Unit 2 Unit Evaluation Method
Unit 2 Unit Evaluation Method
UNIT
EVALUATION
METHOD
Nurimi Che Mahadi
DCV 50283 : BUILDING QUANTITIES AND
ESTIMATING
NURIMI
METHOD OF
PRELIMINARY
UNIT
COST EVALUATION
ESTIMATION
METHOD
2 NURIMI
1
11/23/2021
Introduction
Method is used to estimate
the cost of building whose
sizes depend upon the
units of accommodation
3 NURIMI
FORMULAE
TOTAL COST (RM) = COST PER UNIT X
NUMBER OF UNIT
NURIMI
2
11/23/2021
EXAMPLES
QUESTIONS
EXAMPLES #1
Based on historical cost for past project, the cost per pupil of schools is RM 1,000
and a proposed school to accommodate 500 pupils is to be construct. Calculate
the estimated cost by using Unit Evaluation Method.
SOLUTIONS
cost per pupil of schools = RM 1,000/pupil
No of purposed pupils = 500 pupils
TOTAL COST (RM) = COST PER UNIT X NUMBER OF UNIT
TOTAL COST (RM) = RM 1000/Pupil X 500 = RM 500,000.00
3
11/23/2021
EXAMPLES #2
ABC Berhad wants to build a private hospital area Sri Gading. The quantities of
beds that ABC Berhad need in this construction is 450 beds From previous
project, cost of construction hospital is RM 100,000,000.00 (number of beds is
1000 beds). Estimate the cost ABC Berhad needs in this project.
SOLUTIONS
SOLUTIONS Cost for 1 bed = RM100,000,000.00 /
Cost for 1000 beds = 1000
RM100,000,000.00
= RM 100,000.00 per beds
Proposed bed = 1000 beds
Then, cost for 450 of beds:
= RM 100,000.00 x 450
= RM 45,000,000.00
7 NURIMI
UNIT EVALUATION METHOD
EXERCISE
QUESTION 1 QUESTION 2
A new sewerage treatment plant is going Five blocks of new mechanical car
to be built in Taman Gemilang, Batu parking will be built at Sri Gading which
Pahat. The resident populations are could allocate for fifteenth parking lots
estimated as 8, 000 people. The cost for per block. Calculate the cost for the five
construction is RM 300/people. Estimate
blocks of mechanical car parking if each
the cost for the new STP at Taman
Gemilang. lot is estimated at RM 500.00.
QUESTION 3
Estimate the cost to build a mosque if
number of Muslim in Taman Universiti is 500
persons. The average cost for build a
mosque is RM 1,400 per one Muslim. 8 NURIMI
4
11/23/2021
summary
INTRODUCTION FORMULAE
UNIT EVALUATION
METHOD TOTAL COST (RM)
• Method is used to = COST PER UNIT
estimate the cost
of building whose X NUMBER OF
sizes depend UNIT
upon the units of
accommodation
Thank you