0% found this document useful (0 votes)
105 views31 pages

Design Bhadrwar

Check dam

Uploaded by

Amit Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
105 views31 pages

Design Bhadrwar

Check dam

Uploaded by

Amit Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
HIMACHAL PARDESH JAL SHAKTI VIBHAG PROVIDING IRRIGATION FACILITY UNDER HP SHIVA PROJECT FOR CHAUNTRA GOPALPUR AND DHARAMPUR BLOCK DISTT. MANDI (H.P) PACKAGE 7 RAIN WATER HARVESTING STRUCTURE AT BHADHARWAR_ [Link].L- R.G.I (JV) [Link] JALANDHAR PUNJAB NAGI & ASSOCIATES E- 215, Phase - 88, INDUSTRIAL AREA, MOHALI PH, 9814018332 nagi.associatese215@[Link] © scanned with OKEN Scanner br REPORT FOR CONSTRUCTION oF CHECK OAM / PAIN WATER HARVESTING StRUCTURE ADIARWAN ON SON KHAD, DISTT. MANDI (HP) The project si © Of propoved RW Raver ctu W/check Darn is a Her, Distt, Mandi ct py uated In Son kad near village Bhadharwar in The project comprives of construc Sater of Son khad for utilization of Uses Won of 25 mt high Rain Water Harvesting structure to tap stm "water supply, Wt irigation and industrial other mutipurpose cobbles, gravel, store rain water for odd dry seasons, The water harvesting structure will create a site seei economic development of the area, Catchment Area: Discharge The catchment receives main rainfall during $,W. monsoon ‘occasional rainfalls also received in the month of June. Lit December or January. The discharge of this site has been ca structure and reproduced in this design report also, Period of July to Sept. However, some le rainfall is also received in months of culated a§ 152 cumecs for design of the One no of sluices pipe of 0.3 m dia will be provided wi hich will help to wash out the collected sediments and improve the life of the structure. @ scanned with OKEN Scanner Location Secation of R.W.H.S : The i t location pi W.H.S : The immediate site of Dam has been resurveyed and contour levels noted. The jan and site layout of structure Dam has been given in the Drawing No- DM-1. height. The main hydraulic he corresponding subsequent sections. proval please. and structural stability The desi he design has been carried out for 2.5 m wate! pene analysis has been carried out and presented in tl jetailed design calculations and drawings are submitted for ap| Execute Engineer Jal Shakt{ Pivision Sarkaghat @ scanned with OKEN Scanner @ scanned with OKEN Scanner =r rere PrererTererTewTrewTre 4 Catchment Area of Bhadharwar on Budroli khad i roll The catchment area of Check Dam/R.W.H structure Bhadharwar on Bude Khad_ had been marked on G.T.$ sheets [Link] project iw structure Marked with help of G.P.S coordinates of the Check Dam/ R.W: Bhadharwar on Budroli are 31°41'21.462" N, 76°47'6.702” E. The catchment area of site has been marked on G.T.S sheets. i Ss The survey vertical grid of 4.6 km, for catchment area calculation purposes, ha been subdivided into 8 vertical sub division . Horizontal grid of 4 km has been sub divided into 8 subdivisions. Hence area of one subdivision = 0.575 x 0.5 = 0,288 [Link] Area Between Grid Lines no. of Rectangles for Bhadharwar