Professional Documents
Culture Documents
RAB Cut and Fill
RAB Cut and Fill
A. Excavator
Uraian Volume Biaya Pemakaian
PC 200 2 Rp 185,000.00 720
Upah 1 Rp 250,000.00 900
Solar 240 Rp 4,080,000.00 90
MOB D MOB 2 Rp 7,500,000.00 2
Total
B. Dozer
C. Dump Truck
Uraian Volume Biaya Pemakaian
Sewa 6 Rp 900,000.00 90
D. Over head
Uraian Volume biaya Total
Operasional, Gaji &
3 Rp 29,500,000.00 Rp 88,500,000.00
Lain lain
Total Rp 2,209,000,000.00
lat Berat
Total Biaya
Rp 266,400,000
Rp 225,000,000.00
Rp 367,200,000.00
Rp 15,000,000.00
Rp 873,600,000
Total Biaya
Rp 486,000,000.00
Total
88,500,000.00
p 2,209,000,000.00