You are on page 1of 11
National Highways Authority of India aera (Ministry of Road Transport and Highways, Government of India) 3-5 WH 6, BHeT-10, arc, vi fel - 110 075 # G-5 & 6, Sector-10, Dwarka, Now Delhi-t10075 ‘FPY/Phone : 91-11-25074100 / 25074200 ada uss Usart oifeact (ae oRaet She ast sare, aR AH) oy NHAI/Policy Guidelines/ Procurement/2023 Policy Circular No.9.1.16/2023 dated 215 December, 2023 (Decision taken on E-Office File No. NHAV/CMD/QualifiedBidder/2022 (Comp. No. 149957) Sub: List of Provisionally Qualified Bidders for HAM Projects to avoid repetitive examination of biding documents by Technical Divisions - reg. A Bidder normally submits bids for civil works for different projects. The Technical Capacity & Financial Capacity of the same bidder is being assessed for each project by Technical Divisions which consumes a lot of energy and time. 2. In order to avoid repetitive examination of bids, the pre-qualification done in case of HAM projects for which bids were received, during the period from 01.10.2022 to 30.09.2023, have been taken into consideration. The relevant documents were obtained from the concerned Financial Consultants, 3. Accordingly, lists of provisionally technically qualified bidders for HAM Projects have been prepared and the same are attached at List A and List B with following details: (i) The List A contains Technical Capacity (EPC) upto which a bidder is eligible on the basis of assessment made earlier by Technical Divisions for the bids received during the period from 01.07.2023 to 30.09.2023 (containing technical score of last five years starting from 2018-19 to 2022-23) . (ii) The list B contains Technical Capacity (EPC) upto which a bidder is eligible on the basis of assessment made earlier by Technical Divisions for the bids received during the period from 01.10.2022 to 30.06.2023 (containing technical score of last five years starting from 2017-18 to 2021-22). As per Clause 2.2.2, technical capacity is determined for the last five years, therefore, for determining technical score for the current year 2023-24, the technical score of 2017-18 has been excluded. (iii) A particular bidder is eligible for the EPC mentioned against its respective name. However, if there is specific span/ special eligibility requirement in the project under bidding, the same needs to be evaluated from the bid received. (iv) Both the lists shall remain valid upto 30.06.2024. 4. __ Inview of above, to hasten the process of evaluation, Technical Division may assess the bids without referring to Annex-ll, Ill & IV of Appendix-IA of RFP for HAM Projects for the bidders mentioned in List A (Part I) and without referring to Annex Il & IV of Appendix: A of RFP for HAM Projects for the bidders mentioned at list A (Part Il) and list B, if the Estimated Project Cost of the subject project is less than or equal to the Estimated Project Cost declared in the list of Provisionally Qualified Bidders, and for rest of the criterion, bids shall be assessed by the Technical Divisions as, per requirement of the RFP. Contd...2/- Re Further, it is mentioned that these lists are not applicable for Standalone specialized Projects, therefore, Technical Division are required to carry out complete evaluation in such cases. 5. This issues with the approval of Competent Authority. Encl As stated above pwr (Sanjay Kumar Patel) General Manager (Coord.) To: All Officers of NHAI HQ/ ROs/ PIUs/ CMUs/ Site Offices Copy to: 1. Hindi Division for translation in Hindi. 