Followings are the aspects for consideration in a comprehensive EIA review.
• performance of scoping
• accuracy of impact prediction
• criteria used to evaluate significance
• comparison of alternatives
• effectiveness of proposed mitigation measures
• requirements for monitoring and impact management
A digital copy of EIA report (summary) can be accessed via https://enviro2.doe.gov.my/ekmc/more-
eia-report/. Those are the selected EIA reports by Department of Environment Malaysia for public viewing. i.e. one of the two given projects Choose one of the reports. You are required to review the report using the rubric/indicator given in Figure 1. For each rubric/indicator, write your view/analysis/reflection.
Figure 1
COMPONENTS INDICATOR / ELEMENT OF EVALUATION
1. Scoping Priority issues and Key components are A terms of
relevant impacts are involved reference/study identified guidelines are prepared 2. Impact The affected The estimation and Suitable database and Analysis environment prediction of main impact methodologies are (baseline) conditions categories, including - used are described indirect and cumulative effects - other relevant factors are highlighted. 3. Mitigation Necessary measures The specification of The follow up and or environmental contingency plans or non- monitoring management plan are standardised operating arrangements if identified. responses are included. strategies are untried or impacts uncertain are highlighted. 4. Residual Their scope, duration The relative importance to The possible Impact and irreversibility? dependent communities or compensation or ecological functions offset mechanisms
Mastering Opportunities and Risks in IT Projects: Identifying, anticipating and controlling opportunities and risks: A model for effective management in IT development and operation