2. TRANSPORTATION
1 Transportation of non-local materials 3574.25 3486.9 87.35 0
Sub Total 3574.25 3486.9 87.35 0
3. SKILLED LABOR
1 Skilled Labor 8606.2 8395.88 210.32 0
Sub Total 8606.2 8395.88 210.32 0
4. UNSKILLED LABOR
1 Unskilled Labor for Construction 11917.5 0 0 11917.5
3 Unskilled Labor for Local Materials 10323 7509.87 188.13 2625
4 Unskilled Labor for Porterage 0 0 0 0
Sub Total 22240.5 7509.87 188.13 14542.5
5. OTHER COST
5. OTHER COST, IF ANY 650 633.75 16.25 0
Sub Total 650 633.75 16.25 0
-9-