on Budroli khd catchment of Bhadharwar on Budroli khad A-B 5-7 : 0.5 B-C 2-7 3.5 cD 1-10 2.2 6.2 Thus catchment area of Check Dam/R.W.H structure Bhadharwar on Budroli khad =6.2x 0.288 = 1.7856 Say 1.79 [Link] Catchment area of Check Dam/R.W.H structure Raserh - On Son khad = 27.75 [Link] Total catchment area = 1.79 + 27.75 = 29,54 say 29.5 [Link] ced & Vetted ‘ plies Associate Brotecenr @ scanned with OKEN Scanner ING STRUCTURES MYDROULIC DESIGN OF RAIN WATER MARVES Sr. No. Particulars 1. Catchment area (Sq. Kim.) eee Referring to flood estimation report for western Himalayas Zone 7 Wssued by CN.C. teswarch deware and standards organization Indian Metrological Deptt. and inin of surface transportation’ for Catchment areas less than [Link], the method given in the report no. R.0.F ~ 16 ublished tf R.D.S.0 may be used. As per Railways publication, Flood estimation method 2.1.3. (c) 4 hour rainfall init duration can be taken as 0.65 of 24 hour rainfall value, or 0.1625 for hourly for thi 24 hr. rainfall intensity can be taken 280mm. Hence | = 0.1625 x 280 = 45.5mm As the catchment area is very less let us consider a run off coff. of 0.4 Q=0.278 C1 A =0.278 x 0.40 x 45.5 x 29.5 = 149.25 cumecs The maximum flood discharge Q from a catchment area A is given by the formulae O=f(A) While there are a vast number of formulae of this kind proposed for various part of the world, only a few popular formula used in various part of India are given below. © Dickens Formula * Ryves Formula Dickens formula is the most suitable for the region considered. Qe =CyA2* = 12 (29.5) ** = 151.89 cumes =152 cumes Where Q = maximum flood discharge (? Is) A =catchment area (km? ) Cd = Dickens constant with value between 11 to 14 Ryves Formula Qe = Cn A2? = 10.2 x 29.57? =97.16 cumes Cp= 10.2 @ scanned with OKEN Scanner 186%2 wsty = (OL +£t="H “vas/w or, = yreosdde yo Ayaan mold “mOjaQ SE Payejnr]e> si BBeyIs1p Aemypds ayy ‘18212 Aemijids 43A0 MOY Jo W LT Jo Uap y “EID WED 40 did azinys sapun pasodosd yy w 97°T Jo said auo yum urea W T's 40 sueds Z apyrosd sn 397 “soewno 754 40 aBseypsip ubisap -sX9¢ 40) peubisep eq 0} sey Aemiids ayy sousy 20/0 872} UED MOY JO Buipeauds ou os sysojIIy O”y UseMjeq PeUYUDD SI jeUUEYD e4y Sy- -aBseYosip AemydS WWEXT wgsisl6= 20L+11+57+ 0696 = TL Puvew sin 186xz wgsoele = BOL + Lt + 8296 = jeuueUD soed ERIS L WS'OL6 = LL +8296 = IeuUeUD s08s fle UTS 4 wet = peouay SoBWUND 7S, 152 cumecs Stilling Basin H = 4.25 mor all average operating conditions. The velocity of flow at bucket is given by V. T. Chow formula = Vr = ig +Ha-V) = Vax98125 + 425+02-17) q = 152. = 11.82 m°/s/m 2. D, =(q/g) = (11.827/9.81)? = 2.42m H, = 975.755 -973.055 = 2.7m = 22 = lim 2.42 From Fig 7 of | S 4997 Dy = 050m. O D;= 0.50 x 2.42 = 1.21m = 10.15 misec. @ scanned with OKEN Scanner e + Via eT Oa 4 Ad Vea) Lai 2 Aateom 4 42am Froude number — Fr Y © 1016 = 295 Jab, JoBixiar Cistern level = 668.8 + 17-4.28 % 0.85 © 966.86 (As per clause [Link] cistern level may be raised by 15% of D2) Length of the stiling basin as per 1S 4997 for Fr = 2.96 (stiling basin of type | is to be