You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12

PLANT TN PN
TRUE NORTH
0
NORTH
22.96118 23980 4995 9580 4950 11995

1920
DOMINANT WIND
270 90
A ML DWG NO. MS-DD-4820-ICS-DWG-0320 ML DWG NO. MS-DD-4820-ICS-DWG-0321 A
SECONDARY
WIND
CL 15m ROAD
180 PN 370.000
PN 370.000 P.E 866.500
P.E 811.000

9000
850
2

KEY PLAN
275 300 275 NOTES:
WALK WAY
B 1. ALL DIMENSIONS ARE IN MILLIMETERS, UNLESS OTHERWISE MENTIONED. B

650
10670
(FO) 175 175 ALL LEVELS AND COORDINATES ARE IN METERS.
(P) (S) 2. CABLE TRAY INSTALLATION IS SUBJECT TO SITE ADJUSTMENT, IF NECESSARY.
150 150
3. CABLE TRAY SHALL BE MOUNTED AT EVERY SUPPORT POINT WITH PROPER CLAMP.
CABLE TRAY DESIGN
BY OTHERS 4. TRAY FITTING USED WHERE CHANGE DIRECTION OR LEVEL FOR ELBOW, TEE AND CROSS
B
_ (FO) SHALL BE FIXED WITH CLAMP AT BOTH ENDS TO KEEP DIMENSIONS GIVEN ON THE DRAWING.
(P)

100
(S) 5. EXPANSION SPLICE SHALL BE PROVIDED AT EVERY 40m WITH 21mm GAP BETWEEN TRAYS.
6. DIMENSION SHOWN IN THE DRAWING FOR CONNECTIONS BETWEEN STRAIGHT
AND BEND/TEE FITTINGS SHALL CONSIDER ADDITIONAL 50mm TO STRAIGHT
4813-CTT-0002

4015
SECTION "S05" - "S05" & "S08" - "S08" SECTION "S07" - "S07" SECTION. SEE FIGURE BELOW.
SCALE : 1:10 SCALE : 1:10 1450 + 50
TRAY FITTING 1450 TRAY FITTING

BOT EL+13.856 BOT EL+13.856


A

ML DWG NO. MS-DD-4810-ICS-DWG-0305


_
C STRAIGHT STRAIGHT C

"S08" "S08" BOT EL+11.956

WALK WAY
CL 8m ROAD

16305
"S07" "S07"

DIMENSION SHOWN ACTUAL DIMENSIONS


2 IN THE DRAWING DURING INSTALLATION

4813-CVR-0011 1 L30-4810-GJ-521-D - P,S,FO 7. WHERE TRAY FITTINGS CONSECUTIVELY USED, SPECIAL EXTENSION
SPLICE PLATE SHALL BE USED TO FILL-IN THE 100mm GAP BETWEEN FITTINGS.
100
TRAY FITTING
D D
SPECIAL EXTENSION
CANOPY ABOVE

4015
SPLICE PLATE
8400Wx2000D

SLOPE 4813-CTT-0001 1400 8. CABLE TRAY CLAMP SHALL BE USED FOR TRAY FIXING WITH GUIDE OTHER
46250.00 1000

2990
THAN THE ITEMS SPECIFIED IN NOTE 4.
9. CABLE TRAY CLAMP FOR VERTICAL RUN SHALL BE SIDE RAIL HOLD DOWN CLAMP.
EFLEX FP150

300
865 EL+ 4.580 EL+ 4.633 10. CABLE TRAY SHALL BE SUPPORTED AT 6m FOR HORIZONTAL RUN AND
(FO / S) 3m FOR VERTICAL RUN, AS MAXIMUM, AND FOR EVERY BEND, TEE, CROSS,
TRENCH EFLEX REDUCER AND ADJUSTABLE WITH 0.6m WHEREVER CHANGE ON ROUTE OR ELEVATION.
DROP ZONE
4813-CVR-0101 STUB UP 11. FOR EVERY SPLICED POINT SUPPORT SHALL BE PERMITTED AS BELOW.