2. Library for hosting the circular on library site. 3. Web Admin for circulation. List A Part-I- Provisionally Technically Qualified Bidders: Technical Capacity (EPC) upto which the Bidder is eligible as per assessment made earlier by NHAI Technical Divisions for the bids received during the period from 01.07.2023 to 30.09.2023 pertaining to HAM Projects s. Eligible for Estimated ae No, | Nameofthedidder | Project Costupt0 | (oy ge hai of which provisional eligi aie Ce of the bidder has been determined) = aa 4/6 laning of Bhaniyawala-Jollygrant 1 ce eee jects (P) 565.59 Rishikesh Km. 0.000 to Km 19.780 in the a Sateof UK on HAM 4/6 laning of Bhaniyawala-Jollygrant 2, | Samdaii Batol | sassy | Reem O00 token 10 nthe a Sate of UK on HAM, Tete 1. The aforementioned Bidders are eligible for the EPC mentioned above against their respective names. However, if there is a specific span/ special eligibility requirement in the project under bidding, the same needs to be evaluated from the Bid submitted by the Bidders. 2, Please note the above list is not applicable for Standalone specialized Projects, therefore, the complete evaluation in such cases shall be carried out based on the bids submitted. 3. The Technical Division may assess the bid without referring to Annex Il & IV of Appendix Us for HAM Projects if the Estimated Project Cost of the subject project is less or equal the Estimated Project Cost declared in the list of Provisionally Technically Qualified Bidders, and for the rest criteria the bid shall be assessed by the Technical Divisions as per the requirement of the RFP, Page 1 of 2 List A Part-II - Provisionally Technically Qualified Bidders: Technical Capacity (EPC) upto which the Bidder is eligible as per assessment made earlier by NHAI Technical Divisions for the bids received during the period from 01.07.2023 to 30.09.2023 pertaining to HAM Projects a Bligile for Estimated | Name of the Project 26, | Samara | UPR EnE He | ea wh vi 5 ince ofthe bidder has been determined) 4/6 laning of Bhaniyawala-Jollygrant hy [Reet eoas 565.59 Rishikesh Km. 0,000 to Km 19.780 in the ® state of UK on HAM. Note: 1. The aforementioned Bidders are eligible for the EPC mentioned above against their respective names, However, if there is a specific span/ special eligibility requirement in the project under bidding, the same needs to be evaluated from the Bid submitted by the Bidders. 2. Please note the above list is not applicable for Standalone specialized Projects, therefore, the complete evaluation in such cases shall be carried out based on the bids submitted. 3. The Technical Division may assess the bid without referring to Annex-Il & IV of Appendix-IA, for HAM Projects if the Estimated Project Cost of the subject project is less or equal the Estimated Project Cost declared in the list of Provisionally Technically Qualified Bidders, and for the rest criteria the bid shall be assessed by the Technical Divisions as per the requirement of the RFP, Page 2 of 2 List B Provisionally Technically Qualified Bidders: Technical Capacity (EPC) upto which the Bidder is eligible as per assessment made earlier by NHAI Technical Divisions for the bids received during the period from 01.10.2022 to 30.06.2023, pertaining to HAM Projects No. Name of the Bidder Eligible for Estimated Project Cost upto (Rs. incr.) Dinesh Chandra R Agarwal Infracon Private Ltd 1359.71 Name of the Project (on the bass of which provisional eligibility of thebidderhas beendetermined) | 4 laning of Devinagar Bypass (End) (Existing Km. 208.000 to Kasganj Bypass (End) {Existing Km.150.100) n the State of UP on HAM. APCO Infratech (P) Ltd, 1359.71 | 4 laning of Devinagar Bypass (End) (Existing Km. 208.000 to Kasganj Bypass (End) (Existing Km.150.100) n the State of UP on HAM. GR infraprojects Limited 1359.71 4 laning of Devinagar Bypass (End) (Existing Km. 208.000 to Kasganj Bypass (End) (Existing Km.150.100) n the State of