You are on page 1of 11

S.

No Description Of Material Dia Plan


1 2 3 4 5

Plan 7

1
450 MM Received 0
Bal. to be
Recieved 7

Plan

2
600 MM Received
Bal. to be
Recieved
H
o
Plan l 4
Spigot & Socket RCC i
800 MM
3 Hume Pipe NP3 2.5mtr Received d
a
0
Bal. to be y
Recieved s 4

Plan

4
1000 MM Received
Bal. to be
Recieved

Plan 4

5
1400 MM Received 4
Bal. to be
Recieved 0
Per Day Requirements 0 0 0 30
Jan-18

6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

16 28 28 28 28 21 17 14 10 10 10 10 10 10 13 0

0 0 22 0 10 0 0 22 0 22 0 0 0 54 48 63

16 28 6 28 18 21 17 -8 10 -12 10 10 10 10 -41 -48 -63

5 5 5 5 10 10 10 9 5 8

0 0 0 0 6 12 10 0 0 0 0 16 51 36

5 5 5 5 4 -2 0 9 5 8 0 -16 -51 -36 0 0 0


H
o
4 4 4 10 10 10 10 10 10 l 10 10 10 10 10 6 6 6
i
0 9 4 0 13 0 13 0 0 d 0 0 9 0 4
a
y
4 -5 0 10 -3 10 -3 10 10 s 10 10 1 10 6 6 6 6

9 9 15 15 15 15 15 15 15 15 15 15 15 6 6 6

0 0 0 10 0 0 20 0 0 0 0 11 11 5 15 16

9 9 15 5 15 15 -5 15 15 15 15 4 4 1 -9 -10

4 4 4 4 4 4

4 8 0 8 0 8 0

0 -4 4 -4 4 -4
58 104 96 128 130 124 104 96 80 86 70 70 70 70 50 24 24

No.s Rmt
Required (Plan) 758 1895
Received 703 1757.5
Bal. to be Received 55 137.5
Total
Total length Value
Nos (Aprox)
(rmt)
24 25 26 27 28 29 30 31 total

260 260 650.0 988000

48 14 0 303 289 722.5

-48 0 -43 -29 -72.5

72 72 180.0 369000

10 0 10 151 151 377.5

0 0 -79 -59 -147.5

6 6 6 6 5 173 173 432.5 1307015

9 0 61 61 152.5

6 6 112 104 260.0

6 6 6 6 225 225 562.5 2413125

6 5 15 11 5 0 16 10 156 141 352.5

0 1 69 114 285.0

28 28 70.0 539140

0 32 32 80.0

-4 -4 -10.0
24 24 42 17 5 16 20 5616280
received
S.No Description Of Material Dia As Per As per R4 Qty(no.s)
Boq(rmt) (no.s) up to
today

