOOR TEMPERATURE IS LESS THAN +5°C. ALL INSULATED COVERS, HEATERS,
AND OTHER MATERIALS NEEDED TO PROTECT CONCRETE TO BE ON HAND PRIOR TO POUR. DELIVER CONCRETE Mfy FACTORED MOMENT ABOUT Y-Y (WEAK) AXES IN kN.m
2. ALL REFERENCED STANDARDS SHALL BE THE CURRENT EDITION UNLESS DIFFERENT EDITION IS REFERENCED
BY THE APPLICABLE BUILDING CODE NOTED ABOVE. AT A TEMPERATURE BETWEEN +15°C AND +27°C. ENSURE A MINIMUM CONCRETE TEMPERATURE OF 10° IS
MAINTAINED THROUGHOUT THE CURING PERIOD (MINIMUM 3 DAYS). MPL MASONRY PARTITION LOAD IN kN/m
3. SELF WEIGHT (SWT) IS DUE TO THE WEIGHT OF THE STRUCTURE ITSELF. IT VARIES WITH THE STRUCTURAL MTf FACTORED TORSION IN KN.m
SYSTEM, AND INCLUDES CONCRETE TOPPINGS ON STEEL DECK. 12. MAXIMUM OUTSIDE DIAMETER OF ANY CONDUIT OR PIPE EMBEDDED IN SLAB NOT TO EXCEED ONE THIRD OF
THE SLAB THICKNESS. Rf FACTORED VERTICAL REACTION IN kN
4. SUPERIMPOSED DEAD LOADS (SDL) ARE NON-STRUCTURAL DEAD LOADS DUE TO NON-STRUCTURAL TOPPINGS, RHf FACTORED HORIZONTAL REACTION IN kN
FINISHES, PARTITIONS, ROOFING MATERIALS, SUSPENDED EQUIPMENT, PAVERS, SOIL, ETC. 13. PROVIDE 25 (1”) CHAMFER STRIPS ON EXTERNAL CORNERS AND 25 (1”) FILLETS AT INTERIOR CORNERS.
P SPECIFIED (UNFACTORED) POINT LOAD IN kN
5. DEAD LOAD (DL) IS THE SELF WEIGHT OF THE STRUCTURE PLUS THE SUPERIMPOSED DEAD LOAD. 14. CONVEY CONCRETE FROM TRUCK TO FINAL LOCATION BY METHODS WHICH WILL PREVENT SEPARATION OR
Pf FACTORED POINT LOAD IN kN
LOSS OF MATERIAL. MAXIMUM FREE FALL NOT TO EXCEED 1.5m (5'-0"). CONSOLIDATE CONCRETE USING
6. UNLESS OTHERWISE NOTED, DESIGN LOADS SHOWN ON DRAWINGS ARE SPECIFIED (UNFACTORED) LOADS, TO MECHANICAL VIBRATORS.
BE USED FOR ULS DESIGN. FOR SLS DESIGN, THESE LOADS CAN BE REDUCED BY MULTIPLYING WITH THE RATIO Vf FACTORED SHEAR IN kN