UP on HAM. HG Infra Engineering Limited 1359.71 Four laning of NH 530B from Devinagar Bypass (End) (Existing Km. 208.000 of NH 530B/Design Km. 66.000) to Kasganj Bypass (End) (Existing Km.150.100 of NH 5308/ Design Km, 123.100) in the State of Uttar Pradesh on HAM mode Oriental Structures Engineers Pvt Ltd. 1359.71 4 laning of Devinagar Bypass (End) (Existing Km. 208.000 to Kasganj Bypass (End) (Existing Km.150.100) n the State of UP on HAM. IRB infrastructure Developers Limited 1358.71 4 laning of Devinagar Bypass (End) (Existing Km. 208,000 to Kasganj Bypass (End) (Existing Km.150.100) n the State of UP on HAM. Montecarlo Limited 1359.71 4 laning of Devinagar Bypass (End) (Existing Km. 208.000 to Kasganj Bypass (End) (Existing Km.150.100) n the State of UP on HAM. Page 1 of 7 Name of the Project (on the basis of which provisional eligibility of the bidder has been determined) 4 laning of Devinagar Bypass (End) (Existing Km. 208.000 to Kasganj Bypass (End) (Existing Km.150.100) n the State of UP on HAM, 4 laning of Devinagar Bypass (End) (Existing Km. 208.000 to Kasganj Bypass (End) (Existing Km.150.100) n the State of UP on HAM, Construction of 6-lane Greenfield Varanasi- Ranchi-Kolkata Highway km 288,600 to km 325.500 under Bharatmala in the State of Jharkhand on HAM (Pkg 11) Construction of 4 - Laning Kadapa (Junction with Kadapa Bypass Road) to Chinna Orampadu— (Pkg-1)_ on HAM under Bharatmala in state of AP Construction of 4 - Laning Kadapa (Junction with Kadapa Bypass Road) to Chinna Orampadu —(Pkg-1)_ on HAM under Bharatmala in state of AP Construction of 4 - Laning Kadapa (Junction with Kadapa Bypass Road) to Chinna Orampadu —(Pkg-1) on HAM under Bharatmala in state of AP a Eligible for Estimated * | ame of the Bidder | Project Cost upto (Rs. No. in Cr.) | Gawar Construction ae Limited 9 | KcCBuildcon (P) Ltd 1359.71 10 | Ceigall india Limited 1329.86 11 | Dilip Buildcon urd 1245.66 | 12. | kwr constructions Limited 1285.66 Megha Engineering & 13° | infrastructures Limited aoa Lakshmi infrastructure & 14 | developers india Put. Ltd. pee 15 | CDS infra Projects Limited 1215.02 Construction of 4 - Laning Kadapa (Junction with Kadapa Bypass Road) to Chinna Orampadu—(Pkg-1) on HAM under Bharatmala in state of AP 4 laning from Kasganj Bypass End (Existing Km, 150.100) to Chandan Nagar (Existing Km 96.200) in the State of UP on HAM. ~ Pkg 3 Page 2 of 7 Ss. No. Name of the Bidder Project Cost upto (Rs. ince) Name of the Project (on the basis of which provisional eligibility of the bidder has been determined) 16 Brij Gopal Construction Co. Pvt. Ltd 1215.02 4 laning from Kasganj Bypass End (Existing Km, 150.100 } to Chandan Nagar (Existing Km 96.200) inthe State of UP on HAM. Pkg 3 7 Barbrik Project Limited 1186.00 Construction of 6-lane Greenfield Varanasi- Ranchi-Kolkata Highway km 253.000 to km 288.600 under Bharatmala in the State of Jharkhand on HAM (Pkg 10) 18, MG Contractors Pvt Ltd 1160.02 4-Laning of Behsuma - Bijnor Section (Existing chainage 39/240) to. (Existing chainage 89/590) in the State of UP on HAM under Bharatmala 19 NNKC Projects Private Limited 160,02 4-Laning of Behsuma - Bijnor Section (Existing chainage 39/240) to (Existing chainage 89/590) in the State of UP on HAM under Bharatmala 20 Kalyan Toll infrastructure Limited 1113.08 4 laning of Boregaon Buzurg to Shahpur section Km. 139,000 to Km. 186.000 under Bharatmala in the State of MP on HAM. 21 Adani Enterprises Limited 1113.08 4 Ianing of Boregaon Buzurg to Shahpur section Km. 139.000 to Km. 186.000 under Bharatmala in the State of MP on HAM. 22 Prakash Asphaltings And Toll Highways India Ita. 1113.08, 4 laning of Boregaon Buzurg to Shahpur section Km, 139.000 to km. 186.000 under