Pkg -07

Concrete Consumed Qty


As Per Plant Production up to 9-05-2021
(site use) As per Plant
Grade Of Concrete As per BOQ Qty M3
production M3 Balance M3

M-15 9795.99 1313.5 8482.49


M-20 7134.30 3975.8 3158.50
M-25 111.98 111.98
M-30 5043.47 3820.5 1222.97
M-35 2404.80 1069.7 1335.10
M-40 291.52 63.9 227.62
DLC 2634.53 1031.5 1603.03
M-40PQC 5456.64 1933.1 3523.54
Total Concrete 32873.23 13208 19665.23
Concrete Production Date -24-10-2021 To 26-11-2021
Total Cement Bag cutting In Plant 2030 Bag
Plant
Grade Production Qty As per Design As per site use Cement Avg Cement
In M3 Cement bag Cement in bag Consume in bag Saving in %

M-15 PCC 153 5.28 3.96 605.9 25

M-20 Pcc 49.2 6 4.50 221.4 25

M-20 RCC 226.3 6.32 4.68 1058.4 26

M-30 RCC 19.5 7.6 7.22 140.8 5


Total 2026.4
06*06 mtr drain concrete qty qty
Length width Depth Qty
PCC 1 1.04 0.1 0.104
Raft 1 0.84 0.12 0.101
Wall 1 0.12 0.6 0.144
Slab 1 0.84 0.12 0.101
Cement Recive Details Concrete Production Details Consumption Details
M-20 M40
Cement Cum M-15 M-20 Pcc M-30 Consum
Qty In RCC M-35 RCC Cum.
Recive Brand INVOICE No Qty in Date Location Side RFI No. Description GRADE As per As per As per DLC PQC e Balance
ton As per As per Site As per Consume
Date Ton Site Site Site in Ton
Site Site
12/15/2020 ultratech opc 43g 8970399906 25 25 12/28/2020 04+491 BHS 317 Head wall PCC M-15 3.30 0.871 0.871 24.129
25 12/31/2020 04+491 BHS 370 Headwal 1st Lift M-20 10.75 3.225 4.096 20.904
25 1/1/2021 03+232 BHS 392 Head wall PCC M-15 2.70 0.713 4.809 20.191
25 1/1/2021 04+491 BHS 420 Pipe Bedding M-20 3.70 1.110 5.919 19.081
25 1/2/2021 03+232 BHS 421 Pipe Bedding M-20 3.50 1.050 6.969 18.031
25 1/4/2021 03+232 BHS 451 Head wall 1st Lift M-20 9.00 2.700 9.669 15.331
25 1/4/2021 04+978 BHS 454 Head wall PCC M-15 2.70 0.713 10.382 14.618
25 1/9/2021 03+232 LHS 584 Headwal 2nd Lift M-20 4.70 1.410 11.792 13.208
25 1/9/2021 04+491 BHS 585 Headwal 2nd Lift M-20 14.30 4.290 16.082 8.918
25 1/13/2021 03+232 LHS 639 Headwal 3rd & Final Lift M-20 1.90 0.570 16.652 8.348
25 1/13/2021 03+232 BHS 638 Craddle Portion M-20 3.60 1.080 17.732 7.268
25 1/13/2021 04+491 BHS 636 Craddle Portion M-20 4.10 1.230 18.962 6.038
25 1/14/2021 04+491 BHS 662 A Headwal 3rd & Final Lift M-20 4.35 1.305 20.267 4.733
25 1/14/2021 05+432 BHS 662 A Head wall PCC M-15 2.70 0.713 20.980 4.020
25 1/15/2021 03+232 RHS 687 Headwal 2nd Lift M-20 4.70 1.410 22.390 2.610
1/16/2021 JK Lakshmi opc 43g 5050463821 25 50 1/16/2021 05+432 BHS 705 Headwal 1st Lift M-20 9.00 2.700 25.090 24.910
50 1/16/2021 07+073 BHS 706 Head wall PCC M-15 2.70 0.713 25.803 24.197
50 1/18/2021 03+232 RHS 717 Headwal 3rd & Final Lift M-20 1.90 0.570 26.373 23.627
50 1/18/2021 07+073 BHS 718 Headwal 1st Lift M-20 9.00 2.700 29.073 20.927
50 1/19/2021 04+978 BHS 737 Headwal 1st Lift M-20 9.00 2.700 31.773 18.227
50 1/20/2021 07+073 BHS 752 A Pipe Bedding M-20 3.00 0.900 32.673 17.327
50 1/20/2021 07+148 BHS 758 Head wall PCC M-15 2.70 0.713 33.386 16.614
50 1/21/2021 07+148 RHS 776 Headwal 1st Lift M-20 4.50 1.350 34.736 15.264
50 1/21/2021 04+978 BHS 774 Pipe Bedding M-20 3.00 0.900 35.636 14.364
50 1/22/2021 07+148 LHS 792 Headwal 1st Lift M-20 4.50 1.350 36.986 13.014
50 1/22/2021 07+424 BHS 793 Head wall PCC M-15 2.70 0.713 37.699 12.301
50 1/23/2021 04+978 BHS 806 Craddle Portion M-20 3.00 0.900 38.599 11.401
50 1/23/2021 07+073 RHS 804 Headwal 2nd Lift M-20 4.70 1.410 40.009 9.991
50 1/23/2021 07+148 BHS 810 Pipe Bedding M-20 3.00 0.900 40.909 9.091
50 1/25/2021 04+978 BHS 830 C Headwal 2nd Lift M-20 9.35 2.805 43.714 6.286
50 1/27/2021 07+073 BHS 848 Craddle Portion M-20 3.00 0.900 44.614 5.386
1/29/2021 JK Lakshmi opc 43g 5050467365 25 75 1/29/2021 - - - - - - - - 44.614 30.386
1/29/2021 JK Lakshmi opc 43g 5050467414 25 100 1/29/2021 - - - - - - - 44.614 55.386
100 1/30/2021 07+073 LHS 898 Headwal 2nd Lift M-20 4.70 1.410 46.024 53.976
100 2/1/2021 07+148 LHS 921 Headwal 2nd Lift M-20 4.70 1.410 47.434 52.566
100 2/1/2021 07+148 BHS 922 Craddle Portion M-20 3.00 0.900 48.334 51.666
100 2/2/2021 04+978 BHS 929 Headwal 3rd & Final Lift M-20 3.70 1.110 49.444 50.556
100 2/3/2021 07+148 RHS 942 Headwal 2nd Lift M-20 4.70 1.410 50.854 49.146
100 2/3/2021 07+424 RHS 944 Headwal 1st Lift M-20 4.50 1.350 52.204 47.796
100 2/6/2021 07+073 BHS 979 Headwal 3rd & Final Lift M-20 3.70 1.110 53.314 46.686
100 2/6/2021 07+148 BHS 980 Headwal 3rd & Final Lift M-20 3.70 1.110 54.424 45.576
100 2/6/2021 06+757 BHS 976 Head wall PCC M-15 3.30 0.871 55.295 44.705
100 2/8/2021 07+424 LHS 991 Headwal 1st Lift M-20 4.50 1.350 56.645 43.355
100 2/9/2021 06+757 BHS 998 Headwal 1st Lift M-20 10.75 3.225 59.870 40.130
100 2/9/2021 08+082 BHS 997 Head wall PCC M-15 3.30 0.871 60.741 39.259
100 2/10/2021 06+757 BHS 1008 Pipe Bedding M-20 3.70 1.110 61.851 38.149
100 2/10/2021 07+424 BHS 1012 Pipe Bedding M-20 4.10 1.230 63.081 36.919
100 2/11/2021 05+432 RHS 1026 A Pipe Bedding M-20 1.50 0.450 63.531 36.469
100 2/12/2021 06+757 BHS 1031 Craddle Portion M-20 4.30 1.290 64.821 35.179
100 2/12/2021 07+424 BHS 1037 B Craddle Portion M-20 4.30 1.290 66.111 33.889
100 2/12/2021 05+432 RHS 1039 A Headwal 2nd Lift M-20 4.70 1.410 67.521 32.479
100 2/12/2021 05+432 RHS 1040 A Craddle Portion M-20 1.50 0.450 67.971 32.029
100 2/13/2021 08+082 BHS 1043 Headwal 1st Lift M-20 10.75 3.225 71.196 28.804
2/18/2021 JK Lakshmi opc 43g 5050473263 30 130 2/18/2021 05+432 RHS 1077 Headwal 3rd & Final Lift M-20 1.90 0.570 71.766 58.234
130 2/18/2021 09+363 BHS 1076 Head wall PCC M-15 4.00 1.056 72.822 57.178
2/19/2021 JK Lakshmi opc 43g 5050473736 30 160 2/19/2021 - - - - - - - - 72.822 87.178
2/20/2021 JK Lakshmi opc 43g 5050473873 25 185 2/20/2021 06+757 BHS 1078 Headwal 2nd Lift M-20 14.30 4.290 77.112 107.888
185 2/20/2021 07+424 RHS 1081 Headwal 2nd Lift M-20 4.70 1.410 78.522 106.478
185 2/20/2021 08+082 BHS 1085 Pipe Bedding M-20 3.60 1.080 79.602 105.398
Cement Recive Details Concrete Production Details Consumption Details
M-20 M40
Cement Cum M-15 M-20 Pcc M-30 Consum
Qty In RCC M-35 RCC Cum.
Recive Brand INVOICE No Qty in Date Location Side RFI No. Description GRADE As per As per As per DLC PQC e Balance
ton As per As per Site As per Consume
Date Ton Site Site Site in Ton
Site Site
185 2/20/2021 09+363 BHS 1086 Headwal 1st Lift M-20 13.70 4.110 83.712 101.288
185 2/22/2021 07+424 LHS 1106 Headwal 2nd Lift M-20 4.70 1.410 85.122 99.878
185 2/22/2021 09+748 LHS Head wall PCC M-15 1.60 0.422 85.544 99.456
185 2/24/2021 09+748 LHS Headwal 1st Lift M-20 5.40 1.620 87.164 97.836
185 2/26/2021 06+757 BHS 1157 Headwal 3rd & Final Lift M-20 4.30 1.290 88.454 96.546
185 2/26/2021 07+424 BHS 1154 Headwal 3rd & Final Lift M-20 3.70 1.110 89.564 95.436
185 2/26/2021 09+363 LHS 1151 Pipe Bedding M-20 4.00 1.200 90.764 94.236
185 2/27/2021 09+363 LHS 1106 Headwal 2nd Lift M-20 8.10 2.430 93.194 91.806
185 2/27/2021 09+363 LHS 1156 Craddle Portion M-20 4.90 1.470 94.664 90.336
3/1/2021 JK Lakshmi opc 43g 5050476976 25 210 3/1/2021 05+432 LHS Pipe Bedding M-20 1.45 0.435 95.099 114.901
3/1/2021 JK Lakshmi opc 43g 5050476978 25 235 3/1/2021 08+082 BHS Craddle Portion M-20 4.10 1.230 96.329 138.671
235 3/3/2021 09+363 LHS Headwal 3rd & Final Lift M-20 2.75 0.825 97.154 137.846
235 3/4/2021 05+432 LHS Craddle Portion M-20 1.50 0.450 97.604 137.396
235 3/6/2021 05+432 LHS Headwal 2nd Lift M-20 4.65 1.395 98.999 136.001
235 3/6/2021 09+363 RHS Bed Pcc Below Pipe M-20 4.00 1.200 100.199 134.801
235 3/8/2021 09+748 LHS Pipe Bedding M-20 1.50 0.450 100.649 134.351
235 3/8/2021 05+432 LHS Headwal 3rd & Final Lift M-20 1.85 0.555 101.204 133.796
235 3/8/2021 08+738 LHS Head wall PCC M-15 1.70 0.449 101.653 133.347
235 3/10/2021 09+363 LHS Craddle Portion M-20 4.90 1.470 103.123 131.877
235 3/10/2021 08+082 RHS Headwal 2nd Lift M-20 7.30 2.190 105.313 129.687
235 3/10/2021 09+748 LHS Craddle Portion M-20 1.70 0.510 105.823 129.177
235 3/12/2021 09+363 RHS Headwal 2nd Lift M-20 8.10 2.430 108.253 126.747
235 3/15/2021 08+738 LHS Headwal 1st Lift M-20 5.70 1.710 109.963 125.037
235 3/16/2021 08+082 LHS Headwal 2nd Lift M-20 7.30 2.190 112.153 122.847
235 3/16/2021 04+905 BHS Slab culvert pcc A1,A2 M-15 16.00 4.224 116.377 118.623
235 3/17/2021 03+670 BHS MB culvert pcc A1,A2 M-15 27.00 7.128 123.505 111.495
235 3/17/2021 09+363 RHS Headwal 3rd & Final Lift M-20 2.70 0.810 124.315 110.685
235 3/20/2021 09+748 LHS Headwal 2nd Lift M-20 7.20 2.160 126.475 108.525
235 3/22/2021 09+748 LHS Headwal 3rd & Final Lift M-20 2.20 0.660 127.135 107.865
235 3/22/2021 07+844 BHS Head wall PCC M-15 2.70 0.713 127.848 107.152
235 3/24/2021 07+844 LHS Headwal 1st Lift M-20 4.50 1.350 129.198 105.802
235 3/26/2021 08+082 LHS Headwal 3rd & Final Lift M-20 4.30 1.290 130.488 104.512
235 3/26/2021 08+738 RHS Head wall PCC M-15 1.70 0.449 130.937 104.063
235 3/27/2021 08+738 RHS Headwal 1st Lift M-20 5.70 1.710 132.647 102.353
235 4/1/2021 08+738 BHS Pipe Bedding M-20 7.50 2.250 134.897 100.103
235 4/1/2021 12+340 BHS Head wall PCC M-15 2.70 0.713 135.610 99.390
235 4/2/2021 13+876 BHS Head wall PCC M-15 2.70 0.713 136.323 98.677
235 4/3/2021 14+569 BHS Head wall PCC M-15 2.70 0.713 137.036 97.964
235 4/3/2021 14+904 BHS Head wall PCC M-15 3.30 0.871 137.907 97.093
235 4/5/2021 08+738 LHS Headwal 2nd Lift M-20 5.30 1.590 139.497 95.503
235 4/6/2021 08+738 BHS Craddle Portion M-20 9.00 2.700 142.197 92.803
235 4/6/2021 14+569 BHS Headwal 1st Lift M-20 9.00 2.700 144.897 90.103
235 4/9/2021 08+738 RHS Headwal 2nd Lift M-20 5.30 1.590 146.487 88.513
235 4/9/2021 07+844 RHS Headwal 1st Lift M-20 4.50 1.350 147.837 87.163
235 4/9/2021 14+904 LHS Headwal 1st Lift M-20 5.60 1.680 149.517 85.483
235 4/10/2021 14+904 RHS Headwal 1st Lift M-20 5.60 1.680 151.197 83.803
235 4/12/2021 08+738 BHS Headwal 3rd & Final Lift M-20 4.70 1.410 152.607 82.393
235 4/12/2021 12+340 BHS Headwal 1st Lift M-20 9.00 2.700 155.307 79.693
235 4/12/2021 13+876 BHS Headwal 1st Lift M-20 9.00 2.700 158.007 76.993
235 4/12/2021 14+569 BHS Pipe Bedding M-20 3.00 0.900 158.907 76.093
235 4/12/2021 09+748 RHS Head wall PCC M-15 1.60 0.422 159.329 75.671
235 4/12/2021 09+748 RHS Headwal 1st Lift M-20 5.30 1.590 160.919 74.081
4/21/2021 JK Lakshmi opc 43g 5050491814 25 260 4/21/2021 - - - - - - 160.919 99.081
4/21/2021 JK Lakshmi opc 43g 5050491775 25 285 4/21/2021 - - - - - - 160.919 124.081
4/22/2021 JK Lakshmi opc 43g 5050491895 25 310 4/21/2021 - - - - - - 160.919 149.081
4/22/2021 JK Lakshmi opc 43g 5050491817 25 335 4/21/2021 - - - - - - 160.919 174.081
335 5/6/2021 14+904 BHS Pipe Bedding M-20 - 7.50 - 2.250 163.169 171.831
335 5/6/2021 13+876 BHS Pipe Bedding M-20 - 3.00 - 0.900 164.069 170.931
Cement Recive Details Concrete Production Details Consumption Details
M-20 M40
Cement Cum M-15 M-20 Pcc M-30 Consum
Qty In RCC M-35 RCC Cum.
Recive Brand INVOICE No Qty in Date Location Side RFI No. Description GRADE As per As per As per DLC PQC e Balance
ton As per As per Site As per Consume
Date Ton Site Site Site in Ton
Site Site
335 5/7/2021 14+569 BHS Craddle Portion M-20 - 3.00 - 0.900 164.969 170.031
5/8/2021 ultratech opc 43g 8970415590 30 365 5/8/2021 07+844 LHS Pipe Bedding M-20 - 2.00 - 0.600 165.569 199.431
5/8/2021 ultratech opc 43g 8970415592 30 395 5/8/2021 09+748 RHS Pipe Bedding M-20 - 1.50 - 0.450 166.019 228.981
395 5/8/2021 03+670 A1 MNB Raft M-30 70.00 26.600 192.619 202.381
395 5/10/2021 09+748 RHS Headwal 2nd Lift M-20 7.20 2.160 194.779 200.221
395 5/10/2021 14+569 BHS Headwal 2nd Lift M-20 9.30 2.790 197.569 197.431
395 5/10/2021 07+595 A1 MNB PCC M-15 13.50 3.564 201.133 193.867
395 5/11/2021 09+748 RHS Craddle Portion M-20 1.70 0.510 201.643 193.357
395 5/11/2021 14+904 BHS Craddle Portion M-20 9.00 2.700 204.343 190.657
395 5/11/2021 14+904 RHS Headwal 2nd Lift M-20 5.30 1.590 205.933 189.067
395 5/11/2021 07+844 LHS Headwal 2nd Lift M-20 4.70 1.410 207.343 187.657
395 5/11/2021 13+876 BHS Craddle Portion M-20 3.00 0.900 208.243 186.757
395 5/11/2021 19+750 BHS Head wall PCC M-15 2.70 0.713 208.956 186.044
395 5/12/2021 14+904 LHS Headwal 2nd Lift M-20 5.30 1.590 210.546 184.454
395 5/12/2021 19+750 BHS Headwal 1st Lift M-20 8.90 2.670 213.216 181.784
395 5/15/2021 13+876 BHS Headwal 2nd Lift M-20 9.30 2.790 216.006 178.994
395 5/15/2021 14+904 BHS Headwal 3rd & Final Lift M-20 4.70 1.410 217.416 177.584
395 5/15/2021 14+569 BHS Headwal 3rd & Final Lift M-20 3.70 1.110 218.526 176.474
395 5/15/2021 09+748 RHS Headwal 3rd & Final Lift M-20 2.20 0.660 219.186 175.814
395 5/15/2021 19+750 BHS Pipe Bedding M-20 3.00 0.900 220.086 174.914
395 5/15/2021 03+670 A2 MNB RAFT M-30 70.00 26.600 246.686 148.314
395 5/17/2021 07+595 P1 MNB PCC M-15 10.00 2.640 249.326 145.674
395 5/17/2021 03+670 A1 MNB Wall 1st lift M-30 15.00 5.700 255.026 139.974
395 5/17/2021 19+750 BHS Headwal 2nd Lift M-20 9.30 2.790 257.816 137.184
395 5/17/2021 19+750 BHS Craddle Portion M-20 3.00 0.900 258.716 136.284
395 5/17/2021 13+876 BHS Headwal 3rd & Final Lift M-20 3.70 1.110 259.826 135.174
395 5/17/2021 12+340 BHS Pipe Bedding M-20 4.10 1.230 261.056 133.944
395 5/17/2021 07+844 RHS Pipe Bedding M-20 2.00 0.600 261.656 133.344
395 5/18/2021 15+540 BHS HW Pcc M-15 2.70 0.713 262.369 132.631
395 5/18/2021 19+750 BHS Headwal 3rd & Final Lift M-20 3.70 1.110 263.479 131.521
395 5/18/2021 07+844 BHS Craddle Portion M-20 4.20 1.260 264.739 130.261
395 5/18/2021 12+340 BHS Headwal 2nd Lift M-20 9.30 2.790 267.529 127.471
395 5/18/2021 07+844 BHS Headwal 3rd & Final Lift M-20 1.90 0.570 268.099 126.901
395 5/18/2021 12+340 BHS Craddle Portion M-20 3.70 1.110 269.209 125.791
395 5/19/2021 15+540 BHS Headwal 1st Lift M-20 8.90 2.670 271.879 123.121
395 5/19/2021 15+540 BHS Pipe Bedding M-20 3.00 0.900 272.779 122.221
395 5/19/2021 07+844 RHS Headwal 2nd Lift M-20 4.70 1.410 274.189 120.811
395 5/19/2021 12+340 BHS Headwal 3rd & Final Lift M-20 3.70 1.110 275.299 119.701
395 5/20/2021 15+540 BHS Headwal 2nd Lift M-20 9.30 2.790 278.089 116.911
395 5/20/2021 07+844 RHS Headwal 3rd & Final Lift M-20 2.00 0.600 278.689 116.311
395 5/20/2021 03+670 A1 Wall 2nd Lift M-30 14.70 5.586 284.275 110.725
395 5/21/2021 15+540 BHS Craddle Portion M-20 3.00 0.900 285.175 109.825
5/22/2021 JK Lakshmi opc 43g 5050498263 32 427 5/22/2021 15+540 BHS Headwal 3rd & Final Lift M-20 3.70 1.110 286.285 140.715
427 5/22/2021 16+505 BHS Head wall PCC M-15 2.70 0.713 286.998 140.002
5/24/2021 JK Lakshmi opc 43g 5050498608 20 447 5/24/2021 03+670 A2 Wall A2 1st Lift M-30 15.10 5.738 292.736 154.264
447 5/24/2021 16+505 BHS Headwal 1st Lift M-20 9.00 2.700 295.436 151.564
447 5/25/2021 21+850 BHS Head wall PCC M-15 2.70 0.713 296.149 150.851
447 5/25/2021 21+850 BHS Headwal 1st Lift M-20 9.00 2.700 298.849 148.151
447 5/26/2021 16+505 BHS Pipe Bedding M-20 2.50 0.750 299.599 147.401
447 5/27/2021 16+505 BHS Craddle Portion M-20 2.50 0.750 300.349 146.651
447 27.05-21 03+670 A2 Wall A2 2nd Lift M-30 14.70 5.586 305.935 141.065
447 28.05-21 16+505 BHS Headwal 2nd Lift M-20 9.30 2.790 308.725 138.275
447 29.05-21 16+505 BHS Headwal 3rd & Final Lift M-20 3.75 1.125 309.850 137.150
447 01.06-21 03+670 A1 2527 Wall A1 3rd Lift M-30 14.70 5.586 315.436 131.564
Cement Recive Details Concrete Production Details Consumption Details
M-20 M40
Cement Cum M-15 M-20 Pcc M-30 Consum
Qty In RCC M-35 RCC Cum.
Recive Brand INVOICE No Qty in Date Location Side RFI No. Description GRADE As per As per As per DLC PQC e Balance
ton As per As per Site As per Consume
Date Ton Site Site Site in Ton
Site Site
6/2/2021 JK Lakshmi opc 43g 5050500605 25 472 - - - 315.436 156.564
6/2/2021 JK Lakshmi opc 43g 5050500761 25 497 - - - 315.436 181.564
497 03.06-21 03+670 A1 2539 A1wall Final Lift M-30 3.70 1.406 316.842 180.158
497 07.06-21 07+595 A2 2621 Pcc M-15 13.50 3.564 320.406 176.594
497 10.06-21 03+670 A2 2621 A2wall 3rd Lift M-30 14.70 5.586 325.992 171.008
6/13/2021 JK Lakshmi opc 43g 5050503777 25 522 - - - 325.992 196.008
6/13/2021 JK Lakshmi opc 43g 5050503783 25 547 - - - 325.992 221.008
547 14.06-21 03+670 A2 2639 A2wall Final Lift M-30 3.70 1.406 327.398 219.602
547 14.06-21 10+630 B/s 2642 Head wall PCC M-15 2.70 0.713 328.111 218.889
547 15.06-21 10+630 B/s 2655 Headwal 1st Lift M-20 9.00 2.700 330.811 216.189
547 18.06-21 04+905 A1,A2 2695 Footing M-30 50.00 19.000 349.811 197.189
547 18.06-21 07+595 A1 2694 Footing M-30 70.00 26.600 376.411 170.589
547 19.06-21 07+595 P1 2701 Footing M-30 50.00 19.000 395.411 151.589
547 19.06-21 03+670 A1 2705 A1Cap bracket M-30 10.30 3.914 399.325 147.675
547 21.06-21 04+905 A1,A2 2707 Wall 1st Lift M-30 14.20 5.396 404.721 142.279
547 21.06-21 03+670 A2 2712 A2Cap bracket M-30 10.30 3.914 408.635 138.365
547 22.06-21 07+595 P1 2724 P1 Wall 1st Lift M-30 9.50 3.610 412.245 134.755
547 22.06-21 07+595 A2 2722 A2 Footing M-30 70.00 26.600 438.845 108.155
547 22.06-21 07+595 A1 2721 Wall 1st Lift M-30 15.30 5.814 444.659 102.341
547 22.06-21 10+630 B/s 2717 pipe bedding M-20 2.90 0.870 445.529 101.471
547 22.06-21 12+650 B/s 2723 Head wall PCC M-15 2.70 0.713 446.242 100.758
6/23/2021 JK Lakshmi opc 43g 5050506125 25 572 23.06-22 12+650 B/s 2733 Headwal 1st Lift M-20 8.90 2.670 448.912 123.088
6/23/2021 JK Lakshmi opc 43g 5050506126 25 597 23.06-21 04+905 A1,A2 2731 Wall2ndt Lift M-30 12.70 4.826 453.738 143.262
597 25.06-21 04+905 A1,A2 Wall 3rd/final Lift M-30 6.30 2.394 456.132 140.868
597 25.06-21 10+630 B/s 2753 Headwal 2nd Lift M-20 9.30 2.790 458.922 138.078
597 25.06-21 12+650 B/s 2751 pipe bedding M-20 3.00 0.900 459.822 137.178
597 26.06-21 03+670 A1,A2 2743 Dirt Wall M-30 2.90 1.102 460.924 136.076
597 26.06-21 12+650 B/s 2763 Headwal 2nd Lift M-20 9.30 2.790 463.714 133.286
597 26.06-21 07+595 A1 2762 A1 Wall2ndt Lift M-30 15.00 5.700 469.414 127.586
597 28.06-21 12+650 B/s 2771 Craddle Portion M-20 3.10 0.930 470.344 126.656
597 28.06-21 10+630 B/s 2774 Craddle Portion M-20 3.10 0.930 471.274 125.726
597 28.06-21 11+726 B/s 2772 Head wall PCC M-15 2.70 0.713 471.987 125.013
597 28.06-21 11+580 B/s 2773 Head wall PCC M-15 2.70 0.713 472.700 124.300
597 29.06-21 04+905 A1A2 2787 Dirt Wall M-30 6.60 2.508 475.208 121.792
597 29.06-21 07+595 A2 2786 A1 Wall 1st Lift M-30 15.30 5.814 481.022 115.978
597 29.06-21 10+630 B/s 2784 Headwal 3rd or Final Lift M-20 3.70 1.110 482.132 114.868
597 29.06-21 12+650 B/s 2782 Headwal 3rd or Final Lift M-20 3.70 1.110 483.242 113.758
597 29.06-21 11+580 B/s Headwal 1st Lift M-20 9.00 2.700 485.942 111.058
597 29.06-21 11+726 B/s Headwal 1st Lift M-20 9.00 2.700 488.642 108.358
597 01.07-21 13+550 B/s Head wall PCC M-15 2.70 0.713 489.355 107.645
597 01.07-21 14+242 B/s Head wall PCC M-15 3.10 0.818 490.173 106.827
597 01.07-21 11+580 B/s pipe bedding M-20 3.00 0.900 491.073 105.927
597 01.07-21 11+728 B/s pipe bedding M-20 3.00 0.900 491.973 105.027
597 01.07-21 08+545 B/s Head wall PCC M-15 2.70 0.713 492.686 104.314
597 02.07-21 11+580 B/s Craddle Portion M-20 3.10 0.930 493.616 103.384
597 02.07-21 11+726 B/s Craddle Portion M-20 3.00 0.900 494.516 102.484
597 02.07-21 11+580 B/s Headwal 2nd Lift M-20 9.30 2.790 497.306 99.694
597 02.07-21 11+726 B/s Headwal 2nd Lift M-20 9.30 2.790 500.096 96.904
597 03.07-21 14+242 B/s Headwal 1st Lift M-20 10.80 3.240 503.336 93.664
597 03.07-21 13+550 B/s Headwal 1st Lift M-20 8.90 2.670 506.006 90.994
597 03.07-21 11+580 B/s Headwal 3rd or Final Lift M-20 3.70 1.110 507.116 89.884
597 03.07-21 11+726 B/s Headwal 3rd or Final Lift M-20 3.70 1.110 508.226 88.774
597 03.07-21 08+545 B/s Headwal 1st Lift M-20 8.90 2.670 510.896 86.104
597 03.07-21 04+905 B/s Desk slab casting M-35 19.30 7.836 518.732 78.268
Cement Recive Details Concrete Production Details Consumption Details
M-20 M40
Cement Cum M-15 M-20 Pcc M-30 Consum
Qty In RCC M-35 RCC Cum.
Recive Brand INVOICE No Qty in Date Location Side RFI No. Description GRADE As per As per As per DLC PQC e Balance
ton As per As per Site As per Consume
Date Ton Site Site Site in Ton
Site Site
597 10.07-21 14+242 B/s pipe bedding M-20 3.60 1.080 519.812 77.188
597 10.07-21 13+550 B/s pipe bedding M-20 3.00 0.900 520.712 76.288
597 10.07-21 04+905 A1A2 A1A2 return wall final lift M-30 2.70 1.026 521.738 75.262
597 10.07-21 07+595 P1 Wall 2nd Lift M-30 10.00 3.800 525.538 71.462
597 10.07-21 03+670 slab casting M-35 58.00 23.548 549.086 47.914
597 21.07-21 08+545 R/s pipe bedding M-20 1.50 0.450 549.536 47.464
597 21.07-21 05+231 R/s Head wall PCC M-15 1.30 0.343 549.879 47.121
597 21.07-21 21+850 R/s pipe bedding M-20 1.50 0.450 550.329 46.671
597 22.07-21 08+545 R/s Craddle Portion M-20 1.60 0.480 550.809 46.191
597 22.07-21 05+231 R/s Headwal 1st Lift M-20 4.50 1.350 552.159 44.841
597 22.07-21 14+242 B/s Headwal 2nd Lift M-20 14.30 4.290 556.449 40.551
597 22.07-21 14+242 B/s Craddle Portion M-20 4.20 1.260 557.709 39.291
597 22.07-21 13+550 B/s Craddle Portion M-20 3.00 0.900 558.609 38.391
597 22.07-21 13+550 B/s Headwal 2nd Lift M-20 10.80 3.240 561.849 35.151
597 22.07-21 03+670 A1A2 A1A2 return wall final lift M-30 6.00 2.280 564.129 32.871
597 23.07-21 07+595 A2 Wall 2nd Lift M-30 15.00 5.700 569.829 27.171
597 23.07-21 08+545 R/s Headwal 2nd Lift M-20 4.70 1.410 571.239 25.761