1 450 MM 605 894 829

2 600 MM 610 470 360

3 800 MM 582 373 333


Spigot & Socket RCC
Hume Pipe NP3 2.5mtr
4 1000 MM 199 232 236

5 1200MM 264 163 163

6 1400 MM 79 325 191

Per Day Requirements


2339 2457 2112
Total Required In Rmt 4073.0 6142.5 5280.0
###
Balance
to Plan
Receive
(no.s)
1 2 3 4 5 6 7 8 9 10 11 12 13
Plan 22 22 22 22 22 22 22 22 22 22 22 22 24
65 Received 48 0 48 24 54 15 15 0 24
Balance -26 22 -26 22 -2 22 22 -32 22 7 7 22 0
Plan 15 15 15 15 15 15 15 15 15 15 15 21
110 Received 6 40 10 10 0 10
Balance 15 15 15 15 15 9 15 -25 15 5 5 21 -10
Plan 7 7 7 7 7 7 10 15 15 15 15 18
40 Received 0 6 6 6 6 9 0
Balance 7 7 1 1 7 7 4 15 9 15 6 18 0
Plan 15 15 18
-4 Received 6 11 7 0
Balance -6 -11 0 0 0 0 8 15 18 0 0 0 0
Plan
0 Received
Balance
Plan 8 8 8 8 8 8 8 8 8 8 8 8 8
134 Received 5 5 5 0 5
Balance 8 8 8 8 8 8 8 3 3 3 8 8 3
96 96 96 96 96 96 132 147 153 117 112 130 61
345
862.5
No.s Rmt
Required (Plan) 899 2247.5
Received 554 1385
Bal. to be Received 345 862.5
14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 total
22 22 19 351
0 0 0 0 10 24 12 0 12 0 286
22 22 19 0 0 -10 -24 0 0 0 -12 0 -12 0 0 65
186
0 0 0 76
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 110
130
9 0 13 18 0 11 0 6 90
0 0 -9 0 0 -13 0 0 0 0 -18 0 -11 0 -6 40
48
4 16 0 0 0 8 52
0 -4 -16 0 0 0 0 0 0 0 0 0 0 0 -8 -4
0
0 0 0 0
0
8 8 8 8 8 8 8 8 8 8 184
5 5 0 0 5 0 5 5 0 5 0 50
3 3 8 8 3 8 8 3 8 3 0 0 -5 0 0 134
57 60 54 16 16 16 16 16 16 16 0 0 0 0 0
Total
Total Length Value
Nos (Aprox)
rmt

351 877.5 1333800


286 715
65 162.5
186 465 953250
76 190
110 275
130 325 982150
90 225
40 100
48 120 514800
52 130
-4 -10
0 0
0 0
0 0
184 460 3542920
50 125
134 335
899 7326920
S.No Description Of Material Dia As Per As per R4
Boq(rmt) (no.s)

1 450 MM 605 894

2 600 MM 610 470

3 800 MM 582 373


Spigot & Socket RCC
Hume Pipe NP3 2.5mtr
4 1000 MM 199 232

5 1200MM 264 163

6 1400 MM 79 325

Per Day Requirements


2339 2457
Total Required In Rmt 4073.0 6142.5
###
received Balance
Qty(no.s) to Plan
up to Receive
today (no.s)
1 2 3 4 5 6 7 8 9
Plan 22 0 22 21 0 0 0
905 -11 Received 12 24 40
Balance
Plan 15 15 15 15 8 0 0
448 22 Received 30 0 0 0 0
Balance 15 15 15 15 -22 0 0 0 0
Plan 7 7 7 7 7 5
371 2 Received 12 0 0 0 0 0 0 0 0
Balance -12 7 7 7 7 7 5 0 0
Plan
236 -4 Received
Balance
Plan
163 0 Received
Balance
Plan 8 8 8 8 8 8 8 8 8
236 89 Received 0 0 0 0 0 0 0 0 8
Balance 8 8 8 8 8 8 8 8 0
72 52 98 73 78 22 18 8 16
2359 98
5897.5 245.0
No.s Rmt
Required (Plan) 307 767.5
Received 205 512.5
Bal. to be Received 102 255
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

0 0

0 0 0 0 0 0 0 0 0 0 0 0 8 0 8 0 0
0 0 0 0 0 0 0 0 0 0 0 0 -8 0 -8 0 0

0 0 0 0 0 0 0 0 0 0 0 0 13 0 13 0 0
0 0 0 0 0 0 0 0 0 0 0 0 -13 0 -13 0 0

8 8 8 8 8 8 8 6
8 0 0 0 0 0 0 4 0 0 5 5 0 5 5 0 0
0 8 8 8 8 8 8 2 0 0 -5 -5 0 -5 -5 0 0
16 8 8 8 8 16 16 12 0 0 0 0 0 0 0 0 0
Total
Total Length Value Remarks
Nos (Aprox)
rmt
27 28 total 29 30 31
65 65 162.5 247000
450dia, 12no.s Pipes
76 76 190 Used By Substation
-11 -11 -27.5 Site
68 68 170 348500
0 0 46 46 115
22 22 55
40 40 100 302200
0 0 38 38 95
0 0 2 2 5
0 0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
134 134 335 2580170
5 0 45 45 112.5
-5 0 89 89 222.5
0 0 307 3477870