JUNE 2017
OF APPROPRIATE IMPORTANCE FACTORS Ix(SLS) / Ix(ULS) GIVEN BELOW. 15. CURE CONCRETE SURFACES NOT IN CONTACT WITH FORMS IN ACCORDANCE WITH A23.1 / A23.2, BY
APPLICATION OF A CURING-SEALING COMPOUND CONFORMING TO ASTM C309 IMMEDIATELY AFTER Tf FACTORED TENSION IN kN
7. IF ONLY ONE VALUE IS GIVEN FOR A LOAD, CONSIDER IT LIVE LOAD. DISAPPEARANCE OF SURFACE WATER SHEEN. ENSURE CURING-SEALING COMPOUND IS COMPATIBLE WITH
APPLIED FINISHES.
8. FOR CONNECTION LOADS, “+” SIGN INDICATES TENSION AND “-“ SIGN INDICATES COMPRESSION, EXCEPT FOR
COLUMN LOADS WHERE “+” SIGN INDICATES COMPRESSION AND “-“ SIGN INDICATES TENSION. 16. ENSURE THAT SLEEVES AND OPENINGS DO NOT IMPAIR THE REQUIRED STRENGTH OF THE MEMBER, AND
UNLESS SHOWN ON THE STRUCTURAL DRAWINGS, ARE ACCEPTED BY THE CONSULTANT FOR SIZE, LOCATION, DRAWING ABBREVIATIONS TG-ABBR-01
AND REINFORCEMENT BEFORE CONCRETE IS CAST. NO TRADE SHALL CUT HOLES THROUGH EXISTING
CONCRETE UNLESS ACCEPTABLE TO THE CONSULTANT.
SHOP DRAWINGS
ABUT ABUTMENT DP DEEP ℓd TENSION DEVELOPMENT LENGTH OF REBAR SPEC SPECIFICATIONS
1. SUBMIT 4 HARD COPIES OR PDF'S OF SHOP DRAWINGS FOR REVIEW BEFORE START OF WORK. PACKAGES TO CONCRETE REINFORCEMENT ACA ADHESIVE CONCRETE ANCHORS DWG DRAWING ℓdc COMPRESSION DEVELOPMENT LENGTH OF REBAR SPF SPRUCE PINE FIR
BE SUBMITTED ARE NOTED IN THE RELEVANT SECTIONS BELOW. ADD’L ADDITIONAL DWL DOWEL ℓdh TENSION EMBEDMENT LENGTH WITH STANDARD HOOK SR STUD RAIL
1. CONFORM TO CSA A23.1 “CONCRETE MATERIALS AND METHODS OF CONCRETE CONSTRUCTION”. AEC ARCHITECTURALLY EXPOSED CONCRETE EA EACH LE LEFT END SS STAINLESS STEEL
2. ALL SHOP DRAWINGS ARE TO BE REVIEWED AND STAMPED BY THE CONTRACTOR PRIOR TO DISTRIBUTION TO
AESS ARCHITECTURALLY EXPOSED STRUCTURAL STEEL ECR EPOXY COATED REINFORCEMENT LG LONG ST STRAIGHT
CONSULTANTS. 2. REINFORCEMENT - DEFORMED BAR REINFORCEMENT CONFORMING TO CSA G30.18 GRADE 400R. USE 400W
AIFB ASPHALT IMPREGNATED FIBERBOARD EBF ECCENTRICALLY BRACED FRAME LL LOWER LEVEL STD STANDARD
ONLY WHERE NOTED ON DRAWINGS. STE SHEAR TRANSFER ELEMENTS
3. REVIEW OF SHOP DRAWINGS BY WSP-S IS ON A SAMPLING BASIS, FOR GENERAL CONFORMITY WITH ALT ALTERNATE EE EACH END LLH LONG LEG HORIZONTAL
STRUCTURAL CONTRACT DOCUMENTS. IT IS NOT A DETAILED CHECK AND MUST NOT BE CONSTRUED AS 3. WELDED WIRE FABRIC - CONFORM TO ASTM A1064/A1064M, YIELD STRENGTH 450 MPa, SUPPLIED IN FLAT AMA ADHESIVE MASONRY ANCHORS EF EACH FACE LLV LONG LEG VERTICAL STG STAGGERED