provided.) Wd, = 3.6 for F=2.95 L, = 36%428 = 154m. Basin Appurtenances for type | stilling basin 1. Chute blocks: -Height = 2D, =2 x 1.21 m =2.42 m Provided 1.0 mto match cistern depth 2. Width D, = 1.21 Provided 0.7 m 3 Spacing D, =0.8 Provided 0.7 m wou 4. Basin blocks :- as the velocity is less than 15 m /sec, hence basin blocks will be provided. For Fr =2.95 he =1.25,h, = 1.25% 1.21 = 1.51 msay 1.50m D; 5. width of blocks = h,= 1.50 m Provided 0.7 m to have better dissipation of energy. Distance from chute block = 0.8D; = 0.8 x 4.28 = 3.42 m, provided 5.0 m 6. End sil :- Height ofthe sill shall be kept in slope of 2:1 degree to meet again to the bed level, generally height is = 0.2 d, = 0.2 x 4.28 = 0.856 m provided 0.75 m Spacing between detonated sill = 0.15 D, = 0.15 x 4.28 = 0.642 ™ provided 0.60 m @ scanned with OKEN Scanner — = TS Radius of buckot Dissipation of high energy of spillway water can be effected by use of 4 submerged bucket deflector Radius of bucket depends upon Froude number of water entering at bucket and depth of tall water level. Radius of bucket is derived with the help of Ven Te Chow formula Ref eq 2.22 of Irrigation structures by R.S. Varshney and Gupta. R=0.305 x 10° P = V+64 xHd +4.88 3.6 Hd + 19. 0.15 +6.4x%425+488 = 42.24 = 1.213 3.6%4,25 +19.5 34.8 R=0.305x 10°" = 4.94 Say5.0m vhecked & Vetted GMa Associaté Protessor Civil Engineering Department Punjab Engineering College to be University) @ scanned with OKEN Scanner A) Design of high Ogee overflow spilivay i (As per 15 :6934) Ogee spillway 1s provided for overflow section of Dam. The design of Ogee Is based on 1 6934-1998, The profile of Ogee has two quadrants, Upstream and downstream quadrants. The elliptical downstream quadrants 16 a per xv + ye =. AV BY Eqn :- (1) Value A1,B1 depends upon P/Hd graphs of Fig 2 of IS 6934 : 1998 taking Hd = 4.25 m. for P = 25 = 0.69 HD 4.25 Ay/Hd = =0.25 A, = Hd x 0.25 = 4.25 x 0.25 = 1.063 B/Hd = = 0.146 B, = 0.146 x 4.25 = 0.62 Upstream profile xe Ye 1.0637 + 0.62” =1 max value of Y; =B; = 0.62 Max value of X; = A; = 0.25 mts Equation of u/s profile is Y, = 0.62 ¥ (1 -0.885 X") Profile of Downstream quadrant is given below: X85 = Kd" ¥,_;K; is taken from Fig 2 of IS: 6934: 1998 ; Kp = 2.0 x)! = 2.00 x(4.25)"*Y2 X55 = 6.84 Yo 1.85 X,°% = 6.84 dY2 dx, For a slope of 1:0.6 Max, value of x2 is given by 1.85 X)°* = 6.84 x 1= 11.4 0.6 x = 6.16 ae 8,39m Hence equation of profile is x'® = 6.84) Yp = 0.146 X)'* cked & Vetted @ scanned with OKEN Scanner bh PROFILE OGE DOWN STREAM PROFILE UP STREAM PROFILE ae eco FQuarion(2) arcomtes - a aress) | eal a 11 (MeTes) Yee 062 ATOMIEXDY 72 a . as Yar O16 Ko xaysterens) | vi qmevens) 00 0.62 | 2 on 0.617 [3 02 0.609 g {4 03 0.595 [>t j ; 3 | 4 0.575 | 7 10 | é os 0.547 Tt 7 06 0.512 = 3 8 07 0.467 ry s os 0.40 r 10 09 0.329 a 1.083 0.00 vy Aos u/s ' 038 |" ORIGIN FOR 'D/S QUADRANT ee XL ORIGIN FOR U/S QUADRANT ¥2, Vv OGEE PROFILE OGEE PROFILE @ scanned with OKEN Scanner o Foundation of depth. = 11.82 mvs scour depth is calculated from Lacey's formula, (@'s)"” keeping f as 10.99 and q = 11.82 