You are on page 1of 11

Project Start End

Project Name:
Duration Date Date
Prayagpokhari Site Civil Work Time Schedule 64 18-Dec-23 20-Feb-24

18-Dec-23
19-Dec-23
20-Dec-23
21-Dec-23
22-Dec-23
23-Dec-23
24-Dec-23
25-Dec-23
26-Dec-23
27-Dec-23
28-Dec-23
29-Dec-23
30-Dec-23
31-Dec-23

10-Jan-24
11-Jan-24
12-Jan-24
13-Jan-24
14-Jan-24
15-Jan-24
16-Jan-24
17-Jan-24
18-Jan-24
19-Jan-24
20-Jan-24
21-Jan-24
22-Jan-24
23-Jan-24
1-Jan-24
2-Jan-24
3-Jan-24
4-Jan-24
5-Jan-24
6-Jan-24
7-Jan-24
8-Jan-24
9-Jan-24
Task
SN DESCRIPTION OF WORK Duration Start Date End Date
(Days)

1 Brickwork 9 18-Dec-23 27-Dec-23 X X X X X X X X X X


2 Electrical Drawing 2 28-Dec-23 30-Dec-23 X X X
3 Electrical Conduit Pipe Layout 6 29-Dec-23 4-Jan-24 X X X X X X X
4 Sanitary Pipe layout in Toilet Floor/ Kitchen 2 5-Jan-24 7-Jan-24 X X X
5 Hot and Cold Sanitary Pipe Layout in walls 6 2-Jan-24 8-Jan-24 X X X X X X X
6 Waterproofing Work 7 8-Jan-24 15-Jan-24 X X X X X X X X
7 Screeding Work 8 16-Jan-24 24-Jan-24 X X X X X X X X
8 Floor/ Wall tiles in Toilet 7 26-Jan-24 2-Feb-24
9 Tile work in other Areas 10 3-Feb-24 13-Feb-24
10 Wooden Floorings 6 29-Jan-24 4-Feb-24
11 Laminate Floorings 3 29-Jan-24 1-Feb-24
12 Granite Work 6 27-Jan-24 2-Feb-24
13 Metal Stair Installation 2 25-Jan-24 27-Jan-24
14 Plasterwork 14 5-Jan-24 19-Jan-24 X X X X X X X X X X X X X X X
15 Glass Block Installation 1 20-Jan-24 21-Jan-24 X X
16 Door Shutter Installation 1 20-Jan-24 21-Jan-24 X X
17 UPVC windows Installation 2 22-Jan-24 24-Jan-24 X X
18 Wall Putty work 14 25-Jan-24 8-Feb-24
19 Primer Work 3 9-Feb-24 12-Feb-24
20 Paint Work 7 13-Feb-24 20-Feb-24
X
X
24-Jan-24

X
X
25-Jan-24

X
X
X
26-Jan-24

X
X
X
X
27-Jan-24

X
X
X
28-Jan-24

X
X
X
X
X
29-Jan-24

X
X
X
X
X
30-Jan-24

X
X
X
X
X
31-Jan-24

X
X
X
X
X
1-Feb-24

X
X
X
X
2-Feb-24

X
X
X
3-Feb-24

X
X
X
4-Feb-24

X
X 5-Feb-24

X
X
6-Feb-24

X
X

7-Feb-24

X
X

8-Feb-24

X
X

9-Feb-24

X
X

10-Feb-24

X
X

11-Feb-24

X
X

12-Feb-24

X
X

13-Feb-24
X
14-Feb-24
X

15-Feb-24
X

16-Feb-24
X

17-Feb-24
X

18-Feb-24
X

19-Feb-24
X

20-Feb-24
21-Feb-24
Civil Works Materials
Required Required
S.N Materials
Date Quantity
1 Bricks
2 Electric Conduit Pipes 26-Dec-23 Approx. 4 Rolls
3 Sanitary Pipes 2-Jan-24 As per Site Condition
4 Waterproof membrane Sheet 5-Jan-24 1940.81
5 Tiles 19-Jan-24 3274.22
6 Laminates 26-Jan-24 709.26
7 Wooden Flooring 26-Jan-24 583.46
8 Granite Work 23-Jan-24 429.04
9 Metal Staircase 21-Jan-24 1 Set
10 Glass Blocks 16-Jan-24
11 Doors 17-Jan-24 9 No.s
12 UPVC Windows/ Slidings 19-Jan-24 17 No.s
13 Wall putty 23-Jan-24
14 Primer 7-Feb-24
15 Colors 11-Feb-24
S.N DESCRIPTION OF WORK UNIT NO.S LENGTH BREADTH HEIGHT
1 GROUND FLOOR Sqft
Tiles in toilet
(Ground Floor) 1 9.33 4.58 1
1 5.25 4.17 1
2 9.33 6.00 1
2 4.58 6.00 1
2 5.25 6.00 1
2 4.17 6.00 1
Deduct -2 2.08 4.58 1
-1 2.50 7.00 1
TOTAL