RELIEVING THE CONTRACTOR OF THE CONTRACTOR'S RESPONSIBILITY TO MAKE THE WORK ACCURATE AND IN SHEETS ONLY. ARCH ARCHITECTURAL EJ, EXP JT EXPANSION JOINT LONG LONGITUDINAL STIR STIRRUP
CONFORMITY WITH ALL THE CONTRACT DOCUMENTS, TO REVIEW SHOP DRAWINGS AND TO COORDINATE WORK A-ROD ANCHOR ROD ELECT ELECTRICAL LSH LONG SIDE HORIZONTAL STIFF STIFFENER
OF INTERFACING TRADES AND MANUFACTURE OF INTERFACING PRODUCTS. 4. ALL REINFORCING BAR SIZES ARE METRIC; “M” IS NOT NECESSARILY MARKED AFTER A BAR SIZE. FOR EXAMPLE, ASPH ASPHALT EL ELEVATION LP LOW POINT STL STEEL
10-15B NOTED ON PLAN INDICATES 10 BARS OF 15M DIAMETER, PLACED AT BOTTOM. AVG AVERAGE ELEV ELEVATOR LWT LIGHT WEIGHT STR SEISMIC STRAP
4. REVIEW OF SHOP DRAWINGS DOES NOT IMPLY ANY CHANGE IN ANY OTHER CONSULTANTS' OR PROFESSIONALS' B, BOT BOTTOM EMBED EMBEDMENT MAX MAXIMUM STRUCT STRUCTURAL 1200, 10909 JASPER AVENUE NW
RESPONSIBILITIES RELATED TO DESIGN OF SPECIFIC ITEMS AS OUTLINED BY THESE DRAWINGS. 5. SUBMIT SHOP DRAWINGS FOR REINFORCEMENT DETAILED IN ACCORDANCE WITH THE RSIC MANUAL OF SWT SELF WEIGHT
BOF BOTTOM OF FOOTING ENG ENGINEER MC MOMENT CONNECTION ( ) EDMONTON (ALBERTA) CANADA T5J 3L9
STANDARD PRACTICE. SUBMIT PLANS AND DETAILS NECESSARY TO FABRICATE, PLACE, AND REVIEW SYMM SYMMETRICAL TEL.: 780-410-6740 | FAX: 780-449-4050 | WSP.COM
5. ALLOW A MINIMUM OF 10 WORKING DAYS FOR REVIEW OF EACH SUBMISSION OF SHOP DRAWINGS IN THE BOP BOTTOM OF PILE EOD EDGE OF DECK MECH MECHANICAL
REINFORCEMENT. t THICKNESS WSP Project # 211-02280-00
STRUCTURAL CONSULTANT'S OFFICE. ALLOW MORE TIME WHEN LARGE QUANTITIES OF SHOP DRAWINGS ARE BCE BOTTOM CHORD EXTENSION EOS EDGE OF SLAB MEZZ MEZZANINE
6. ALL REBAR HOOKS TO BE STANDARD LENGTH 90° OR 180° HOOKS. REBAR LENGTHS LISTED ON DRAWINGS DO BCP BORED CONCRETE PILE ES EACH SIDE MF MOMENT FRAME TB TRANSFER BEAM
SUBMITTED. SUBMIT IN GENERAL CONFORMITY WITH THE SEQUENCE OF CONSTRUCTION INTENDED.
NOT INCLUDE THE HOOK LENGTH. BEW BOTTOM EACH WAY EQ EQUAL MIN MINIMUM TBB TOP BASIC BARS
6. AFTER REVIEW, SHOP DRAWINGS WILL BE STAMPED AND RETURNED. DO NOT COMMENCE FABRICATION UNTIL BLL BOTTOM LOWER LAYER EW EACH WAY MISC MISCELLANEOUS T TOP
RETURNED SHOP DRAWINGS HAVE BEEN EXAMINED. 7. FIELD BENDING OF BARS IS NOT PERMITTED UNLESS INDICATED OR APPROVED BY WSP-S. APPROVED FIELD BP BASE PLATE EX, EXIST EXISTING MJ MOVEMENT JOINT TDL TENSION DEVELOPMENT LENGTH
