Professional Documents
Culture Documents
PLANT TN PN
TRUE NORTH
0
NORTH
22.96118 23980 4995 9580 4950 11995
1920
DOMINANT WIND
270 90
A ML DWG NO. MS-DD-4820-ICS-DWG-0320 ML DWG NO. MS-DD-4820-ICS-DWG-0321 A
SECONDARY
WIND
CL 15m ROAD
180 PN 370.000
PN 370.000 P.E 866.500
P.E 811.000
9000
850
2
KEY PLAN
275 300 275 NOTES:
WALK WAY
B 1. ALL DIMENSIONS ARE IN MILLIMETERS, UNLESS OTHERWISE MENTIONED. B
650
10670
(FO) 175 175 ALL LEVELS AND COORDINATES ARE IN METERS.
(P) (S) 2. CABLE TRAY INSTALLATION IS SUBJECT TO SITE ADJUSTMENT, IF NECESSARY.
150 150
3. CABLE TRAY SHALL BE MOUNTED AT EVERY SUPPORT POINT WITH PROPER CLAMP.
CABLE TRAY DESIGN
BY OTHERS 4. TRAY FITTING USED WHERE CHANGE DIRECTION OR LEVEL FOR ELBOW, TEE AND CROSS
B
_ (FO) SHALL BE FIXED WITH CLAMP AT BOTH ENDS TO KEEP DIMENSIONS GIVEN ON THE DRAWING.
(P)
100
(S) 5. EXPANSION SPLICE SHALL BE PROVIDED AT EVERY 40m WITH 21mm GAP BETWEEN TRAYS.
6. DIMENSION SHOWN IN THE DRAWING FOR CONNECTIONS BETWEEN STRAIGHT
AND BEND/TEE FITTINGS SHALL CONSIDER ADDITIONAL 50mm TO STRAIGHT
4813-CTT-0002
4015
SECTION "S05" - "S05" & "S08" - "S08" SECTION "S07" - "S07" SECTION. SEE FIGURE BELOW.
SCALE : 1:10 SCALE : 1:10 1450 + 50
TRAY FITTING 1450 TRAY FITTING
WALK WAY
CL 8m ROAD
16305
"S07" "S07"
4813-CVR-0011 1 L30-4810-GJ-521-D - P,S,FO 7. WHERE TRAY FITTINGS CONSECUTIVELY USED, SPECIAL EXTENSION
SPLICE PLATE SHALL BE USED TO FILL-IN THE 100mm GAP BETWEEN FITTINGS.
100
TRAY FITTING
D D
SPECIAL EXTENSION
CANOPY ABOVE
4015
SPLICE PLATE
8400Wx2000D
SLOPE 4813-CTT-0001 1400 8. CABLE TRAY CLAMP SHALL BE USED FOR TRAY FIXING WITH GUIDE OTHER
46250.00 1000
2990
THAN THE ITEMS SPECIFIED IN NOTE 4.
9. CABLE TRAY CLAMP FOR VERTICAL RUN SHALL BE SIDE RAIL HOLD DOWN CLAMP.
EFLEX FP150
300
865 EL+ 4.580 EL+ 4.633 10. CABLE TRAY SHALL BE SUPPORTED AT 6m FOR HORIZONTAL RUN AND
(FO / S) 3m FOR VERTICAL RUN, AS MAXIMUM, AND FOR EVERY BEND, TEE, CROSS,
TRENCH EFLEX REDUCER AND ADJUSTABLE WITH 0.6m WHEREVER CHANGE ON ROUTE OR ELEVATION.
DROP ZONE
4813-CVR-0101 STUB UP 11. FOR EVERY SPLICED POINT SUPPORT SHALL BE PERMITTED AS BELOW.
8000
(a) STANDARD SPLICE PLATE WITHIN 1.5m.
HOIST BEAM STUB UP (b) EXPANSION SPLICE WITHIN 1.5m.
(R=1.5m)
EFLEX FP150
(P) 6m
E E
1.5m (max) 1.5m (max)
1 L30-4810-GJ-521-D - P,S,FO
2
4000
WALK WAY
STRUCTURE CABLE TRAY
A
_
DETAIL B SECTION 12. THIS DRAWING SHOWS ONLY INSTRUMENT MAIN CABLE LADDER TRAY.
"S05" "S05" SCALE : 1:50 _
SCALE : 1:50 13. CABLE TRAY UNDER RIB AND PDP SHALL HAVE NO COVER, UNLESS
6000
CONCENTRATE OTHERWISE MENTIONED.
STOCK PILE 4813-CHU-0001 14. CABLE TRAY DIMENSION IS FROM CENTER OF COLUMN TO INNER SIDE OF TRAY.
(11,000 DRY-t) 4813-TRP-0001 300 300 300 300
4813-CVR-0001
F
6000 F
600(max)
0 2 4 6 8 10 20m
THIS DOCUMENT WAS PREPARED FOR THE EXCLUSIVE USE OF PT FREEPORT INDONESIA (PTFI) AND CHIYODA GROUP
PURSUANT TO THE ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT BETWEEN PTFI AND PT CHIYODA
MS PROJECT
INTERNATIONAL INDONESIA. THIS DOCUMENT IS THE PROPERTY OF PTFI, AND THIS DOCUMENT, DATA AND
INFORMATION MAY BE DISCLOSED TO THIRD PARTIES ONLY FOR THE MANYAR SMELTER PROJECT. CHIYODA GROUP TITLE
SHALL NOT BE LIABLE FOR USE OR RELIANCE ON THIS DRAWING BY ANY THIRD PARTY NOT UNDER THE DIRECTION OF
CHIYODA GROUP, UNLESS OTHERWISE AGREED IN WRITING.