597 23.07-21 05+231 R/s pipe bedding M-20 1.50 0.450 571.689 25.311
597 23.07-21 14+242 B/s Headwal 3rd or Final Lift M-20 4.30 1.290 572.979 24.021
597 23.07-21 13+550 B/s Headwal 3rd or Final Lift M-20 3.70 1.110 574.089 22.911
597 24.07-21 08+545 R/s Headwal 3rd or Final Lift M-20 1.90 0.570 574.659 22.341
597 24.07-21 05+231 R/s Headwal 2nd Lift M-20 4.70 1.410 576.069 20.931
597 24.07-21 21+850 R/s Headwal 2nd Lift M-20 4.70 1.410 577.479 19.521
597 26.07-21 05+231 R/s Headwal 3rd or Final Lift M-20 1.90 0.570 578.049 18.951
597 26.07-21 21+850 R/s Headwal 3rd or Final Lift M-20 1.90 0.570 578.619 18.381
597 26.07-21 08+545 L/s pipe bedding M-20 1.50 0.450 579.069 17.931
597 28.07-21 08+545 L/s Craddle Portion M-20 1.60 0.480 579.549 17.451
597 28.07-21 08+545 L/s Headwal 2nd Lift M-20 4.70 1.410 580.959 16.041
597 28.07-21 21+850 R/s Craddle Portion M-20 1.60 0.480 581.439 15.561
597 29.07-21 21+850 R/s pipe bedding M-20 1.50 0.450 581.889 15.111
597 30.07-21 21+850 L/s Craddle Portion M-20 1.60 0.480 582.369 14.631
597 30.07-21 21+850 L/s Headwal 2nd Lift M-20 4.70 1.410 583.779 13.221
597 31.07-21 08+545 L/s Headwal 3rd or Final Lift M-20 1.90 0.570 584.349 12.651
597 31.07-21 21+850 L/s Headwal 3rd or Final Lift M-20 1.90 0.570 584.919 12.081
597 05.08-21 05+231 R/s Craddle Portion M-20 1.60 0.480 585.399 11.601
597 06.08-21 21+055 B/s Head wall PCC M-15 4.00 1.056 586.455 10.545
597 10.08-21 21+055 B/s Headwal 1st Lift M-20 13.70 4.110 590.565 6.435
597 11.08-21 05+231 L/s Head wall PCC M-15 1.30 0.343 590.908 6.092
8/12/2021 ultratech opc 43g 8970425798 30 627 12.08-21 05+231 L/s Headwal 1st Lift M-20 4.50 1.350 592.258 34.742
627 12.08-21 21+055 R/s pipe bedding M-20 3.80 1.140 593.398 33.602
627 13.08-21 05+231 L/s pipe bedding M-20 1.50 0.450 593.848 33.152
627 14.08-21 05+231 R/s Craddle Portion M-20 1.60 0.480 594.328 32.672
627 14.08-21 05+231 L/s Headwal 2nd Lift M-20 4.70 1.410 595.738 31.262
627 17.08-21 21+055 R/s Craddle Portion M-20 4.70 1.410 597.148 29.852
627 17.08-21 05+231 L/s Headwal 3rd or Final Lift M-20 1.90 0.570 597.718 29.282
627 17.08-21 20+675 B/s Head wall PCC M-15 4.00 1.056 598.774 28.226
627 18.08-21 07+595 A2 Wall 3rd Lift M-30 15.00 5.700 604.474 22.526
8/19/2021 ultratech opc 43g 8970426386 26 653 19.08-21 20+675 B/s Headwal 1st Lift M-20 13.70 4.110 608.584 44.416
653 20.08-21 20+675 L/s pipe bedding M-20 3.80 1.140 609.724 43.276
653 24.08-21 07+595 A1 Wall 3rd Lift M-30 15.00 5.700 615.424 37.576
653 25.08-21 21+055 R/s Headwal 2nd Lift M-20 8.10 2.430 617.854 35.146
653 27.08-21 21+055 R/s Headwal 3rd or Final Lift M-20 2.80 0.840 618.694 34.306
653 27.08-21 20+675 L/s Headwal 2nd Lift M-20 8.10 2.430 621.124 31.876
653 27.08-21 20+675 L/s Craddle Portion M-20 4.70 1.410 622.534 30.466
Cement Recive Details Concrete Production Details Consumption Details
M-20 M40
Cement Cum M-15 M-20 Pcc M-30 Consum
Qty In RCC M-35 RCC Cum.
Recive Brand INVOICE No Qty in Date Location Side RFI No. Description GRADE As per As per As per DLC PQC e Balance
ton As per As per Site As per Consume
Date Ton Site Site Site in Ton
Site Site
653 31.08-21 20+675 L/s Headwal 3rd or Final Lift M-20 2.80 0.840 623.374 29.626
653 01.09-21 21+055 L/s pipe bedding M-20 3.80 1.140 624.514 28.486
653 02.09-21 21+055 L/s Craddle Portion M-20 4.70 1.410 625.924 27.076
653 06.09-21 21+055 L/s Headwal 2nd Lift M-20 8.10 2.430 628.354 24.646
653 08.09-21 20+675 R/s pipe bedding M-20 3.80 1.140 629.494 23.506
653 10.09-21 20+135 L/s Head wall PCC M-15 1.70 0.449 629.943 23.057
653 11.09-21 07+595 A2 Wall final lift Lift M-30 15.80 6.004 635.947 17.053
653 22.09-21 07+595 A1 Wall final lift Lift M-30 - 635.947 17.053
653 23.09-21 20+135 L/s Headwal 1st Lift M-20 5.70 1.710 637.657 15.343
653 28.09-21 21+640 BHS Head wall PCC M-15 2.70 0.713 638.370 14.630
653 28.09-21 20+135 L/s 3418 Pipe Bedding M-20 3.10 0.930 639.300 13.700
653 28.09-21 20+675 R/s 3420 Craddle Portion M-20 4.70 1.410 640.710 12.290
653 29.09-21 04+124 BHS 3444 Head wall PCC M-15 3.10 0.818 641.528 11.472
653 29.09-21 20+675 R/s 3440 Headwal 2nd Lift M-20 8.10 2.430 643.958 9.042
653 29.09-21 21+055 L/s 3441 Headwal 3rd or Final Lift M-20 2.80 0.840 644.798 8.202
653 29.09-21 21+640 BHS Headwal 1st Lift M-20 8.90 2.670 647.468 5.532
653 30.09-21 20+675 R/s Headwal 3rd or Final Lift M-20 2.80 0.840 648.308 4.692
653 30.09-21 21+640 BHS Pipe Bedding M-20 2.90 0.870 649.178 3.822
653 30.09-21 04+124 R/s Headwal 1st Lift M-20 5.40 1.620 650.798 2.202
653 04.10-21 21+640 BHS Craddle Portion M-20 3.10 0.930 651.728 1.272
653 04.10-21 17+370 BHS Head wall PCC M-15 4.00 1.056 652.784 0.216
### ultratech opc 43g 8970430066 25 678 23.10-21 21+640 BHS Headwal 2nd Lift M-20 9.30 2.790 655.574 22.426
### ultratech opc 43g 8970430072 25 703 23.10-21 04+905 BHS crush barrier M-40 5.20 2.163 657.737 45.263
### JK Lakshmi opc 43g 5050524191 26 729 23.10-21 07+595 p1 pier 3rd lift M-30 9.50 3.610 661.347 67.653
729 25.10-21 07+595 p1 pier final lift M-30 10.30 3.914 665.261 63.739
729 25.10-21 07+595 A2 cap M-30 6.00 2.280 667.541 61.459
729 25.10-21 5+540-5+690 R/s Drain pcc M-15 15.50 4.092 671.633 57.367
729 25.10-21 5+540-5+690 L/s Drain pcc M-15 16.00 4.224 675.857 53.143
729 25.10-21 21+640 BHS Headwal 3rd or Final Lift M-20 3.70 1.110 676.967 52.033
729 26.10-21 15+315 A2 Pcc M-15 13.50 3.564 680.531 48.469
729 26.10-21 9+820-9+920 R/s Drain pcc M-15 10.50 2.772 683.303 45.697
729 26.10-21 5+580-5+660 L/s Drain Raft M-20 8.00 2.528 685.831 43.169
729 26.10-21 5+590-5+690 R/s Drain Raft M-20 10.00 3.160 688.991 40.009
729 27.10-21 17+370 L/s Headwal 1st Lift M-20 7.00 2.100 691.091 37.909
729 27.10-21 5+580-5+660 L/s Drain Wall M-20 11.50 3.634 694.725 34.275
729 27.10-21 5+590-5+690 R/s Drain Wall M-20 14.50 4.582 699.307 29.693
729 27.10-21 20+135 L/s Headwal 2nd Lift M-20 5.30 1.590 700.897 28.103
729 27.10-21 9+820-9+920 R/s Drain Raft M-20 10.30 3.255 704.152 24.848
729 28.10-21 07+595 A1 cap M-30 6.00 2.280 706.432 22.568
729 28.10-21 5+610-5+660 L/s Drain cover slab M-20 5.00 1.580 708.012 20.988
729 28.10-21 5+640-5+690 R/s Drain cover slab M-20 5.00 1.580 709.592 19.408
729 28.10-21 20+135 L/s Headwal 3rd or Final Lift M-20 2.50 0.750 710.342 18.658
729 28.10-21 20+135 L/s Craddle Portion M-20 3.50 1.050 711.392 17.608
729 29.10-21 5+600-5+640 R/s Drain cover slab M-20 4.00 1.264 712.656 16.344
729 29.10-21 9+820-9+870 R/s Drain Wall M-20 7.30 2.307 714.963 14.037
729 30.10.21 5+540-5+590 R/S Drain Raft M-20 - 5.10 1.612 716.575 12.425
729 30.10.21 5+590-5+600 R/S Drain cover slab M-20 1.00 0.316 716.891 12.109
729 10/30/2021 9+870-9+890 R/S Drain Wall M-20 3.00 0.948 717.839 11.161
Cement Recive Details Concrete Production Details Consumption Details
M-20 M40
Cement Cum M-15 M-20 Pcc M-30 Consum
Qty In RCC M-35 RCC Cum.
Recive Brand INVOICE No Qty in Date Location Side RFI No. Description GRADE As per As per As per DLC PQC e Balance
ton As per As per Site As per Consume
Date Ton Site Site Site in Ton
Site Site
729 11/1/2021 4+124 R/S pipe bedding M-20 1.50 0.450 718.289 10.711
729 11/1/2021 9+890-9+920 R/S Drain wall M-20 4.40 1.390 719.679 9.321
729 11/2/2021 4+124 R/S Headwal 2nd Lift M-20 7.30 2.190 721.869 7.131
729 11/9/2021 4+650 R/S Head wall PCC M-15 2.70 0.713 722.582 6.418
729 ### 5+440-5+540 R/S Drain pcc M-15 10.40 2.746 725.328 3.672
729 ### 5+540-5+590 R/S Drain wall M-20 7.30 2.307 727.635 1.365
729 ### 5+510-5+580 L/S Drain Raft M-20 7.00 2.212 729.847 (0.847)
### JK Lakshmi opc 43g 5050527820 25 754 ### 4+650 BHS Headwal 1st Lift M-20 9.00 2.700 732.547 21.453
### JK Lakshmi opc 43g 5050527829 25 779 ### 4+124 R/S Headwal 3rd or Final Lift M-20 2.30 0.690 733.237 45.763
779 ### 10+250-10+350 R/S Drain pcc M-15 10.30 2.719 735.956 43.044
779 ### 5+440-5+540 R/S Drain Raft M-20 10.30 3.255 739.211 39.789
779 ### 5+510-5+580 R/S Drain wall M-20 10.10 3.192 742.403 36.597
779 ### 9+760-9+860 L/S Drain pcc M-15 10.40 2.746 745.149 33.851
779 ### 5+440-5+540 R/S Drain wall M-20 14.50 4.582 749.731 29.269
779 ### 5+440-5+510 L/S Drain pcc M-15 7.30 1.927 751.658 27.342
779 ### 2+884 R/S Head wall PCC M-15 1.60 0.422 752.080 26.920
779 ### 5+440-5+510 L/S Drain Raft M-20 7.10 2.244 754.324 24.676
779 ### 4+650 R/S Pipe Bedding M-20 1.50 0.450 754.774 24.226
### ultratech opc 43g 8970432311 25 804 ### 2+884 L/S Head wall PCC M-15 1.60 0.422 755.196 48.804
### ultratech opc 43g 8970432314 25 829 ### 2+884 R/S Headwal 1st Lift M-20 5.40 1.620 756.816 72.184
### JK Lakshmi opc 43g 5050528354 25 854 - 756.816 97.184
854 ### 2+660-2+760 R/S Drain pcc M-15 10.40 2.746 759.562 94.438
854 ### 5+340-5+440 L/S Head wall PCC M-15 10.40 2.746 762.308 91.692
854 ### 2+884 L/S Headwal 1st Lift M-20 5.40 1.620 763.928 90.072
854 ### 4+650 R/S Craddle Portion M-20 1.50 0.450 764.378 89.622
854 ### 5+100-5+200 R/S Drain pcc M-15 10.40 2.746 767.124 86.876
854 ### 4+650 R/S Headwal 2nd Lift M-20 4.70 1.410 768.534 85.466
854 ### 5+440-5+510 L/S Drain wall M-20 10.10 3.192 771.726 82.274
854 ### 2+660-2+760 R/S Drain Raft M-20 10.10 3.192 774.918 79.082
854 ### 5+100-5+230 L/S Drain pcc M-15 13.60 3.590 778.508 75.492
854 ### 5+100-5+200 R/S Drain Raft M-20 10.30 3.255 781.763 72.237
854 ### 2+884 R/S Pipe Bedding M-20 1.50 0.450 782.213 71.787
854 ### 4+124 R/S hpc encasing M-20 5.00 1.500 783.713 70.287
854 ### 4+650 R/S Headwal 3rd or Final Lift M-20 1.90 0.570 784.283 69.717
854 ### 5+100-5+230 L/S Drain Raft M-20 13.10 4.140 788.423 65.577
854 ### 5+100-5+200 R/S Drain wall M-20 14.50 4.582 793.005 60.995
854 ### 4+124 R/S hpc slab M-20 3.00 0.948 793.953 60.047
854 ### 4+650 L/S Pipe Bedding M-20 1.50 0.450 794.403 59.597
854 ### 5+200-5+231 R/S Drain pcc M-15 3.30 0.871 795.274 58.726
854 ### 5+100-5+230 L/S Drain wall M-20 19.00 6.004 801.278 52.722
854 ### 4+124 L/S Pipe Bedding M-20 1.50 0.450 801.728 52.272
19+600-
854 ### R/S Drain pcc 10.50
19+700 M-15 2.772 804.500 49.500
854 ### 4+650 L/S Craddle Portion M-20 1.50 0.450 804.950 49.050
854 ### 5+200-5+231 R/S Drain Raft M-20 3.30 1.043 805.993 48.007
854 ### 4+124 L/S Headwal 1st Lift M-20 5.40 1.620 807.613 46.387
854 ### 15+315 P1 P1 pcc M-15 10.00 2.640 810.253 43.747
854 ### 4+650 L/S Headwal 2nd Lift M-20 4.70 1.410 811.663 42.337
854 ### 2+884 L/S Pipe Bedding M-20 1.50 0.450 812.113 41.887
854 ### 5+200-5+231 R/S Drain wall M-20 4.50 1.422 813.535 40.465
854 ### 07+595 A1 Retaining wall Footing pcc 5.30
M-15 1.399 814.934 39.066
854 ### 2+884 R/S Headwal 2nd Lift M-20 7.30 2.190 817.124 36.876
Cement Recive Details Concrete Production Details Consumption Details
M-20 M40
Cement Cum M-15 M-20 Pcc M-30 Consum
Qty In RCC M-35 RCC Cum.
Recive Brand INVOICE No Qty in Date Location Side RFI No. Description GRADE As per As per As per DLC PQC e Balance
ton As per As per Site As per Consume
Date Ton Site Site Site in Ton
Site Site
854 ### 4+650 L/S Headwal 3rd or Final Lift M-20 1.90 0.570 817.694 36.306
854 ### 2+884 L/S Craddle Portion M-20 3.40 1.020 818.714 35.286
854 ### 07+595 A2 Retaining wall Footing pcc M-15 5.30
1.399 820.113 33.887
### Jk Lakshmi opc 43 5050535920 25 879 ### 15+315 A2 Footing M-30 70.00 26.600 846.713 32.287
### Jk Lakshmi opc 44 5050536057 25 904 ### 5+100-5+200 R/s Drain cover slab M-20 10.10 3.192 849.905 54.095
904 ### 5+100-5+200 L/S Drain cover slab M-20 10.10 3.192 853.097 50.903
904 ### 2+884 L/S Headwal 2nd Lift M-20 7.30 2.190 855.287 48.713
904 ### 19+650-19+700 R/S Drain Raft M-20 5.00 1.580 856.867 47.133
12/2/2021 ultratech opc 43g 8970433875 30 934 12/2/2021 19-600-19+650 R/S 4042 Drain Raft M-20 5.00 1.580 858.447 75.553
12/2/2021 ultratech opc 43g 8970433883 32 966 12/2/2021 19+650-19+700 R/S 4043 Drain wall M-20 7.30 2.307 860.754 105.246
12/2/2021 JK Lakshmi opc 43g 5050530507 25 991 12/2/2021 2+884 R/S 4059 Headwal 3rd or Final Lift M-20 2.30 0.690 861.444 129.556
991 12/3/2021 16+900 R/S 4086 Head wall PCC M-15 1.30 0.343 861.787 129.213
991 12/3/2021 15+315 A1 4081 MNB A1 Pcc M-15 13.50 3.564 865.351 125.649
991 12/3/2021 4+124 L/S 4087 encasing pipe bottom M-20 5.00 1.500 866.851 124.149
991 12/4/2021 2+660-2+760 R/S 4114 Drain wall M-20 14.50 4.582 871.433 119.567
991 12/4/2021 2+884 L/S 4106 Headwal 3rd or Final Lift M-20 2.30 0.690 872.123 118.877
991 12/4/2021 5+200-5+231 R/S 4116 Drain Cover slab M-20 3.30 1.043 873.166 117.834
991 12/4/2021 5+200-5+231 L/S 4118 Drain Cover slab M-20 3.30 1.043 874.209 116.791
991 12/4/2021 19+380-19+480 R/S 4122 Drain pcc M-15 10.40 2.746 876.955 114.045
991 12/4/2021 2+920-2+950 R/S 4120 Drain pcc M-15 3.30 0.871 877.826 113.174
991 12/4/2021 15+315 P1 raft casting M-30 50.00 19.000 896.826 94.174
12/5/2021 JK Lakshmi opc 43g 5050530933 25 1016 12/5/2021 - 896.826 119.174
1016 12/6/2021 19+380-19+480 L/S 4136 Drain Cover slab M-20 8.60 2.718 899.544 116.456
1016 12/6/2021 16+900 L/S 4137 Headwal 1st Lift M-20 4.50 1.350 900.894 115.106
1016 12/6/2021 4+124 L/S 4138 hpc encasing pipe top M-20 2.70 0.853 901.747 114.253
1016 12/6/2021 9+920-9+950 R/S 4140 Drain Raft M-20 3.10 0.980 902.727 113.273
1016 12/6/2021 19+380-19+480 R/S 4139 Drain Raft M-20 10.10 3.192 905.919 110.081
1016 12/6/2021 19+615-19+650 R/S 4141 Drain wall M-20 5.00 1.580 907.499 108.501
1016 12/6/2021 19+670-19+700 R/S 4143 Drain Cover slab M-20 2.60 0.822 908.321 107.679
1016 12/6/2021 5+231-5+331 R/S 4145 Drain pcc M-15 10.50 2.772 911.093 104.907
1016 12/6/2021 2+760-2+850 R/S 4147 Drain pcc M-15 9.50 2.508 913.601 102.399
1016 12/7/2021 19+380-19+480 R/S 4159 Drain wall M-20 14.50 4.582 918.183 97.817
1016 12/7/2021 19+565-19+600 R/S 4160 Drain Raft M-20 3.50 1.106 919.289 96.711
1016 12/7/2021 5+231-5+331 L/S 4161 Drain Raft M-20 10.10 3.192 922.481 93.519
1016 12/7/2021 10+050-10+100 R/S 4158 Drain Cover slab M-20 4.30 1.359 923.840 92.160
1016 12/7/2021 9+920-10+050 R/S 4155 Drain wall M-20 18.80 5.941 929.781 86.219
1016 12/7/2021 2+760-2+850 R/S 4162 Drain Raft M-20 9.00 2.844 932.625 83.375
1016 12/7/2021 10+250-10+350 R/S 4163 Drain Raft M-20 10.30 3.255 935.880 80.120
1016 12/7/2021 9+950-10+050 R/S 4166 Drain pcc M-15 10.50 2.772 938.652 77.348
1016 12/7/2021 10+150-10+250 R/S 4168 Drain pcc M-15 10.50 2.772 941.424 74.576
1016 12/8/2021 17+370 L/S 4185 Pipe Bedding M-20 3.80 1.140 942.564 73.436
1016 12/8/2021 5+231-5+331 L/S 4187 Drain wall M-20 10.50 3.318 945.882 70.118
1016 12/8/2021 2+760-2+850 R/S 4188 Drain wall M-20 13.00 4.108 949.990 66.010
1016 12/8/2021 10+250-10+350 R/S 4189 Drain wall M-20 14.50 4.582 954.572 61.428
1016 12/8/2021 9+950-10+050 R/S 4195 Drain Raft M-20 10.50 3.318 957.890 58.110
1016 12/8/2021 10+150-10+250 R/S 4196 Drain Raft M-20 10.50 3.318 961.208 54.792
1016 12/8/2021 19+650-19+670 R/S 4194 Drain Cover slab M-20 2.00 0.632 961.840 54.160
1016 12/9/2021 17+340 L/S 4206 Hpc creddle M-20 4.70 1.410 963.250 52.750
1016 12/9/2021 17+948 BHS 4212 Hpc Hw Pcc M-15 4.00 1.056 964.306 51.694
1016 12/9/2021 19+565-19+615 R/S 4208 Drain wall M-20 7.30 2.307 966.613 49.387
Cement Recive Details Concrete Production Details Consumption Details
M-20 M40
Cement Cum M-15 M-20 Pcc M-30 Consum
Qty In RCC M-35 RCC Cum.
Recive Brand INVOICE No Qty in Date Location Side RFI No. Description GRADE As per As per As per DLC PQC e Balance
ton As per As per Site As per Consume
Date Ton Site Site Site in Ton
Site Site
1016 12/9/2021 4+124 L/S 4217 Headwal 2nd Lift M-20 7.30 2.190 968.803 47.197
1016 12/9/2021 19+380-19+480 L/S 4219 Drain Cover slab M-20 8.60 2.718 971.521 44.479
1016 12/9/2021 10+150-10+250 R/S 4222 Drain wall M-20 14.50 4.582 976.103 39.897
1016 ### 19+565-19+615 R/S 4258 Drain wall M-20 7.30 2.307 978.410 37.590
1016 ### 4+124 L/S 4262 Headwal 3rd or Final Lift M-20 2.30 0.690 979.100 36.900
### JK Lakshmi opc 43g 5050532350 25 1041 ### 15+788 A2 4278 footing pcc M-15 14.40 3.802 982.902 58.098
1041 ### 19+480-19+580 L/S 4293 Drain pcc M-15 10.40 2.746 985.648 55.352
1041 ### 10+250-10+350 L/S 4295 Drain pcc M-15 10.40 2.746 988.394 52.606
1041 ### 16+900 L/S 4291 Pipe Bedding M-20 1.50 0.450 988.844 52.156
1041 ### 2+660-2+760 L/S 4297 Drain pcc M-15 10.40 2.746 991.590 49.410
1041 ### 17+948 BHS 4299 Headwal 1st Lift M-20 13.70 4.110 995.700 45.300
1041 ### 16+900 L/S 4318 Headwal 2nd Lift M-20 4.70 1.410 997.110 43.890
1041 ### 16+900 L/S 4317 Hpc creddle M-20 1.60 0.480 997.590 43.410
1041 ### 2+660-2+760 L/S 4321 Drain Raft M-20 10.10 3.192 1,000.782 40.218
1041 ### 15+315 A1 4315 footing M-30 70.00 26.600 1,027.382 13.618
### JK Lakshmi opc 43g 5050533046 25 1066 ### 17+948 BHS 4356 Pipe Bedding M-20 7.60 2.280 1,029.662 36.338
### JK Lakshmi opc 43g 5050533327 25 1091 ### 2+660-2+760 L/S 4365 Drain wall M-20 14.50 4.582 1,034.244 56.756
1091 ### 17+340 L/S 4380 Headwal 2nd Lift M-20 8.10 2.430 1,036.674 54.326
1091 ### 15+315 A2 4385 A2 wall 1st Lift M-30 21.20 8.056 1,044.730 46.270
1091 ### 17+948 R/S 4386 Headwal 2nd Lift M-20 8.10 2.430 1,047.160 43.840
1091 ### 20+135 R/S 4382 Hpc Hw Pcc M-15 1.70 0.449 1,047.609 43.391
1091 ### 17+948 R/S 4399 Hpc creddle M-20 4.70 1.410 1,049.019 41.981
1091 ### 18+135 R/S 4403 Hpc Hw Pcc M-15 1.30 0.343 1,049.362 41.638
1091 ### 15+788 A2 4406 MJB A2 Footing M-30 75.00 28.500 1,077.862 13.138
1091 ### 20+135 R/S 4401 Headwal 1st Lift M-20 5.70 1.710 1,079.572 11.428
12/22/2021 JK Lakshmi opc 43g 5050534308 25 1116 ### 18+135 R/S 4416 Headwal 1st Lift M-20 4.70 1.410 1,080.982 35.018
1116 ### 18+135 R/S 4435 Pipe Bedding M-20 1.50 0.450 1,081.432 34.568
1116 12/24/2021 18+135 R/S 4451 Hpc creddle M-20 1.50 0.450 1,081.882 34.118
1116 12/24/2021 19+480-19+580 L/S 4441 Drain Raft M-20 10.10 3.192 1,085.074 30.926
1116 12/24/2021 10+250-10+350 L/S 4442 Drain Raft M-20 10.10 3.192 1,088.266 27.734
12/26/2021 JK Lakshmi opc 43g 5050535132 25 1141 12/26/2021 - 1,088.266 52.734
### JK Lakshmi opc 43g 5050535495 25 1166 12/27/2021 15+315 P1 P1 wall 1st Lift M-30 13.30 5.054 1,093.320 72.680
1166 12/27/2021 15+315 A2 A2 wall 2nd Lift M-30 20.00 7.600 1,100.920 65.080
1166 12/27/2021 18+135 L/S Head wall PCC M-15 1.30 0.343 1,101.263 64.737
1166 12/27/2021 18+135 R/S Hpc creddle M-20 4.70 1.410 1,102.673 63.327
1166 12/28/2021 10+100-10+250 L/S Drain pcc M-15 15.60 4.118 1,106.791 59.209
1166 12/28/2021 19+485-19+580 L/S Drain wall M-20 13.70 4.329 1,111.120 54.880
1166 12/29/2021 10+100-10+250 L/S Drain Raft M-20 15.20 4.803 1,115.923 50.077
1166 12/29/2021 17+948 R/S Headwal 3rd or Final Lift M-20 2.80 0.840 1,116.763 49.237
1166 12/29/2021 20+135 R/S Hpc creddle M-20 3.50 1.050 1,117.813 48.187
1166 12/29/2021 18+135 L/S Headwal 1st Lift M-20 4.50 1.350 1,119.163 46.837
1166 12/30/2021 17+948 L/S Hpc creddle M-20 4.70 1.410 1,120.573 45.427
1166 12/30/2021 17+948 L/S Headwal 2nd Lift M-20 8.10 2.430 1,123.003 42.997
1166 12/30/2021 18+135 L/S Pipe Bedding M-20 1.50 0.450 1,123.453 42.547
1166 12/30/2021 20+135 R/S Headwal 2nd Lift M-20 5.30 1.590 1,125.043 40.957
1166 12/30/2021 17+340 L/S Headwal 3rd or Final Lift M-20 2.80 0.840 1,125.883 40.117
12/31/2022 JK Lakshmi opc 43g 5050536145 25 1191 12/31/2022 - 1,125.883 65.117
1/1/2022 JK Lakshmi opc 43g 5050536451 25 1216 1/1/2022 2+760-2+824 L/S 4640 Drain pcc M-15 6.70 1.769 1,127.652 88.348
1216 1/1/2022 2+887-2+950 R/S 4638 Drain pcc M-15 6.70 1.769 1,129.421 86.579
1216 1/1/2022 17+948 L/S 4641 Headwal 3rd or Final Lift M-20 2.80 0.840 1,130.261 85.739
1216 1/1/2022 15+788 P1 4649 Pi pier pcc M-15 9.80 2.587 1,132.848 83.152
1/2/2022 JK Lakshmi opc 43g 5050536605 25 1241 1/2/2022 - 1,132.848 108.152
1/2/2022 JK Lakshmi opc 43g 5050536644 25 1266 1/3/2022 2+887-2+950 R/S 4671 Drain Raft M-20 6.40 2.022 1,134.870 131.130
Cement Recive Details Concrete Production Details Consumption Details
M-20 M40
Cement Cum M-15 M-20 Pcc M-30 Consum
Qty In RCC M-35 RCC Cum.
Recive Brand INVOICE No Qty in Date Location Side RFI No. Description GRADE As per As per As per DLC PQC e Balance
ton As per As per Site As per Consume
Date Ton Site Site Site in Ton
Site Site
1266 1/3/2022 2+760-2+824 L/S 4676 Drain Raft M-20 6.50 2.054 1,136.924 129.076
1266 1/3/2022 20+135 R/S 4681 Headwal 3rd or Final Lift M-20 2.40 0.720 1,137.644 128.356
1266 1/4/2022 15+788 A2 4711 A2 Wall 1st Lift M-30 22.20 8.436 1,146.080 119.920
1266 1/4/2022 2+887-2+950 R/S 4705 Drain wall M-20 9.10 2.876 1,148.956 117.044
1266 1/4/2022 23+350 BHS 4707 Head wall PCC M-15 2.70 0.713 1,149.669 116.331
1266 1/4/2022 2+760-2+824 L/S 4710 Drain wall M-20 9.30 2.939 1,152.608 113.392
1266 1/5/2022 24+650 BHS 4739 Head wall PCC M-15 2.70 0.713 1,153.321 112.679
1/6/2022 JK Lakshmi opc 43g 5050537383 25 1291 1/6/2022 18+135 L/S 4775 Hpc creddle M-20 1.50 0.450 1,153.771 137.229
1291 1/6/2022 9+760-9+840 L/S 4785 Drain wall M-20 11.50 3.634 1,157.405 133.595
1291 1/6/2022 24+650-24+750 L/S 4789 Drain pcc M-15 10.40 2.746 1,160.151 130.849
1291 1/6/2022 9+860-10+000 L/S 4786 Drain pcc M-15 14.60 3.854 1,164.005 126.995
1291 1/7/2022 15+315 P1 4815 P1 Wall 2nd Lift M-30 12.50 4.750 1,168.755 122.245
1291 1/7/2022 07+595 R/S 4819 A2 Retaining wall footing M-30 7.30 2.774 1,171.529 119.471
1291 1/7/2022 15+788 A2 4825 A2 Wall 2nd Lift M-30 20.00 7.600 1,179.129 111.871