BENDING TO BE DONE WITHOUT THE USE OF HEAT, THROUGH APPLICATION OF SLOW AND STEADY PRESSURE. BRG BEARING EXT EXTERIOR ML MIDDLE LAYER TEW TOP EACH WAY
7. SHOP DRAWINGS MARKED “REVIEWED” CAN BE USED FOR FABRICATION. REPLACE BARS WITH CRACKS OR SPLITS. BRP BEARING PLATE FC FUTURE COLUMN NF NEAR FACE T&G TONGUE AND GROOVE
8. SHOP DRAWINGS MARKED “REVIEWED AS NOTED” CAN BE USED FOR FABRICATION AFTER THE REVISIONS BSMT BASEMENT FD FLOOR DRAIN NIC NOT IN CONTRACT TJ TIE JOIST
8. ALL REINFORCING TO BE CLEAN, FREE OF LOOSE SCALE, OIL, DIRT, RUST, AND ANY OTHER FOREIGN COATING
NOTED ARE IMPLEMENTED. BUL BOTTOM UPPER LAYER FF FAR FACE NOM NOMINAL TLL TOP LOWER LAYER
THAT AFFECT BONDING CAPACITY.
BUP BOTTOM OF UNDERPINNING FIN FINISHED NTS NOT TO SCALE T/O TOP OF
9. SHOP DRAWINGS MARKED “REVISE AND RESUBMIT” REQUIRE SUBSTANTIAL REVISIONS AND MUST BE 9. FOR CLASS N CONCRETE, MINIMUM CONCRETE COVER TO REINFORCING BARS CLOSEST TO THE CONCRETE C CAMBER FL FLOOR O/C ON CENTER TOB TOP OF (GRADE) BEAM
RESUBMITTED FOR ADDITIONAL REVIEW PRIOR TO FABRICATION. SURFACE TO BE 40 (1½”) FOR BEAMS AND COLUMNS AND 25 (1”) FOR SLABS AND WALLS. CA COLUMN ABOVE ONLY (NO COLUMN BELOW) FMC FULL MOMENT CONNECTION (FOR FULL MOMENT CAPACITY) OD OUTSIDE DIAMETER TOC TOP OF CONCRETE
CANT CANTILEVER FND FOUNDATION OF OUTSIDE FACE TOF TOP OF FOOTING TRUE NORTH (SITE VERIFY) PLAN NORTH
10. SHOP DRAWINGS MARKED “REVIEWED FOR IMPACT ON BASE STRUCTURE ONLY” SHOW WORKS WHICH ARE NOT 10. ENSURE COVER TO REINFORCEMENT IS MAINTAINED DURING CONCRETE POUR. TOS TOP OF STEEL
CAT CATEGORY (FOR AESS) FTG FOOTING OPP OPPOSITE
WITHIN THE SCOPE OF STRUCTURAL CONSULTING SERVICES BUT AFFECT BEHAVIOUR OF THE BASE TOP TOP OF PILE
CB COLUMN BELOW ONLY (NO COLUMN ABOVE) GA GAUGE OWSJ OPEN WEB STEEL JOIST
STRUCTURE. WSP-S WILL NOT REVIEW THESE WORKS AND ASSUMES THAT THE INDICATED WEIGHTS AND ALL TOW TOP OF WALL
CDL COMPRESSION DEVELOPMENT LENGTH GALV GALVANIZED PAF POWDER ACTUATED FASTENERS
OTHER LOADS IMPOSED ON THE BASE STRUCTURE ARE CORRECTLY IDENTIFIED BY THE DESIGNER / SUPPLIER CONCRETE FINISHING CEL CUT OFF ELEVATION FOR PILES GB GRADE BEAM PC PILE CAP TPC TOP OF PILE CAP
OF THESE ELEMENTS. TRANS TRANSVERSE
CIP CAST-IN PLACE GEN GENERAL PL PLATE
1. EXPOSED CONCRETE TO MATCH APPEARANCE OF NEARBY EXISTING EXPOSED ARCHITECTURAL CONCRETE. CJ CONTROL JOINT GL GRIDLINE PROJ PROJECT, PROJECTION TSA TENSION SPLICE “A”