cum/m as calculated above Assunwng a silt factor of 10.99 m for bed material = 314m wnstream cut off shall be provided to cater for boundary strata exists at site, the above depths R = 1.35 x (11.627/10.99)" As per clause 17.1 of IS 6966 upstream and do} 1.0R and 1.25 R (Alluvial reaches) how ever as will be highly safe Depth of U/S cut off will ( 1 OR from U/S HFL i.e = 969.04 2.5 + 1.7-3.14 = 970.06 m provide 968.0 m (i) Max depth of cut off for central pile = 1.5x3.14=4.71m from DIS HFL = 968.8 + 1.7-4.71 = 965.79 m provide 965.21 m Depth of d/s scour level off 4.25(d,) = 1.25 R = 1.25 x 3.14 = 3.925m Level of d/s cut off = 968.8 + 1.7 - 3.925 = 966.57 m provide 966.4 Design of Apron:- Length of downstream concrete block protection = 1.5 D = 1.5 x 3.14 = 4.71 say 5.0 m length of with cone. blocks of size 1.0x 1.0x0.60m Let us provide 0.3m thick rip rap on u/s side Length of downstream apron = 1.5D = 1.5 x 3.14 = 4.71 m with 5.0 m thickness. @ scanned with OKEN Scanner JRADIENT BY KHOSLA'S THEORY CHECKING OF APRON LENGTH, THICKNESS AND EXITE Total Creep length = 1x24 11.304 2.(969 965.21) + 15.40 + 2(968.8 9664) S110 758 115.4648 20.88 + 15.4048 418m Head loss if future pate are installed ata tater stage = 973.2 - 968.8 = 4.4 m = 4.4 = 0.107 | in 9.33 <1 in5 ok 41,08 Check for thickness of floor with pond storage up to level t full height i.e at 968.8 mt level, because in Hydraulic Gradient Since cistern will be full at times when the reservoir is at early parts of monsoon some water will flow through spillways or under sluices. Residual Pressure at D/s end of U/spile = 4.4~2 x 0.107 = 4.186 m. Residual Pressure at D/s end of Central pile = 4.4 20.88 x 0.107 = 2.16 m. ) = (2,161.94) =0.15 Provided is 0.50 m. 14 14 Residual Pressure at a distance of 7.13 m from start of Cistern = 4.4— 28. = (1,403-1.94) =Nil Provided is 0.40 m. 14 Thickness required at start of cistern = (P .01 x 0.107 = 1.403 m. Thickness required @ scanned with OKEN Scanner | LVL.973.95 of non spillway section | | MAS Woks 73,2! 3.10 T | I I | | 4.20 © 2.45—1—1.75 0.87 / LVL.965.21 0.80 3.50 1.70 fy 0.90 | 7.78 Non Spillway @ scanned with OKEN Scanner 1 Stability analysts far load Combination under Construction condition | Dam complete but no water in reservolr and 10 tail water (14 Code 612 ~ 1984) Section through non spillway portion: vertical torent in UNIT — force Lever arm vertical DISCRIPTION LENGTH WEIGHT =F. WEIGHT (KM) (m) — direction(ktt-mn) Rectangle 1 12 As 1 25 144 3 432 Tangle -2 1 245 0.5 25 33.69 3.96 133.41 Trlangle 3 1 2A 08 25 33.69 2.036 68.59 Triangle -4 oa? 12 05 25 13.05 7.19 93.83 Base 6.9 12 1 25 207 3.45 T1415 Triangle 6 1.75 244 05 25 53.38 02.28 124.71 Rectangle 7 08 2.44 1 25 48.8 13 63.44 Trlangle 8 0.9 2440 08 25 = 43.92 0.45 19.76 TOTAL 577.53 1646.89 - 2.85 0 0.6 1.15 Hence No tension will occur anywhere in Dam. Vertical stress = Vo (1 Ge)= 40.03 KN/m? = & = 127.37 KN/m? 8 8 < 272.42 kN/m* 6= 30° Principal stresses at toe = P minx Sec’® 170.68 KN/m? Principal stresses at heel =P maxxSec’® = 53.64 KN/m? Shear stresses at toe =Pminxtand = = 