Professional Documents
Culture Documents
J. Johnny Rocha E.
Medellin, Nov 9, 2011
La Estrategia de Energía Limpia Alstom
Generación de Energía
Emisiones de CO2
Portafolio
equilibrado
Eficiencia
& Flexibilidad
Captura
CO2
2035 Estabilizar
2005 emisiones
BAU
5 Éxitos contemporáneos
6 Referencias
Soluciones sostenibles para proyectos hidráulicos - 09 Nov 2011 - P 3
© ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
… traemos la energía de los ríos hasta sur puerta!
1891 Lauffen - Frankfurt – 175 km de transmisión en alta tensión
2 x 210 kW (300 hp) – 150 rpm – 40 Hz
El 1er sistema trifásico
5 Éxitos contemporáneos
6 Referencias
Soluciones sostenibles para proyectos hidráulicos - 09 Nov 2011 - P 10
© ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
Hydro
Coal Wind
9,9% 0,1%
Gas Hydro
23,4% 66.6%
El Quimbo – 2x203 MW
EMGESA / ENDESA
1000
PT
100
KAPLAN
10
PELTON
BULB FRANCIS
Pelton
Francis
Kaplan
Bulbo
5 Éxitos contemporáneos
6 Referencias
Soluciones sostenibles para proyectos hidráulicos - 09 Nov 2011 - P 18
© ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
La rutina Hydro PlantLife™
mantenimiento
Renovación
Reparación
Fin de la garantía
Tiempo
5 Éxitos contemporáneos
6 Referencias
Soluciones sostenibles para proyectos hidráulicos - 09 Nov 2011 - P 21
© ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
Componentes lubricados sin aceite
Protegen el medio ambiente y reducen el impacto ambiental
Evitan riesgos de polución accidental debido a fugas de aceite.
- Cojinetes lubricados con agua
- Cojinetes de empuje lubricados con agua
- Turbina Kaplan accionado con agua
- Camisas auto-lubricadas
Cota mínima
Energía transferida Cota mínima
Turbinar
(Generación)
Servicios Ancilares:
- Regulación de voltaje y frecuencia
- Reserva de capacidad (girante o en reposo) Represa inferior
Central subterránea
- Modo de operación como Condensador Sincrónico
- Partida auto-asistida
5 Éxitos contemporáneos
6 Referencias
Soluciones sostenibles para proyectos hidráulicos - 09 Nov 2011 - P 27
© ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
Éxitos contemporáneos
2011 - Central Hidroeléctrica Paute Mazar – Ecuador
2 x 100 MVA 13,8 kV 257,14 rpm 60 Hz
• Rendimiento nominal
Garantizado: 98,71%
Medido: 98,78%
225/245 MVA
13800 V
0.9 factor de potencia
60 Hz
163,63 180/330 rpm
18400 tm2
5 Éxitos contemporáneos
6 Referencias
Soluciones sostenibles para proyectos hidráulicos - 09 Nov 2011 - P 32
© ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
Proyectos hidroeléctricos en construcción
Turkey Vietnam
Deriner 4x186 MW Son La 6x400 MW
Iran
Karun 4x250 MW
Brazil
Santo Antonio 19x75 MW India
Jirau 10x75 MW Lower Jurala 6x40 MW
Foz Do Chapeco 4x217 MW Subansiri 8x282 MW
Estreito 4x140 MW South Africa
Gariep 4x90 MW
Venezuela
La Vueltosa 2x257 MW Mozambique
Cahora Bassa 3x415 MW
Colombia
El Quimbo 2x203 MW Uganda
Buiagali 5x51 MW
Soluciones sostenibles para proyectos hidráulicos - 09 Nov 2011 - P 33
© ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
Nuestras referencias en plantas
hidroeléctricas
China
Three Gorges 14x700 MW
Canada Switzerland
Jin Ping 6x110 MW
La Grande 33 units Linthal 4x250 MW
Ludila 6x360 MW
8654 MW
Turkey Ahai 5x400 MW
USA Rirecik 6x112 MW Li Yuan 4x600 MW
Rocky Reach 7x120 MW
India Korea
Chief Joseph 2458 MW
Koyna II 4x250 MW Yangyang 4x250 MW
Mexico Teesta IV 4x125 MW
Malaysia
Chicoasen 3x318 MW
Bakun 4x315 MW