1291 1/7/2022 9+860-10+000 L/S 4823 Drain Raft M-20 14.20 4.487 1,183.616 107.384
1291 1/8/2022 15+788 P1 4863 P1 footong M-30 50.00 19.000 1,202.616 88.384
1291 1/8/2022 24+650-24+750 L/S 4862 Drain Raft M-20 10.10 3.192 1,205.808 85.192
1291 1/8/2022 23+878 B/s 4855 Head wall PCC M-15 3.30 0.871 1,206.679 84.321
1291 1/8/2022 23+350 B/s 4858 Headwal 1st Lift M-20 8.90 2.670 1,209.349 81.651
1291 1/8/2022 15+788 A1 4859 A1 MJB Pcc M-15 14.40 3.802 1,213.151 77.849
1291 1/8/2022 24+650 B/s 4860 Headwal 1st Lift M-20 8.90 2.670 1,215.821 75.179
1291 1/8/2022 18+135 L/S 4861 Headwal 2nd Lift M-20 4.70 1.410 1,217.231 73.769
1291 1/8/2022 9+840-10+000 L/S 4864 Drain wall M-20 23.10 7.300 1,224.531 66.469
1/8/2022 A2 L/s Retaining wall
1291 07+595 L/s 4869 M-30 7.50 2.850 1,227.381 63.619
footing
1291 1/10/2022 18+135 L/s 4904 Headwal 1st Lift M-20 1.90 0.570 1,227.951 63.049
1291 1/10/2022 10+00-10+100 L/s 4909 Drain pcc M-15 10.40 2.746 1,230.697 60.303
1291 1/10/2022 15+315 A1 4898 A1 Wall 1st Lift M-30 21.10 8.018 1,238.715 52.285
1291 1/10/2022 23+350 L/s 4900 Pipe Bedding M-20 1.50 0.450 1,239.165 51.835
1291 1/10/2022 2+950-3+000 R/S 4912 Drain pcc M-15 5.20 1.373 1,240.538 50.462
1291 1/10/2022 5+332-5+390 L/s 4910 Drain Raft M-20 5.80 1.833 1,242.371 48.629
1291 1/11/2022 10+00-10+100 L/s 4932 Drain Raft M-20 10.10 3.192 1,245.563 45.437
1291 1/11/2022 5+332-5+390 L/s 4933 Drain wall M-20 8.40 2.654 1,248.217 42.783
1291 1/12/2022 24+650 L/s 4940 Pipe Bedding M-20 1.50 0.450 1,248.667 42.333
1291 1/12/2022 07+595 R/s 4943 A1 R/s Ret.wall footing M-30 7.30 2.774 1,251.441 39.559
1291 1/12/2022 2+950-3+000 R/s 4946 Drain Raft M-20 5.10 1.612 1,253.053 37.947
1291 1/12/2022 23+350 L/s 4949 Headwal 2nd Lift M-20 4.70 1.410 1,254.463 36.537
1291 1/12/2022 23+350 L/s 4950 Hpc creddle M-20 1.50 0.450 1,254.913 36.087
1/13/2022 JK Lakshmi opc 43g 5050538978 25 1316 1/13/2022 16+773 BHS 4952 Head wall PCC M-15 2.70 0.713 1,255.626 60.374
1316 1/13/2022 2+950-3+000 R/s 4955 Drain wall M-20 7.30 2.307 1,257.933 58.067
1316 1/13/2022 10+100-10+250 L/s 4954 Drain wall M-20 36.00 11.376 1,269.309 46.691
1316 1/13/2022 16+553 BHS 4957 Head wall PCC M-15 2.70 0.713 1,270.022 45.978
1316 1/13/2022 16+900 R/s 4958 Head wall PCC M-15 1.30 0.343 1,270.365 45.635
1/14/2022 JK Lakshmi opc 43g 5050539443 26 1342 1/14/2022 16+773 BHS 4974 Headwal 1st Lift M-20 8.90 2.670 1,273.035 68.965
1342 1/14/2022 16+553 BHS 4975 Headwal 1st Lift M-20 8.90 2.670 1,275.705 66.295
1342 1/14/2022 07+595 L/s 4982 A1 L/s Reta.wall Footing M-30 7.30 2.774 1,278.479 63.521
1342 1/14/2022 23+350 L/s 4977 Headwal 3rd or Final Lift M-20 1.90 0.570 1,279.049 62.951
1342 1/14/2022 23+350 R/s 4979 Pipe Bedding M-20 1.50 0.450 1,279.499 62.501
1342 1/14/2022 16+900 R/s 4980 Headwal 1st Lift M-20 4.50 1.350 1,280.849 61.151
1342 1/14/2022 15+788 A2 4983 A2 wall 3rd Lift M-30 20.00 7.600 1,288.449 53.551
1/15/2022 JK Lakshmi opc 43g 5050539645 26 1368 1/15/2022 15+788 A2 5000 A2 wall 4th Lift M-30 20.00 7.600 1,296.049 71.951
1368 1/15/2022 16+773 L/s 4997 Pipe Bedding M-20 1.50 0.450 1,296.499 71.501
1/17/2022 JK Lakshmi opc 43g 5050540065 25 1393 1/17/2022 15+788 P9 5021 P9 Pcc for Raft M-15 9.80 2.587 1,299.086 93.914
Cement Recive Details Concrete Production Details Consumption Details
M-20 M40
Cement Cum M-15 M-20 Pcc M-30 Consum
Qty In RCC M-35 RCC Cum.
Recive Brand INVOICE No Qty in Date Location Side RFI No. Description GRADE As per As per As per DLC PQC e Balance
ton As per As per Site As per Consume
Date Ton Site Site Site in Ton
Site Site
1393 1/17/2022 23+350 R/s 5015 Headwal 2nd Lift M-20 4.70 1.410 1,300.496 92.504
1/18/2022 JK Lakshmi opc 43g 5050539937 25 1418 1/18/2022 16+553 L/s 5039 Pipe Bedding M-20 1.50 0.450 1,300.946 117.054
1418 1/18/2022 23+350 R/s 5041 Headwal 3rd or Final Lift M-20 1.90 0.570 1,301.516 116.484
1418 1/19/2022 23+878 BHS 5068 Headwal 1st Lift M-20 11.20 3.360 1,304.876 113.124
1418 1/19/2022 18+131 R/s 5064 Headwal 3rd or Final Lift M-20 1.90 0.570 1,305.446 112.554
1418 1/19/2022 16+553 L/s 5066 Headwal 2nd Lift M-20 4.70 1.410 1,306.856 111.144
1418 1/19/2022 16+553 L/s 5067 Hpc creddle M-20 1.60 0.480 1,307.336 110.664
1418 1/19/2022 23+350 R/s 5069 Hpc creddle M-20 1.50 0.450 1,307.786 110.214
1418 1/19/2022 15+315 A1 5072 A1 wall 2nd Lift M-30 19.30 7.334 1,315.120 102.880
1418 1/19/2022 15+788 P9 5074 P9 Raft M-30 50.00 19.000 1,334.120 83.880
1418 1/19/2022 2+660-2+752.4 BHS 5085 Drain Cover slab M-20 15.80 4.993 1,339.113 78.887
1418 1/20/2022 2+753.6-2+838.8 R/s 5109 Drain Cover slab M-20 7.30 2.307 1,341.420 76.580
1418 1/20/2022 2+753.6-2+824 L/s 5107 Drain Cover slab M-20 6.30 1.991 1,343.411 74.589
1418 7+595 B/s 5097 A2 Retaining Wall 1st Lift M-30 6.50
1/20/2022 2.470 1,345.881 72.119
1418 1/21/2022 7+595 B/s 5121 A2 Retaining Wall 2nd Lift M-30 5.10 1.938 1,347.819 70.181
1418 1/21/2022 16+773 L/s 5110 Headwal 2nd Lift M-20 4.70 1.410 1,349.229 68.771
1418 1/21/2022 16+773 L/s 5111 Hpc creddle M-20 1.60 0.480 1,349.709 68.291
1418 1/21/2022 23+878 R/s 5127 Pipe Bedding M-20 3.10 0.930 1,350.639 67.361
1418 1/21/2022 5+231-5+390 L/s 5140 Drain Cover slab M-20 13.60 4.298 1,354.937 63.063
1418 1/21/2022 2+887-2+950 R/s 5138 Drain Cover slab M-20 5.50 1.738 1,356.675 61.325
1418 1/22/2022 16+773 L/s 5141 Headwal 3rd or Final Lift M-20 1.90 0.570 1,357.245 60.755
1418 1/22/2022 16+553 L/s 5144 Headwal 3rd or Final Lift M-20 1.90 0.570 1,357.815 60.185
1418 1/22/2022 16+900 L/s 5145 Headwal 3rd or Final Lift M-20 1.90 0.570 1,358.385 59.615
1418 1/22/2022 7+595 B/s 5150 A2 Retaining Wall 3rd Lift M-30 5.10 1.938 1,360.323 57.677
1418 1/22/2022 7+595 B/s 5152 A2 Retaining Wall 1st Lift M-30 6.50 2.470 1,362.793 55.207
1418 1/22/2022 15+315 A1 5151 A1 Wall 3rd Lift M-30 19.10 7.258 1,370.051 47.949
1418 1/22/2022 16+553 R/s 5157 Pipe Bedding M-20 1.50 0.450 1,370.501 47.499
1418 1/22/2022 2+950-2+300 R/s 5166 Drain Cover slab M-20 4.30 1.359 1,371.860 46.140
1/24/2022 JK Lakshmi opc 43g 5050541487 30 1448 1/24/2022 23+878 R/s 5178 Headwal 2nd Lift M-20 5.30 1.590 1,373.450 74.550
1/24/2022 JK Lakshmi opc 43g 5050541722 25 1473 1/24/2022 24+650 L/s 5185 Hpc creddle M-20 1.60 0.480 1,373.930 99.070
1473 1/24/2022 16+553 R/s 5187 Hpc creddle M-20 1.60 0.480 1,374.410 98.590
1473 1/24/2022 16+773 R/s 5189 Pipe Bedding M-20 1.50 0.450 1,374.860 98.140
1473 1/24/2022 7+595 B/s 5181 A2 Retaining Wall final Lift M-30 2.50 0.950 1,375.810 97.190
1473 1/24/2022 7+595 B/s 5184 A1 Retaining Wall 2nd Lift M-30 5.10 1.938 1,377.748 95.252
1473 1/24/2022 24+650 L/s 5176 Headwal 2nd Lift M-20 4.70 1.410 1,379.158 93.842
1473 1/25/2022 7+595 B/s 5184 A1 Retaining Wall 3rd Lift M-30 5.10
1.938 1,381.096 91.904
1473 1/25/2022 15+788 P9 5204 P9 Pier Wall 1st lift M-30 13.30 5.054 1,386.150 86.850
1473 1/25/2022 16+553 R/s 5200 Headwal 2nd Lift M-20 4.70 1.410 1,387.560 85.440
1473 1/25/2022 16+773 R/s 5202 Hpc creddle M-20 1.60 0.480 1,388.040 84.960
1473 1/25/2022 24+650 L/s 5199 Headwal 3rd or Final Lift M-20 1.90 0.570 1,388.610 84.390
1473 1/25/2022 16+900-16+950 L/s 5206 Drain pcc M-15 5.20 1.373 1,389.983 83.017
1/27/2022 A1 Retaining Wall Final
1473 7+595 B/s 5218 M-30 2.50
Lift 0.950 1,390.933 82.067
1473 1/27/2022 23+878 R/s 5222 Headwal 3rd or Final Lift M-20 2.40 0.720 1,391.653 81.347
1473 1/27/2022 24+650 R/s 5220 Pipe Bedding M-20 1.50 0.450 1,392.103 80.897
1/28/2022 JK Lakshmi opc 43g 5050542933 25 1498 1/28/2022 16+773 R/s 5249 Headwal 2nd Lift M-20 4.70 1.410 1,393.513 104.487
1498 1/28/2022 17+370 R/s 5248 Pipe Bedding M-20 3.80 1.140 1,394.653 103.347
1498 1/28/2022 16+553 R/s 5246 Headwal 3rd or Final Lift M-20 1.90 0.570 1,395.223 102.777
1498 1/28/2022 16+900-16+950 L/s 5253 Drain Raft M-20 5.10 1.612 1,396.835 101.165
Cement Recive Details Concrete Production Details Consumption Details
M-20 M40
Cement Cum M-15 M-20 Pcc M-30 Consum
Qty In RCC M-35 RCC Cum.
Recive Brand INVOICE No Qty in Date Location Side RFI No. Description GRADE As per As per As per DLC PQC e Balance
ton As per As per Site As per Consume
Date Ton Site Site Site in Ton
Site Site
1498 1/28/2022 19+565-19+650 R/s 5242 Drain Cover slab M-20 7.30 2.307 1,399.142 98.858
1498 1/28/2022 24+650 L/s 5245 Hpc creddle M-20 1.60 0.480 1,399.622 98.378
1498 1/28/2022 24+650-24+750 L/s 5252 Drain wall M-20 14.40 4.550 1,404.172 93.828
1498 1/28/2022 15+788 A2 5254 A2 Wall Final Lift M-30 18.50 7.030 1,411.202 86.798
1498 1/28/2022 24+750-24+850 L/s 5251 Drain Pcc M-15 10.40 2.746 1,413.948 84.052
1498 1/29/2022 17+370 R/s 5283 Headwal 1st Lift M-20 6.90 2.070 1,416.018 81.982
1498 1/29/2022 24+650 R/s 5282 Headwal 2nd Lift M-20 4.70 1.410 1,417.428 80.572
1498 1/29/2022 24+650-24+750 L/s 5279 Drain Cover slab M-20 8.60 2.718 1,420.146 77.854
1498 1/29/2022 15+788 P8 5289 P8 Pcc M-15 9.80 2.587 1,422.733 75.267
1498 1/29/2022 15+788 P9 5290 P9 Pier Wall 2nd Lift M-30 12.30 4.674 1,427.407 70.593
1498 1/29/2022 16+773 R/s 5284 Headwal 3rd or Final Lift M-20 1.90 0.570 1,427.977 70.023
1/31/2022 JK Lakshmi opc 43g 5050543844 25 1523 1/31/2022 9+760-9+880 L/s 5299 Drain Cover slab M-20 10.50 3.318 1,431.295 91.705
1/31/2022 JK Lakshmi opc 43g 5050543833 25 1548 1/31/2022 9+920-9+950 L/s 5297 Drain Cover slab M-20 2.60 0.822 1,432.117 115.883
1548 1/31/2022 23+878 R/s 5304 Hpc creddle M-20 3.50 1.050 1,433.167 114.833
1548 1/31/2022 15+788 P8 5314 P8 footing M-30 50.00 19.000 1,452.167 95.833
1548 1/31/2022 7+595 B/s 5306 P1 Pier cap M-30 6.00 2.280 1,454.447 93.553
1548 2/1/2022 24+750-24+850 L/s 5333 Drain Raft M-20 10.10 3.192 1,457.639 90.361
2/1/2022 JK Lakshmi opc 43g 50505441362 25 1573 2/1/2022 26+700 B/s 5344 Head wall PCC M-15 2.70 0.713 1,458.352 114.648
1573 2/1/2022 27+000 B/s 5345 Head wall PCC M-15 2.70 0.713 1,459.065 113.935
1573 2/2/2022 17+370 R/s 5362 Hpc creddle M-20 4.70 1.410 1,460.475 112.525
1573 2/2/2022 16+900-16+950 L/s 5368 Drain wall M-20 7.20 2.275 1,462.750 110.250
1573 2/2/2022 24+650 R/s 5360 Headwal 3rd or Final Lift M-20 1.90 0.570 1,463.320 109.680
1573 2/2/2022 23+878 L/s 5367 Pipe Bedding M-20 3.10 0.930 1,464.250 108.750
1573 2/2/2022 16+900 R/s 5372 Pipe Bedding M-20 1.50 0.450 1,464.700 108.300
1573 2/2/2022 26+700 B/s 5380 Headwal 1st Lift M-20 8.90 2.670 1,467.370 105.630
1573 2/2/2022 27+000 B/s 5381 Headwal 1st Lift M-20 8.90 2.670 1,470.040 102.960
1573 2/2/2022 19+480-19+565 R/s 5383 Drain Pcc M-15 8.90 2.350 1,472.390 100.610
1573 2/2/2022 15+315 A2 5379 A2 wall 3rd Lift M-30 19.20 7.296 1,479.686 93.314
1573 2/3/2022 24+750-24+850 L/s 5409 Drain wall M-20 14.40 4.550 1,484.236 88.764
1573 2/3/2022 23+878 L/s 5412 Hpc creddle M-20 3.50 1.050 1,485.286 87.714
1573 2/3/2022 17+595 B/s 5423 A1 Pcc M-15 13.50 3.564 1,488.850 84.150
1573 2/3/2022 16+900 R/s 5414 Headwal 2nd Lift M-20 4.70 1.410 1,490.260 82.740
1573 2/3/2022 16+900 R/s 5412 Hpc creddle M-20 1.60 0.480 1,490.740 82.260
1573 2/3/2022 26+700 L/s 5427 Pipe Bedding M-20 1.20 0.360 1,491.100 81.900
1573 2/3/2022 19+480-19+565 R/s 5434 Drain Raft M-20 8.60 2.718 1,493.818 79.182
1573 2/3/2022 27+000 R/s 5431 Pipe Bedding M-20 1.50 0.450 1,494.268 78.732
1573 2/3/2022 16+900-16+950 L/s 5436 Drain Cover slab M-20 4.50 1.422 1,495.690 77.310
1573 2/4/2022 17+370 R/s 5478 Headwal 2nd Lift M-20 8.10 2.430 1,498.120 74.880
1573 2/4/2022 16+900 R/s 5480 Headwal 3rd or Final Lift M-20 1.90 0.570 1,498.690 74.310
1573 2/4/2022 23+878 L/s 5479 Headwal 2nd Lift M-20 5.30 1.590 1,500.280 72.720
1573 2/4/2022 15+788 P9 5486 P9 wall 3rd Lift M-30 12.30 4.674 1,504.954 68.046
1573 2/4/2022 26+700 L/s 5490 Headwal 2nd Lift M-20 4.70 1.410 1,506.364 66.636
1573 2/4/2022 26+700 L/s 5491 Hpc creddle M-20 1.30 0.390 1,506.754 66.246
1573 2/4/2022 27+000 L/s 5494 Hpc creddle M-20 1.60 0.480 1,507.234 65.766
1573 2/4/2022 26+070-26+195 R/s 5495 Drain Pcc M-15 13.00 3.432 1,510.666 62.334
1573 2/5/2022 17+370 R/s 5500 Headwal 3rd or Final Lift M-20 2.80 0.840 1,511.506 61.494
1573 2/5/2022 15+315 P1 5507 P1 wall 3rd Lift M-30 12.30 4.674 1,516.180 56.820
1573 2/5/2022 26+700 L/s 5510 Headwal 3rd or Final Lift M-20 1.90 0.570 1,516.750 56.250
1573 2/5/2022 27+000 L/s 5515 Headwal 2nd Lift M-20 4.70 1.410 1,518.160 54.840
2/7/2022 JK Lakshmi opc 43g 5050545510 25 1598 2/7/2022 27+000 L/s 5548 Headwal 3rd or Final Lift M-20 1.90 0.570 1,518.730 79.270
2/7/2022 JK Lakshmi opc 43g 5050545519 25 1623 2/7/2022 17+595 B/s 5532 A1Footong M-30 70.00 26.600 1,545.330 77.670
1623 2/7/2022 15+315 A1 5530 A1 Retaining Wall Pcc M-15 6.00 1.584 1,546.914 76.086
Cement Recive Details Concrete Production Details Consumption Details
M-20 M40
Cement Cum M-15 M-20 Pcc M-30 Consum
Qty In RCC M-35 RCC Cum.
Recive Brand INVOICE No Qty in Date Location Side RFI No. Description GRADE As per As per As per DLC PQC e Balance
ton As per As per Site As per Consume
Date Ton Site Site Site in Ton
Site Site
1623 2/7/2022 15+788 P9 5529 P9 wall 4th Lift M-30 12.30 4.674 1,551.588 71.412
2/8/2022 ultratech opc 43g 8970443222 30 1653 2/8/2022 15+315 P1 5554 P1 wall Final Lift M-30 3.30 1.254 1,552.842 100.158
2/8/2022 ultratech opc 43g 8970443225 30 1683 2/8/2022 15+315 A1 5555 A1 Wall final lift M-30 5.00 1.900 1,554.742 128.258
2/8/2022 ultratech opc 43g 8970443227 32 1715 2/8/2022 7+595 A1-A2 5558 A1-A2 bracket M-35 3.00 1.218 1,555.960 159.040
1715 2/8/2022 15+788 P2 5562 P2 pcc M-15 9.80 2.587 1,558.547 156.453
1715 2/8/2022 26+070-26+195 R/s 5564 Drain Raft M-20 12.70 4.013 1,562.560 152.440
1715 2/8/2022 19+480-19+565 R/s 5565 Drain wall M-20 12.30 3.887 1,566.447 148.553
1715 2/8/2022 27+310 B/s 5560 Head wall PCC M-15 2.70 0.713 1,567.160 147.840
1715 2/9/2022 15+315 A2 5603 A2 Wall Final Lift M-30 5.00 1.900 1,569.060 145.940
1715 2/9/2022 7+595 A1-A2 5595 A1-A2 Dirt wall M-35 3.40 1.380 1,570.440 144.560
1715 2/9/2022 26+700 R/s 5598 Pipe Bedding M-20 1.20 0.360 1,570.800 144.200
2/10/2022 JK Lakshmi opc 43g SKL/21-22/3895 25 1740 2/10/2022 26+700 R/s 5635 Hpc creddle M-20 1.30 0.390 1,571.190 168.810
2/10/2022 JK Lakshmi opc 43g SKL/21-22/3897 25 1765 2/10/2022 15+788 P9 5630 P9 Wall 5th final lift M-30 11.40 4.332 1,575.522 189.478
1765 2/10/2022 27+310 B/s 5632 Headwal 1st Lift M-20 8.90 2.670 1,578.192 186.808
1765 2/10/2022 26+700 L/s 5636 Headwal 2nd Lift M-20 4.70 1.410 1,579.602 185.398
1765 2/10/2022 27+000 R/s 5639 Pipe Bedding M-20 1.50 0.450 1,580.052 184.948
1765 2/11/2022 15+788 P7 5684 P7 pcc M-15 9.80 2.587 1,582.639 182.361
1765 2/11/2022 15+788 P2 5686 P2 footing M-30 50.00 19.000 1,601.639 163.361
1765 2/12/2022 15+315 P1 5708 P1 cap M-30 6.00 2.280 1,603.919 161.081
1765 2/12/2022 15+788 P8 5709 P8 wall 1st lift M-30 13.20 5.016 1,608.935 156.065
1765 2/12/2022 27+000 R/s 5711 Hpc creddle M-20 1.60 0.480 1,609.415 155.585
1765 2/12/2022 27+000 R/s 5712 Headwal 2nd Lift M-20 4.70 1.410 1,610.825 154.175
1765 2/12/2022 27+300-27+400 R/s 5714 Drain Pcc M-15 10.40 2.746 1,613.571 151.429
1765 2/12/2022 16+900-16+990 R/s 5715 Drain Pcc M-15 9.40 2.482 1,616.053 148.947
1765 2/14/2022 15+788 P7 5720 P7 footing M-30 50.00 19.000 1,635.053 129.947
1765 2/14/2022 15+788 P8 5709 P8 wall 2n lift M-30 12.30 4.674 1,639.727 125.273
1765 2/14/2022 27+310 L/s 5728 Pipe Bedding M-20 1.50 0.450 1,640.177 124.823
1765 2/14/2022 27+000 R/s 5729 Headwal 3rd or Final Lift M-20 1.90 0.570 1,640.747 124.253
1765 2/14/2022 16+900-16+990 R/s 5734 Drain Raft M-20 9.10 2.876 1,643.623 121.377
1765 2/15/2022 7+595 P1-A2 5745 Desk slab casting M-35 84.00 34.104 1,677.727 87.273
1765 2/15/2022 27+310 L/s 5743 Headwal 2nd Lift M-20 4.70 1.410 1,679.137 85.863
2/16/2022 JK Lakshmi opc 43g SKL/21-22/4072 25 1790 2/16/2022 15+788 P8 5753 P8 wall 3rd Lift M-30 12.30 4.674 1,683.811 106.189
2/16/2022 JK Lakshmi opc 43g SKL/21-22/4073 25 1815 2/16/2022 27+310 L/s 5754 Hpc creddle M-20 1.60 0.480 1,684.291 130.709
1815 2/16/2022 27+310 L/s 5755 Headwal 3rd or Final Lift M-20 1.90 0.570 1,684.861 130.139
1815 2/16/2022 25+300-25+400 L/s 5759 Drain Raft M-20 10.10 3.192 1,688.053 126.947
1815 2/16/2022 26+070-26+195 R/s 5760 Drain wall M-20 18.00 5.688 1,693.741 121.259
1815 2/16/2022 25+560-25+640 L/s 5762 Drain Pcc M-15 8.40 2.218 1,695.959 119.041
1815 2/16/2022 3+670 R/s 5766 A1,A2 retaining wall pcc M-15 3.00 0.792 1,696.751 118.249
1815 2/17/2022 15+788 P2 5771 P2 wall 1st Lift M-30 13.30 5.054 1,701.805 113.195
1815 2/17/2022 27+310 L/s 5779 Pipe Bedding M-20 1.50 0.450 1,702.255 112.745
1815 2/17/2022 26+070-26+195 R/s 5783 Drain cover slab M-20 11.50 3.634 1,705.889 109.111
1815 2/17/2022 25+560-25+640 L/s 5784 Drain Raft M-20 8.10 2.560 1,708.449 106.551
1815 2/17/2022 25+970-26+070 R/s 5785 Drain Pcc M-15 10.40 2.746 1,711.195 103.805
2/18/2022 JK Lakshmi opc 43g SKL/21-22/4146 25 1840 2/18/2022 15+788 P8 5796 P8 wall 4th Lift M-30 12.30 4.674 1,715.869 124.131
2/18/2022 JK Lakshmi opc 43g SKL/21-22/4147 25 1865 2/18/2022 7+595 A-p1 5798 Desk slab casting M-35 84.00 34.104 1,749.973 115.027
2/18/2022 ultratech opc 43g 8970444222 31 1896 2/18/2022 25+970-26+070 R/s 5800 Drain raft M-20 10.10 3.192 1,753.165 142.835
2/19/2022 ultratech opc 43g 8970444223 32 1928 2/19/2022 15+788 A1 5809 A1 footing M-30 75.00 28.500 1,781.665 146.335
2/19/2022 ultratech opc 43g 8970444236 32 1960 2/19/2022 15+788 P3 5810 P3 Pcc M-15 9.80 2.587 1,784.252 175.748
2/19/2022 JK Lakshmi opc 43g SKL/21-22/4167 25 1985 2/19/2022 27+310 R/s 5811 Hpc creddle M-20 1.60 0.480 1,784.732 200.268
2/19/2022 JK Lakshmi opc 43g SKL/21-22/4168 25 2010 2/19/2022 25+560-25+640 L/s 5813 Drain wall M-20 11.60 3.666 1,788.398 221.602
2/19/2022 JK Lakshmi opc 43g 5050548526 25 2035 2/19/2022 27+310 R/s 5812 Headwal 2nd Lift M-20 4.70 1.410 1,789.808 245.192
2035 2/19/2022 25+970-26+070 R/s 5814 Drain wall M-20 14.40 4.550 1,794.358 240.642
Cement Recive Details Concrete Production Details Consumption Details
M-20 M40
Cement Cum M-15 M-20 Pcc M-30 Consum
Qty In RCC M-35 RCC Cum.
Recive Brand INVOICE No Qty in Date Location Side RFI No. Description GRADE As per As per As per DLC PQC e Balance
ton As per As per Site As per Consume
Date Ton Site Site Site in Ton
Site Site
2/21/2022 JK Lakshmi opc 43g SKL/21-22/4219 8.2 2043.2 2/21/2022 15+788 P2 5831 P2 wall 2nd Lift M-30 12.30 4.674 1,799.032 244.168
2/21/2022 JK Lakshmi opc 43g SKL/21-22/4217 6.5 2049.7 2/21/2022 27+310 R/s 5834 Headwal 3rd or Final Lift M-20 1.90 0.570 1,799.602 250.098
2/21/2022 JK Lakshmi opc 43g SKL/21-22/4234 6 2055.7 2/21/2022 15+788 P8 5833 P8 wall 5th/final lift M-30 11.40 4.332 1,803.934 251.766
2055.7 2/21/2022 25+970-26+070 R/s 5836 Drain cover slab M-20 8.60 2.718 1,806.652 249.048
2/22/2022 JK Lakshmi opc 43g SKL/21-22/4279 8.2 2063.9 2/22/2022 15+788 P2 5842 P2 wall 3rd lift M-30 12.30 4.674 1,811.326 252.574
2/22/2022 JK Lakshmi opc 43g SKL/21-22/4269 5 2068.9 2/22/2022 17+595 A2 5844 Footing pcc M-15 13.50 3.564 1,814.890 254.010
Crash Barrier. Retaining
2/22/2022 JK Lakshmi opc 43g SKL/21-22/4263 8 2076.9 2/22/2022 7+595 A2 5846 Wall & Return Wall of M-40 4.50 1.872 1,816.762 260.138
2/23/2022 MNB A2 Side.
2/23/2022 JK Lakshmi opc 43g SKL/21-22/4285 8.1 2085 15+788 P2 5858 P2wall 4th Lift M-30 12.30 4.674 1,821.436 263.564
2/23/2022 JK Lakshmi opc 43g 5050550646 25 2110 2/23/2022 28+540 B/s 5866 Head wall PCC M-15 2.70 0.713 1,822.149 287.851
2/24/2022 JK Lakshmi opc 43g SKL/21-22/4330 25 2135 2/24/2022 28+540 B/s 5889 Headwal 1st Lift M-20 8.90 2.670 1,824.819 310.181
Crash Barrier. Retaining
25 2160 2/25/2022 7+595 A1 5846 Wall & Return Wall of M-40
2/24/2022 JK Lakshmi opc 43g SKL/21-22/4331 4.50 1.872 1,826.691 333.309
2/25/2022
MNB A1 Side.
2/25/2022 JK Lakshmi opc 43g 5050550750 25 2185 15+788 P2 5906 P9 Wall 5th final lift M-30 11.40 4.332 1,831.023 353.977
2185 2/25/2022 15+788 P3 5911 P3 footing M-30 50.00 19.000 1,850.023 334.977
2185 2/25/2022 15+788 P7 5908 P7 wall 1st Lift M-30 13.30 5.054 1,855.077 329.923
2185 2/25/2022 28+540 R/s 5916 Pipe Bedding M-20 1.20 0.360 1,855.437 329.563
2185 2/26/2022 17+595 A2 5927 A2 Footing M-30 70.00 26.600 1,882.037 302.963
2/28/2022 ultratech opc 43g 8970445668 25 2210 2/28/2022 15+788 P6 5944 Footing pcc M-15 9.80 2.587 1,884.624 325.376
2/28/2022 ultratech opc 43g 8970445667 25 2235 2/28/2022 15+788 P7 5947 P7 wall 2nd Lift M-30 12.30 4.674 1,889.298 345.702
2235 2/28/2022 15+788 P3 5949 P3 wall 1st Lift M-30 13.30 5.054 1,894.352 340.648
2235 2/28/2022 28+540 R/s 5951 Headwal 2nd Lift M-20 4.70 1.410 1,895.762 339.238
2235 2/28/2022 23+878 L/s 5952 Headwal 3rd or Final Lift M-20 2.40 0.720 1,896.482 338.518
2235 2/28/2022 26+700 R/s 5953 Headwal 3rd or Final Lift M-20 1.90 0.570 1,897.052 337.948
2235 2/28/2022 24+850-24+950 L/s 5955 Drain pcc M-15 10.40 2.746 1,899.798 335.202
2235 2/28/2022 25+300-25+350 R/s 5956 Drain wall M-20 7.20 2.275 1,902.073 332.927
2235 3/1/2022 15+788 P7 5969 P7 wall 3rd Lift M-30 12.30 4.674 1,906.747 328.253
2235 3/1/2022 23+350-23+400 R/s 5976 Drain wall M-20 7.20 2.275 1,909.022 325.978
2235 3/1/2022 24+850-24+900 L/s 5975 Drain raft M-20 5.00 1.580 1,910.602 324.398
2235 3/2/2022 15+788 P7 5988 P7wall 4th Lift M-30 12.30 4.674 1,915.276 319.724