Bharatmala in the State of MP on HAM 23 Kalthia Engineering & Construction Limited 1113.08 4 laning of Boregaon Buzurg to Shahpur section Km. 139,000 to Km. 186.000 under Bharatmala in the State of MP on HAM 24 | Ravitnfrabuild Projects Pvt td 1083.45 Construction of 4/6 lane Bypass for Belagavi city km 11.773 to km, 46.253 in the State of Karnataka on HAM Pkg 1 Page 3 of 7 Name of the Bidder Eligible for Estimated Project Cost upto (Rs. incr) Name of the Project. (on the basis of which provisional eligibility of the bidder has been determined) 25 Raj Corporation Ltd. 978.88 4-Laning of MP/UP Border to Kabrai section km 197.000 to km 242.991 (Sagar-Kabrai Package-5) under Bharat Mala in the State of UP on HAM 26 Bansal Construction Works Private Limited 978.88 4-Laning of MP/UP Border to Kabrai section km 197.000 to km 242.991 (Sagar-Kabrai Package-5) under Bharat Mala in the State of UP on HAM 27 VRC Constructions (I) Pvt La. 969.8 4 Laning of Abohar Existing Km. 49+070 to Fazilka Existing Km. 80#655 and Construction of New 4-lanes Greenfield highway of Abohar bypass Existing Km '58+230 Existing Km 42+305, Abohar - Fazilka Road on HAM in the state of Punjab under Bharatmala 28 JM Mbatre Infra Pvt. Ltd 961.47 6 laning of Surat — Nashik ~Ahmednagar — Solapur—MH/KNT Border Greenfield stretch [Pkg -XIV from km $12,000 (Hasapur) to km 548.400 (Badadal)] in the State of Maharashtra to be executed on HAM under Bharatmala 29 Chetak Enterprises Limited 940.18 4-taning of Phagwara to Hoshiarpur road including Phagwara & Hoshiarpur Bypass under Bharatmala from Ch. -0.600 to Ch. 46,902 & Ch. 7.780 to Ch. 8.900, in the State of Punjab on HAM 30 Bekem Infra Projects Pvt. Ld. 881.57 Construction of 4 lane Access Controlled New Greenfield Highway Section (Mancherial ~ Warangal) from Puttapaka village at to Pangidipalle village under Other Economic Corridor programme as part of Nagpur — Vijayawada Corridor on HAM in the state of Telangana (Pkg!) 31 Krishna Constellation Private Limited 871.96 Construction of 4 laning of Bakarpur- Manikpur road km 0+00) and terminating at SH-74 near manikpur (38+814) under Bharatmala on HAM in the state of Bihar Page 4 of 7 Name of the Project (on the basis of which provisional eligibility of Construction of 4 laning of Bakarpur- Manikpur road km 0+00) and terminating at SH-74 near manikpur (38+814) under Bharatmala on HAM in the state of Bihar Construction of 6-lane Greenfield Varanasi Ranchi-Kolkata Highway (Km. 04000 to Km. 27+000) under Bharatmala in the states of T 4 Lane with Paved Shoulders from in Belgaum —Hungund — Raichur in the State of 4 Lane with Paved Shoulders from in Belgaum - Hungund — Raichur in the State of 4 Laning of Raghogarh Existing Ch. 294555 to Nanasa Existing Ch. 95+000) under Bharatmala Phase | in the State of MP on Construction of (i) 41ane highway from Vidisha to Hinotiya km 0+000 to Km 274000 (Vidisha ~ Mehulwa- Talbehat Pkg-!) (i) @taning of Vidisha— to Morikori from Km 39+000 to 59+476 under Bharatmala in the State of MP on HAM Rehabilitation and Up gradation from 4 to 8 laning of Chandikhole - Paradip from Km.60.000 to Km.76.646 (Pkg - 4) in the : Eligible for Estimated No. Name of the Bidder Project Cost upto (Rs. ace) the bidder has been determined) RKO Construction Private 32 pean 871.96 gg | PNCInfratech Ut, 868.91 UP and Bihar on HAM shankaranarayana 34 | Constructions Private 836.65 Limited Karnataka on HAM (Pkg-S) 35 Patel nas 823.85 pi Karnataka on HAM Shreeji Infrastructure India 36 ne 814.43 HAM 37 Ashok Buildcon Ltd. 787.86, 38. | Rail Vikas Nigam Limited 7738 | State of Odisha on HAM a | 39. | KM Projects Limited 704.34 Construction of 4-Lane Access Controlled Greenfield Highway section (Warangal- Khammam under other Economic Corridor (NH(O)) programme on HAM in the State of Telangana (Pkg-II). Page 5 of 7 No. Name of the Bidder Eligible for Estimated Project Cost upto (Rs. in Cr.) Name of the Project {on the basis of which provisional eligibility of ‘the bidder has been determined) 40 VBD Projects Pvt. Ltd 704.34 Construction of 4-Lane Access Controlled Greenfield Highway section (Warangal- Khammam under other Economic Corridor (NH(O}) programme on HAM in the State of Telangana (Pkgull). 