PROJECT: IDP IRAQ SITE: South Samara Ref No: IDP IRAQ/RA/ Serial No:
Erection and Dismantling of Scaffolds
JOB UNDER RISK ASSESSMENT: DATE OF ASSESSMENT:
(WAH)
NAME & POSITION OF THE
ASSESSOR:
Ibrahim Ghanim PTW Coordinator/ Wissam Anwar HSE Manager / Ziad Ibrahim Civil Engineer
Storing of Fall of material from Ensure top rail, Mid rail, & toe board is
material at height. provided.
Scaffold. All hand tools should be tied.
Covers all gaps/spaces in top working
platform (TWP).
5 5 25 3 1 3 HSE+ S.V
Page 2 of 6
PROJECT: IDP IRAQ SITE: South Samara Ref No: IDP IRAQ/RA/ Serial No:
Erection and Dismantling of Scaffolds
JOB UNDER RISK ASSESSMENT: DATE OF ASSESSMENT:
(WAH)
NAME & POSITION OF THE
ASSESSOR:
Ibrahim Ghanim PTW Coordinator/ Wissam Anwar HSE Manager / Ziad Ibrahim Civil Engineer
Page 3 of 6
PROJECT: IDP IRAQ SITE: South Samara Ref No: IDP IRAQ/RA/ Serial No:
Erection and Dismantling of Scaffolds
JOB UNDER RISK ASSESSMENT: DATE OF ASSESSMENT:
(WAH)
NAME & POSITION OF THE
ASSESSOR:
Ibrahim Ghanim PTW Coordinator/ Wissam Anwar HSE Manager / Ziad Ibrahim Civil Engineer
Page 4 of 6
PROJECT: IDP IRAQ SITE: South Samara Ref No: IDP IRAQ/RA/ Serial No:
Erection and Dismantling of Scaffolds
JOB UNDER RISK ASSESSMENT: DATE OF ASSESSMENT:
(WAH)
NAME & POSITION OF THE
ASSESSOR:
Ibrahim Ghanim PTW Coordinator/ Wissam Anwar HSE Manager / Ziad Ibrahim Civil Engineer
Environmental Dehydration Work rest rotation must be observed as heat HSE+ S.V
Hazards heat exhaustion prevention program.
Heat stroke. Cold drinking water is provided at the place of
Heat Stress work
Internal chronic disease
Appropriate persona' protective equipment such
and infection as dusk mask, safety goggles must be used.
4 4 16 Shade for rest is provided for break time and for 4 1 4
any weak workers.
In heavy sand storm, considering the wind
speed work can be cease.
COVID 19 infection lead to serious 3 4 12 All Employees temp should be checked at 2 2 4 HSE+ S.V
health damage or death main Gate.
Keep at least 2m distance between the
workers.
Wearing special PPE (face mask, gloves)
Using hand sanitizer for employees
Attend TBT and training for COVID 19.
Any employee feeling tired should inform
management and leave the site and should
recommend visiting the nearest health
facility.
Any employee feels tired at home should
not come to work.
Page 5 of 6
PROJECT: IDP IRAQ SITE: South Samara Ref No: IDP IRAQ/RA/ Serial No:
Erection and Dismantling of Scaffolds
JOB UNDER RISK ASSESSMENT: DATE OF ASSESSMENT:
(WAH)
NAME & POSITION OF THE
ASSESSOR:
Ibrahim Ghanim PTW Coordinator/ Wissam Anwar HSE Manager / Ziad Ibrahim Civil Engineer
Housekeeping Slips, Trips And falls 3 3 9 Ensure proper housekeeping in working 2 1 2 HSE+ S.V
location.
Maintain proper arrangement of hand tools.
Make clear access/egress all time.
Severity
1 2 3 4 5
Risk level
2 4 6 8 10
Likelihood.
Low
3 6 9 12 15
Medium
4 8 12 16 20
High
5 10 15 20 25
Severity Likelihood
1- No potential for injury, illness or incident 1- Very unlikely
2- Potential for minor injury, illness or incident 2- Unlikely
3- Potential for recordable injury, illness or incident 3- Likely
4- Potential for major incident, or major injury or illness causing short term disability 4- Very likely
5- Potential for major incident or major injury or illness causing a fatality or long-term disability 5- Certain
Page 6 of 6