3/2/2022 MNB Crass Barrier of A1 &


2235 7+595 R/s 5995 M-40
A2 6.60 2.746 1,918.022 316.978
2235 3/2/2022 28+540 R/s 5992 Headwal 3rd or Final Lift M-20 1.90 0.570 1,918.592 316.408
2235 3/2/2022 24+850-24+900 L/s 5998 Drain wall M-20 7.20 2.275 1,920.867 314.133
2235 3/2/2022 24+900-24+950 L/s 5999 Drain raft M-20 5.00 1.580 1,922.447 312.553
2235 3/2/2022 25+300-25+350 L/s 6001 Drain Cover slab M-20 4.30 1.359 1,923.806 311.194
2235 3/3/2022 15+788 P3 6018 P3 wall 2nd Lift M-30 12.30 4.674 1,928.480 306.520
2235 3/3/2022 25+350-25+400 R/s 6025 Drain cover slab M-20 4.30 1.359 1,929.839 305.161
2235 3/3/2022 24+850-24+900 L/s 6027 Drain cover slab M-20 4.30 1.359 1,931.198 303.802
2235 3/3/2022 24+900-24+950 L/s Drain wall M-20 7.20 2.275 1,933.473 301.527
2235 3/4/2022 17+595 A2 6054 A2 Wall 1st Lift M-30 21.20 8.056 1,941.529 293.471
2235 3/4/2022 24+900-24+950 L/s 6056 Drain cover slab M-20 4.30 1.359 1,942.888 292.112
2235 3/4/2022 15+788 P6 6048 P6Footing M-30 50.00 19.000 1,961.888 273.112
2235 3/4/2022 3+670 R/s 6060 A1,A2 footing M-30 7.60 2.888 1,964.776 270.224
2235 3/4/2022 28+540 R/s 6050 Hpc creddle M-20 1.30 0.390 1,965.166 269.834
3/5/2022 MNB Crass Barrier of A1 &
3/5/2022 JK Lakshmi opc 43g SKL/21-22/4683 25 2260 7+595 L/s 6080 M-40 6.60 2.746 1,967.912 292.088
A2
3/5/2022 JK Lakshmi opc 43g SKL/21-22/4682 25 2285 3/5/2022 28+540 L/s 6079 Hpc pipe beddin pcc M-20 1.20 0.360 1,968.272 316.728
2285 3/5/2022 15+788 P7 6075 P7wall final Lift M-30 11.40 4.332 1,972.604 312.396
3/6/2022 JK Lakshmi opc 43g 5050553317 25 2310 3/7/2022 15+788 P3 6125 P3wall 3rd Lift M-30 12.30 4.674 1,977.278 332.722
3/6/2022 JK Lakshmi opc 43g 5050553324 25 2335 3/7/2022 3+670 R/s 6127 Retaining wall 1st Lift M-30 3.20 1.216 1,978.494 356.506
2335 3/8/2022 15+788 P6 6139 P6 wall 1st Lift M-30 13.30 5.054 1,983.548 351.452
2335 3/8/2022 15+788 P3 6143 P6 wall 4th Lift M-30 12.30 4.674 1,988.222 346.778
2335 3/8/2022 3+670 R/s 6147 Retaining wall 2ndt Lift M-30 2.60 0.988 1,989.210 345.790
Cement Recive Details Concrete Production Details Consumption Details
M-20 M40
Cement Cum M-15 M-20 Pcc M-30 Consum
Qty In RCC M-35 RCC Cum.
Recive Brand INVOICE No Qty in Date Location Side RFI No. Description GRADE As per As per As per DLC PQC e Balance
ton As per As per Site As per Consume
Date Ton Site Site Site in Ton
Site Site
2335 3/8/2022 28+770 B/s 6150 Head wall PCC M-15 2.70 0.713 1,989.923 345.077
2335 3/8/2022 25+540 L/s 6152 Hpc creddle M-20 1.30 0.390 1,990.313 344.687
2335 3/8/2022 28+540 L/s 6153 Headwal 2nd Lift M-20 4.70 1.410 1,991.723 343.277
2335 3/9/2022 3+670 R/s 6182 Retaining wall 3rd Lift M-30 2.30 0.874 1,992.597 342.403
2335 3/9/2022 15+788 P3 6143 P6 wall 5th/final Lift M-30 11.40 4.332 1,996.929 338.071
2335 3/9/2022 15+315 B/s 6173 A1 Retaining wall footing M-30 17.60 6.688 2,003.617 331.383
2335 3/9/2022 28+540 L/s 6185 Headwal 3rd or Final Lift M-20 1.90 0.570 2,004.187 330.813
2335 3/9/2022 15+788 P6 6170 P6 wall 2ndf Lift M-30 12.30 4.674 2,008.861 326.139
2335 3/10/2022 25+920-26+000 L/s 6208 Drain pcc M-15 8.40 2.218 2,011.079 323.921
2335 3/10/2022 28+770 B/s 6206 Headwal 1st Lift M-20 8.90 2.670 2,013.749 321.251
2335 3/10/2022 17+595 A2 6203 A2 wall 2nd lift M-30 20.10 7.638 2,021.387 313.613
2335 3/10/2022 15+788 P1 6202 P1 wall 1st Lift M-30 13.30 5.054 2,026.441 308.559
2335 3/10/2022 15+788 P6 6201 P6 wall 3rd Lift M-30 12.30 4.674 2,031.115 303.885
2335 3/10/2022 15+788 P4 6198 P4 pcc for footing M-15 9.80 2.587 2,033.702 301.298
2335 3/11/2022 15+788 P6 6219 P6 wall 4th Lift M-30 12.30 4.674 2,038.376 296.624
2335 3/11/2022 25+920-26+000 L/s 6223 Drain Raft M-20 8.10 2.560 2,040.936 294.064
2335 3/12/2022 15+788 P6 6241 P6 wall 5th Lift M-30 11.40 4.332 2,045.268 289.732
3/12/2022 A1,A2 Retaining wall final
2335 3+670 R/s 6242 M-30 1.00 0.380 2,045.648 289.352
lift
2335 3/12/2022 25+920-26+000 L/s 6242 Drain Wall M-20 11.60 3.666 2,049.314 285.686
2335 3/14/2022 28+770 L/s 6268 Pipe Bedding M-20 1.20 0.360 2,049.674 285.326
2335 3/14/2022 25+920-26+000 L/s 6266 Drain Cover slab M-20 6.70 2.117 2,051.791 283.209
3/14/2022 A1-A2 crash barrier for
2335 3+670 R/s 6262 M-40 1.60 0.666 2,052.457 282.543
retaining wall
3/15/2022 ultratech opc 43g 8970448053 32 2367 3/15/2022 28+770 L/s 6283 Headwal 2nd Lift M-20 4.70 1.410 2,053.867 313.133
2367 3/15/2022 28+770 L/s 6284 Hpc creddle M-20 1.30 0.390 2,054.257 312.743
2367 3/15/2022 15+315 R/s 6276 A1 retaining wall 1st lift M-30 3.50 1.330 2,055.587 311.413
2367 3/16/2022 15+788 P4 6295 P4 footing M-30 50.00 19.000 2,074.587 292.413
2367 3/16/2022 3+670 L/s 6298 A1,A2 pcc for Ret.wall M-15 3.00 0.792 2,075.379 291.621
2367 3/16/2022 28+770 L/s 6300 Headwal 3rd or Final Lift M-20 1.90 0.570 2,075.949 291.051
3/22/2022 ultratech opc 43g 8970448481 30 2397 3/22/2022 15+788 P5 6311 P5 pcc for footing M-15 9.80 2.587 2,078.536 318.464
3/22/2022 ultratech opc 43g 8970448487 25 2422 3/22/2022 15+788 P1 6316 P1wall 2nd lift M-30 12.30 4.674 2,083.210 338.790
2422 3/22/2022 15+788 P4 6318 P4 wall 1st Lift M-30 13.30 5.054 2,088.264 333.736
3/22/2022 A1-A2 Retaining wall
2422 3+670 L/s 6321 M-30 7.60 2.888 2,091.152 330.848
footing
3/22/2022 A1,A2crass barrier slab
2422 3+670 L/s 6313 M-40
&return wall 4.60 1.914 2,093.066 328.934
2422 3/22/2022 15+315 L/s 6324 A1 retaining wall 1st lift M-30 3.50 1.330 2,094.396 327.604
2422 3/23/2022 15+788 P1 6338 P1 wall 3rd lift M-30 12.30 4.674 2,099.070 322.930
2422 3/23/2022 15+788 P4 6340 P4 wall 2nd Lift M-30 12.30 4.674 2,103.744 318.256
3/23/2022 A1-A2 Retaining wall 1st
2422 3+670 L/s 6343 M-30 3.20 1.216 2,104.960 317.040
lift
A1-A2 Retaining wall 2nd
2422 3/24/2022 3+670 L/s 6363 M-30 2.60 0.988 2,105.948 316.052
lift
2422 3/25/2022 15+788 P4 6380 P4 wall 3rd Lift M-30 12.30 4.674 2,110.622 311.378
2422 3/25/2022 15+788 P1 6379 P1 wall 4th lift M-30 12.30 4.674 2,115.296 306.704
3/25/2022 A1-A2 Retaining wall 3rd
2422 3+670 L/s 6384 M-30 2.30 0.874 2,116.170 305.830
lift
2422 3/26/2022 15+788 P5 6402 P5 footing M-30 50.00 19.000 2,135.170 286.830
2422 3/26/2022 15+788 P4 6400 P4 wall 4th lift M-30 12.30 4.674 2,139.844 282.156
3/26/2022 A1-A2 Retaining wall final
2422 3+670 L/s 6405 M-30 2.70 1.026 2,140.870 281.130
lift
2422 3/26/2022 15+315 B/s 6408 A1 retaining wall 2nd lift M-30 5.40 2.052 2,142.922 279.078
3/28/2022 ultratech opc 43g 8970449658 25 2447 3/28/2022 15+788 P1 6430 P1 wall final lift M-30 11.30 4.294 2,147.216 299.784
2447 3/28/2022 28+150 B/s 6438 MNB Pcc for raft M-15 36.50 9.636 2,156.852 290.148
3/28/2022 A1-A2 crash barrier for
2447 3+670 L/s 6437 M-40 1.60 289.482
retaining wall 0.666 2,157.518
2447 3/29/2022 15+788 P4 6457 P4 wall final lift M-30 11.30 4.294 2,161.812 285.188
2447 3/29/2022 3+670 R/s 6460 pcc for approch slab M-15 6.00 1.584 2,163.396 283.604
Cement Recive Details Concrete Production Details Consumption Details
M-20 M40
Cement Cum M-15 M-20 Pcc M-30 Consum
Qty In RCC M-35 RCC Cum.
Recive Brand INVOICE No Qty in Date Location Side RFI No. Description GRADE As per As per As per DLC PQC e Balance
ton As per As per Site As per Consume
Date Ton Site Site Site in Ton
Site Site
2447 3/30/2022 3+670 R/s 6481 A1,A2 Approch slab M-30 11.70 4.446 2,167.842 279.158
2447 3/30/2022 2+660-2+690 L/s 6491 Drain Pcc M-15 3.20 0.845 2,168.687 278.313
2447 3/31/2022 28+770 R/s 6516 Pipe Bedding M-20 1.20 0.360 2,169.047 277.953
2447 3/31/2022 19+600-19+676 L/s 6520 Drain Pcc M-15 8.00 2.112 2,171.159 275.841
2447 3/31/2022 15+315 A2 6521 A2 cap M-30 6.00 2.280 2,173.439 273.561
2447 4/1/2022 15+788 P5 6540 P5 wall 1st Lift M-30 13.30 5.054 2,178.493 268.507
2447 4/1/2022 19+600-19+676 L/s 6545 Drain Raft M-20 7.70 2.433 2,180.926 266.074
2447 4/1/2022 15+315 A2 6546 A2 Bracket & Dirt wall M-30 3.50 1.330 2,182.256 264.744
4/2/2022 ultratech opc 43g 8970450451 32 2479 4/2/2022 17+595 A1 6564 A1 Wall 1st Lift M-30 21.20 8.056 2,190.312 288.688
4/2/2022 ultratech opc 43g 8970450454 32 2511 4/2/2022 2+660-2+690 L/s 6565 Drain Raft M-20 3.00 0.948 2,191.260 319.740
2511 4/2/2022 28+770 R/s 6566 Hpc creddle M-20 1.30 0.390 2,191.650 319.350
2511 4/2/2022 28+770 R/s 6567 Headwal 2nd Lift M-20 4.70 1.410 2,193.060 317.940
2511 4/2/2022 19+600-19+630 L/s 6568 Drain Wall M-20 4.40 1.390 2,194.450 316.550
4/3/2022 ultratech opc 43g 8970450561 32 2543 4/4/2022 2+660-2+685 L/s 6584 Drain Wall M-20 3.60 1.138 2,195.588 347.412
4/3/2022 ultratech opc 43g 8970450577 32 2575 4/4/2022 15+788 P5 6886 P5 wall 2nd Lift M-30 12.30 4.674 2,200.262 374.738
4/3/2022 ultratech opc 43g 8970450631 32 2607 4/4/2022 28+770 R/s 6587 Headwal 3rd or Final Lift M-20 1.90 0.570 2,200.832 406.168
2607 4/4/2022 19+630-19+676 L/s 6588 Drain Wall M-20 6.70 2.117 2,202.949 404.051
2607 4/4/2022 16+850-16+900 R/s 6590 Drain pcc M-15 5.20 1.373 2,204.322 402.678
2607 4/4/2022 16+950-17+000 R/s 6592 Drain pcc M-15 5.30 1.399 2,205.721 401.279
4/5/2022 ultratech opc 43g 8970450738 32 2639 4/5/2022 15+788 P5 6621 P5 wall 3rd Lift M-30 12.30 4.674 2,210.395 428.605
4/5/2022 ultratech opc 43g 8970450746 32 2671 4/5/2022 19+666-19+690 L/s 6627 Drain Cover slab M-20 2.20 0.695 2,211.090 459.910
4/5/2022 ultratech opc 43g 8970450750 25 2696 4/5/2022 16+850-16+900 R/s 6628 Drain Raft M-20 5.10 1.612 2,212.702 483.298
2696 4/5/2022 16+950-17+000 R/s 6629 Drain Raft M-20 5.10 1.612 2,214.314 481.686
2696 4/6/2022 16+850-16+900 R/s 6652 Drain Wall M-20 7.30 2.307 2,216.621 479.379
2696 4/7/2022 15+788 P5 6670 P5 wall 4th lift M-30 12.30 4.674 2,221.295 474.705
2696 4/7/2022 2+550-6+660 L/s 6675 Drain pcc M-15 11.50 3.036 2,224.331 471.669
2696 4/7/2022 19+600-19+666 L/s 6668 Drain Cover slab M-20 5.70 1.801 2,226.132 469.868
2696 4/7/2022 2+824-2+888 L/s 6679 Drain pcc M-15 6.70 1.769 2,227.901 468.099
2696 4/8/2022 2+824-2+850 R/s 6690 Drain Cover slab M-20 2.30 0.727 2,228.628 467.372
2696 4/8/2022 15+315 B/s A2 retaining wall Pcc M-15 6.00 1.584 2,230.212 465.788
2696 4/8/2022 2+550-2+660 L/s 6700 Drain Raft M-20 11.20 3.539 2,233.751 462.249
2696 4/8/2022 2+824-2+888 L/s 6699 Drain Raft M-20 6.50 2.054 2,235.805 460.195
2696 4/8/2022 10+300-10+400 R/s 6684 DLC DLC 80.00 12.400 2,248.205 447.795
2696 4/9/2022 2+550-2+600 L/s 6712 Drain Wall M-20 7.30 2.307 2,250.512 445.488
2696 4/9/2022 2+824-2+888 L/s 6713 Drain Wall M-20 9.30 2.939 2,253.451 442.549
2696 4/9/2022 28+150 A1 6720 A1raft section-1 M-30 59.50 22.610 2,276.061 419.939
2696 4/9/2022 2+850-2+887 R/s 6715 Drain Pcc M-15 4.00 1.056 2,277.117 418.883
2696 4/9/2022 15+315 A1 6716 A1 cap,dirtwall,bracket M-30 9.50 3.610 2,280.727 415.273
2696 4/11/2022 2+550-2+600 L/s 6731 Drain Cover slab M-20 4.30 1.359 2,282.086 413.914
2696 4/11/2022 2+600-2+660 L/s 6732 Drain Wall M-20 8.70 2.749 2,284.835 411.165
2696 4/11/2022 15+315 B/s 6736 A2 Retain.wall footing M-30 17.60 6.688 2,291.523 404.477
2696 4/11/2022 2+824-2+888 L/s 6734 Drain Cover slab M-20 5.40 1.706 2,293.229 402.771
2696 4/11/2022 2+850-2+887 R/s 6735 Drain Raft M-20 3.80 1.201 2,294.430 401.570
2696 4/11/2022 15+788 P5 6737 P5 wall final lift M-30 11.40 4.332 2,298.762 397.238
2696 4/11/2022 3+670 L/s 6741 A1,A2 Approch slab pcc M-15 6.00 1.584 2,300.346 395.654
2696 4/11/2022 10+150-10+300 R/s 6728 DLC DLC 120.00 18.600 2,318.946 377.054
2696 4/12/2022 2+850-2+887 R/s 6754 Drain Wall M-20 5.50 1.738 2,320.684 375.316
2696 4/12/2022 2+600-2+660 L/s 6753 Drain Cover slab M-20 5.30 1.675 2,322.359 373.641
2696 4/12/2022 17+595 A1 6758 A1 wall 2nd Lift M-30 20.10 7.638 2,329.997 366.003
2696 4/12/2022 3+670 L/s 6759 A1,A2 Approch slab M-30 11.70 4.446 2,334.443 361.557
2696 4/12/2022 10+000-10+150 R/s 6750 DLC DLC 120.00 18.600 2,353.043 342.957
2696 4/13/2022 9+900-10+000 R/s 6769 DLC DLC 80.00 12.400 2,365.443 330.557
Cement Recive Details Concrete Production Details Consumption Details
M-20 M40
Cement Cum M-15 M-20 Pcc M-30 Consum
Qty In RCC M-35 RCC Cum.
Recive Brand INVOICE No Qty in Date Location Side RFI No. Description GRADE As per As per As per DLC PQC e Balance
ton As per As per Site As per Consume
Date Ton Site Site Site in Ton
Site Site
2696 4/13/2022 2+850-2+887 R/s 6771 Drain Cover slab M-20 3.30 1.043 2,366.486 329.514
2696 4/13/2022 17+595 P2 6773 P2 raft pcc M-15 10.00 2.640 2,369.126 326.874
2696 4/13/2022 15+315 B/s 6774 A2 retain.wall 1st Lift M-30 7.30 2.774 2,371.900 324.100
2696 4/14/2022 17+595 P1 6803 P1 raft pcc M-15 10.00 2.640 2,374.540 321.460
2696 4/14/2022 15+315 B/s 6799 A2 retain.wall 2nd Lift M-30 6.00 2.280 2,376.820 319.180
2696 4/14/2022 25+560-25+640 L/s 6795 Drain Cover slab M-20 7.10 2.244 2,379.064 316.936
2696 4/14/2022 9+880-9+920 L/s 6793 Drain Cover slab M-20 3.60 1.138 2,380.202 315.798
2696 4/14/2022 9+750-9+900 R/s 6791 DLC DLC 120.00 18.600 2,398.802 297.198
2696 4/16/2022 3+000-3+080 R/s 6811 Drain pcc M-15 8.40 2.218 2,401.020 294.980
2696 4/16/2022 24+750-24+850 L/s 6818 Drain Cover slab M-20 8.70 2.749 2,403.769 292.231
2696 4/16/2022 19+580-19+600 L/s 6820 Drain pcc M-15 2.10 0.554 2,404.323 291.677
2696 4/16/2022 10+100-10+150 R/s 6822 Drain pcc M-15 5.20 1.373 2,405.696 290.304
2696 4/16/2022 10+250-10+300 L/s 6823 Drain Wall M-20 7.20 2.275 2,407.971 288.029
2696 4/16/2022 19+480-19+565 R/s 6825 Drain Cover slab M-20 7.50 2.370 2,410.341 285.659
2696 4/18/2022 15+315 B/s 6835 A2 Retaining Wall 3rd Lift M-30 4.50 1.710 2,412.051 283.949
2696 4/18/2022 25+240 A2 6837 A2 footinf pcc M-15 13.50 3.564 2,415.615 280.385
2696 4/19/2022 3+000-3+050 R/s 6848 Drain Raft M-20 5.10 1.612 2,417.227 278.773
2696 4/19/2022 10+300-10+350 L/s 6851 Drain Wall M-20 7.20 2.275 2,419.502 276.498
2696 4/19/2022 10+100-10+150 R/s 6852 Drain Raft M-20 5.10 1.612 2,421.114 274.886
2696 4/19/2022 19+580-19+600 L/s 6853 Drain Raft M-20 2.00 0.632 2,421.746 274.254
2696 4/20/2022 15+315 A2-P1 6859 A2-P1 slab M-35 84.00 34.104 2,455.850 240.150
2696 4/20/2022 3+000-3+050 R/s 6861 Drain Wall M-20 7.30 2.307 2,458.157 237.843
2696 4/20/2022 10+100-10+150 R/s 6864 Drain Wall M-20 7.30 2.307 2,460.464 235.536
2696 4/20/2022 19+480-19+580 L/s 6867 Drain Cover slab M-20 8.50 2.686 2,463.150 232.850
2696 4/20/2022 19+580-19+600 L/s 6865 Drain Wall M-20 2.90 0.916 2,464.066 231.934
4/21/2022 ultratech opc 43g 8970452683 25 2721 4/21/2022 25+240 P2 6878 P2 footinf pcc M-15 9.90 2.614 2,466.680 254.320
4/21/2022 ultratech opc 43g 8970452688 25 2746 4/21/2022 3+050-3+080 R/s 6881 Drain Raft M-20 3.00 0.948 2,467.628 278.372
4/21/2022 ultratech opc 43g 8970452703 25 2771 4/21/2022 3+080-3+100 R/s 6883 Drain pcc M-15 2.10 0.554 2,468.182 302.818
4/21/2022 ultratech opc 43g 8970452704 25 2796 4/21/2022 10+100-10+150 R/s 6885 Drain Cover slab M-20 4.50 1.422 2,469.604 326.396
2796 4/21/2022 19+580-19+600 L/s 6887 Drain Cover slab M-20 1.80 0.569 2,470.173 325.827
2796 4/21/2022 9+950-10+000 L/s 6889 Drain Cover slab M-20 4.50 1.422 2,471.595 324.405
2796 4/22/2022 7+595 B/s 6900 A1,A2 Approch slab pcc M-15 11.20 2.957 2,474.552 321.448
2796 4/22/2022 3+000-3+050 R/s 6905 Drain Cover slab M-20 4.50 1.422 2,475.974 320.026
2796 4/22/2022 10+000-10+050 L/s 6907 Drain Cover slab M-20 4.50 1.422 2,477.396 318.604
4/23/2022 ultratech opc 43g 8970453000 25 2821 4/23/2022 10+340-10+390 R/s 6921 PQC M-40 75.00 30.975 2,508.371 312.629
4/23/2022 ultratech opc 43g 8970453003 25 2846 4/23/2022 3+080-3+100 R/s 6937 Drain Raft M-20 2.00 0.632 2,509.003 336.997
2846 4/23/2022 3+050-3+080 R/s 6939 Drain Cover slab M-20 2.70 0.853 2,509.856 336.144
2846 4/23/2022 10+050-10+100 L/s 6941 Drain Cover slab M-20 4.40 1.390 2,511.246 334.754
2846 4/23/2022 17+595 P2 6922 P2 footing M-30 50.00 19.000 2,530.246 315.754
2846 4/23/2022 15+315 B/s 6924 A1 retaining wall 3rd lift M-30 4.60 1.748 2,531.994 314.006
2846 4/23/2022 15+315 B/s 6929 A2 retaining wall final lift M-30 3.00 1.140 2,533.134 312.866
2846 4/24/2022 10+290-10+340 R/s 6953 PQC M-40 75.00 30.975 2,564.109 281.891
2846 4/24/2022 28+150 A2 6958 A2raft section-2 M-30 59.50 22.610 2,586.719 259.281
2846 4/25/2022 10+240-10+290 R/s 6972 PQC M-40 75.00 30.975 2,617.694 228.306
2846 4/25/2022 7+595 B/s 6973 A1,A2 Approch slab M-30 24.00 9.120 2,626.814 219.186
2846 4/25/2022 10+100-10+150 L/s 6986 Drain Cover slab M-20 4.40 1.390 2,628.204 217.796
2846 4/25/2022 3+080-3+100 R/s 6987 Drain Wall M-20 2.90 0.916 2,629.120 216.880
2846 4/26/2022 10+110-10+190 R/s 6993 PQC M-40 120.00 49.560 2,678.680 167.320
2846 4/26/2022 15+788 P6 7003 P6 cap M-30 6.00 2.280 2,680.960 165.040
2846 4/26/2022 10+150-10+250 L/s 7005 Drain Cover slab M-20 8.70 2.749 2,683.709 162.291
2846 4/26/2022 9+920-10+050 R/s 7007 Drain Cover slab M-20 11.00 3.476 2,687.185 158.815
2846 4/27/2022 10+060-10+110 R/s 7016 PQC M-40 75.00 30.975 2,718.160 127.840
Cement Recive Details Concrete Production Details Consumption Details
M-20 M40
Cement Cum M-15 M-20 Pcc M-30 Consum
Qty In RCC M-35 RCC Cum.
Recive Brand INVOICE No Qty in Date Location Side RFI No. Description GRADE As per As per As per DLC PQC e Balance
ton As per As per Site As per Consume
Date Ton Site Site Site in Ton
Site Site
2846 4/27/2022 27+590 B/s 7022 Head wall PCC M-15 2.70 0.713 2,718.873 127.127
2846 4/27/2022 17+595 P1 7024 P2 wall 1st Lift M-30 13.50 5.130 2,724.003 121.997
2846 4/27/2022 10+150-10+250 R/s 7026 Drain Cover slab M-20 8.50 2.686 2,726.689 119.311
2846 4/27/2022 15+788 P7 7028 P7 cap M-30 6.00 2.280 2,728.969 117.031
4/28/2022 ultratech opc 43g 8970453500 25 2871 4/28/2022 10+190-10+240 R/s 7041 PQC M-40 75.00 30.975 2,759.944 111.056
4/28/2022 ultratech opc 43g 8970453539 25 2896 4/28/2022 10+250-10+350 R/s 7050 Drain Cover slab M-20 8.50 2.686 2,762.630 133.370
2896 4/30/2022 16+900-16+950 R/s 7085 Drain pcc M-15 5.30 1.399 2,764.029 131.971
2896 4/30/2022 17+020-17+070 R/s 7087 Drain pcc M-15 5.30 1.399 2,765.428 130.572
2896 4/30/2022 25+760-25+780 R/s 7090 Retaining wall footing pcc M-15 13.00
3.432 2,768.860 127.140
5/2/2022 ultratech opc 43g 8970453900 25 2921 5/2/2022 16+900-16+950 R/s 7098 Drain raft M-20 5.10 1.612 2,770.472 150.528
5/2/2022 ultratech opc 43g 8970453978 25 2946 5/2/2022 17+020-17+070 R/s 7099 Drain raft M-20 5.10 1.612 2,772.084 173.916
2946 5/2/2022 17+040-17+110 L/s 7101 Drain pcc M-15 7.30 1.927 2,774.011 171.989
2946 5/2/2022 28+150 sec-2 main wall 1st lift M-30 8.50 3.230 2,777.241 168.759
5/2/2022 ultratech opc 43g 8970454264 25 2971 5/4/2022 15+315 A2 7113 return wall final lift M-30 1.90 0.722 2,777.963 193.037
2971 5/4/2022 16+900-16+950 R/s 7114 Drain wall M-20 7.30 2.307 2,780.270 190.730
2971 5/4/2022 17+020-17+070 R/s 7115 Drain wall M-20 7.30 2.307 2,782.577 188.423
2971 5/4/2022 17+040-17+110 L/s 7117 Drain raft M-20 7.10 2.244 2,784.821 186.179
2971 5/4/2022 17+595 P2 P2 wall 2nd Lift M-30 13.00 4.940 2,789.761 181.239
2971 5/4/2022 28+150 sec-2 7121 mid wall 1st lift M-30 7.00 2.660 2,792.421 178.579
2971 5/6/2022 16+900-16+950 R/s 7142 Drain Cover slab M-20 4.00 1.264 2,793.685 177.315
2971 5/6/2022 17+040-17+110 L/s 7145 Drain wall M-20 10.10 3.192 2,796.877 174.123
2971 5/6/2022 17+020-17+070 R/s Drain Cover slab M-20 4.50 1.422 2,798.299 172.701
2971 5/6/2022 28+150 sec-1,2 7151 sec-1,2 main wall 1st lift M-30 17.00 6.460 2,804.759 166.241
5/2/2022 ultratech opc 43g 8970454621 25 2996 5/7/2022 28+150 sec-1 sec-1 mid wall 1st lift M-30 7.00 2.660 2,807.419 188.581
2996 5/7/2022 28+150 sec-1 sec-1 Main wall 1st lift M-30 8.50 3.230 2,810.649 185.351
2996 5/7/2022 15+788 P-5 cap M-30 6.00 2.280 2,812.929 183.071
2996 5/7/2022 25+240 P-1 Footing pcc M-15 9.80 2.587 2,815.516 180.484
2996 5/9/2022 15+788 P-6,7 MJB slab M-35 130.00 53.300 2,868.816 127.184
2996 5/9/2022 27+590 R/s Hpc pipe beddin pcc M-20 1.50 0.450 2,869.266 126.734
2996 5/10/2022 27+590 R/s Headwal 2nd Lift M-20 4.70 1.410 2,870.676 125.324
2996 5/10/2022 27+590 R/s Hpc creddle M-20 1.50 0.450 2,871.126 124.874
2996 5/11/2022 25+760-25+780 R/s Retaining wall footing M-30 30.00 11.400 2,882.526 113.474
2996 5/12/2022 25+760-25+780 R/s Retaining wall 1st lift M-30 12.30 4.674 2,887.200 108.800
2996 5/12/2022 27+590 R/s Headwal 3rd or Final Lift M-20 1.90 0.570 2,887.770 108.230
2996 5/13/2022 15+315 A1-P1 Mnb slab M-35 84.00 34.440 2,922.210 73.790
5/14/2022 Ultratech opc 43g 8970455361 25.00 3021 5/14/2022 25+760-25+780 R/s Retaining wall 2nd lift M-30 9.80 3.724 2,925.934 95.066
5/14/2022 Ultratech opc 43g 8970455365 25.00 3046 5/14/2022 27+590 L/s Hpc pipe beddin pcc M-20 1.50 0.450 2,926.384 119.616
5/15/2022 JK Lakshmi OPC 43g 5050571246 25.00 3071 5/16/2022 25+240 P2 P2 mnb footing M-30 50.00 19.000 2,945.384 125.616
5/16/2022 JK Lakshmi OPC 43g 5050571361 25.00 3096 5/16/2022 25+760-25+780 R/s Retaining wall 3rd lift M-30 3.00 1.140 2,946.524 149.476
5/16/2022 JK Lakshmi OPC 43g 5050571370 25 3121 5/18/2022 27+590 L/s 7264 Headwal 2nd Lift M-20 4.70 1.410 2,947.934 173.066
3121 5/18/2022 15+788 P4 7221 P4cap M-30 6.00 2.280 2,950.214 170.786
3121 5/18/2022 27+590 L/s 7265 Hpc creddle M-20 1.60 0.480 2,950.694 170.306
3121 5/18/2022 26+484 B/s 7267 Head wall PCC M-15 4.00 1.056 2,951.750 169.250
3121 5/18/2022 17+595 P1 7268 MNB P1 footing M-30 50.00 19.000 2,970.750 150.250
3121 5/18/2022 25+761.4-25+780 R/s 7270 Retaining wall 3rd lift M-30 7.00 2.660 2,973.410 147.590
3121 5/19/2022 27+590 L/s 7275 Headwal 3rd or Final Lift M-20 1.90 0.570 2,973.980 147.020
3121 5/19/2022 26+484 B/s 7276 Head wall 1st Lift M-20 13.70 4.110 2,978.090 142.910
5/20/2022 Ultratech opc 43g 8970456025 25.00 3146 5/20/2022 17+5595 P1 7300 P1 wall 1st Lift M-30 13.50 5.130 2,983.220 162.780
5/20/2022 Ultratech opc 43g 8970456033 32.00 3178 5/20/2022 26+484 R/s 7299 Pipe Bedding M-20 3.80 1.140 2,984.360 193.640
5/20/2022 Ultratech opc 43g 8970456047 32.00 3210 5/21/2022 26+484 R/s 7316 Hpc creddle M-20 4.70 1.410 2,985.770 224.230
5/21/2022 JK Lakshmi OPC 43g 5050572446 25.00 3235 5/21/2022 25+240 P2 7317 P2 wall 1st Lift M-30 13.50 5.130 2,990.900 244.100
Cement Recive Details Concrete Production Details Consumption Details
M-20 M40
Cement Cum M-15 M-20 Pcc M-30 Consum
Qty In RCC M-35 RCC Cum.
Recive Brand INVOICE No Qty in Date Location Side RFI No. Description GRADE As per As per As per DLC PQC e Balance
ton As per As per Site As per Consume
Date Ton Site Site Site in Ton
Site Site
3235 5/21/2022 25+928 B/s 7318 Head wall PCC M-15 4.00 1.056 2,991.956 243.044
3235 5/21/2022 5+040-5+100 L/s 7321 Drain pcc M-15 6.30 1.663 2,993.619 241.381
5/23/2022 JK Lakshmi OPC 43g 5050572890 25.00 3260 5/23/2022 26+484 L/s 7338 Pipe Bedding M-20 3.80 1.140 2,994.759 265.241
5/24/2022 JK Lakshmi OPC 43g 5050573304 25.00 3285 5/24/2022 17+595 P1 7357 P1 Wall 2nd Lift M-30 13.00 4.940 2,999.699 285.301
5/24/2022 JK Lakshmi OPC 43g 5050573308 25.00 3310 5/24/2022 26+484 L/s 7352 Hpc creddle M-20 4.70 1.410 3,001.109 308.891
5/24/2022 JK Lakshmi OPC 43g 5050573311 25.00 3335 5/24/2022 25+240 P1 7353 P1 footing M-30 50.00 19.000 3,020.109 314.891
5/24/2022 JK Lakshmi OPC 43g 5050573313 25.00 3360 5/24/2022 25+928 B/s 7358 Head wall 1st Lift M-20 13.60 4.080 3,024.189 335.811
5/24/2022 JK Lakshmi OPC 43g 5050573314 25.00 3385 5/24/2022 15+788 A1 7359 A1 Wall 1st Lift M-30 22.30 8.474 3,032.663 352.337
3385 5/24/2022 5+040-5+100 L/s 7360 Drain raft M-20 6.10 1.928 3,034.591 350.409
3385 5/25/2022 5+040-5+100 R/s 7389 Drain pcc M-15 6.30 1.663 3,036.254 348.746
3385 5/25/2022 15+788 P5-p6 7388 P5-p6 mjb slab M-35 130.00 52.780 3,089.034 295.966
3385 5/26/2022 26+484 R/s 7404 Headwal 2nd Lift M-20 8.10 2.430 3,091.464 293.536
5/26/2022 A1 Retaining Wall Final
3385 15+315 B/s 7410 M-30 2.60 0.988 3,092.452 292.548
Lift
3385 5/27/2022 25+240 A2 7417 A2 footing M-30 70.00 26.600 3,119.052 265.948
3385 5/27/2022 25+928 R/s 7424 Pipe Bedding M-20 4.70 1.410 3,120.462 264.538
3385 5/27/2022 25+240 P2 7418 P2 wall 2nd Lift M-30 14.00 5.320 3,125.782 259.218
3385 5/27/2022 5+690-5+740 R/s 7426 Drain pcc M-15 5.20 1.373 3,127.155 257.845