Balcony in store room 1 15.00 2.50 1


1 10.67 2.50 1
skerting 1 15.00 0.50 1
TOTAL

Entrance 1 12.25 16.58 1


Skerting 1 28.83 0.50 1
TOTAL

Granite in Entance Steps/ Platform 1 6.33 7.33 1


2 7.33 1.00 1
3 7.44 1.00 1
TOTAL

Kitchen flooring 1 12.17 16.58 1

Kitchen counter (Granite) 1 8.17 2.00 1


1 8.67 2.00 1
1 5.47 2.00 1
1 6.00 0.50 1
1 5.47 0.50 1
1 4.17 0.50 1
2 2.08 0.50 1
1 6.00 0.50 1
1 2.50 0.33 1
1 6.00 0.50 1
1 3.00 0.50 1
1 6.50 0.50 1
1 2.50 0.33 1
TOTAL

Laminate Flooring in rooms


1 15.00 12.00 1
TOTAL
Wooden Parqueting except rooms/ toilet/kitchen 1 9.00 3.25 1
1 13.00 4.47 1
1 16.58 17.67 1
TOTAL

2 FIRST FLOOR
Tiles in Toilets
1 5.67 6.92 1
2 5.67 6.00 1
2 6.92 6.00 1
1 3.47 9.58 1
2 3.47 6.00 1
2 9.58 6.00 1
TOTAL

Balcony 1 3.50 24.47 1


1 24.50 10.25 1
Skerting 1 24.47 0.50 1
1 34.75 0.50 1
TOTAL

Tiles in slab projection 1 10.25 2.59 1


1 25.17 2.59 1
1 19.83 15.00 1
1 13.33 8.00 1
TOTAL

Granite
1 6.00 0.50 1
1 4.67 0.50 1
1 8.83 0.50 1
1 3.33 0.50 1
2 2.92 0.50 1
2 4.58 0.50 1
TOTAL

Wooden Flooring 1 9.08 12.75 1


1 9.00 3.25 1
1 13.00 4.47 1
TOTAL

Laminate Flooring 1 14.75 14.50 1


1 12.17 12.25 1
1 14.25 11.67 1
TOTAL

3 TOP FLOOR
Puja Room
Tiles in Puja Room Sqft
Flooring 1 14.25 3.33 1
1 8.83 3.58 1
TOTAL

Toilet
Flooring
1 3.17 7.50 1
Wall 2 3.17 6.00 1
2 7.50 6.00 1
Deduct -1 2.50 7.00 1
-1 1.50 2.00 1
TOTAL

Granite 1 4.47 0.50 1


1 2.58 0.50 1
1 33.33 1.00 1
1 28.57 1.00 1
1 18.75 1.00 1
1 2.83 1.00 1
1 3.08 1.00 1
1 5.67 1.00 1
1 25.25 1.00 1
1 12.42 1.00 1
4 6.08 1.00 1
4 7.33 1.00 1
2 3.50 1.00 1
2 15.83 1.00 1
1 16.33 1.00 1
1 17.75 1.00 1
TOTAL

Terrace
1 1111.67 1.00 1
deduct void -1 44.18 1.00 1
-1 44.98 1.00 1
TOTAL

WATERPROOFING SHEET
Ground floor Sqft
Toilet
1 9.33 4.58 1
1 9.33 2.00 1
1 4.58 2.00 1
1 5.25 4.17 1
1 5.25 4.17 1
1 5.25 2.00 1
1 4.17 2.00 1
TOTAL

First Floor
Toilet
1 5.67 6.92 1
1 5.67 2.00 1
1 6.92 2.00 1
1 3.47 9.58 1
1 3.47 2.00 1
1 9.58 2.00 1
TOTAL
Terrace
1 19.83 15.08 1
1 19.83 0.75 1
1 15.08 0.75 1
1 3.50 25.83 1
1 3.50 0.75 1
1 25.83 0.75 1
TOTAL

Top Floor
Toilet
1 3.17 7.50 1
1 3.17 2.00 1
1 7.50 2.00 1
TOTAL
Terrace
1 33.33 28.58 1
1 33.33 0.75 1
1 28.58 0.75 1
1 16.50 11.00 1
1 16.50 0.75 1
1 11.00 0.75 1
TOTAL
QUANTITY REMARKS

42.76
21.89
111.96
54.96
63.00
50.04
-19.10
-17.50
308.02

37.50
26.68
7.50
71.68

203.11
14.42
217.52

46.40
14.66
22.32
83.38

201.78

16.34
17.34
10.94
3.00
2.74
2.09
2.08
3.00
0.83
3.00
1.50
3.25
0.83
66.93

180.00
180.00
29.25
58.11
292.97
380.33

39.21
68.04
83.04
33.24
41.64
114.96
380.14

85.65
251.13
12.24
17.38
366.38

26.55
65.19
297.45
106.64
495.83

3.00
2.34
4.42
1.67
2.92
4.58
18.92

115.77
29.25
58.11
203.13

213.88
149.08
166.30
529.26
47.45
31.61
79.06

23.78
38.04
90.00
-17.50
-3.00
131.32

2.24
1.29
33.33
28.57
18.75
2.83
3.08
5.67
25.25
12.42
24.32
29.32
7.00
31.66
16.33
17.75
259.81

1111.67
-44.18
-44.98
1022.51

42.76
18.66
9.16
21.89
21.89
10.50
8.34
133.21

39.21
11.34
13.84
33.24
6.94
19.16
123.74

299.04
14.87
11.31
90.41
2.63
19.37
437.62

23.78
6.34
15.00
45.11

952.57
25.00
21.44
181.50
12.38
8.25
1201.13