You are on page 1of 2

SOIL SURVEY and SAMPLING 6.

One (1) set portable stove with oven


7. Supply of calibrated sand (10 kg)

Objective: Exploration Team:

The objective of soil survey which is made in connection with the One (1) – Soil Engineer One (1) – Driver
preliminary or detailed engineering study of a proposed highway is to obtain Two (2) – Soil Technician Three (3) – Aides
information relative to the distribution and properties of soils, ground water
and surface drainage condition and other pertinent data necessary for a The above number of personnel may be increased
national and economic design of the highway. depending upon the nature of exploration work, length of proposed
route, and time allocated for the exploration work.
Equipment: Procedure:

A. Along New Route: 1. Before starting, obtain information which may be useful in
1. Two (2) post hole augers, 100 mm diameter planning and organizing the field work from among the following
2. Six (6) 2400 mm post – hole Auger extension with sources:
couplings a. topographic map
3. Two screw type soil auger, 38 mm diameter b. air photographs
4. Ten (10) 2400 mm auger extensions with couplings c. geological maps
5. Two (2) pipe wrenches, 200 mm d. soil maps
6. Two (2) crow bars e. previous laboratory test data
7. Four (4) spades f. available engineering or construction data of similar
8. Two (2) picks completed structures in the vicinity of the site.
9. One (1) 50 meter metallic tape
10. One (1) 1.8 meter carpenters folding paper 2. Conduct reconnaissance investigation along the proposed route
11. One (1) roll, 500 mm cross section paper obtain additional information on the probable soil conditions,
12. Supply of sample bags (50 kg cap.) and sample tags rock outcrops, nature of terrain, kind of vegetation and other
13. Supply of plastic bags (20 kg cap.) land features which will influence the planning and organizing
14. Supply of marking crayons the field work, as well as the size of the exploration crew and
15. Roll of twine the equipment to be used.
16. Record books and pencils 3. Conduct field exploration be means of auger borings and
17. Heavy truck examination of the soil from test pits or road cuttings.
Geophysical methods may also be employed, if warranted.
B. Along Existing Road
A. Along New Route:
In addition to the equipment listed under new route a. Location of borings
the following shall be included: Boring shall be taken along the proposed
centerline. Boring may also be taken along the sides of
1. One (1) sand density cone and bottle the route if necessary.
2. One (1) guide plate, 150 mm diameter hole b. Spacing of Borings
3. One (1) solution balance, 20 kg x 1 g A spacing of 300 meters for preliminary and 130
4. One (1) beam balance, 2 kg x 1 g meters for detailed soil survey may assumed at the
5. One (1) dozen, moisture content cans beginning. If the soil profile is uniform the spacing may
be increased. When the character of soil profile changes, 5. Explore sample probable sources of borrow and aggregates
intermediate borings shall be made until it is clear that along the route and determine the approximate quantity of
all variations have been mapped out. When the grade available materials. Note down also the hauling distances and
changes rapidly from cut to fill, detailed borings are accessibility.
necessary only in cut. 6. Prepare a sketch of the soil profile similar to the attached sheet.
c. Depth of Borings
All borings shall generally be carried to a depth
of at least one (1) meter below the proposed grade line. Sampling Samples
When fill material is to be borrowed from ditches along
the road, the boring shall extend to the estimated depth Sufficient sample shall be taken to enable the performance all
of borrow. When the muck or other unstable soils are the necessary test. The kind and quantity of samples shall be as
encountered, borings shall extend to the full depth of follows:
such soil.
1. Disturbed Samples
B. Along Existing Road: a. 5 – 10 kg for classification test
Same as in new route, but shall include the following: b. 15 kg for compaction test
c. 50 kg for CBR test
a. Condition of surfacing, shoulder, back slopes and ditches d. 50 kg for material sources
shall be noted.
b. In areas, where there are pavement failures, 2. Undisturbed Samples
supplemental borings shall be taken to a depth of at 1 – Shelby tube sample, full length, for strength or consolidation
least one (1) meter below the sub – grade. test.
c. Moisture content and density determination shall be
performed on the base, sub – base, and sub – grade. Common Laboratory Tests:
d. When boring cannot be made along the centerline as in
concrete pavements, these be made along the 1. Mechanical Analysis and Atterberg Limits
shoulders. Additional information on the soil profile may 2. Natural moisture content, field density and compaction test.
also be obtained by visual examination of the back 3. CBR, unconfined compression, and other test that may be
slope. required.

4. Prepare the log of borings, which shall include the following:

a. Location of each test pit or auger boring.


b. Depth of water table
c. Thickness of each soil layer
d. Description of each layer according to texture, structure,
organic content relative moisture and degree of
cementation.
e. Location and identification of each sample taken for
laboratory test.
f. Location of seepage zones.