3385 5/27/2022 5+040-5+100 L/s 7427 Drain wall M-20 8.70 2.749 3,129.904 255.096
3385 5/27/2022 15+315 A1 7429 Return wall M-30 1.90 0.722 3,130.626 254.374
5/28/2022 JK Lakshmi OPC 43g 5050574133 22.00 3407 5/28/2022 25+240 P1 7439 P1 wall 1st Lift M-30 13.30 5.054 3,135.680 271.320
5/28/2022 JK Lakshmi OPC 43g 5050574154 25.00 3432 5/28/2022 5+040-5+100 R/s 7445 Drain raft M-20 6.10 1.928 3,137.608 294.392
5/28/2022 JK Lakshmi OPC 43g 5050574163 25.00 3457 5/28/2022 25+928 R/s 7443 Hpc creddle M-20 5.30 1.590 3,139.198 317.802
5/29/2022 JK Lakshmi OPC 43g 5050574373 25.00 3482 5/30/2022 25+240 P1 7456 P1 wall 2nd lift M-30 14.00 5.320 3,144.518 337.482
5/30/2022 JK Lakshmi OPC 43g 5050574630 25.00 3507 5/30/2022 25+928 R/s 7459 HPC HW 2nd lift M-20 6.00 1.800 3,146.318 360.682
3507 5/30/2022 26+484 R/s 7454 HPC HW final lift M-20 2.80 0.840 3,147.158 359.842
3507 5/31/2022 26+484 L/s 7469 HPC HW 2nd lift M-20 8.10 2.430 3,149.588 357.412
3507 5/31/2022 5+660-5+730 L/s 7471 Drain pcc M-15 7.30 1.927 3,151.515 355.485
3507 5/31/2022 17+595 P2 7472 P2 cap M-30 6.00 2.280 3,153.795 353.205
3507 5/31/2022 17+595 P1 7473 P1 cap M-30 6.00 2.280 3,156.075 350.925
3507 5/31/2022 25+928 R/s 7474 HPC HW final lift M-20 2.80 0.840 3,156.915 350.085
3507 6/1/2022 10+010-10+060 R/s PQC M-40 75.00 30.900 3,187.815 319.185
3507 6/1/2022 5+040-5+100 L/s 7485 Drain wall M-20 8.70 2.749 3,190.564 316.436
3507 6/1/2022 25+928 L/s 7489 Pipe Bedding M-20 4.70 1.410 3,191.974 315.026
3507 6/1/2022 25+240 A2 7490 A2 wall 1st Lift MNB M-30 21.20 8.056 3,200.030 306.970
3507 6/1/2022 15+788 A1 7491 A1 wall 2nd Lift M-30 20.00 7.600 3,207.630 299.370
3507 6/2/2022 5+660-5+730 L/s 7507 Drain raft M-20 7.10 2.244 3,209.874 297.126
3507 6/2/2022 5+690-5+740 R/s 7508 Drain raft M-20 5.10 1.612 3,211.486 295.514
3507 6/2/2022 5+040-5+100 L/s 7509 Drain Cover slab M-20 5.30 1.675 3,213.161 293.839
3507 6/2/2022 25+928 L/s 7512 Hpc creddle M-20 5.30 1.590 3,214.751 292.249
3507 6/2/2022 9+960-10+010 R/s 7506 PQC M-40 75.00 30.900 3,245.651 261.349
6/3/2022 JK Lakshmi OPC 43g 5050575476 25.00 3532 6/3/2022 19+350-19+380 R/s 7521 Drain pcc M-15 3.20 0.845 3,246.496 285.504
6/3/2022 JK Lakshmi OPC 43g 5050575479 25.00 3557 6/3/2022 5+690-5+740 R/s 7522 Drain wall M-20 7.20 2.275 3,248.771 308.229
6/3/2022 JK Lakshmi OPC 43g 5050575490 25.00 3582 6/3/2022 25+928 L/s 7528 HPC HW 2nd lift M-20 6.00 1.800 3,250.571 331.429
6/4/2022 JK Lakshmi OPC 43g 5050575870 25.00 3607 6/4/2022 25+240 A2 7541 MNB A2 wall 2nd lift M-30 21.70 8.246 3,258.817 348.183
3607 6/4/2022 25+928 L/s 7543 HPC HW final lift M-20 2.90 0.870 3,259.687 347.313
3607 6/4/2022 9+910-9+960 R/s 7537 PQC M-40 75.00 30.900 3,290.587 316.413
3607 6/6/2022 19+350-19+380 R/s 7558 Drain raft M-20 3.10 0.980 3,291.567 315.433
3607 6/6/2022 25+240 A1 7561 MNB A1 footing Pcc M-15 13.50 3.564 3,295.131 311.869
3607 6/6/2022 9+860-9+910 R/s 7558 PQC M-40 75.00 30.900 3,326.031 280.969
3607 6/7/2022 19+350-19+380 R/s 7580 Drain wall M-20 4.40 1.390 3,327.421 279.579
3607 6/7/2022 26+484 L/s 7582 HPC HW final lift M-20 2.80 0.840 3,328.261 278.739
3607 6/7/2022 9+810-9+860 R/s 7579 PQC M-40 75.00 30.900 3,359.161 247.839
Cement Recive Details Concrete Production Details Consumption Details
M-20 M40
Cement Cum M-15 M-20 Pcc M-30 Consum
Qty In RCC M-35 RCC Cum.
Recive Brand INVOICE No Qty in Date Location Side RFI No. Description GRADE As per As per As per DLC PQC e Balance
ton As per As per Site As per Consume
Date Ton Site Site Site in Ton
Site Site
3607 6/8/2022 19+350-19+380 L/s 7600 Drain pcc M-15 3.10 0.818 3,359.979 247.021
3607 6/8/2022 15+788 P4-P5 7596 MJB P4-P5 Slab M-35 130.00 52.780 3,412.759 194.241
3607 6/8/2022 5+330-5+380 R/s 7602 Drain pcc M-15 5.20 1.373 3,414.132 192.868
3607 6/9/2022 19+350-19+380 L/s 7613 Drain raft M-20 3.10 0.980 3,415.112 191.888
3607 6/9/2022 5+330-5+380 R/s 7612 Drain raft M-20 5.10 1.612 3,416.724 190.276
3607 6/10/2022 25+240 A1 7624 MNB A1 Footing M-30 70.00 26.600 3,443.324 163.676
3607 6/10/2022 5+280-5+330 R/s 7622 Drain pcc M-15 5.20 1.373 3,444.697 162.303
3607 6/11/2022 5+280-5+330 R/s 7632 Drain raft M-20 5.10 1.612 3,446.309 160.691
3607 6/13/2022 19+350-19+380 L/s 7649 Drain wall M-20 4.40 1.390 3,447.699 159.301
3607 6/14/2022 5+280-5+330 R/s 7671 Drain wall M-20 7.20 2.275 3,449.974 157.026
3607 6/14/2022 19+330-19+350 L/s 7668 Drain pcc M-15 2.10 0.554 3,450.528 156.472
6/15/2022 JK Lakshmi OPC 43g 5050578717 25.00 3632 6/15/2022 28+900-29+010 L/s 7685 Drain pcc M-15 11.50 3.036 3,453.564 178.436
3632 6/15/2022 10+300-10+400 L/s 7680 DLC DLC 80.00 12.400 3,465.964 166.036
3632 6/15/2022 9+780-9+810 R/s 7681 PQC M-40 45.00 18.540 3,484.504 147.496
3632 6/16/2022 10+200-10+300 L/s 7694 DLC DLC 80.00 12.400 3,496.904 135.096
3632 6/16/2022 25+240 A1 7700 A1 Wall 1st Lift M-30 21.20 8.056 3,504.960 127.040
3632 6/16/2022 5+200 L/s 7704 Bus shelter Footing pcc M-15 1.20 0.317 3,505.277 126.723
6/17/2022 JK Lakshmi OPC 43g 5050579082 26.00 3658 6/17/2022 17+595 P1-P2 7716 P1-P2 slab M-35 130.0 52.780 3,558.057 99.943
3658 6/18/2022 19+350-19+380 L/s 7725 Drain Cover slab M-20 3.00 0.948 3,559.005 98.995
3658 6/18/2022 19+350-19+380 R/s 7727 Drain Cover slab M-20 2.70 0.853 3,559.858 98.142
3658 6/18/2022 10+100-10+200 L/s 7706 DLC DLC 80.00 12.400 3,572.258 85.742
6/19/2022 JK Lakshmi OPC 43g 5050579536 26.00 3684 6/20/2022 15+788 P9 7735 MJB CAP M-30 6.000 2.280 3,574.538 109.462
6/19/2022 JK Lakshmi OPC 43g 5050579641 26.00 3710 6/20/2022 5+380-5+430 R/s 7737 Drain pcc M-15 5.20 1.373 3,575.911 134.089
3710 6/21/2022 5+380-5+430 R/s 7747 DrainRaft M-20 5.10 1.612 3,577.523 132.477
3710 6/21/2022 19+330-19+350 L/s 7748 DrainRaft M-20 2.00 0.632 3,578.155 131.845
3710 6/21/2022 28+800-28+900 L/s 7749 Drain pcc M-15 10.50 2.772 3,580.927 129.073
3710 6/21/2022 28+450-28+500 L/s 7751 Drain pcc M-15 5.30 1.399 3,582.326 127.674
3710 6/22/2022 5+330-5+380 R/s 7785 Drain wall M-20 7.20 2.275 3,584.601 125.399
3710 6/22/2022 28+800-28+900 L/s 7788 DrainRaft M-20 10.10 3.192 3,587.793 122.207
3710 6/22/2022 28+350-38+450 L/s 7790 Drain pcc M-15 10.50 2.772 3,590.565 119.435
3710 6/22/2022 28+450-28+500 L/s 7789 DrainRaft M-20 5.10 1.612 3,592.177 117.823
3710 6/22/2022 19+330-19+350 L/s 7786 Drain wall M-20 2.90 0.916 3,593.093 116.907
3710 6/22/2022 9+750-9+780 R/s 7784 PQC M-40 44.50 18.334 3,611.427 98.573
6/23/2022 Ultratech opc 43g 8970460523 32.00 3742 6/23/2022 5+330-5+380 R/s 7796 Drain Cover slab M-20 4.50 1.422 3,612.849 129.151
6/23/2022 Ultratech opc 43g 8970460525 32.00 3774 6/23/2022 5+380-5+430 R/s 7797 Drain wall M-20 7.30 2.307 3,615.156 158.844
6/23/2022 Ultratech opc 43g 8970460534 32.00 3806 6/23/2022 28+250-28+350 L/s 7803 Drain pcc M-15 10.40 2.746 3,617.902 188.098
3806 6/23/2022 28+400-28+450 L/s 7802 DrainRaft M-20 5.10 1.612 3,619.514 186.486
3806 6/23/2022 19+330-19+350 L/s 7799 Drain Cover slab M-20 1.80 0.569 3,620.083 185.917
3806 6/24/2022 15+788 A2 7810 A2 cap bracket dirt wall M-30 14.300 5.434 3,625.517 180.483
3806 6/24/2022 5+380-5+430 R/s 7808 Drain Cover slab M-20 4.50 1.422 3,626.939 179.061
6/25/2022 JK Lakshmi OPC 43g 5050580699 25.00 3831 6/25/2022 28+700-28+800 L/s 7818 Drain pcc M-15 10.50 2.772 3,629.711 201.289
6/25/2022 JK Lakshmi OPC 43g 5050580695 25.00 3856 6/25/2022 10+342-10+392 L/s 7813 PQC M-40 75.00 30.975 3,660.686 195.314
6/27/2022 Ultratech opc 43g 8970461077 32.00 3888 6/28/2022 28+700-28+800 L/s Drain pcc M-15 0.40 0.106 3,660.792 227.208
3888 6/29/2022 28+700-28+800 L/s 7832 DrainRaft M-20 10.10 3.192 3,663.984 224.016
3888 6/30/2022 28+160-28+250 L/s 7840 Drain pcc M-15 9.40 2.482 3,666.466 221.534
3888 6/30/2022 28+750-28+800 L/s 7841 Drain wall M-20 7.20 2.275 3,668.741 219.259
3888 6/30/2022 28+450-28+500 L/s 7842 Drain wall M-20 7.20 2.275 3,671.016 216.984
3888 7/1/2022 15+788 P8 7848 P8- Cap M-30 6.000 2.280 3,673.296 214.704
3888 7/1/2022 28+900-29+000 L/s 7850 DrainRaft M-20 10.10 3.192 3,676.488 211.512
3888 7/2/2022 15+788 A1 7860 A1 wall 3rd lift M-30 20.000 7.600 3,684.088 203.912
3888 7/2/2022 28+850-28+900 R/s 7862 Drain pcc M-15 10.50 2.772 3,686.860 201.140
3888 7/2/2022 28+950-29+000 L/s 7873 Drain wall M-20 7.20 2.275 3,689.135 198.865
Cement Recive Details Concrete Production Details Consumption Details
M-20 M40
Cement Cum M-15 M-20 Pcc M-30 Consum
Qty In RCC M-35 RCC Cum.
Recive Brand INVOICE No Qty in Date Location Side RFI No. Description GRADE As per As per As per DLC PQC e Balance
ton As per As per Site As per Consume
Date Ton Site Site Site in Ton
Site Site
3888 7/2/2022 10+000-10+100 L/s 7863 DLC DLC 77.50 12.013 3,701.148 186.852
3888 7/4/2022 15+788 A2-P9 7872 A2-P9 slab M-35 130.00 52.780 3,753.928 134.072
7/5/2022 JK Lakshmi OPC 43g 5050582992 25.00 3913 7/5/2022 28+900-28+950 L/s 7883 Drain wall M-20 7.30 2.307 3,756.235 156.765
7/5/2022 JK Lakshmi OPC 43g 5050582999 35.00 3948 7/5/2022 28+900-28+950 R/s 7884 DrainRaft M-20 5.10 1.612 3,757.847 190.153
3948 7/5/2022 9+900-10+000 L/s 7885 DLC DLC 77.50 12.013 3,769.860 178.140
3948 7/5/2022 10+300-10+342 L/s 7886 PQC M-40 63.00 25.956 3,795.816 152.184
7/6/2022 Ultratech opc 43g 8970462016 25.00 3973 7/6/2022 9+820-9+900 L/s 7894 DLC DLC 62.00 9.610 3,805.426 167.574
3973 7/6/2022 28+900-28+950 R/s 7897 Drain wall M-20 7.30 2.307 3,807.733 165.267
3973 7/6/2022 28+850-28+900 R/s 7899 DrainRaft M-20 5.10 1.612 3,809.345 163.655
3973 7/7/2022 10+250-10+300 L/s 7906 PQC M-40 75.00 30.900 3,840.245 132.755
3973 7/8/2022 28+850-28+900 R/s 7920 Drain wall M-20 7.30 2.307 3,842.552 130.448
3973 7/9/2022 10+200-10+250 L/s 7921 PQC M-40 75.00 30.900 3,873.452 99.548
3973 7/9/2022 28+800-28+850 L/s 7931 Drain wall M-20 7.30 2.292 3,875.744 97.256
3973 7/9/2022 28+600-28+700 L/s 7933 Drain pcc M-15 10.50 2.772 3,878.516 94.484
3973 7/9/2022 28+250-28+350 L/s 7934 DrainRaft M-20 10.10 3.171 3,881.687 91.313
7/10/2022 NUVOCO DOUBLE BU 1225049523 26.00 3999 7/11/2022 28+600-28+700 L/s 7947 DrainRaft M-20 10.10 3.171 3,884.858 114.142
7/10/2022 NUVOCO DOUBLE BU 1225049524 26.00 4025 7/11/2022 10+150-10+200 L/s 7935 PQC M-40 75.00 30.900 3,915.758 109.242
7/10/2022 NUVOCO DOUBLE BU 1225049531 26.00 4051 7/12/2022 10+100-10+150 L/s 7949 PQC M-40 75.00 30.900 3,946.658 104.342
4051 7/12/2022 28+750-28+850 R/s 7957 Drain pcc M-15 10.50 2.772 3,949.430 101.570
4051 7/12/2022 28+650-28+700 L/s 7958 Drain wall M-20 7.30 2.292 3,951.722 99.278
4051 7/13/2022 10+050-10+100 L/s 7960 PQC M-40 75.00 30.975 3,982.697 68.303
4051 7/15/2022 9+790-9+820 L/s 7989 DLC DLC 23.50 3.643 3,986.340 64.660
4051 7/15/2022 28+500-28+600 L/s 7986 Drain pcc M-15 10.50 2.772 3,989.112 61.888
4051 7/15/2022 28+600-28+650 L/s 7988 Drain wall M-20 7.30 2.292 3,991.404 59.596
4051 7/16/2022 28+500-28+600 L/s 7996 DrainRaft M-20 10.10 3.171 3,994.575 56.425
4051 7/16/2022 28+750-28+850 R/s 7997 DrainRaft M-20 10.10 3.171 3,997.746 53.254
4051 7/16/2022 28+350-28+400 L/s 7998 DrainRaft M-20 5.10 1.601 3,999.347 51.653
7/17/2022 NUVOCO DOUBLE BU 1225052281 31.00 4082 7/18/2022 28+350-28+400 L/s 8011 Drain wall M-20 7.30 2.292 4,001.639 80.361
7/17/2022 NUVOCO DOUBLE BU 1225052291 32.00 4114 7/18/2022 5+242-5+280 R/s 8006 DrainRaft M-20 4.00 1.256 4,002.895 111.105
4114 7/18/2022 2+822-2+850 R/s 8007 Drain wall M-20 4.10 1.287 4,004.182 109.818
4114 7/18/2022 28+550-28+600 L/s 8009 Drain wall M-20 7.30 2.292 4,006.474 107.526
4114 7/18/2022 28+800-28+850 R/s 8010 Drain wall M-20 7.30 2.292 4,008.766 105.234
4114 7/18/2022 3+0803+100 R/s 8013 Drain Cover slab M-20 1.90 0.597 4,009.363 104.637
4114 7/19/2022 5+242-5+280 R/s 8026 Drain wall M-20 5.50 1.727 4,011.090 102.910
4114 7/19/2022 2+752-2+824 R/s 8028 Drain Cover slab M-20 6.30 1.978 4,013.068 100.932
4114 7/19/2022 5+040-5+100 R/s 8030 Drain Cover slab M-20 5.30 1.664 4,014.732 99.268
4114 7/19/2022 5+690-5+710 R/s 8036 Drain Cover slab M-20 1.80 0.565 4,015.297 98.703
4114 7/19/2022 5+280-5+332 R/s 8032 Drain Cover slab M-20 4.60 1.444 4,016.741 97.259
4114 7/19/2022 9+990-10+050 L/s 8014 PQC M-40 90.00 37.170 4,053.911 60.089
4114 7/20/2022 9+750-9+918 R/s 8042 Drain pcc M-15 7.10 1.874 4,055.785 58.215
4114 7/20/2022 9+750-9+760 L/s 8043 DrainRaft M-20 1.00 0.314 4,056.099 57.901
4114 7/20/2022 5+660-5+710 L/s 8044 Drain wall M-20 7.30 2.292 4,058.391 55.609
4114 7/20/2022 5+710-5+730 R/s 8046 Drain Cover slab M-20 1.90 0.597 4,058.988 55.012
4114 7/20/2022 5+242-5+280 R/s 8048 Drain Cover slab M-20 3.40 1.068 4,060.056 53.944
4114 7/20/2022 9+930-9+990 L/s 8037 PQC M-40 90.00 37.170 4,097.226 16.774
4114 7/21/2022 9+750-9+718 R/s 8052 DrainRaft M-20 6.90 2.167 4,099.393 14.607
4114 7/21/2022 28+300-28+350 L/s 8053 Drain wall M-20 7.30 2.292 4,101.685 12.315
4114 7/21/2022 9+750-9+760 L/s 8054 Drain wall M-20 1.50 0.471 4,102.156 11.844
4114 7/21/2022 9+750-9+790 L/s 8049 DLC DLC 31 4.805 4,106.961 7.039
4114 7/21/2022 5+660-5+710 L/s 8056 Drain Cover slab M-20 4.50 1.413 4,108.374 5.626
4114 7/21/2022 9+852-9+880 L/s 8058 Drain Cover slab M-20 2.50 0.785 4,109.159 4.841
4114 7/21/2022 10+250-10+350 L/s 8062 Drain Cover slab M-20 4.50 1.413 4,110.572 3.428
Cement Recive Details Concrete Production Details Consumption Details
M-20 M40
Cement Cum M-15 M-20 Pcc M-30 Consum
Qty In RCC M-35 RCC Cum.
Recive Brand INVOICE No Qty in Date Location Side RFI No. Description GRADE As per As per As per DLC PQC e Balance
ton As per As per Site As per Consume
Date Ton Site Site Site in Ton
Site Site
7/22/2022 NUVOCO DOUBLE BU 1225054408 32.00 4146 7/22/2022 9+750-9+760 L/s 8069 Drain Cover slab M-20 1.00 0.314 4,110.886 35.114
7/22/2022 NUVOCO DOUBLE BU 1225054437 32.00 4178 7/22/2022 9+750-9+718 R/s 8066 Drain wall M-20 9.80 3.077 4,113.963 64.037
4178 7/22/2022 28+250-28+300 L/s 8067 Drain wall M-20 7.30 2.292 4,116.255 61.745
4178 7/22/2022 28+150 B/s 8072 main wall 2nd lift (sec-2) M-30 7.10 2.698 4,118.953 59.047
4178 7/22/2022 28+150 B/s 8073 Mid wall 2nd lift (sec-2) M-30 5.50 2.090 4,121.043 56.957
4178 7/22/2022 10+300-10+350 L/s 8071 Drain Cover slab M-20 4.50 1.413 4,122.456 55.544
4178 7/22/2022 9+880-9+930 L/s 8063 PQC M-40 75.00 30.975 4,153.431 24.569
4178 7/23/2022 9+750-9+818 R/s 8077 Drain Cover slab M-20 6.00 1.884 4,155.315 22.685
4178 7/23/2022 28+900-28+950 R/s 8079 Drain Cover slab M-20 4.50 1.413 4,156.728 21.272
4178 7/23/2022 28+950-29+000 L/s 8081 Drain Cover slab M-20 4.50 1.413 4,158.141 19.859
4178 7/23/2022 28+850-28+900 R/s 8083 Drain wall M-20 7.30 2.292 4,160.433 17.567
7/25/2022 NUVOCO DOUBLE BU 1225055243 31.00 4209 7/25/2022 9+820-9+880 L/s 8086 PQC M-40 90.00 37.170 4,197.603 11.397
7/25/2022 NUVOCO DOUBLE BU 1225055215 32.00 4241 7/25/2022 28+850-28+900 R/s 8088 Drain Cover slab M-20 4.50 1.413 4,199.016 41.984
4241 7/25/2022 28+900-28+950 L/s 8090 Drain Cover slab M-20 4.50 1.413 4,200.429 40.571
4241 7/26/2022 9+790-9+820 L/s 8094 PQC M-40 45.00 18.585 4,219.014 21.986
4241 7/26/2022 28+800-28+850 R/s 8096 Drain Cover slab M-20 4.50 1.413 4,220.427 20.573
4241 7/26/2022 28+850-28+900 L/s 8098 Drain Cover slab M-20 4.50 1.413 4,221.840 19.160
4241 7/27/2022 28+750-28+800 R/s 8100 Drain wall M-20 7.30 2.292 4,224.132 16.868
4241 7/27/2022 28+800-28+850 L/s 8102 Drain Cover slab M-20 4.50 1.413 4,225.545 15.455
7/28/2022 JK Lakshmi OPC 43g 5050586930 25.00 4266 7/28/2022 28+700-28+750 L/s 8105 Drain wall M-20 7.30 2.292 4,227.837 38.163
4266 7/28/2022 28+170-28+250 L/s 8106 Drain raft M-20 8.10 2.543 4,230.380 35.620
7/29/2022 JK Lakshmi OPC 43g 5050587120 25.00 4291 7/29/2022 9+750-9+790 L/s 8109 PQC M-40 59.30 24.491 4,254.871 36.129
4291 7/29/2022 10+392-10+400 L/s 8108 PQC M-40 11.30 4.667 4,259.538 31.462
4291 7/29/2022 28+500-28+550 L/s 8110 Drain wall M-20 7.30 2.292 4,261.830 29.170
4291 7/29/2022 28+400-28+450 L/s 8111 Drain wall M-20 7.30 2.292 4,264.122 26.878
4291 7/29/2022 28+170-28+250 L/s 8112 Drain wall M-20 11.60 3.642 4,267.764 23.236
4291 7/29/2022 28+750-28+800 L/s 8114 Drain Cover slab M-20 4.50 1.413 4,269.177 21.823
4291 7/30/2022 28+150 L/s 8118 main wall 2nd lift(sec-2) M-30 7.10 2.698 4,271.875 19.125
4291 7/30/2022 15+788 A1 8119 MJB A1 wall 4th lift M-30 20.000 7.600 4,279.475 11.525
7/31/2022 JK Lakshmi OPC 43g 5050587538 25.00 4316 7/30/2022 28+700-28+750 L/s 8117 Drain Cover slab M-20 4.50 1.413 4,280.888 35.112
7/31/2022 JK Lakshmi OPC 43g 5050587573 25.00 4341 8/1/2022 28+600-28+700 R/s 8122 Drain pcc M-15 10.40 2.746 4,283.634 57.366
8/1/2022 NUVOCO DOUBLE BU 1225058016 26.00 4367 8/1/2022 17+110-17+200 L/s 8123 Drain pcc M-15 9.40 2.482 4,286.116 80.884
4367 8/3/2022 28+650-28+700 L/s 8139 Drain Cover slab M-20 4.20 1.327 4,287.443 79.557
4367 8/4/2022 17+110-17+200 R/s 8144 Drain raft M-20 9.10 2.876 4,290.319 76.681
4367 8/5/2022 17+110-17+160 R/s 8150 Drain wall M-20 7.30 2.307 4,292.626 74.374
4367 8/5/2022 15+315 R/s 8151 A2-P1 crush barrier M-40 5.60 2.330 4,294.956 72.044
4367 8/6/2022 17+160-17+200 R/s 8153 Drain wall M-20 5.70 1.801 4,296.757 70.243
4367 8/6/2022 28+150 B/s 8154 Section-2 slab M-30 65.000 24.700 4,321.457 45.543
4367 8/8/2022 17+110-17+150 R/s 8156 Drain Cover slab M-20 4.30 1.359 4,322.816 44.184
4367 8/9/2022 17+150-17+200 R/s 8158 Drain Cover slab M-20 4.30 1.359 4,324.175 42.825
8/13/2022 JK Lakshmi OPC 43g 5050589803 26 4393 8/13/2022 - 4,324.175 68.825
4393 8/19/2022 15+315 R/s 8175 A1-P1 crush barrier M-40 5.70 2.371 4,326.546 66.454
8/23/2022 NUVOCO DOUBLE BU 1225062980 32 4425 8/23/2022 28+150 R/s 8181 Section-2 crush barrier M-40 3.00 1.248 4,327.794 97.206
4425 8/24/2022 25+640-25+840 L/s 8184 Drain pcc M-15 21.00 5.544 4,333.338 91.662
4425 8/25/2022 25+840-25+860 L/s 8188 Drain pcc M-15 2.10 0.554 4,333.892 91.108
4425 8/25/2022 25+870-25+920 L/s 8190 Drain pcc M-15 5.30 1.399 4,335.291 89.709
4425 8/25/2022 25+640-25+740 L/s 8191 Drain pcc M-15 10.20 2.693 4,337.984 87.016
4425 8/25/2022 28+150 L/s 8192 Section-2 crush barrier M-40 3.00 1.248 4,339.232 85.768
4425 8/25/2022 15+315 R/s 8193 A2-P1 crush barrier M-40 5.70 2.371 4,341.603 83.397
4425 8/26/2022 25+740-25+860 L/s 8194 Drain raft M-20 12.20 3.855 4,345.458 79.542
4425 8/26/2022 25+870-25+920 L/s 8195 Drain raft M-20 5.10 1.612 4,347.070 77.930
4425 8/26/2022 25+640-25+690 L/s 8196 Drain wall M-20 7.30 2.307 4,349.377 75.623
Cement Recive Details Concrete Production Details Consumption Details
M-20 M40
Cement Cum M-15 M-20 Pcc M-30 Consum
Qty In RCC M-35 RCC Cum.
Recive Brand INVOICE No Qty in Date Location Side RFI No. Description GRADE As per As per As per DLC PQC e Balance
ton As per As per Site As per Consume
Date Ton Site Site Site in Ton
Site Site
4425 8/27/2022 25+690-25+740 L/s 8198 Drain wall M-20 7.30 2.307 4,351.684 73.316
4425 8/29/2022 19+676-19+700 L/s 8201 Drain pcc M-15 2.50 0.660 4,352.344 72.656
4425 8/29/2022 25+740-25+800 L/s 8202 Drain wall M-20 8.70 2.732 4,355.076 69.924
4425 8/29/2022 15+315 L/s 8203 A1-P1 crush barrier M-40 5.70 2.371 4,357.447 67.553
8/30/2022 JK Lakshmi OPC 43g 5050592353 25 4450 8/30/2022 28+450-28+530 R/s 8204 Drain pcc M-15 8.40 2.218 4,359.665 90.335
8/30/2022 JK Lakshmi OPC 43g 5050592361 25 4475 8/30/2022 25+800-25+860 L/s 8206 Drain wall M-20 8.70 2.732 4,362.397 112.603
4475 8/30/2022 19+676-19+700 L/s 8205 Drain raft M-20 2.50 0.785 4,363.182 111.818
4475 8/30/2022 28+600-28+700 R/s 8207 Drain raft M-20 10.10 3.171 4,366.353 108.647
4475 8/30/2022 5+200 L/s 8209 Bus shelter Footing pcc M-15 1.20 0.317 4,366.670 108.330
4475 8/31/2022 28+450-28+530 R/s 8210 Drain raft M-20 8.10 2.543 4,369.213 105.787
4475 8/31/2022 25+870-25+920 L/s 8212 Drain wall M-20 7.30 2.292 4,371.505 103.495
4475 8/31/2022 28+650-28+700 R/s 8213 Drain wall M-20 7.30 2.292 4,373.797 101.203
4475 8/31/2022 19+676-19+700 L/s 8211 Drain wall M-20 3.50 1.099 4,374.896 100.104
4475 8/31/2022 5+200 L/s 8215 Bus shelter Footing M-20 2.60 0.816 4,375.712 99.288
4475 9/1/2022 28+450-28+500 R/s 8216 Drain wall M-20 7.30 2.292 4,378.004 96.996
4475 9/1/2022 19+676-19+700 L/s 8218 Drain Cover slab M-20 2.10 0.659 4,378.663 96.337
4475 9/2/2022 25+641.2-25+712 L/s 8221 Drain Cover slab M-20 6.10 1.915 4,380.578 94.422
4475 9/2/2022 28+592-28+648.4 L/s 8223 Drain Cover slab M-20 5.00 1.570 4,382.148 92.852
4475 9/16/2022 25+713.2-25+784 L/s 8225 Drain Cover slab M-20 6.10 1.915 4,384.063 90.937
4475 9/16/2022 28+520-28+590.8 L/s 8527 Drain Cover slab M-20 6.10 1.915 4,385.978 89.022
4475 9/16/2022 17+200-17+250 R/s 8229 Drain pcc M-15 5.20 1.373 4,387.351 87.649
4475 9/16/2022 28+600-28+650 R/s 8230 Drain wall M-20 7.20 2.261 4,389.612 85.388
4475 9/16/2022 6+655 L/s 8232 Bus shelter footing pcc M-15 1.20 0.317 4,389.929 85.071
4475 9/16/2022 15+788 A1 8235 A1 Wall final lift M-30 18.300 6.954 4,396.883 78.117
4475 9/19/2022 25+785.2-25+848.8 R/s 8237 Drain Cover slab M-20 5.50 1.727 4,398.610 76.390
4475 9/19/2022 28+448-28+518.8 L/s 8239 Drain Cover slab M-20 6.10 1.915 4,400.525 74.475
4475 9/19/2022 17+200-17+250 R/s 8240 Drain raft M-20 5.10 1.601 4,402.126 72.874
4475 9/20/2022 28+382-28+446.8 L/s 8244 Drain Cover slab M-20 5.50 1.727 4,403.853 71.147
4475 9/20/2022 25+871.6-25+913.6 L/s 8246 Drain Cover slab M-20 3.70 1.162 4,405.015 69.985
4475 9/20/2022 17+200-17+250 R/s 8249 Drain wall M-20 7.30 2.292 4,407.307 67.693
4475 9/21/2022 28+310-28+362 L/s 8254 Drain Cover slab M-20 6.10 1.915 4,409.222 65.778
4475 9/21/2022 17+250-17+300 R/s 8256 Drain pcc M-15 5.30 1.399 4,410.621 64.379
4475 9/22/2022 28+392.2-28+310 L/s 8263 Drain Cover slab M-20 6.10 1.915 4,412.536 62.464
4475 9/22/2022 15+788 A1 8268 A1 cap,dirtwall,bracket M-30 14.500 5.510 4,418.046 56.954
4475 9/22/2022 17+250-17+300 R/s 8264 Drain raft M-20 5.10 1.601 4,419.647 55.353
4475 9/22/2022 6+655 L/s 8267 Bus shelter column footing M-20 2.60 0.816 4,420.463 54.537
4475 9/23/2022 28+170-28+238 L/s 8270 Drain Cover slab M-20 5.80 1.821 4,422.284 52.716
4475 9/23/2022 17+250-17+300 R/s 8273 Drain wall M-20 7.30 2.292 4,424.576 50.424
4475 9/24/2022 17+200.8-17+250 R/s 8277 Drain Cover slab M-20 4.30 1.350 4,425.926 49.074
4475 9/24/2022 28+752-28+798.8 R/s 8279 Drain Cover slab M-20 4.00 1.256 4,427.182 47.818
4475 9/24/2022 28+651.2-28+700 R/s 8281 Drain Cover slab M-20 4.30 1.350 4,428.532 46.468
4475 9/24/2022 28+530-28+600 R/s 8283 Drain pcc M-15 7.30 1.927 4,430.459 44.541
4475 9/24/2022 28+530-28+600 R/s 8284 Drain raft M-20 7.10 2.229 4,432.688 42.312
4475 9/24/2022 6+655 L/s 8286 Bus Shelter Column M-20 - 4,432.688 42.312
4475 9/24/2022 15+788 P1 8287 P1 cap M-30 6.000 2.280 4,434.968 40.032
4475 9/24/2022 28+500-28+600 R/s 8288 Drain wall M-20 14.50 4.553 4,439.521 35.479
4475 9/26/2022 28+608-28+650 R/s 8290 Drain Cover slab M-20 3.70 1.162 4,440.683 34.317
9/24/2022 JK Lakshmi OPC 43g 5050597870 25 4500 9/26/2022 15+788 P2 8292 P2 cap M-30 6.000 2.280 4,442.963 57.037
4500 9/27/2022 28+543.2-28+606.8 R/s 8294 Drain Cover slab M-20 5.50 1.727 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
Cement Recive Details Concrete Production Details Consumption Details
M-20 M40
Cement Cum M-15 M-20 Pcc M-30 Consum
Qty In RCC M-35 RCC Cum.
Recive Brand INVOICE No Qty in Date Location Side RFI No. Description GRADE As per As per As per DLC PQC e Balance
ton As per As per Site As per Consume
Date Ton Site Site Site in Ton
Site Site
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
Cement Recive Details Concrete Production Details Consumption Details
M-20 M40
Cement Cum M-15 M-20 Pcc M-30 Consum
Qty In RCC M-35 RCC Cum.
Recive Brand INVOICE No Qty in Date Location Side RFI No. Description GRADE As per As per As per DLC PQC e Balance
ton As per As per Site As per Consume
Date Ton Site Site Site in Ton
Site Site
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 - 4,444.690 55.310
4500 Cum 1,313.5 1,775.50 2,200.30 3,820.50 1,069.70 63.90 1,031.5 1,933
4500 Cum
4500 Cum 346.76 532.65 695.29 1451.790 434.298 26.582 159.883 798.370 4445.632 54.368