73.62 KN/m? Shear stresses atheel =Pmaxxtan® = 23.14 KN/m? @ scanned with OKEN Scanner LVL.973.95 of non spillway section | 1,66 | 1,35 | LIVE. }/-—_— 3.69 —— a @ scanned with OKEN Scanner ™ ~ ~ ~ ~ ~~ » ~ ~ ~~ J e » 2. e S » » > » » > > > » . . . > > \F Case <0 1 Stability analysis for load Combination under Construction condition + Dam complete but no Section through spillway portion: vertical Moment in UNIT force Lever arm vertical DISCRIPTION LENGTH HEIGHT MF. WEIGHT (KN) (mm) diectlon(kat-m) e- 1.35 25 1 25 84.38 5.425 457.76 Triangle -2 3.25 25 OS 25 101.56 3.125 317.38 Triangle -3 15 08 1 25 30 05 15 Triangle -4 0.87 1200S 2 © 13.05 7.19 93.83 Base -5 69 1200 OS 25 1038S 3.45, 357.08 Triangle - 6 175 2.44 1 25 106.75 2.28 243.39 Rectangle -7 08 244 0S 25 24.4 13 31.72 Triangle -8 09 2.44 1 25 549 0.45 2471 TOTAL 518.54 1540.87 “X= _ 69 - 2.97 = 048 0 1.5m FO.p 15 x 88.2 Case -IV Section through spillway portion reservoir at maximum pond level normal water level:- vertical Moment Length( Height = UNIT force Leverarm Direction DISCRIPTION sm) (m) WEIGHT MF (kN) (m) (ktt-m) a 1.66 42 10 1 69.72 6.93 483.16 b 1.35 17 10 1 = 22.95 5.425 1245 wt. of water TOTAL= 92.67 607.66 Vt Hore. Horz. Force Lever [Link] Force Leverarm Moment at Force (KN) arm (m) (kN-m) (kN) (m) ‘toe (kN-m) @ scanned with OKEN Scanner Penge eoenadveeeseseseeeeeesereseseseerserrrer 20 ’ an ave ora n7.98 1208.73 maa aaa gs xo Ml me? let V ~ 387 98 ee is te 8 11S om 6 heft = ah = 3(_1208.7 ) 2 591 m w 131.3 kN/m* < ITLAL kN ett Factor of safety against overturning, 120873 * an >2 444.53 Factor of safety against sliding Fe[w-u)tand © _ 387.98 _xtan 40° ‘Op 15x 88.2 2.46 >1.5m Safety against earthquake (|.S. : 1893 ~ 1984) Hydrodynamic effect due to reservoir are calculated P= Ca, Where P = hydrodynamic pressure KN/m’ at depth y , = coefficient which varies with shape and depth for vertical section at y/h © Distance below water surface = 42 Depth of reservoir 42 074 ‘ah Design horizontal seismic coefficient = BI ao Where B = Coefficient depending upon soil foundation system = 1.0 for Dam on hard soils | = Importance Factor depending upon importance system = 3.0 for Dams. @ scanned with OKEN Scanner weswvwvevvwvuewewevvvvvevevewvevevevevewvewee sees eee ee 21 igontal selstni 008 res xo.0w oa ye amitaxt-ofwater © 101/m", 1 2.0 (safe) 367 Factor of safety against sliding 52555 xtanao” = 4.24 103.96 X=M= 1498.67 -367.47 = 215m v 525.55 e= 1300 2.0(safe) 7285.82 factor of safety against sliding 471s? xtndo" = 4.24 93.34 X=M= 1402.19 -285.82 = 237m v 471.87 es B-x= 108 1.5 (safe) 851.35 Factor of safety against sliding. 470.68 xtangot = 184 214.91 @ scanned with OKEN Scanner | e aN . coe 1800.78 851.95 tam » , A008 oem 205 >he tay 2 6 aye 1500.8 85195 PAD an eft 470.08 page DY ae ATO. 2AAy Kn < 4053 Ku/m? bef 42 casei etn hough Spilway Reservolr full max uplit pressure no overflow and full selemie frees from case -1V& tw 387.98 EM, 1208.73 Caevi TH 9334 22.75 BB2 208.29 KN MM 285.82 39.35 444.53 769.7 KN et vt force = 38798 x0.91= 353.06 kN hiet vertical resisting moments= 120873 x0.91= 