Project Name:
Duration Date Date
Prayagpokhari Site Civil Work Time Schedule 64 18-Dec-23 20-Feb-24
18-Dec-23
19-Dec-23
20-Dec-23
21-Dec-23
22-Dec-23
23-Dec-23
24-Dec-23
25-Dec-23
26-Dec-23
27-Dec-23
28-Dec-23
29-Dec-23
30-Dec-23
31-Dec-23
10-Jan-24
11-Jan-24
12-Jan-24
13-Jan-24
14-Jan-24
15-Jan-24
16-Jan-24
17-Jan-24
18-Jan-24
19-Jan-24
20-Jan-24
21-Jan-24
22-Jan-24
23-Jan-24
1-Jan-24
2-Jan-24
3-Jan-24
4-Jan-24
5-Jan-24
6-Jan-24
7-Jan-24
8-Jan-24
9-Jan-24
Task
SN DESCRIPTION OF WORK Duration Start Date End Date
(Days)
X
X
25-Jan-24
X
X
X
26-Jan-24
X
X
X
X
27-Jan-24
X
X
X
28-Jan-24
X
X
X
X
X
29-Jan-24
X
X
X
X
X
30-Jan-24
X
X
X
X
X
31-Jan-24
X
X
X
X
X
1-Feb-24
X
X
X
X
2-Feb-24
X
X
X
3-Feb-24
X
X
X
4-Feb-24
X
X 5-Feb-24
X
X
6-Feb-24
X
X
7-Feb-24
X
X
8-Feb-24
X
X
9-Feb-24
X
X
10-Feb-24
X
X
11-Feb-24
X
X
12-Feb-24
X
X
13-Feb-24
X
14-Feb-24
X
15-Feb-24
X
16-Feb-24
X
17-Feb-24
X
18-Feb-24
X
19-Feb-24
X
20-Feb-24
21-Feb-24
Civil Works Materials
Required Required
S.N Materials
Date Quantity
1 Bricks
2 Electric Conduit Pipes 26-Dec-23 Approx. 4 Rolls
3 Sanitary Pipes 2-Jan-24 As per Site Condition
4 Waterproof membrane Sheet 5-Jan-24 1940.81
5 Tiles 19-Jan-24 3274.22
6 Laminates 26-Jan-24 709.26
7 Wooden Flooring 26-Jan-24 583.46
8 Granite Work 23-Jan-24 429.04
9 Metal Staircase 21-Jan-24 1 Set
10 Glass Blocks 16-Jan-24
11 Doors 17-Jan-24 9 No.s
12 UPVC Windows/ Slidings 19-Jan-24 17 No.s
13 Wall putty 23-Jan-24
14 Primer 7-Feb-24
15 Colors 11-Feb-24
S.N DESCRIPTION OF WORK UNIT NO.S LENGTH BREADTH HEIGHT
1 GROUND FLOOR Sqft
Tiles in toilet
(Ground Floor) 1 9.33 4.58 1
1 5.25 4.17 1
2 9.33 6.00 1
2 4.58 6.00 1
2 5.25 6.00 1
2 4.17 6.00 1
Deduct -2 2.08 4.58 1
-1 2.50 7.00 1
TOTAL
2 FIRST FLOOR
Tiles in Toilets
1 5.67 6.92 1
2 5.67 6.00 1
2 6.92 6.00 1
1 3.47 9.58 1
2 3.47 6.00 1
2 9.58 6.00 1
TOTAL
Granite
1 6.00 0.50 1
1 4.67 0.50 1
1 8.83 0.50 1
1 3.33 0.50 1
2 2.92 0.50 1
2 4.58 0.50 1
TOTAL
3 TOP FLOOR
Puja Room
Tiles in Puja Room Sqft
Flooring 1 14.25 3.33 1
1 8.83 3.58 1
TOTAL
Toilet
Flooring
1 3.17 7.50 1
Wall 2 3.17 6.00 1
2 7.50 6.00 1
Deduct -1 2.50 7.00 1
-1 1.50 2.00 1
TOTAL
Terrace
1 1111.67 1.00 1
deduct void -1 44.18 1.00 1
-1 44.98 1.00 1
TOTAL
WATERPROOFING SHEET
Ground floor Sqft
Toilet
1 9.33 4.58 1
1 9.33 2.00 1
1 4.58 2.00 1
1 5.25 4.17 1
1 5.25 4.17 1
1 5.25 2.00 1
1 4.17 2.00 1
TOTAL
First Floor
Toilet
1 5.67 6.92 1
1 5.67 2.00 1
1 6.92 2.00 1
1 3.47 9.58 1
1 3.47 2.00 1
1 9.58 2.00 1
TOTAL
Terrace
1 19.83 15.08 1
1 19.83 0.75 1
1 15.08 0.75 1
1 3.50 25.83 1
1 3.50 0.75 1
1 25.83 0.75 1
TOTAL
Top Floor
Toilet
1 3.17 7.50 1
1 3.17 2.00 1
1 7.50 2.00 1
TOTAL
Terrace
1 33.33 28.58 1
1 33.33 0.75 1
1 28.58 0.75 1
1 16.50 11.00 1
1 16.50 0.75 1
1 11.00 0.75 1
TOTAL
QUANTITY REMARKS
42.76
21.89
111.96
54.96
63.00
50.04
-19.10
-17.50
308.02
37.50
26.68
7.50
71.68
203.11
14.42
217.52
46.40
14.66
22.32
83.38
201.78
16.34
17.34
10.94
3.00
2.74
2.09
2.08
3.00
0.83
3.00
1.50
3.25
0.83
66.93
180.00
180.00
29.25
58.11
292.97
380.33
39.21
68.04
83.04
33.24
41.64
114.96
380.14
85.65
251.13
12.24
17.38
366.38
26.55
65.19
297.45
106.64
495.83
3.00
2.34
4.42
1.67
2.92
4.58
18.92
115.77
29.25
58.11
203.13
213.88
149.08
166.30
529.26
47.45
31.61
79.06
23.78
38.04
90.00
-17.50
-3.00
131.32
2.24
1.29
33.33
28.57
18.75
2.83
3.08
5.67
25.25
12.42
24.32
29.32
7.00
31.66
16.33
17.75
259.81
1111.67
-44.18
-44.98
1022.51
42.76
18.66
9.16
21.89
21.89
10.50
8.34
133.21
39.21
11.34
13.84
33.24
6.94
19.16
123.74
299.04
14.87
11.31
90.41
2.63
19.37
437.62
23.78
6.34
15.00
45.11
952.57
25.00
21.44
181.50
12.38
8.25
1201.13