13,208.00

1,990.50 7979.200 5109.400 7116.200 ###

1,990.50 0.000 0.000 0.000 0.000


Cement Recive Details Concrete Production Details Consumption Details
M-20 M40
Cement Cum M-15 M-20 Pcc M-30 Consum
Qty In RCC M-35 RCC Cum.
Recive Brand INVOICE No Qty in Date Location Side RFI No. Description GRADE As per As per As per DLC PQC e Balance
ton As per As per Site As per Consume
Date Ton Site Site Site in Ton
Site Site

1,990.50 0.000 0.000 0.000 0.000


Cement Recive Details Concrete Production Details Consumption Details
M-20 M40
Cement Cum M-15 M-20 Pcc M-30 Consum
Qty In RCC M-35 RCC Cum.
Recive Brand INVOICE No Qty in Date Location Side RFI No. Description GRADE As per As per As per DLC PQC e Balance
ton As per As per Site As per Consume
Date Ton Site Site Site in Ton
Site Site

1,990.50 0.000 0.000 0.000 0.000

1,990.50 0.000 0.000 0.000 0.000


Cement Recive Details Concrete Production Details Consumption Details
M-20 M40
Cement Cum M-15 M-20 Pcc M-30 Consum
Qty In RCC M-35 RCC Cum.
Recive Brand INVOICE No Qty in Date Location Side RFI No. Description GRADE As per As per As per DLC PQC e Balance
ton As per As per Site As per Consume
Date Ton Site Site Site in Ton
Site Site

1,990.50 0.000 0.000 0.000 0.000

1,990.50 0.000 0.000 0.000 0.000


Cement Recive Details Concrete Production Details Consumption Details
M-20 M40
Cement Cum M-15 M-20 Pcc M-30 Consum
Qty In RCC M-35 RCC Cum.
Recive Brand INVOICE No Qty in Date Location Side RFI No. Description GRADE As per As per As per DLC PQC e Balance
ton As per As per Site As per Consume
Date Ton Site Site Site in Ton
Site Site

1,990.50 0.000 0.000 0.000 0.000


Cement Recive Details Concrete Production Details Consumption Details
M-20 M40
Cement Cum M-15 M-20 Pcc M-30 Consum
Qty In RCC M-35 RCC Cum.
Recive Brand INVOICE No Qty in Date Location Side RFI No. Description GRADE As per As per As per DLC PQC e Balance
ton As per As per Site As per Consume
Date Ton Site Site Site in Ton
Site Site

1,990.50 0.000 0.000 0.000 0.000

1,990.50 0.000 0.000 0.000 0.000


Cement Recive Details Concrete Production Details Consumption Details
M-20 M40
Cement Cum M-15 M-20 Pcc M-30 Consum
Qty In RCC M-35 RCC Cum.
Recive Brand INVOICE No Qty in Date Location Side RFI No. Description GRADE As per As per As per DLC PQC e Balance
ton As per As per Site As per Consume
Date Ton Site Site Site in Ton
Site Site

1,990.50 0.000 0.000 0.000 0.000

1,990.50 0.000 0.000 0.000 0.000


Cement Recive Details Concrete Production Details Consumption Details
M-20 M40
Cement Cum M-15 M-20 Pcc M-30 Consum
Qty In RCC M-35 RCC Cum.
Recive Brand INVOICE No Qty in Date Location Side RFI No. Description GRADE As per As per As per DLC PQC e Balance
ton As per As per Site As per Consume
Date Ton Site Site Site in Ton
Site Site
M-20 M-20 As per
As per As per As per As per
M-15 M-30 M-35 M-40 DLC PQC Cement site use site use site use site use
PCC RCC Type of Mix design M-15 M-20 M-20 Rcc M-30
Recive cement bag
Date Chainage structure Bag Required