41 RR Constructions & Infrastructure 684.03 4 Laning existing km 346.300 to km 39.380 of ‘Anantapur ~ Muchukota section on HAM, in the state of AP. 42 SRC Infra Developers 684.03 4 Laning existing km 346.300 to km 39.380 of Anantapur ~ Muchukota section on HAM, in the state of AP. 43 Raj Path Infracon Pvt. Ltd. 675.15 | Development of 6-Lane Access Controlled Greenfield Highway from Vankarakunta (Ch. 454700) to Odulapalle (Ch, 724000) Bengaluru ~ Vijayawada on HAM under Bharatmala in the State of AP (Pkg-3) 44 Ramalingam Construction Company Pvt Ltd 662.83 Construction of access controlled 4 laning with paved shoulder from Mysore to Kushalnagara to Srirangapatna bypass near Paschima Vahini in the state of Karnataka (Pkg-V). 45, Ram Kumar Contractor Private Limited 615.13 | construction of 6-lane Greenfield Ambala Ring Road starting from junction with ShamliAmbala under Bharatmala in the State of Haryana on HAM, 46 M/S NSPR Constructions India (P) Ltd 594.1 Development of 6-Lane Access Controlled Greenfield Highway from Kodur (Ch. 0+000) to Vanavolu (Ch. 24+300) Bengaluru - Vijayawada Economie Corridor on HAM under Bharatmala in the State of AP (Pkg-1) Page 6 of 7 Name of the Bidder Project Cost upto (Rs. incr.) ‘Name of the Project (on the basis of which provisional eligibility of the hidder has been determined) a7 Rajendra Singh Bhamboo Infra (P) Utd. 594.1 Development of 6-Lane Access Controlled Greenfield Highway from Kodur (Ch. 0+000) to Vanavolu (Ch. 24+300) Bengaluru — Vijayawada Economic Corridor on HAM under Bharatmala in the State of AP (Pkg-1) 48. RNS Infrastructure Limited 589.5 Construction of access controlled 4 laning with paved shoulder from Mysore to Kushalnagara on HAM in the state of Karnataka (Pkg-III) 49 Bharat Constructions (india) Pvt. Ltd, 568.42 Development of Rudrapur Bypass in the State of Uttarakhand on HAM 50 Dhariwal Buildtech Limited 484.54 Rehabilitation, Up-gradation and Construction of 2 Lane with paved Shoulder of Selected road stretches from Bakaur to Parsarma Section-I Parsarma to Bariyahi Section-II, Bangaon Bypass Section-Ill & Mahishi Spur Road Section IV under BRT Scheme Bharatmala in the state of Bihar on HAM 51 Nirmal Build infra Private Limited 357.42 Rehabilitation and Upgradation of Chorma~ Bairgania to 2 lane with paved shoulders in the state of Bihar on HAM Note: 1. The aforementioned Bidders are eligible for the EPC mentioned above against theit respective names. However, if there is a specific span/ special eligibility requirement in the project under bidding, the same needs to be evaluated from the Bid submitted by the Bidders, 2. Please note the above list is not applicable for Standalone specialized Projects, therefore, the complete ‘evaluation in such cases shall be carried out based on the bids submitted. 3, The Technical Division may assess the bid without referring to Annex-II & IV of Appendix-IA for HAM Projects if the Estimated Project Cost of the subject project is less or equal the Estimated Project Cost dectared in the list of Provisionally Technically Qualified Bidders, and for the rest criteria the bid shall be assessed by the Technical Divisions as per the requirement of the REP. Page 7 of 7

You might also like