8000
(a) STANDARD SPLICE PLATE WITHIN 1.5m.
HOIST BEAM STUB UP (b) EXPANSION SPLICE WITHIN 1.5m.
(R=1.5m)
EFLEX FP150
(P) 6m
E E
1.5m (max) 1.5m (max)
1 L30-4810-GJ-521-D - P,S,FO
2

4000
WALK WAY
STRUCTURE CABLE TRAY
A
_
DETAIL B SECTION 12. THIS DRAWING SHOWS ONLY INSTRUMENT MAIN CABLE LADDER TRAY.
"S05" "S05" SCALE : 1:50 _
SCALE : 1:50 13. CABLE TRAY UNDER RIB AND PDP SHALL HAVE NO COVER, UNLESS

6000
CONCENTRATE OTHERWISE MENTIONED.
STOCK PILE 4813-CHU-0001 14. CABLE TRAY DIMENSION IS FROM CENTER OF COLUMN TO INNER SIDE OF TRAY.
(11,000 DRY-t) 4813-TRP-0001 300 300 300 300

4813-CVR-0001
F
6000 F

TOP VIEW SECTION VIEW


15. SPECIAL SUPPORT RECOMMENDATION.
ML DWG NO. MS-DD-4810-ICS-DWG-0303 600 (max)
SUPPORT
SUPPORT
STRUCTURE CABLE TRAY 600 (max)
9000 8000 6000 8000 6000 8000 10500 CABLE TRAY

600(max)

FOR CONSTRUCTION FOR HORIZONTAL ADJUSTABLE FOR OFFSET REDUCER

16. REFER TO TYPICAL INSTRUMENT INSTALLATION DETAIL FOR CABLING


(MS-DD-3000-ICS-STA-0051).
G G
CWA : 481A 17. REFER TO MS-DD-WEA03-ICS-DWG-0001-3 INSTRUMENT BULK MATERIAL (B-LINE CABLE TRAY).
18. REFER TO CIVIL DRAWING FOR THE DETAILS OF INSTRUMENT DUCT BANK AND TRENCH.

ALL RIGHTS RESERVED


PROJECT

0 2 4 6 8 10 20m
THIS DOCUMENT WAS PREPARED FOR THE EXCLUSIVE USE OF PT FREEPORT INDONESIA (PTFI) AND CHIYODA GROUP
PURSUANT TO THE ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT BETWEEN PTFI AND PT CHIYODA
MS PROJECT
INTERNATIONAL INDONESIA. THIS DOCUMENT IS THE PROPERTY OF PTFI, AND THIS DOCUMENT, DATA AND
INFORMATION MAY BE DISCLOSED TO THIRD PARTIES ONLY FOR THE MANYAR SMELTER PROJECT. CHIYODA GROUP TITLE
SHALL NOT BE LIABLE FOR USE OR RELIANCE ON THIS DRAWING BY ANY THIRD PARTY NOT UNDER THE DIRECTION OF
CHIYODA GROUP, UNLESS OTHERWISE AGREED IN WRITING.

SCALE 1:200 (METERS)


DRAWN CHECKED APPROVED DATE
INSTRUMENT MAIN CABLE WAY LAYOUT
FOR MATERIAL HANDLING
H H
2 S.AKIYAMA H.NOSHO T.TSUBOTA MAY 23, 2023 ISSUED FOR CONSTRUCTION MS-DD-PHB05-MAT-GA-2124 CONCENTRATE BEDDING RECLAIM CONVEYOR-1 GENERAL ASSEMBLY
S.AKIYAMA H.NOSHO T.TSUBOTA MAY 23, 2023
CONCENTRATING BEDDING (1)
1 S.AKIYAMA N.IWATA T.TSUBOTA MAY 12, 2023 ISSUED FOR CONSTRUCTION MS-DD-4810-ENG-PP-0005 AREA PLOT PLAN MATERIAL HANDLING CONCENTRATING BEDDING
T.KIZAWA N.IWATA T.TSUBOTA OCT. 07, 2022 ISSUED FOR CONSTRUCTION MS-DD-3000-ICS-DWG-0001 SYMBOLS & LEGENDS FOR INSTRUMENT CONSTRUCTION DRAWING JOB NO. SIZE SCALE
0
T.KIZAWA N.IWATA T.TSUBOTA MAR. 18, 2022 ISSUED FOR OWNER APPROVAL MS-DD-3000-ICS-DWG-0201 LAYOUT OF INSTRUMENT MAIN CABLE WAY (OVERALL) ANX17 A1 1:200
E
A T.KIZAWA N.IWATA T.TSUBOTA FEB. 11, 2022 ISSUED FOR INTERNAL REVIEW MS-DD-3000-ICS-STA-0155~0157 TYPICAL ARRANGEMENT OF LADDER TRAY VENDOR DRAWING NO. REV. DRAWING NO. REV.
NO. DRAWN CHECKED APPROVED DATE DESCRIPTION DWG NO. REFERENCE DRAWINGS - - MS-DD-4810-ICS-DWG-0302 2
1 2 3 4 5 8 9 10 11 12

You might also like