12/28/2020 3.5 4+491 HPC 500 18.48 14.78 0 0 0

12/31/2020 6 4+491 HPC 36 0 28.8 0 0

1/1/2021 6 4+491 HPC 36 0 28.8 0 0

1/2/2021 6 3+232 HPC 36 0 28.8 0 0

1/3/2021 6 4+491 HPC 31.68 25.34 0 0 0

1/4/2021 6 3+232 HPC 36 0 28.8 0 0

1/5/2021 3 3+232 HPC 18 0 14.4 0 0

1/9/2021 6 4+491 HPC 36 0 28.8 0 0

1/10/2021 6 3+232 HPC 36 0 28.8 0 0

1/10/2021 6.5 4+491 HPC 39 0 31.2 0 0

1/13/2021 6 4+491 HPC 36 0 28.8 0 0

1/14/2021 5.5 4+491,5+432 HPC 33 0 26.4 0 0

1/15/2021 6.5 3+232 HPC 39 0 31.2 0 0

1/16/2021 6 5+432 HPC 500 36 0 28.8 0 0

1/17/2021 6.5 5+432,7+073 HPC 39 0 31.2 0 0

1/18/2021 6.5 3+232,7+073 HPC 39 0 31.2 0 0

1/19/2021 6.5 7+073,4+987 HPC 39 0 31.2 0 0

1/19/2021 6.5 4+987 HPC 39 0 31.2 0 0

1/20/2021 5.5 7+148,7+073 HPC 33 0 26.4 0 0

1/21/2021 6.5 7+148,4+978 HPC 39 0 31.2 0 0

1/22/2021 6.5 7+148,4+978 HPC 39 0 31.2 0 0

1/23/2021 6 7+148,4+978 HPC 36 0 28.8 0 0

1/24/2021 6.5 7+073 HPC 39 0 31.2 0 0


1/25/2021 6.5 4+978 HPC 39 0 31.2 0 0

1/27/2021 6 4+978 HPC 36 0 28.8 0 0

1/30/2021 6.5 7+073,7+148 HPC 500 39 0 31.2 0 0

2/1/2021 6.5 7+073,7+148 HPC 39 0 31.2 0 0

2/2/2021 4 4+978 HPC 24 0 19.2 0 0

2/3/2021 4.5 7+148 HPC 27 0 21.6 0 0

2/4/2021 4.5 7+424 HPC 27 0 21.6 0 0

2/6/2021 4.5 7+148 HPC 27 0 21.6 0 0

2/7/2021 5.5 6+757 HPC 29.04 23.23 0 0 0

2/8/2021 6.5 7+424,5+432 HPC 39 0 31.2 0 0

2/9/2021 6.5 6+757,5+432 HPC 39 0 31.2 0 0

2/9/2021 6.5 6+757 HPC 39 0 31.2 0 0

2/9/2021 3 8+082 HPC 18 0 14.4 0 0

2/10/2021 6.5 6+757,7+424 HPC 39 0 31.2 0 0

2/12/2021 6.5 6+757 HPC 39 0 31.2 0 0

2/12/2021 6 5+432 HPC 36 0 28.8 0 0

2/13/2021 6.5 8+082 HPC 39 0 31.2 0 0

2/19/2021 6 5+432 HPC 600 36 0 28.8 0 0

2/19/2021 6.5 6+757 HPC 600 39 0 31.2 0 0

2/19/2021 6.5 9+745 HPC 34.32 27.46 0 0 0

2/19/2021 6.5 9+745 HPC 39 0 31.2 0 0

2/21/2021 6.5 9+363 HPC 500 39 0 31.2 0 0

2/21/2021 5 6+757 HPC 30 0 24 0 0

2/22/2021 6 7+432 HPC 36 0 28.8 0 0

2/23/2021 6.5 9+363 HPC 39 0 31.2 0 0

2/24/2021 6.5 5+424 HPC 39 0 31.2 0 0

2/26/2021 6.5 6+757 HPC 39 0 31.2 0 0


2/27/2021 6.5 9+363 HPC 39 0 31.2 0 0

2/27/2021 6.5 8+082 HPC 39 0 31.2 0 0

3/3/2021 6.5 9+363,5+432 HPC 500 39 0 31.2 0 0

3/5/2021 6.5 5+432 HPC 39 0 31.2 0 0

3/6/2021 6.5 9+363 HPC 39 0 31.2 0 0

3/8/2021 5 5+432 HPC 30 0 24 0 0

3/10/2021 6.5 8+082 HPC 39 0 31.2 0 0

3/10/2021 6.5 9+363 HPC 39 0 31.2 0 0

3/12/2021 6.5 9+363 HPC 39 0 31.2 0 0

3/13/2021 6.5 8+736 HPC 39 0 31.2 0 0

3/14/2021 6.5 8+082 HPC 39 0 31.2 0 0

3/16/2021 6 5+432 HPC 36 0 28.8 0 0

3/16/2021 6 5+432 HPC 36 0 28.8 0 0

3/16/2021 13 0 4+905 slab culvert 68.64 54.91 0 0 0

3/17/2021 6.5 3+670 slab culvert 34.32 27.46 0 0 0

3/17/2021 6.5 3+670 slab culvert 34.32 27.46 0 0 0

3/17/2021 6.5 3+670 slab culvert 34.32 27.46 0 0 0

3/17/2021 6.5 3+670 slab culvert 34.32 27.46 0 0 0

3/20/2021 6.5 9+748 HPC 39 0 31.2 0 0

3/22/2021 6.5 9+741 HPC 39 0 31.2 0 0

3/24/2021 6.5 7+844 HPC 39 0 31.2 0 0

3/26/2021 6 8+082 HPC 36 0 28.8 0 0

3/27/2021 6 8+944 HPC 36 0 28.8 0 0

4/1/2021 6.5 8+700 HPC 39 0 31.2 0 0

4/2/2021 6.5 13+876 HPC 39 0 31.2 0 0

4/3/2021 5.5 0 14+569 HPC 29.04 23.23 0 0 0

4/4/2021 6.5 8+738 HPC 39 0 31.2 0 0


4/6/2021 6.5 8+738 HPC 39 0 31.2 0 0

4/6/2021 6.5 14+569 HPC 39 0 31.2 0 0

4/9/2021 6.5 8+738 HPC 39 0 31.2 0 0

4/9/2021 6.5 14+569 HPC 39 0 31.2 0 0

4/9/2021 6.5 7+844 HPC 39 0 31.2 0 0

4/10/2021 5.25 14+900 HPC 31.5 0 25.2 0 0

4/11/2021 6.5 8+738 HPC 39 0 31.2 0 0

4/12/2021 6.5 13+876,8+738 HPC 39 0 31.2 0 0

4/12/2021 5.5 12+540 HPC 33 0 26.4 0 0

4/13/2021 6.5 12+336 HPC 39 0 31.2 0 0

4/14/2021 6.5 9+748 HPC 39 0 31.2 0 0

4/15/2021 6.5 13+876 HPC 39 0 31.2 0 0

4/15/2021 61 3+670 slab culvert 463.6 0 0 0 372.1

4/16/2021 6.5 9+748 HPC 39 0 31.2 0 0

4/16/2021 6.5 7+595 HPC 34.32 27.46 0 0 0

4/16/2021 6.5 14+569 HPC 39 0 31.2 0 0

4/16/2021 4 7+595 HPC 21.12 16.9 0 0 0

4/17/2021 6.5 9+748 HPC 39 0 31.2 0 0

4/18/2021 6.5 7+844 HPC 39 0 31.2 0 0

4/19/2021 6.5 14+569 HPC 39 0 31.2 0 0

4/19/2021 3.5 19+000 HPC 18.48 14.78 0 0 0

4/26/2021 25 4+905 slab culvert 2000 190 0 0 0 152.5

4/27/2021 21.35 4+905 slab culvert 162.26 0 0 0 130.24

4/27/2021 6.5 14+904 HPC 39 0 31.2 0 0

4/28/2021 63.5 3+670 slab culvert 482.6 0 0 0 387.35

4/29/2021 4 14+904,13+876 HPC 24 0 19.2 0 0

5/1/2021 6.5 4+905 slab culvert 49.4 0 0 0 39.65


5/1/2021 6.5 13+876,8+744 HPC 39 0 31.2 0 0

5/3/2021 13 7+595 mnb 68.64 54.91 0 0 0

5/4/2021 6.5 4+905 slab culvert 49.4 0 0 0 39.65

5/4/2021 5.5 12+340,13+876 HPC 33 0 26.4 0 0

5/6/2021 9 12+340,13+876 HPC 54 0 43.2 0 0

5/7/2021 67.5 7+595 mnb 513 0 0 0 411.75

5/8/2021 6.5 12+340 HPC 1200 39 0 31.2 0 0

5/9/2021 4 13+876+17+950 HPC 24 0 19.2 0 0

5/10/2021 2.5 19+750 BHS HPC 15 0 12 0 0

5/11/2021 6.2 4+905 slab culvert 47.12 0 0 0 37.82


19+750,12+340,
5/12/2021 11 15+540,7+740 HPC 66 0 52.8 0 0
19+750,12+340,
5/13/2021 12.9 15+540 HPC 77.4 0 61.92 0 0

5/14/2021 6.5 3+670 mnb 49.4 0 0 0 39.65

5/14/2021 4.5 12+340, 15+540 HPC 27 0 21.6 0 0

5/15/2021 15 3+670,4+905 HPC 114 0 0 0 91.5

5/15/2021 1.8 19+750 HPC 10.8 0 8.64 0 0

5/17/2021 6 15+905 HPC 36 0 28.8 0 0

5/18/2021 6.5 15+940,7+800 HPC 39 0 31.2 0 0

5/19/2021 48.5 7+595 P1 MNB 368.6 0 0 0 295.85

5/20/2021 13 3+670 MNB 98.8 0 0 0 79.3

5/20/2021 0.7 HPC 4.2 0 3.36 0 0

5/21/2021 6.5 3+670 MNB 49.4 0 0 0 39.65

5/22/2021 6.5 15+540 HPC 640 39 0 31.2 0 0

5/22/2021 2.5 15+540 HPC 13.2 10.56 0 0 0

5/24/2021 24.7 3+670,4+905 MNB 187.72 0 0 0 150.67

5/24/2021 5 16+550 HPC 30 0 24 0 0


12+242,12+650
5/26/2021 5.5 13+550 HPC 29.04 23.23 0 0 0
5/26/2021 4 HPC 24 0 19.2 0 0

5/27/2021 18.5 3+670 MNB 140.6 0 0 0 112.85

5/27/2021 5 HPC 30 0 24 0 0
13+550,15+542,
5/28/2021 18.5 16+505,13+550 HPC 111 0 88.8 0 0
12+550,16+505,
5/29/2021 11.25 14+242 HPC 67.5 0 54 0 0

5/30/2021 6.5 12+650 HPC 39 0 31.2 0 0

5/31/2021 6.5 12+650 HPC 39 0 31.2 0 0

6/1/2021 18 3+670 MNB 136.8 0 0 0 109.8

6/1/2021 5.35 12+650 HPC 32.1 0 25.68 0 0

6/2/2021 6.5 4+905 slab culvert 49.4 0 0 0 39.65

6/2/2021 6.5 12+650 HPC 39 0 31.2 0 0


6/3/2021 18.5 3+250,7+595 MNB 140.6 0 0 0 112.85

6/4/2021 14.5 12+650,14+242,11HPC 87 0 69.6 0 0

6/5/2021 12.1 11+726,11580,122HPC 72.6 0 58.08 0 0

6/7/2021 29.5 5 4+905,3+670,7+59HPC 185.76 124.61 24 0 0

6/8/2021 6 11+580 HPC 36 0 28.8 0 0

6/9/2021 10 7+595 MNB 76 0 0 0 61

6/9/2021 13 11+580,13+550,11HPC 78 0 62.4 0 0

6/10/2021 11.5 3+670,3+250 MNB 87.4 0 0 0 70.15

6/13/2021 6.5 3+250 MNB 1000 49.4 0 0 0 39.65

6/14/2021 9.2 11+726,11+580,11HPC 55.2 0 44.16 0 0

6/16/2021 5.25 11+750,10+626 HPC 27.72 22.18 0 0 0

6/17/2021 12.5 11+750,10+626,11HPC 75 0 60 0 0

6/18/2021 45.5 7+595 A2 raft MNB 345.8 0 0 0 277.55

6/19/2021 22.5 7+595 A2 raft MNB 171 0 0 0 137.25

6/20/2021 6.5 3+670 MNB 49.4 0 0 0 39.65

6/20/2021 4.75 11+750 HPC 28.5 0 22.8 0 0


6/21/2021 6.5 3+670 HPC 49.4 0 0 0 39.65

6/22/2021 26 4+905 slab culvert 211.12 0 0 0 0

6/23/2021 10.5 10+630,11+726,11HPC 1480 63 0 50.4 0 0

6/24/2021 4 11+580 HPC 24 0 19.2 0 0

6/26/2021 13 7+595 MNB 98.8 0 0 0 79.3

6/27/2021 4 7+595 MNB 30.4 0 0 0 24.4

6/30/2021 6.5 10+630 HPC 39 0 31.2 0 0


7/2/2021 19.5 7+595 MNB 148.2 0 0 0 118.95
7/3/2021 6.5 8+545 HPC 39 0 31.2 0 0
7/3/2021 2.5 7+595 MNB 19 0 0 0 15.25
7/10/2021 55.5 3+670 MNB slab 450.66 0 0 0 0
7/11/2021 10 7+595 MNB 76 0 0 0 61
7/12/2021 3.75 4+905 slab culvert 30.45 0 0 0 0
7/12/2021 2.5 8+545 HPC 15 0 12 0 0
7/13/2021 3.5 5+221 HPC 21 0 16.8 0 0
7/14/2021 6.3 4+905,3+670 MNB 51.16 0 0 0 0
7/16/2021 14.7 7+595 MNB 111.72 0 0 0 89.67
7/19/2021 3.2 3+670 MNB 24.32 0 0 0 19.52
7/20/2021 5.75 5+231,8+245 HPC 34.5 0 27.6 0 0
7/22/2021 3 8+545 HPC 18 0 14.4 0 0
7/23/2021 4.5 5+231 HPC 27 0 21.6 0 0
7/24/2021 4.6 21+850 HPC 27.6 0 22.08 0 0
7/25/2021 2.5 21+850 HPC 15 0 12 0 0
7/28/2021 6.5 8+545,5+231 HPC 39 0 31.2 0 0
7/30/2021 4.5 21+850 HPC 27 0 21.6 0 0
8/1/2021 4 8+550 HPC 24 0 19.2 0 0
8/2/2021 1.8 21+850 HPC 10.8 0 8.64 0 0
8/5/2021 5.5 21+650 HPC 33 0 26.4 0 0
8/6/2021 4.5 21+650 HPC 27 0 21.6 0 0
8/7/2021 5.5 21+650 HPC 33 0 26.4 0 0
8/7/2021 5 21+650 HPC 30 0 24 0 0
8/9/2021 5 21+650 HPC 30 0 24 0 0
8/10/2021 5 21+650 HPC 30 0 24 0 0
8/11/2021 4 5+231 HPC 21.12 16.9 0 0 0
8/12/2021 6.8 5+231,21+640 HPC 40.8 0 32.64 0 0
8/13/2021 4.5 21+640 HPC 27 0 21.6 0 0
8/14/2021 4.5 5+231 HPC 27 0 21.6 0 0
8/14/2021 2 21+640 HPC 12 0 9.6 0 0
8/17/2021 5 5+231 HPC 30 0 24 0 0
8/17/2021 4.5 21+640 HPC 27 0 21.6 0 0
8/18/2021 14.7 7+595 MNB 111.72 0 0 0 89.67
8/19/2021 2 7+595 MNB 15.2 0 0 0 12.2
8/19/2021 3 20+670 HPC 15.84 12.67 0 0 0
8/20/2021 5 20+670 HPC 30 0 24 0 0
8/24/2021 19.5 7+595 MNB 148.2 0 0 0 118.95
8/25/2021 7 21+055 HPC 42 0 33.6 0 0
8/27/2021 11.5 20+675 HPC 69 0 55.2 0 0
8/31/2021 3 21+055 HPC 18 0 14.4 0 0
8/31/2021 2 21+055 HDPE pipe 15.2 0 0 0 12.2
8/31/2021 2 20+675 HPC 12 0 9.6 0 0
9/1/2021 4.5 21+055,20+675 HPC 27 0 21.6 0 0
9/2/2021 3.5 20+675 HPC 21 0 16.8 0 0
9/6/2021 7 20+675 HPC 42 0 33.6 0 0
9/8/2021 3 20+675 HPC 18 0 14.4 0 0
9/9/2021 4 20+675 HPC 24 0 19.2 0 0
9/10/2021 2 20+675 HPC 12 0 9.6 0 0
9/12/2021 12.5 7+595 MNB 95 0 0 0 76.25
9/13/2021 1 7+595 MNB 7.6 0 0 0 6.1
9/20/2021 5 5+ Drain 26.4 21.12 0 0 0
9/21/2021 3.5 20+135 HPC 21 0 16.8 0 0
9/22/2021 12 7+595 MNB 91.2 0 0 0 73.2
9/23/2021 5 20+135 HPC 30 0 24 0 0
9/23/2021 5 5+680 Drain 26.4 21.12 0 0 0
9/24/2021 5 5+680 Drain 26.4 21.12 0 0 0
9/24/2021 8.5 20+675 HPC 51 0 40.8 0 0
9/25/2021 5 5+680 Drain 26.4 21.12 0 0 0
9/25/2021 5 5+680 Drain 31.6 0 0 23.7 0
9/26/2021 5 5+680 Drain 26.4 21.12 0 0 0
9/27/2021 8.5 5+680 Drain 53.72 0 0 40.29 0
9/28/2021 15 5+680 Drain 94.8 0 0 71.1 0
9/29/2021 5 5+700 Drain 31.6 0 0 23.7 0
9/29/2021 5 4+124 HPC 26.4 21.12 0 0 0
9/30/2021 7 4+124,20+675 HPC 42 0 33.6 0 0
9/30/2021 7 5+700 Drain 44.24 0 0 33.18 0

10/1/2021 14.3 7+595 mNB 108.68 0 0 0 87.23


10/3/2021 4 17+370 hpc 21.12 15.84 0 0 0
10/24/2021 6.5 7+595 MNB 49.4 0 0 0 39.65
10/24/2021 5.5 5+500 Drain 34.76 0 0 26.07 0
10/25/2021 6.5 7+595 MNB 49.4 0 0 0 39.65
10/25/2021 6.5 7+595,5+500 drain,MNB 41.08 0 0 30.81 0
10/26/2021 6.5 9+80 DRAIN 34.32 25.74 0 0 0
10/26/2021 13 15+315 MNB A2 pcc 68.64 51.48 0 0 0
10/26/2021 5.2 20+130 HPC 31.2 0 23.4 0 0
10/27/2021 6.5 17+350 HPC 39 0 29.25 0 0
10/27/2021 10.5 5+500,9+300 DRAIN 55.44 41.58 0 0 0
10/28/2021 6.5 7+595 MNB 49.4 0 0 0 39.65
10/28/2021 13 5+500 DRAIN 82.16 0 0 61.62 0
10/28/2021 6.5 20+130 HPC 39 0 29.25 0 0
10/29/2021 6.5 9+800 DRAIN 41.08 0 0 30.81 0
10/30/2021 18.1 5+500,9+800 DRAIN 114.39 0 0 85.79 0
10/30/2021 5 5+500 DRAIN 26.4 19.8 0 0 0
10/31/2021 10.2 5+500 DRAIN 64.46 0 0 48.35 0
11/1/2021 5 4+124,9+500 HPC 30 0 22.5 0 0
11/2/2021 6.5 0 4+124 HPC 39 0 29.25 0 0
11/2/2021 5 9+500,5+500 DRAIN 31.6 0 0 23.7 0
11/8/2021 6 5+150 DRAIN 31.68 23.76 0 0 0
11/9/2021 11.5 4+650,5+150 DRAIN 60.72 45.54 0 0 0
11/10/2021 6.5 5+150 DRAIN 41.08 0 0 30.81 0
11/10/2021 5 5+150 HPC 26.4 19.8 0 0 0
11/11/2021 19.5 4+650 DRAIN 123.24 0 0 92.43 0
11/11/2021 11.5 10+350 DRAIN 60.72 45.54 0 0 0
11/12/2021 6 5+400 DRAIN 37.92 0 0 28.44 0
11/12/2021 6.5 5+400 DRAIN 34.32 25.74 0 0 0
11/13/2021 5.5 2+880,5+500 Hpc,Drain 29.04 21.78 0 0 0
11/13/2021 13 5+500 DRAIN 82.16 0 0 61.62 0
11/14/2021 6.5 5+500 DRAIN 34.32 25.74 0 0 0
11/14/2021 13 5+500 DRAIN 82.16 0 0 61.62 0
11/15/2021 6.5 5+550 DRAIN 41.08 0 0 30.81 0
11/15/2021 13 5+551 DRAIN 68.64 51.48 0 0 0
11/17/2021 6.5 2+660 DRAIN 34.32 25.74 0 0 0
11/17/2021 13 5+500,2+800 DRAIN 82.16 0 0 61.62 0
11/19/2021 5 5+550 DRAIN 26.4 19.8 0 0 0
11/20/2021 6.5 5+800 DRAIN 34.32 25.74 0 0 0
11/20/2021 6.5 4+124,4+150 HPC 39 0 29.25 0 0
11/20/2021 13 5+800 DRAIN 82.16 0 0 61.62 0
11/21/2021 6.5 5+800 DRAIN 34.32 25.74 0 0 0
11/22/2021 6.5 10+950 DRAIN 34.32 25.74 0 0 0
11/22/2021 25.5 2+600,5+200 DRAIN 161.16 0 0 120.87 0
11/23/2021 6.5 2+700 DRAIN 41.08 0 0 30.81 0
11/24/2021 19.5 2+700,5+200 DRAIN 123.24 0 0 92.43 0
11/24/2021 8.5 15+315 MNB P1 pcc 44.88 33.66 0 0 0
11/25/2021 13 2+700,19+700 DRAIN 68.64 51.48 0 0 0
11/25/2021 13 5+200 DRAIN 82.16 0 0 61.62 0
11/26/2021 13 2+800,4+650 HPC 78 0 58.5 0 0
11/26/2021 6.5 2+600 Hpc 41.08 0 0 30.81 0
11/27/2021 13 5+200 DRAIN 82.16 0 0 61.62 0
11/27/2021 5.5 7+595 MNB P1 pcc 29.04 21.78 0 0 0
11/28/2021 26 2+600,4+650,5+20DRAIN 164.32 0 0 123.24 0
11/28/2021 5.5 19+700 DRAIN PCC 29.04 21.78 0 0 0
11/29/2021 65 15+315 A2raft 494 0 0 0 416
11/29/2021 6.5 5+600 DRAIN 41.08 0 0 30.81 0
11/30/2021 6.5 2+660 Hpc 39 0 29.25 0 0
11/30/2021 12.5 19+700,10+350 DRAIN 79 0 0 59.25 0
11/30/2021 6.5 10+350 DRAIN 34.32 25.74 0 0 0
12/1/2021 13 10+350,2+600 DRAIN 82.16 0 0 61.62 0
12/2/2021 19.5 10+300,19+750 DRAIN 123.24 0 0 92.43 0
12/2/2021 13 5+600,19+750 DRAIN 68.64 51.48 0 0 0
12/3/2021 13 5+600,10+350 DRAIN 82.16 0 0 61.62 0
12/3/2021 13 15+315 MNB A1 Pcc 68.64 51.48 0 0 0
12/4/2021 6.5 19+750 DRAIN 34.32 25.74 0 0 0
12/4/2021 13 19+750 DRAIN 82.16 0 0 61.62 0
12/4/2021 45.5 15+315 MNB p1 Raft 345.8 0 0 0 259.35
12/5/2021 19.5 10+350,2+700,19+DRAIN 123.24 0 0 92.43 0
12/5/2021 10.5 16+900,10+350 DRAIN 55.44 41.58 0 0 0
12/6/2021 25.5 10+360,19+750,2+DRAIN 161.16 0 0 120.87 0
12/7/2021 13 10+360,19+750 DRAIN 82.16 0 0 61.62 0
12/7/2021 6.5 4+124 hpc 39 0 29.25 0 0
12/7/2021 6.5 2+700 DRAIN 34.32 25.74 0 0 0
12/8/2021 19.5 10+360,19+450 DRAIN 123.24 0 0 92.43 0
12/8/2021 5 19+450 DRAIN 26.4 19.8 0 0 0
12/8/2021 6.5 17+948 hpc 39 0 29.25 0 0
12/9/2021 6.5 19+450 DRAIN 34.32 25.74 0 0 0
12/9/2021 26 4+124,10+360,2+7DRAIN 164.32 0 0 123.24 0
12/10/2021 26 2+600,10+360,19+DRAIN 164.32 0 0 123.24 0
12/11/2021 19.5 10+400,19+450,5+DRAIN 123.24 0 0 92.43 0
12/11/2021 13 4+124,16+900 hpc 78 0 58.5 0 0
12/11/2021 6.5 2+600 DRAIN 34.32 25.74 0 0 0
12/12/2021 6.5 2+600 DRAIN 34.32 25.74 0 0 0
12/12/2021 18.5 15+788 MJB 97.68 73.26 0 0 0
12/12/2021 13 10+400 DRAIN 82.16 0 0 61.62 0
12/13/2021 11.5 2+600,10+400 DRAIN 72.68 0 0 54.51 0
12/13/2021 6.5 16+900,17+124 hpc 39 0 29.25 0 0
12/13/2021 6.5 17+124,19+450 DRAIN 34.32 25.74 0 0 0
12/14/2021 13 15+315 mnb 98.8 0 0 0 79.04
12/14/2021 13 2+600,5+600 DRAIN 82.16 0 0 61.62 0
12/15/2021 65 15+315 mnb A1 raft 494 0 0 0 370.5
12/17/2021 3.5 17+900 hpc 18.48 13.86 0 0 0
12/18/2021 26 2+800,19+450,10+DRAIN 164.32 0 0 123.24 0
12/18/2021 6.5 10+360 DRAIN 34.32 25.74 0 0 0
12/19/2021 13 17+124,17+900 hpc 78 0 58.5 0 0
12/19/2021 10.5 19+450,2+800 DRAIN 66.36 0 0 49.77 0
12/20/2021 19.5 15+315 mnb 148.2 0 0 0 110.76
12/20/2021 24 19+450,10+250 DRAIN 151.68 0 0 113.76 0
12/21/2021 78.5 15+788 MJB 596.6 0 0 0 447.45
12/22/2021 13 2+800,10+250 DRAIN 82.16 0 0 61.62 0
12/23/2021 16.5 10+250,19+450 DRAIN 104.28 0 0 78.21 0
12/23/2021 6.5 2+800 DRAIN 34.32 25.74 0 0 0
12/23/2021 6.5 hpc 39 0 29.25 0 0
12/24/2021 22.5 2+800,19+450,10+DRAIN 142.2 0 0 106.65 0
12/25/2021 5 18+135 hpc 30 0 22.5 0 0
12/25/2021 12.85 15+315 mnb 97.66 0 0 0 72.99
12/26/2021 19.5 2+800,19+450 DRAIN 123.24 0 0 92.43 0
12/26/2021 1.5 20+135 hpc 9 0 6.75 0 0
12/26/2021 11 10+250,19+450 DRAIN 58.08 43.56 0 0 0
12/27/2021 13 2+800,10+250 DRAIN 82.16 0 0 61.62 0
12/27/2021 19.5 15+315 mnb 148.2 0 0 0 110.76
12/27/2021 6.5 17+948 hpc 39 0 29.25 0 0
12/29/2021 26 19+450,2+800.10+DRAIN 164.32 0 0 123.24 0
12/30/2021 6.5 17+948 hpc 39 0 29.25 0 0
12/30/2021 19.5 10+250,19+450 DRAIN 123.24 0 0 92.43 0
1/1/2022 26 19+450,10+250 DRAIN 164.32 0 0 123.24 0
1/1/2022 9 15+780 DRAIN 47.52 35.64 0 0 0
1/2/2022 6.5 20+135 hpc 39 0 29.25 0 0
1/2/2022 10.5 10+450 DRAIN 66.36 0 0 49.77 0
1/3/2022 19.5 2+800,19+450,10+DRAIN 123.24 0 0 92.43 0
1/3/2022 6.5 20+135 hpc 39 0 29.25 0 0
1/4/2022 26 10+250,19+250,15DRAIN 164.32 0 0 123.24 0
1/4/2022 19.5 15+788 mnb 148.2 0 0 0 124.8
1/5/2022 19.5 10+250,23+878,2+DRAIN,hpc 102.96 77.22 0 0 0
1/5/2022 6.5 10+250 DRAIN 41.08 0 0 30.81 0
1/5/2022 6.5 18+135 hpc 39 0 29.25 0 0
1/6/2022 10.5 10+250 DRAIN 66.36 0 0 49.77 0
1/6/2022 13 7+595 mnb 78 0 58.5 0 0
1/6/2022 11.5 10+250,24+650 DRAIN 60.72 45.54 0 0 0
1/7/2022 6.5 24+650 hpc 39 0 29.25 0 0
1/7/2022 32.5 15+788 MJB 247 0 0 0 185.25
1/7/2022 6.5 10+250 DRAIN 41.08 0 0 30.81 0
1/8/2022 45.5 15+788 MJB 345.8 0 0 0 259.35
1/8/2022 19.5 10+250,23+300 DRAIN 123.24 0 0 92.43 0
1/9/2022 19.5 7+595,19+450,18+mnb,hpc 123.24 0 0 92.43 0
1/9/2022 21.5 15+788 MJB 113.52 85.14 0 0 0
1/10/2022 26 23+300,10+250 hpc,Drain 164.32 0 0 123.24 0
1/10/2022 19.5 15+315 MNB 148.2 0 0 0 118.56
1/11/2022 19.5 10+250,2+450,24+Drain 123.24 0 0 92.43 0
1/12/2022 19.5 2+450,7+595,24+7Mnb,Drain 123.24 0 0 92.43 0
1/13/2022 26.5 16+500.7+595, Drain Hpc 167.48 0 0 125.61 0
1/13/2022 2.5 23+878 Hpc 13.2 9.9 0 0 0
1/14/2022 19.85 15+788 MJB 150.86 0 0 0 120.69
1/14/2022 18.5 16+553 Hpc 111 0 83.25 0 0
1/14/2022 6.5 2+800 Drain 41.08 0 0 30.81 0
1/14/2022 6.5 10+250 Drain 34.32 25.74 0 0 0
1/15/2022 13 15+788 MJB 68.64 51.48 0 0 0
1/15/2022 2 16+778 Hpc 12 0 9 0 0
1/15/2022 6.5 24+750 Drain 34.32 25.74 0 0 0
1/15/2022 25.5 24+750,2+450 Drain 161.16 0 0 120.87 0
1/16/2022 19.5 15+315 Mnb 148.2 0 0 0 118.56
1/16/2022 12.5 2+450,10+250 Drain 79 0 0 59.25 0
1/16/2022 6 23+330 Hpc 36 0 27 0 0
1/17/2022 6.5 16+776 Hpc 39 0 29.25 0 0
1/18/2022 6 23+300 Hpc 36 0 27 0 0
1/18/2022 6.85 7+595 Mnb 52.06 0 0 0 38.91
1/18/2022 17 24+600,10+250,2+Drain 107.44 0 0 80.58 0
1/19/2022 48 15+788 MJB 364.8 0 0 0 273.6
1/19/2022 19 15+315 Mnb 144.4 0 0 0 115.52
1/19/2022 6.5 10+250 Drain 41.08 0 0 30.81 0
1/19/2022 6 23+350,24+650 Hpc 36 0 27 0 0
1/20/2022 6.5 23+350,24+650 Hpc 39 0 29.25 0 0
1/20/2022 12.5 2+600,10+250 Drain 79 0 0 59.25 0
1/20/2022 6 7+595 Mnb 45.6 0 0 0 34.08
1/21/2022 6.5 7+595 Mnb 49.4 0 0 0 36.92
1/21/2022 5 23+300,24+600 Hpc 26.4 19.8 0 0 0
1/21/2022 6 16+775 Hpc 36 0 27 0 0
1/21/2022 12 24+650,2+500 Drain 75.84 0 0 56.88 0
1/22/2022 9.5 16+773,24+600 Hpc 50.16 37.62 0 0 0
1/22/2022 6.25 7+595 MNB 47.5 0 0 0 35.5
1/22/2022 5.5 16+770 Hpc 29.04 21.78 0 0 0
1/23/2022 6.5 16+900,23+300 Hpc 39 0 29.25 0 0
1/23/2022 19.5 15+315 MNB 148.2 0 0 0 110.76
1/23/2022 6 16+600 Drain 37.92 0 0 28.44 0
1/23/2022 5 15+315 MNB 26.4 19.8 0 0 0
1/24/2022 9.5 15+315 MNB 50.16 37.62 0 0 0
1/24/2022 6.5 24+650 Hpc 39 0 29.25 0 0
1/25/2022 31.5 7+595 MNB 166.32 124.74 0 0 0
1/25/2022 5 16+553 Hpc 30 0 22.5 0 0
1/25/2022 12.5 15+788 MJB 95 0 0 0 71
1/25/2022 6 16+900,10+050 Drain 37.92 0 0 28.44 0
1/27/2022 16.75 24+650,10+050,2+Drain 105.86 0 0 79.4 0
1/27/2022 2.25 7+595 MNB 17.1 0 0 0 12.78
1/27/2022 6.5 24+600 Drain 34.32 25.74 0 0 0
1/27/2022 2.75 17+600 HPC 16.5 0 12.38 0 0
1/28/2022 18.5 15+788 MJB 140.6 0 0 0 105.08
1/28/2022 9.5 16+553,10+050 hpc,Drain 57 0 42.75 0 0
1/28/2022 3 15+788 MJB 15.84 11.88 0 0 0
1/29/2022 12.5 10+050,16+900 Drain 79 0 0 59.25 0
1/29/2022 14 17+370,23+580,16hpc 84 0 63 0 0
1/29/2022 12.5 15+788 MJB 95 0 0 0 71
1/29/2022 6 7+595 MNB 45.6 0 0 0 34.08
1/30/2022 20 2+800,23+600,24+Drain 126.4 0 0 94.8 0
1/30/2022 19 17+595 MNB 100.32 75.24 0 0 0
1/31/2022 16.5 15+788 MJB 125.4 0 0 0 94.05
2/1/2022 5.5 24+650 Drain 34.76 0 0 26.07 0
2/1/2022 32.5 15+788 MJB 247 0 0 0 185.25
2/2/2022 4 7+595 MNB 30.4 0 0 0 22.8
2/2/2022 12.5 17+300,23+800,26hpc 75 0 56.25 0 0
2/2/2022 18.5 15+315 MNB 140.6 0 0 0 105.08
2/2/2022 12.5 10+050,24+650 Drain 79 0 0 59.25 0
2/3/2022 11.5 27+00,24+650,10+Drain 72.68 0 0 54.51 0
2/3/2022 18 16+900,26+00,27+Drain 95.04 71.28 0 0 0
2/4/2022 12.5 15+788 MJB 95 0 0 0 71
2/4/2022 6 7+595 MNB 45.6 0 0 0 34.08
2/4/2022 6.5 24+650 Drain 34.32 25.74 0 0 0
2/4/2022 18.5 26+700,17+370,23hpc 111 0 83.25 0 0
2/5/2022 15.75 16+900,27+00,2+6Drain 99.54 0 0 74.66 0
2/5/2022 12 15+315 MNB 91.2 0 0 0 68.16
2/5/2022 12.5 23+878,24+600,23hpc 75 0 56.25 0 0
2/6/2022 12.5 15+788 MJB 95 0 0 0 71
2/6/2022 6 26+100,26+700 Drain 37.92 0 0 28.44 0
2/7/2022 62.5 17+595 MNB 475 0 0 0 356.25
2/7/2022 12 26+135,24+650 Drain 75.84 0 0 56.88 0
2/8/2022 18.5 27+300,26+150,24Drain 116.92 0 0 87.69 0
2/8/2022 11.5 15+788 MJB 60.72 45.54 0 0 0
2/9/2022 5.4 15+315 MNB 28.51 21.38 0 0 0
2/9/2022 14.75 26+100,17+070 Drain 93.22 0 0 69.92 0
2/10/2022 5 26+700 HPC 30 0 22.5 0 0
2/10/2022 7 15+788 mjb p9 53.2 0 0 0 39.9
2/10/2022 10 15+788 mjB p7 PCC 52.8 39.6 0 0 0
2/11/2022 60 15+788 p3 RTAFT 456 0 0 0 342
2/11/2022 6 25+600 drain 31.68 23.76 0 0 0
2/11/2022 6 24+550 drain 37.92 0 0 28.44 0
2/12/2022 5 16+900 drain 26.4 19.8 0 0 0
2/12/2022 16.6 26+700,27+300 HPC 99.6 0 74.7 0 0
2/13/2022 6.5 15+788 mjb p1 CAP 49.4 0 0 0 36.92
2/13/2022 12.35 15+788 mjb p8 2ND LIFT 93.86 0 0 0 70.15
2/13/2022 12 17+595 MNB A2 pcc 63.36 47.52 0 0 0
2/13/2022 4.5 17+500 drain 23.76 17.82 0 0 0
2/13/2022 4.25 26+750 drain 26.86 0 0 20.15 0
2/14/2022 42 15+788 mjb p7 FOOTING 319.2 0 0 0 238.56
2/14/2022 26.25 16+900,26+050 drain 165.9 0 0 124.43 0
2/15/2022 84 7+595 MNB P1-A2 SLAB 682.08 0 0 0 0
2/16/2022 31 3+670,27+310 drain,hPC 195.92 0 0 146.94 0
2/16/2022 5 25+900 drain PCC 26.4 19.8 0 0 0
2/16/2022 12 15+788 mjb p8 THIRD LIFT 91.2 0 0 0 68.16
2/17/2022 13.3 15+788 mjb p2 1ST Lift 101.08 0 0 0 75.54
2/17/2022 5 27+310 HPC PCC 26.4 19.8 0 0 0
2/18/2022 84 7+595 MNB P1-A1 SLAB 682.08 0 0 0 0
2/18/2022 12 15+788 mjb p8 4th LIFT 91.2 0 0 0 68.16
2/18/2022 6 25+600 drain 37.92 0 0 28.44 0
2/19/2022 20.75 25+350,16+900 drain 131.14 0 0 98.36 0
2/19/2022 6 16+900 drain 31.68 23.76 0 0 0
2/20/2022 72 15+788 mjb A1 FOOTING 547.2 0 0 0 410.4
2/20/2022 6 15+788 mjb p2 2nd Lift 45.6 0 0 0 34.08
2/20/2022 9 15+788 mjb p3 Pcc 47.52 35.64 0 0 0
2/20/2022 6 27+310 Hpc 36 0 27 0 0
2/20/2022 18 25+300,26+060 drain 113.76 0 0 85.32 0
2/21/2022 10 25+300.26+060 drain 63.2 0 0 47.4 0
2/21/2022 6 27+310 Hpc 36 0 27 0 0
2/21/2022 20 15+788 P8,P3 wall 152 0 0 0 121.6
2/22/2022 6 7+595 crass barrier M-40 49.92 0 0 0 0
2/22/2022 10.5 16+900,25+500 Drain wall 66.36 0 0 49.77 0
2/22/2022 4 26+060 Drain pcc 21.12 15.84 0 0 0
2/22/2022 12.2 15+788 P3 wall 92.72 0 0 0 74.18
2/23/2022 9 25+700 Drain pcc 47.52 35.64 0 0 0
2/23/2022 18 25+500 Drain,hpc 113.76 0 0 85.32 0
2/24/2022 15 28+550,25+500,16drain 94.8 0 0 71.1 0
2/25/2022 5.5 7+595 crass barrier M-40 45.76 0 0 0 0
2/25/2022 48 15+788 P3raft 364.8 0 0 0 273.6
2/25/2022 14.5 15+788 P7 wall 110.2 0 0 0 88.16
2/25/2022 12 28+500 drain 75.84 0 0 56.88 0
2/26/2022 63 17+595 A2 raft 478.8 0 0 0 359.1
2/27/2022 10.25 25+900 drain 64.78 0 0 48.59 0
2/27/2022 12 15+788 P7 wall 91.2 0 0 0 68.4
2/28/2022 6.5 7+595 crass barrier M-40 54.08 0 0 0 0
2/28/2022 6 28+540 HPC 36 0 27 0 0
2/28/2022 13.2 15+788 P3 wall 100.32 0 0 0 80.26
2/28/2022 2.75 16+900 drain 17.38 0 0 13.04 0
2/28/2022 12.5 15+788 p6pcc 66 49.5 0 0 0
3/1/2022 2 7+595 crass barrier M-40 16.64 0 0 0 0
3/1/2022 12 15+788 P7 wall 91.2 0 0 0 72.96
3/1/2022 12 25+900 drain 75.84 0 0 56.88 0
3/2/2022 6 28+540 HPC 36 0 27 0 0
3/2/2022 6 26+600 drain 37.92 0 0 28.44 0
3/2/2022 9 26+600,19+550 Drain 47.52 35.64 0 0 0
3/2/2022 12.2 15+788 P7 wall 92.72 0 0 0 74.18
3/3/2022 11 25+900,26+600 Drain raft 69.52 0 0 52.14 0
3/3/2022 12 15+788 P3 wall 91.2 0 0 0 72.96
3/4/2022 3.5 17+000 drain 18.48 13.86 0 0 0
3/4/2022 6 25+900 drain 37.92 0 0 28.44 0
3/4/2022 6 3+670 retaining wall 45.6 0 0 0 36.48
3/4/2022 47.5 15+788 P6raft 361 0 0 0 270.75
3/4/2022 21 17+595 A2wall 159.6 0 0 0 127.68
3/5/2022 8 7+595 crass barrier M-40 66.56 0 0 0 0
3/5/2022 1 17+595 A2wall 7.6 0 0 0 6.08
3/5/2022 12.4 15+788 P3wall 94.24 0 0 0 75.39
3/5/2022 15.35 28+500,25+900 drain 97.01 0 0 72.76 0
3/6/2022 6 19+550,25+900 drain 37.92 0 0 28.44 0
3/6/2022 12 15+788 P7 wall 91.2 0 0 0 72.96
3/6/2022 3.5 7+595 crass barrier M-40 29.12 0 0 0 0
3/7/2022 12.2 15+788 P3 wall 92.72 0 0 0 74.18
3/7/2022 3.5 3+670 retaining wall 26.6 0 0 0 21.28
3/7/2022 8.5 26+050,16+00 Drain 53.72 0 0 40.29 0
3/7/2022 4.7 28+500 Hpc 28.2 0 21.15 0 0
3/7/2022 6 26+050 Drain pcc 31.68 23.76 0 0 0
3/8/2022 13.7 15+788 P6 wall 104.12 0 0 0 83.3
3/8/2022 6 25+900 Drain 37.92 0 0 28.44 0
3/8/2022 3.75 28+500 Hpc 22.5 0 16.88 0 0
3/9/2022 12 15+315 retaining wall footing 91.2 0 0 0 68.4
3/9/2022 18.4 15+788 P3,P6 wall 139.84 0 0 0 111.87
3/9/2022 6 25+920 Drain 37.92 0 0 28.44 0
3/10/2022 10 25+900.2+600 Drain 63.2 0 0 47.4 0
3/10/2022 12.5 15+788 P6 wall 95 0 0 0 76
3/11/2022 3 28+700 Hpc 18 0 13.5 0 0
3/11/2022 12 15+315 retaining wall footing 91.2 0 0 0 72.96
3/11/2022 9 15+788 P6wall 68.4 0 0 0 54.72
3/11/2022 8 15+788 P4pcc 42.24 31.68 0 0 0
3/12/2022 6 25+900,28+600 Drain 37.92 0 0 28.44 0
3/12/2022 7 3+670 crass barrier M-40 58.24 0 0 0 0
3/13/2022 1.9 3+670 crass barrier M-40 15.81 0 0 0 0
3/13/2022 12 15+788 P6 wall final 91.2 0 0 0 72.96
3/13/2022 16 17+595 A2 wall 2nd lift 121.6 0 0 0 97.28
3/13/2022 5 25+400,25+920 Drain 31.6 0 0 23.7 0
3/14/2022 5.5 28+600,25+900 Drain 34.76 0 0 26.07 0
3/16/2022 5.5 3+670 Pcc 29.04 21.78 0 0 0
3/16/2022 2.75 28+700 HPC 16.5 0 12.38 0 0
3/16/2022 6 3+670 retaining wall footing 45.6 0 0 0 34.2
3/16/2022 13.5 15+788 P4 P4raft 102.6 0 0 0 82.08
3/16/2022 47 15+788 P4raft 357.2 0 0 0 267.9
3/21/2022 12 15+788 P1wall 1st lift 91.2 0 0 0 72.96
3/21/2022 5.5 3+670 crass barrier M-40 45.76 0 0 0 0
3/21/2022 3.5 15+315 Retaining wall 26.6 0 0 0 21.28
3/21/2022 13 15+788 P4 wall 98.8 0 0 0 79.04
3/22/2022 2.5 25+900 Drain 15.8 0 0 11.85 0
3/22/2022 4 3+670 Retaining wall 25.28 0 0 18.96 0
3/22/2022 10.5 15+788 P5pcc 55.44 41.58 0 0 0
3/23/2022 12 15+788 P1wall 2nd lift 91.2 0 0 0 72.96
3/23/2022 3 3+670 crass barrier M-40 24.96 0 0 0 0
3/23/2022 2.5 25+900 Drain 15.8 0 0 11.85 0
3/23/2022 13 15+788 P4wall 2nd lift 98.8 0 0 0 79.04
3/24/2022 5 3+670,15+315 Retaining wall 38 0 0 0 28.4
3/24/2022 2.5 25+900 Drain 15.8 0 0 11.85 0
3/25/2022 13.5 15+788 P1 4th lift 102.6 0 0 0 82.08
3/25/2022 1.5 3+670 crass barrier M-40 12.48 0 0 0 0
3/25/2022 12.75 15+788 P4 3rd lift 96.9 0 0 0 77.52
3/25/2022 2.5 25+900 Drain 15.8 0 0 11.85 0
3/26/2022 6 17+100,25+900 Drain slab 37.92 0 0 28.44 0
3/27/2022 13 15+788 P4 4th Lift 98.8 0 0 0 79.04
3/27/2022 45.5 15+788 P5 footing 345.8 0 0 0 258.44
3/27/2022 21 28+515 Raft pcc 110.88 83.16 0 0 0
3/28/2022 6.4 15+788 P1 final lift 48.64 0 0 0 38.91
3/28/2022 11.5 16+590,17+100,25Drain 72.68 0 0 54.51 0
3/29/2022 12.5 15+788 P4 final lift 95 0 0 0 76
3/29/2022 3.5 15+315 Retaining wall 26.6 0 0 0 19.88
3/29/2022 12 3+670,7+595 Approch slab pcc 63.36 47.52 0 0 0
3/30/2022 4.25 2+690 Drain pcc 22.44 16.83 0 0 0
3/30/2022 4.5 28+700 hpc 27 0 20.25 0 0
3/30/2022 5.8 17+100,19+500 36.66 0 0 27.49 0
3/30/2022 12 3+670 Approch slab 91.2 0 0 0 75.84
3/30/2022 2 15+315 Retaining wall 15.2 0 0 0 11.36
3/31/2022 10 15+315 A2 cap bracket dirt wall 76 0 0 0 65.2
3/31/2022 11.75 7+595 Approch slab 89.3 0 0 0 74.26
3/31/2022 8 28+670,25+900 Hpc 42.24 31.68 0 0 0
4/1/2022 14.5 15+788 P5wall 1st lift 110.2 0 0 0 88.16
4/1/2022 3 16+590 Drain pcc 15.84 11.88 0 0 0
4/2/2022 20.5 17+590 A1 wall 1st lift 155.8 0 0 0 124.64
4/2/2022 4 28+770 HPC 24 0 18 0 0
4/2/2022 11.5 19+500,2+690.16+Drain 72.68 0 0 54.51 0
4/3/2022 12.5 15+788 P5 wall 2nd lift 95 0 0 0 76
4/3/2022 11.95 2+690,15+315,16+Dran,Mnb Block casting 75.52 0 0 56.64 0
4/4/2022 2 28+770 HPC 12 0 9 0 0
4/4/2022 12 2+690,15+500,15+Drain MNB Block casting 75.84 0 0 56.88 0
4/4/2022 2 28+150 MNB 10.56 7.92 0 0 0
4/5/2022 12.5 15+788 P5 mjb wall 95 0 0 0 76
4/5/2022 2 15+315 Block casting 12 0 9 0 0

