Professional Documents
Culture Documents
Water Re-cycle
Filter Back wash
Bar Screen
Equalization Tank
Settling Tank
Post Aeration
Treat Water
Flocculation
Secondary
Flash Mixing
Filter Feed Tank
Correction
Tank
pH
ACF
Filter unit
Air Line
Poly
Acid
BIO
Aeration Blower
Dosing Platform
Air Li ne
Sludge Store
Treated Water
Storage Tank
FeSO4 BIO-101 Poly Acid
Lime
Flocculation Tank
Holding Tank
G.L
66.0831
Sewage Inlet
Toilet/Wash
Effluent
To Re-Used & Drain
Oil & Grid Separator Tank
1380.66
Equalization Tank Biological Tank Filter Feed Tank Post Aeration Tank
DO Meter Garden
RAS Pump
Biological Tank
Aeration System
Equalizing of Water & Increase of Aeration/Oxidizing System Secondary Sedimentation System Advanced & RO System Reduce
Chemical &Sedimentation System
Dissolved Oxygen in Water Reduce with Control of BOD, COD & Nitrogen Reduce High TSS & Recycling of TDS, Chloride, Nitrate , Sodium &
is All ways Reduce High TSS
Sludge in Oxidizing Tank Coliforms Bacteria.
Irrigation /Land
MGF
Filter Unit
Dosing Unit
Equalization Tank Biological Tank
DO Spry Header
Area: 18.87m2, H-2.1m
Area: 5.75m2, H-2.1m .9x.9x.75m
Operation Room
66.0831
Oil Trap Floc. Mixing
Blower Unit
ACF
Outlet
Primary Clarifier Secondary Clarifier
D:2.5m, H-2.1m D:2.5m, H-2.1m
Post Aeration
Inlet .9x.9x.75m
Area: 2.5m2, H-2m
Flash Mixing Panel Board
66.0831
Bottom Tank Layout Plan
Filter Unit
Dosing Dosing
Lifting Pump Filter Feed Tank Tank Tank
Area: 1.65m2, H-2m
MGF
Equalization Tank Biological Tank
Filter Unit
Dosing Unit
Area: 5.75m2, H-2.1m Area: 18.87m2, H-2.1m
DO Spry Header
Floc. Mixing Operation Room
66.0831
Oil Trap .9x.9x.75m
Blower Unit
ACF
Outlet
Primary Clarifier Secondary Clarifier
D:2.5m, H-2.1m D:2.5m, H-2.1m
Post Aeration
Inlet Area: 2.5m2, H-2m
Flash Mixing
Panel Board
66.0831
.9x.9x.75m
Aeration System Layout Plan SN Tank Name Tank Size F- Board Volume HRT
U.G. STP TANK AREA 01 Septic/Collection Tank 3.5x2x3m (Bonded) 300mm 20m3 10hr
02 Oil &Grid Tank 1x.75x2.1m 225mm 1.5m3 0.75hr
03 Equalization Tank Area: 5.75m2, H-2.1m 300mm 12m3 6hr
04 Flash Mixing Tank 0.8x0.8x1.25m 150mm 0.50m3 15Min
05 Flocculation Tank 0.8x0.8x1.5m 150mm 0.65m3 18Min
06 Primary Clarifier Ø-2.5m, H-2.1m 150mm 8m3 4hr
07 pH Correction 0.8x0.8x1.55m 150mm 0.65m3 18Min
08 Biological Tank Area: 18.87m2, H-2.1m 225mm 38m3 19hr
09 Secondary Clarifier Ø-2.5m, H-2.1m 150mm 8m3 4hr
10 Filter Feed Tank Area: 1.65m2, H-2m 300mm 3m3 1.5hr
11 Post Aeration Tank Area: 2.5m2, H-2m 300mm 5m3 2.5hr
12 Sludge Dryer Bed 3x1.5x1.5m 225mm
Syphon Inlet
Dosing Dosing
Lifting Pump Filter Feed Tank Tank Tank
Area: 1.65m2, H-2m
MGF
Biological Tank
Filter Unit
Dosing Unit
Equalization Tank Area: 18.87m2, H-2.1m
Area: 5.75m2, H-2.1m
DO Spry Header
Floc. Mixing
Operation Room
66.0831
.9x.9x.75m
Oil Trap
Blower Unit
ACF
Outlet
Primary Clarifier Secondary Clarifier
D:2.5m, H-2.1m D:2.5m, H-2.1m
66.0831
Syphon Ventilation Bottom Tank Layout Plan
Dosing Dosing
Lifting Pump Filter Feed Tank Tank Tank
Area: 1.65m2, H-2m
MGF
Equalization Tank Biological Tank
Filter Unit
Dosing Unit
Area: 5.75m2, H-2.1m Area: 18.87m2, H-2.1m
DO Spry Header
Floc. Mixing Operation Room
66.0831
Oil Trap .9x.9x.75m
Blower Unit
ACF
Outlet
Secondary Clarifier (Room Height: 11'-0")
Primary Clarifier
D:2.5m, H-2.1m D:2.5m, H-2.1m
Post Aeration
Inlet Area: 2.5m2, H-2m
Flash Mixing
Panel Board
66.0831
.9x.9x.75m
Underground
Septic Tank (If Possible) Underground
Septic Tank
ST.TOILET
FEMALE WORKER
MALE WORKER
Option-2
MEDICAL CENTER
Ground Floor
UP Dryer Bed
STAIR LEVEL
LEVEL +450mm
LEVEL+450mm
+450mm
STORE
LEVEL(±)00mm LEVEL(±)00mm