1099.94 kN Factor of safety against overturning. = 1,43 >1.5 (safe) Factor of safety against slidin 353.05 xtando” = 1.45, 204.29 1099.94 -769.7 = 094m 353.06 > e 251 beff = 3M=3( 1099.9 -7697 ) = 282 m w 353.06 » = WW =2 35305 = 250.4 KN/m* < 340,53 kN/m* J bet 2a , » » @ scanned with OKEN Scanner [Link] ater Retaining Wall::[Link] cotwrated back fill from behind Lan 20x.208 20 KN/M less tal force * %4x 20% 3.0% 30 KN/m? (0.1338 fekbd pars 30430x03= 30KN-m, deff = = 106 min 0.1338 x 30 x 1000 Let us provide D = 275 mm at bottom and 200 mm at top deff, = 275- 25-5 = 245mm 1.5m,/bd'= 15x 30x 108 = 0.75 from SP-16, pt=0.18, At= 245% 0.18 = 4.4. cm? 1000 x 2457 10 Provide 12mm @ 1.13 x 100 = 25.4 cm c/c 44 Let us provide 12 mm@ 250 c/c. Check for S.F. = S.F. at ‘ -. at dist. 0.24 m above bottom face:- (1/3 x 202.76) X%x2.76= 25.4 KN. d= 235mm .5x 25.4 x 1000 = 0.162 N/mm*< 0.33 N/mm* hence safe. 1000 x 235 Shear stress @ scanned with OKEN Scanner Retaining Wall:[Link] poen of Us sponated back fil from behind yon 204 2.75 © 28.0 KN/m? contal force © 4X 25.0% 3.752 47 kN/m? max © 0.2388 fekbd? a7, 275N0.3=S3kNem, deff = 3x15x10 #141 mm 0.1338 x 30 x 1000 et us prowide D = 300 mm at bottom and 200 mm at top 300 - 25-6 = 269 say 26.9mm 1S mJbd"=1.5x 53x 10° = 1.13 from SP-16, pt = 0.275, At= 265x0.27. = 7.16cm! 1000 x 265° 10 Provide 12mm @ 1,13 + 0.785 x 100 = 13.3 cm say @ 13.0 cmc/c 2x7.16 Let us provide 12mm@ 260 c/c. alt. with 10mm @ 260c/c. both eff. @ 130 ¢/c. (1/3 x 20x 3.481) x%x3.481= 40.4 kN. d= 260mm Shear stress = 1.5% 40.4 x1000 = 0.23 N/mm’< 0.33 N/mm’ hence safe. 1000 x 260 @ scanned with OKEN Scanner Deslatl otclstocn Aetalning Wal <4 25. sonuatodt back fil from bet po 1/4 (20% 4,25) © 26.3 KA? shoeontal force © %# 28.34 4.25 © 60-13 KIn? Mu max 0.1338 fckbd?” aM: (0.134425 x03 76.7 kiln, deff= (To 7xL EXIF — = 169.3 mm Ni 0.1328 x 30 x 1000 Lot us provide D ® 350 mm at bottom and 200 mm at top dof, = 350 20-6 = 324 mm 41.5 m,/bd’ = 1,576.7 x10° = 1.1 from SP-16, pt=0.285, At = 345 x.285 =8.6 cm? 1000 x 324” aan Provide 12mm @ 1.12 »100 =13.02cme/c. 8.6 Te = 0.38.N/mm? Check for S.F. =S,F, at ‘d’ i.e, at dist. 0.324 m above bottom face:- (1/3 x 20 x 3.93) x% x 3.93 = 51.5 kN. D=310mm d=310-20-6 = 284mm. Shear stress = 1.5 x 51.5x1000 =0.27 N/mm? <0.38N/ mm’ hence safe. E 1000 x 284 Curtail 12mm bars at 2.25 m from top level. @ scanned with OKEN Scanner 28 . preenure OREO ARNE O88 wt er tug . iv Ce © 1600. © Loin 90* 0.5» 0 299 Wen Weondo 18 ponign ot Retaining Wall 4.25.m height above Ground Love, » » » ’ U , ’ Data ng Wall 4 26 m gags and ther restoring moments Ay Width = 0 2349 43/2 = 0.33 Table - 1 Verto! Le Mt 2s and overturning Moments Pressure from back ka #033 5] wd | Ka | y_ 05 1033] 20] Upit Forces T uplit force is 2.16 m. uplitforce =Wus 246 x = 275 x 10s 59.4 KNm Moment about toe Mu = 594 x 1.375 = 81.68 KN-m We 226.72 EMir= 397.67 KNm wnet= ZW- EU Twnet= 226.72 - 594 wi 1b 275 = 167 32 y @Minet= Er - Imo- Mu 39767 - «1209-8168 ’ = 18814 y = eMnet /dwnet ) * 186.14 212m ) 167-32 © bax = 275 + 1412 0263

You might also like