Professional Documents
Culture Documents
Plan 7
1
450 MM Received 0
Bal. to be
Recieved 7
Plan
2
600 MM Received
Bal. to be
Recieved
H
o
Plan l 4
Spigot & Socket RCC i
800 MM
3 Hume Pipe NP3 2.5mtr Received d
a
0
Bal. to be y
Recieved s 4
Plan
4
1000 MM Received
Bal. to be
Recieved
Plan 4
5
1400 MM Received 4
Bal. to be
Recieved 0
Per Day Requirements 0 0 0 30
Jan-18
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
16 28 28 28 28 21 17 14 10 10 10 10 10 10 13 0
0 0 22 0 10 0 0 22 0 22 0 0 0 54 48 63
5 5 5 5 10 10 10 9 5 8
0 0 0 0 6 12 10 0 0 0 0 16 51 36
9 9 15 15 15 15 15 15 15 15 15 15 15 6 6 6
0 0 0 10 0 0 20 0 0 0 0 11 11 5 15 16
9 9 15 5 15 15 -5 15 15 15 15 4 4 1 -9 -10
4 4 4 4 4 4
4 8 0 8 0 8 0
0 -4 4 -4 4 -4
58 104 96 128 130 124 104 96 80 86 70 70 70 70 50 24 24
No.s Rmt
Required (Plan) 758 1895
Received 703 1757.5
Bal. to be Received 55 137.5
Total
Total length Value
Nos (Aprox)
(rmt)
24 25 26 27 28 29 30 31 total
72 72 180.0 369000
9 0 61 61 152.5
0 1 69 114 285.0
28 28 70.0 539140
0 32 32 80.0
-4 -4 -10.0
24 24 42 17 5 16 20 5616280
received
S.No Description Of Material Dia As Per As per R4 Qty(no.s)
Boq(rmt) (no.s) up to
today
6 1400 MM 79 325
0 0
0 0 0 0 0 0 0 0 0 0 0 0 8 0 8 0 0
0 0 0 0 0 0 0 0 0 0 0 0 -8 0 -8 0 0
0 0 0 0 0 0 0 0 0 0 0 0 13 0 13 0 0
0 0 0 0 0 0 0 0 0 0 0 0 -13 0 -13 0 0
8 8 8 8 8 8 8 6
8 0 0 0 0 0 0 4 0 0 5 5 0 5 5 0 0
0 8 8 8 8 8 8 2 0 0 -5 -5 0 -5 -5 0 0
16 8 8 8 8 16 16 12 0 0 0 0 0 0 0 0 0
Total
Total Length Value Remarks
Nos (Aprox)
rmt
27 28 total 29 30 31
65 65 162.5 247000
450dia, 12no.s Pipes
76 76 190 Used By Substation
-11 -11 -27.5 Site
68 68 170 348500
0 0 46 46 115
22 22 55
40 40 100 302200
0 0 38 38 95
0 0 2 2 5
0 0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
134 134 335 2580170
5 0 45 45 112.5
-5 0 89 89 222.5
0 0 307 3477870