11. DRAWINGS MARKED “NOT REVIEWED” SHOW WORKS WHICH ARE NOT WITHIN THE SCOPE OF STRUCTURAL
CONSULTING SERVICES. CLR CLEAR GRD GROUND PS PIPE SUPPORT TSB TENSION SPLICE “B”
TUL TOP UPPER LAYER
POST-INSTALLED ANCHORS AND DOWELS CL
CMU
CENTRELINE
CONCRETE MASONRY UNITS
h
hd
TOTAL THICKNESS, SLAB THICKNESS AWAY FROM DROP PANEL
SLAB OVERALL THICKNESS AT DROP PANEL
PT
PTL
POST TENSIONED
PRESSURE TREATED LUMBER TYP TYPICAL
FIELD REVIEW 1. WHERE DRILLED CONCRETE ANCHORS (DCA) ARE NOTED ON DRAWINGS, PROVIDE HILTI KWIK BOLT - TZ
CNT STEEL DECK CORE NOMINAL THICKNESS H, HORIZ HORIZONTAL R RADIUS U-BAR “U” SHAPED BAR
COMP COMPOSITE (H) HIGH BEAM RA ROOF ANCHOR UDB UNIFORMLY DISTRIBUTED BARS
1. STRUCTURAL CONSULTANT WILL PROVIDE PERIODIC FIELD REVIEW OF A REPRESENTATIVE SAMPLE OF THE EXPANSION ANCHORS. EFFECTIVE EMBEDMENT LENGTHS AS FOLLOWS: COL COLUMN HC HOLLOWCORE RD ROOF DRAIN U/F UNDERSIDE OF FOOTING
STRUCTURAL WORKS DETAILED ON THESE DRAWINGS FOR GENERAL CONFORMANCE WITH CONTRACT 9.5 (3/8”) DIAMETER - 51 (2-0”) EMBEDMENT CONC CONCRETE HD HOLD DOWN RE RIGHT END UL UPPER LEVEL
DOCUMENTS. THESE REVIEWS DO NOT REPLACE THE CONTRACTOR'S RESPONSIBILITY TO IMPLEMENT AND CONT CONTINUOUS HDG HOT DIPPED GALVANIZED REINF REINFORCEMENT ULS ULTIMATE LIMIT STATE
2. WHERE ADHESIVE CONCRETE ANCHORS (ACA) ARE NOTED ON DRAWINGS, PROVIDE HILTI HIT-HY200 ADHESIVE
MAINTAIN A QUALITY CONTROL PROGRAM, AND DO NOT MAKE WSP-S. A GUARANTOR OF THE CONTRACTOR'S CONT’D CONTINUED HEF HORIZONTAL EACH FACE REM REMAINDER U/S UNDERSIDE
ANCHORING SYSTEM WITH HILTI HIT-Z ANCHOR RODS. EFFECTIVE EMBEDMENT LENGTHS AS FOLLOWS:
WORK. CONST.J. CONSTRUCTION JOINT HIF HORIZONTAL INSIDE FACE REQ’D REQUIRED U/N, UNO UNLESS NOTED OTHERWISE
12 (1/2”) DIAMETER - 114 (4-1/2”) EMBEDMENT
CP CONNECTION PLATE HH HOOK EACH END REV REVISION UPT UPTURNED
2. ASSIST THE CONSULTANTS DOING FIELD REVIEW, AND PROVIDE SAFE ACCESS TO WORK AREAS AS REQUIRED. CPL CAP PLATE HIC HORIZONTAL IN CENTRE RF RIGID FRAME V, VERT VERTICAL, VERTICALS Building ID PCRVAB01
3. WHERE REBAR DOWEL ANCHORS (RDA) ARE NOTED ON DRAWINGS, PROVIDE HILTI HIT-RE 500 V3 ADHESIVE
ANCHORING SYSTEM INSTALLED USING HILTI SAFESET HOLLOW DRILL BIT TECHNOLOGY. SEE DRAWINGS FOR CS COMPRESSION LAP SPLICE HOF HORIZONTAL OUTSIDE FACE RL REFERENCE LINE VB VERTICAL BRACING
3. CHECK THE WORK PRIOR TO FIELD REVIEW TO CONFIRM IT IS COMPLETED AND IN ACCORDANCE WITH
EMBEDMENT LENGTHS. COV CLEAR COVER HP HIGH POINT RSS RETAINED SOIL SYSTEM VEF VERTICAL EACH FACE ADDRESS:
CONTRACT DOCUMENTS.
C/W COMPLETE WITH, CONNECT WITH HSC HORIZONTAL SLOTTED CONNECTION RTU ROOF TOP UNIT VIF VERTICAL INSIDE FACE
4. NOTIFY THE CONSULTANT 48 HOURS PRIOR TO CONCRETE POURS, BACKFILLING, AND COVERING UP THE 4. CONCRETE TO BE MINIMUM 28 DAYS OLD AT THE TIME OF ANCHOR INSTALLATION. CWS (SEE GENERAL NOTES) IBI INTEGRITY BARS INTERIOR RET. WALL RETAINING WALL VIC VERTICAL IN CENTRE Peace River Toll
STRUCTURE WITH FINISHES. CLS (SEE GENERAL NOTES) IBE INTEGRITY BARS EXTERIOR R/W REINFORCE WITH VOF VERTICAL OUTSIDE FACE 10010 - 100 AVE
5. USE DRILLING AND INSTALLATION TOOLS AND PROCEDURES PER MANUFACTURERS' RECOMMENDATIONS. VSC VERTICALLY SLOTTED CONNECTION
DCA DRILLED CONCRETE ANCHOR, SEE GENERAL NOTES IBA INTEGRITY BARS ADDED r.w. REQUIRED WITH
6. DO NOT CUT REINFORCEMENT TO ACCOMMODATE DRILLED ANCHORS AND DOWELS. DEMO DEMOLITION IBB INTEGRITY BOTTOM BARS (THROUGHOUT) SDF STEP DOWN FOOTING (IN DIRECTION OF ARROW) WB WALL BELOW Peace River, AB
EXISTING STRUCTURE DET DETAIL ID INSIDE DIAMETER SEC SECTION WC WIND COLUMN BOILER REPLACEMENT
7. A WHEN OBSTRUCTIONS PREVENT DRILLING HOLES IN SPECIFIED LOCATIONS TO THE REQUIRED DEPTH, D.FIR-L DOUGLAS FIR-LARCH INT INTERIOR SIM SIMILAR w/o WITHOUT
1. EXISTING STRUCTURAL INFORMATION IS BASED UPON DRAWINGS PREPARED BY B W BROOKER ENGINEERING RELOCATE AT NO EXTRA COST TO THE CONTRACT. OBTAIN WSP-S APPROVAL OF NEW LOCATIONS BEFORE DIA, Ø DIAMETER IF INSIDE FACE SJ STEEL JOIST WP WORK POINT Drawing Title:
LTD. , DATED NOVEMBER 5, 1964. DRILLING HOLES. FILL ALL ABANDONED HOLES WITH MIN. 30MPa GROUT. DO NOT TIGHTEN ANCHORS UNTIL DIV DIVIDER BEAM JG JOIST GIRDER SL SLAB, SHELF ANGLE WSP-S WSP STRUCTURAL
GROUT IN ADJACENT ABANDONED HOLES REACHES 75% fc'. DMA DRILLED MASONRY ANCHOR, SEE GENERAL NOTES KB KNEE BRACING SLBB SHORT LEG BACK TO BACK WWF WELDED WIRE FABRIC
2. EXISTING CONDITIONS ARE ASSUMED. SURVEY THE EXISTING STRUCTURE AFTER REMOVING FINISHES AND DN DOWN (L) LOW BEAM SLS SERVICEABILITY LIMIT STATE ZRP ZINC RICH PAINT GENERAL NOTES
REPORT ANY VARIATIONS TO THE STRUCTURAL CONSULTANT BEFORE PROCEEDING WITH THE WORK. DNW DOUBLE NUT AND WASHER 2-L BACK TO BACK ANGLES SOG SLAB-ON-GRADE ‫ץ‬c CONCRETE DENSITY
3. TAKE ALL PRECAUTIONS NECESSARY TO PROTECT THE EXISTING STRUCTURE DURING CONSTRUCTION.
DEC 2017

Scale Last Modified Date:


NTS 2021-04-29

Modified By:
RDP
Approved By:
EML
Checked By:
S1
STT
Revisions, Issues

1 1a 2a 2 3 4 4a 5
1a

W150x22 WELDED TOGETHER TYP


C/W PL 1/8" (3) TOP PLATE PLUG
WELDED TO STEEL BEAMS TYP

10" 2'-0"

EQ
3

CL FRAMING
S2

20'-0"
4'-5 5/8"

2'-0"

2'-3"
A1
EQ

EXISTING TRUSS

EXISTING TRUSS

EXISTING TRUSS

19'-2"
2 2021-04-29 ISSUED FOR CONSTRUCTION
2 PRE DRILLED HOLES
1 2021-04-29 ISSUED FOR REVIEW
ON TOP FLANGE
S2 EXISTING MASONRY WALL

EXISTING
FACP
C
NOTE:
BOLT HOLES TO BE COORDINATED
WITH BOILER SUPPLIER
EXISTING PUMPS &
PAD TO REMAIN 3'-9 3/4" 2.67kN
ENLARGED FRAMING PLAN

EXISTING TRUSS
1a

19'-2"
4'-0"
FD

EXIST C15x50
S2 1" = 1'-0"
2.55kN

4'-9"
EXISTING EXISTING
24" JOISTS 24" JOISTS
10.2kN
D
1.34kN 3.07kN

EXIST C15x50
NEW 3"(76) HOUSEKEEPING
EXISTING TANKS AND
PAD. SEE TC-MISC-01 11.05kN
2'-3" PAD TO REMAIN

14'-9"
FD
3

20'-0"
S2 EXISTING TRUSS
TYP 1/4" 12"
CONNECTION OF BOILER TO NEW 3"(76)HOUSEKEEPING
PAD. SEE TC-MISC-01 2.44kN
SKID BY BOILER SUPPLIER
TYP 10.2kN
1/4"
STEEL BEAM, SEE PLAN
7'-3"

12Ø ACA @ 400 E E


1a 2 EXIST W16x31
4'-0"
S2 MIN
S2

MAIN FLOOR NOTE

16'-0"
CONTRACTOR TO CONDUCT GPR
SCAN OF MASONRY WALL AND SEND
RESULTS TO WSP FOR REVIEW AND 1200, 10909 JASPER AVENUE NW
APPROVAL PRIOR TO REMOVING WALL EDMONTON (ALBERTA) CANADA T5J 3L9
FOR NEW DOUBLE DOORS ON GL-2 TEL.: 780-410-6740 | FAX: 780-449-4050 | WSP.COM
WSP Project # 211-02280-00
EXISTING JOIST F

2
S2
1 1/2" = 1'-0"
1 PARTIAL MAIN FLOOR FRAMING PLAN
TRUE NORTH (SITE VERIFY) PLAN NORTH
S2 1/8" = 1'-0"

MAIN FLOOR FRAMING PLAN NOTES


1. SEE GENERAL NOTES ON S1 AND TYPICAL DETAILS ON S2.
HOUSEKEEPING PADS / BUILT UP SLABS TC-MISC-01
(MODIFIED) 2. MAIN FLOOR DATUM ELEVATION IS 0.00.
2 10M@400(16") TOP EACH WAY MECHANICAL / ELECTRICAL UNIT
3. UNLESS NOTED OTHERWISE ON PLAN, DESIGN LOADS ARE:
S2 (WHERE APPLICABLE) LIVE LOAD (LL) = 7.2 kN/m²
SLAB ON GRADE SUPERIMPOSED DEAD LOAD (SDL) = 0.5 kN/m²
OR FRAMED SLAB HOUSEKEEPING PAD IS INCLUDED IN THE LL
1a MIN 150 (6") ALL AROUND 1-10M CONT
4. ALL HOUSEKEEPING PADS TO BE 3” THICK. REFER TC-MISC-01 FOR DETAILS UNO.
ALL AROUND
2 -' 71 /2"

COORDINATE WITH M&E AND


4'-5 5/8" SEISMIC RESTRAINT SUPPLIER 5. SCAN EXISTING SLAB BEFORE DOWELING REBAR.

(76)
1362 3" 1 -'1 51 8"/
TOP OF SLAB

Building ID PCRVAB01
ROUGHEN SURFACE TO ADDRESS:
100 SLAB ON GRADE OR
5 (3/16") AMPLITUDE
Peace River Toll
1 -' 61 /4"

FRAMED SLAB
10M@16"x 5" LG EMBED 2 1/2”
INTO EXISTING CONCRETE 10010 - 100 AVE
(AROUND PERIMETER) Peace River, AB
BOILER REPLACEMENT
MAIN FLOOR
Drawing Title:
NOTES:
AUGUST 2017

1. CONCRETE SHALL HAVE 25 MPa. MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS. MAIN FLOOR MECHANICAL
ROOM BOILER LAYOUT
Scale Last Modified Date:
As indicated 2021-04-29

Modified By:
RDP
3
S2
1 1/2" = 1'-0"
Approved By:
EML
Checked By:
S2
STT