4/6/2022 2 15+315 Block casting 12 0 9 0 0


4/7/2022 12.5 15+788 P5 mjb wall 95 0 0 0 76
4/7/2022 3.25 19+550 Drain 20.54 0 0 15.41 0
4/7/2022 28 10+000 DLC 86.8 0 0 0 0
4/8/2022 26 25+760 retaining wall footing 197.6 0 0 0 158.08
4/9/2022 57 28+150 MNB raft A-1 433.2 0 0 0 323.76
4/9/2022 9.5 19+550,2+850 Drain 60.04 0 0 45.03 0
4/9/2022 9.5 9+860,15+315 Drain,mnb 50.16 37.62 0 0 0
4/9/2022 36 10+000 DLC 111.6 0 0 0 0
4/10/2022 78.7 10+000 DLC 243.97 0 0 0 0
4/10/2022 13 15+788 Mjb p5wall 98.8 0 0 0 79.04
4/10/2022 6 3+670 Approch slab pcc 31.68 23.76 0 0 0
4/11/2022 13 15+315 A2 retaining wall MNB 98.8 0 0 0 73.84
4/11/2022 12 3+670 Approch slab 91.2 0 0 0 72.96
4/11/2022 13 9+860,2+850 Drain 82.16 0 0 61.62 0
4/11/2022 42 130.2 0 0 0 0
4/12/2022 13.2 19+550,17+595 drain,mnb pcc 69.7 52.27 0 0 0
4/12/2022 9 9+800,2+900 drain 56.88 0 0 42.66 0
4/12/2022 24 17+595 A1,7+595 A1 wall 1st lift,approch slab 182.4 0 0 0 150.24
4/12/2022 68 10+000 Dlc 210.8 0 0 0 0
4/13/2022 10 16+950,19+550 drain 63.2 0 0 47.4 0
4/13/2022 6.5 15+315 retain wall 49.4 0 0 0 37.05
4/13/2022 104 10+000 Dlc 322.4 0 0 0 0
4/14/2022 8 17+595 P1 pcc 42.24 31.68 0 0 0
4/14/2022 8.7 9+800,19+550 drain 54.98 0 0 41.24 0
4/14/2022 19 25+760 retain wall 144.4 0 0 0 108.3
4/14/2022 86 10+000 Dlc 266.6 0 0 0 0
4/15/2022 6 2+850 drain 31.68 23.76 0 0 0
4/15/2022 13.4 16+950,9+860 drain 84.69 0 0 63.52 0
4/15/2022 56 10+000 Dlc 173.6 0 0 0 0
4/16/2022 10.8 10+00,2+600 drain 68.26 0 0 51.19 0
4/17/2022 4.8 15+315 retain wall 36.48 0 0 0 27.36
4/17/2022 10 2+600,16+950 drain 63.2 0 0 47.4 0
4/18/2022 9.5 15+315 retain wall 72.2 0 0 0 59.47
4/18/2022 13 25+240 mnb 68.64 51.48 0 0 0
4/18/2022 8.5 2+600,9+800 drain 53.72 0 0 40.29 0
4/19/2022 11 25+760 retain wall 83.6 0 0 0 66.88
4/19/2022 5 17+010 drain 31.6 0 0 23.7 0
4/20/2022 83 15+315 A2-P1 slab 680.6 0 0 0 0
4/21/2022 13.5 15+315,15+788,2+drain,mnb block casting 85.32 0 0 63.99 0
4/21/2022 9 25+240 P2 pcc mnb 47.52 35.64 0 0 0
4/21/2022 5 15+315 retain wall 38 0 0 0 31.3
4/22/2022 7 15+788 MJB 53.2 0 0 0 39.9
4/23/2022 48 17+595 P2 Raft mnb 364.8 0 0 0 273.6
4/23/2022 6 15+315 retain wall 45.6 0 0 0 37.68
4/23/2022 7.2 2+600,9+800 drain 45.5 0 0 34.13 0
4/24/2022 60 28+150 A2raft mnb 456 0 0 0 342
4/24/2022 6 15+788 mjb block casting 37.92 0 0 28.44 0
4/25/2022 11 25+760,15+788 retain wall 83.6 0 0 0 66.88
4/25/2022 10.2 16+950,15+788 drain 64.46 0 0 48.35 0
4/26/2022 4.2 15+788 mjb block casting 25.2 0 18.9 0 0
4/26/2022 6 15+788 Cap 45.6 0 0 0 36.48
4/27/2022 4 15+315 mnb block casting 24 0 18 0 0
4/27/2022 6.5 15+788 Cap 49.4 0 0 0 40.82
4/27/2022 13 17+595 P1wall mnb 98.8 0 0 0 79.04
4/28/2022 2 15+788 mjb block casting 12 0 9 0 0
4/28/2022 5 16+950 drain 31.6 0 0 23.7 0
4/28/2022 3.4 25+760 retain wall 25.84 0 0 0 19.38
4/28/2022 21.35 10+000 R/S PQC 176.35 0 0 0 0
4/29/2022 2.2 28+250 mnb hunch 16.72 0 0 0 13.38
4/29/2022 1.5 15+315 mnb block casting 9 0 6.75 0 0
4/30/2022 4.5 16+650 drain 28.44 0 0 21.33 0
4/30/2022 30 10+000 R/S PQC 247.8 0 0 0 0
5/1/2022 11.5 28+250 A2 wall 1st lift mnb 87.4 0 0 0 69.92
5/1/2022 3.6 16+650 drain 22.75 0 0 17.06 0
5/1/2022 42 10+000 R/S PQC 346.92 0 0 0 0
5/2/2022 3.6 16+950 drain 21.6 0 16.2 0 0
5/2/2022 6 27+690 HPC 37.92 0 0 28.44 0
5/2/2022 48 10+000 R/S PQC 396.48 0 0 0 0
5/3/2022 4.8 17+000 drain 30.34 0 0 22.75 0
5/3/2022 6 28+150 MNB 45.6 0 0 0 36.48
5/3/2022 54 10+000 R/S PQC 446.04 0 0 0 0
5/4/2022 5 28+150,17+650 MNB,drain 31.6 0 0 23.7 0
5/4/2022 13 17+595 MNB 98.8 0 0 0 79.04
5/6/2022 17 28+150 MNB 129.2 0 0 0 103.36
5/6/2022 67 10+000 R/S PQC 553.42 0 0 0 0
5/7/2022 3.6 7+595 MNB Toe wallpcc 19.01 14.26 0 0 0
5/7/2022 14 28+150 MNB 106.4 0 0 0 85.12
5/7/2022 48 10+000 R/S PQC 396.48 0 0 0 0
5/8/2022 12 7+595 MNB Toe wallpcc 72 0 54 0 0
5/9/2022 126 15+788 MJB SLAB 1033.2 0 0 0 0
5/9/2022 39 10+000 R/S PQC 322.14 0 0 0 0
5/11/2022 4 15+788,27+590 24 0 18 0 0
5/11/2022 6.25 15+788 mjb P5cap 47.5 0 0 0 39.63
5/11/2022 48.5 10+000 R/S PQC 400.61 0 0 0 0
5/12/2022 6 25+880 drain pcc 31.68 23.76 0 0 0
5/12/2022 4 25+880 drainRaft 25.28 0 0 18.96 0
5/12/2022 60.5 10+000 R/S PQC 499.73 0 0 0 0
5/13/2022 84 15+315 A1 slab 688.8 0 0 0 0
5/14/2022 1.5 27+990 Drain pcc 7.92 5.94 0 0 0
5/14/2022 8 25+880,15+388 Drain 50.56 0 0 37.92 0
5/14/2022 43.5 10+000 R/S PQC 359.31 0 0 0 0
5/15/2022 36 10+000 R/S PQC 297.36 0 0 0 0
5/16/2022 6 27+590 HPC 36 0 27 0 0
5/16/2022 51 25+240 mnb raft P2 387.6 0 0 0 289.68
5/17/2022 4.7 27+590 HPC 28.2 0 21.15 0 0
5/17/2022 5.8 25+880 Drain 36.66 0 0 27.49 0
5/17/2022 48 17+595 P1 raft 364.8 0 0 0 272.64
5/17/2022 54 10+000 R/S PQC 446.04 0 0 0 0
5/18/2022 2 15+788 A1 starter 15.2 0 0 0 12.76
5/18/2022 5.1 27+590 Drain 32.23 0 0 24.17 0
5/18/2022 48 10+000 R/S PQC 396.48 0 0 0 0
5/19/2022 16 25+240 Mnb pcc 84.48 63.36 0 0 0
5/19/2022 6.75 15+788 MJB cap 51.3 0 0 0 43.07
5/19/2022 3.6 16+950 Drain 22.75 0 0 17.06 0
5/20/2022 13 17+595 P1 mnb wall 98.8 0 0 0 78.78
5/20/2022 6 16+980 Drain 37.92 0 0 28.44 0
5/20/2022 37 10+000 R/S PQC 305.62 0 0 0 0
5/21/2022 11.5 25+940,5+00 Drain 60.72 45.54 0 0 0
5/21/2022 13 25+240 P1 mnb wall 98.8 0 0 0 78.78
5/21/2022 6 16+900 Drain 37.92 0 0 28.44 0
5/24/2022 12.5 17+595 MNB wall 95 0 0 0 75.75
5/24/2022 24 25+900,26+484 Drain 151.68 0 0 113.76 0
5/24/2022 19.75 15+788 A1 mjb wall 150.1 0 0 0 119.69
5/24/2022 48 25+240 Mnb raft P1 364.8 0 0 0 272.64
5/25/2022 124.5 15+788 MJB slab 1020.9 0 0 0 0
5/25/2022 6 drain 37.92 0 0 28.44 0
5/26/2022 12.5 26+400,25+928 Hpc 75 0 56.25 0 0
5/26/2022 6 5+100 Drain 37.92 0 0 28.44 0
5/26/2022 6 15+315 retaining wall 45.6 0 0 0 36.36
5/26/2022 6 5+100 Drain 31.68 23.76 0 0 0
5/26/2022 12 10+000 R/S PQC 99.12 0 0 0 0
5/27/2022 78 25+240 A2 mnb footing 592.8 0 0 0 443.04
5/27/2022 6 26+400 Hpc 36 0 27 0 0
5/27/2022 48.5 10+000 R/S PQC 400.61 0 0 0 0
5/28/2022 15.1 16+950,5+100,7+0Drain 95.43 0 0 71.57 0
5/28/2022 4.4 25+900 Hpc 26.4 0 19.8 0 0
5/28/2022 14.5 25+240 MNB P1 wall 110.2 0 0 0 87.87
5/28/2022 36 10+000 R/S PQC 297.36 0 0 0 0
5/29/2022 9 26+240,25+928 HPC 54 0 40.5 0 0
5/29/2022 6 5+100 Drain 37.92 0 0 28.44 0
5/29/2022 8.25 17+595 MNB WAll 62.7 0 0 0 50
5/29/2022 4.75 5+600 Drain pcc 25.08 18.81 0 0 0
5/30/2022 8.25 25+940,5+600 Drain 52.14 0 0 39.11 0
5/30/2022 10 25+240 MNB WAll 76 0 0 0 60.6
5/31/2022 6 5+600 Drain 31.68 23.76 0 0 0
5/31/2022 6 26+900 HPC 36 0 27 0 0
5/31/2022 7.25 17+595 MNB Cap 55.1 0 0 0 43.94
6/1/2022 3 25+900 HPC 18 0 13.5 0 0
6/1/2022 8.3 5+100,16+500 Drain 52.46 0 0 39.34 0
6/1/2022 19.35 15+788 A1 wall mjb 147.06 0 0 0 117.26
6/1/2022 20.5 25+240 MNB A2 wall 155.8 0 0 0 124.23
6/2/2022 14.5 5+100,25+200 Drain,HPC 91.64 0 0 68.73 0
6/3/2022 6 25+928 HPC 36 0 27 0 0
6/3/2022 12 7+595,5+100 Drain 75.84 0 0 56.88 0
6/3/2022 3 19+550 Drain 15.84 11.88 0 0 0
6/4/2022 3 25+900 HPC 18 0 13.5 0 0
6/4/2022 9 5+100,7+595 Drain,mnb 56.88 0 0 42.66 0
6/4/2022 19.5 25+240 A2 wall mnb 148.2 0 0 0 118.17
6/5/2022 1.5 9 0 6.75 0 0
6/6/2022 9 5+100 Drain 56.88 0 0 42.66 0
6/6/2022 3.5 7+595 Toe wall 21 0 15.75 0 0
6/6/2022 13 25+240 A1 pcc mnb 68.64 51.48 0 0 0
6/7/2022 17.5 17+595,26+840,7+HPC ,Toe wall ,block casting 110.6 0 0 82.95 0
6/8/2022 126 15+788 MJB slab 1033.2 0 0 0 0
6/8/2022 7 19+150,5+115 Drain pcc 36.96 27.72 0 0 0
6/9/2022 11 5+150,19+150 Drain 69.52 0 0 52.14 0
6/9/2022 6 7+595 Toe wall 36 0 27 0 0
6/10/2022 67 25+240 A1 footing 509.2 0 0 0 380.56
6/10/2022 6 7+595 Toe wall 36 0 27 0 0
6/11/2022 11 5+100,3.370 Drain pcc, 58.08 43.56 0 0 0
6/11/2022 5.5 7+595 Toe wall 33 0 24.75 0 0
6/11/2022 11.75 5+100 Drain 74.26 0 0 55.7 0
6/12/2022 6 3+670 Toe wall 31.68 23.76 0 0 0
6/12/2022 6 7+595 Toe wall 36 0 27 0 0
6/12/2022 12 5+100,19+150 Drain 75.84 0 0 56.88 0
6/12/2022 1 25+240 MNB 7.6 0 0 0 6.06
6/12/2022 36 10+000 PQC RHS 297.36 0 0 0 0
6/13/2022 6 5+400 37.92 0 0 28.44 0
6/14/2022 12 29+000 Drain 63.36 47.52 0 0 0
6/14/2022 11.25 7+595,3+670 Toe wall 67.5 0 50.63 0 0
6/14/2022 9.75 19+150,5+100 Drain 61.62 0 0 46.22 0
6/14/2022 62 10+000 DLC LHS 192.2 0 0 0 0
6/14/2022 54 10+000 PQC RHS 446.04 0 0 0 0
6/15/2022 3 19+150 Drain 18.96 0 0 14.22 0
6/15/2022 20.75 25+240 MNB A1 wall 157.7 0 0 0 125.75
6/15/2022 50 10+000 DLC LHS 155 0 0 0 0
6/16/2022 6 5+100 Drain 31.68 23.76 0 0 0
6/16/2022 2.1 19+000 Drain 13.27 0 0 9.95 0
6/16/2022 49 10+000 DLC LHS 151.9 0 0 0 0
6/17/2022 127.5 17+595 MNB SLAB P1-P2 1045.5 0 0 0 0
6/18/2022 12 5+300,28+500 Drain,toe wall 63.36 47.52 0 0 0
6/18/2022 3.1 19+400 Drain 19.59 0 0 14.69 0
6/19/2022 28 10+000 PQC RHS 231.28 0 0 0 0
6/19/2022 16.5 5+100,19+500 Drain 104.28 0 0 78.21 0
6/20/2022 3 19+500 Drain 18.96 0 0 14.22 0
6/20/2022 7.5 15+788 MJB 57 0 0 0 45.45
6/20/2022 47 10+000 DLC LHS 145.7 0 0 0 0
6/21/2022 6 28+700 Drain 31.68 23.76 0 0 0
6/21/2022 15.8 5+100,28+500,19+Drain 99.86 0 0 74.89 0
6/21/2022 50 10+000 DLC LHS 155 0 0 0 0
6/21/2022 40 10+000 PQC RHS 330.4 0 0 0 0
6/22/2022 40 10+000 DLC LHS 124 0 0 0 0
6/22/2022 12 28+500,28+700 Drain 63.36 47.52 0 0 0
6/22/2022 20.1 5+300,28+700,19+Drain 127.03 0 0 95.27 0
6/22/2022 3 10+000 PQC RHS 24.78 0 0 0 0
6/23/2022 16 5+370,7+595,28+8Drain 101.12 0 0 75.84 0
6/23/2022 75 10+000 DLC LHS 232.5 0 0 0 0
6/24/2022 5 28+600 Drain 26.4 19.8 0 0 0
6/24/2022 9.5 28+700 Drain 60.04 0 0 45.03 0
6/24/2022 12 15+788 MJB A2 cap 91.2 0 0 0 72.72
6/24/2022 68 10+000 DLC LHS 210.8 0 0 0 0
6/24/2022 36 10+000 PQC LHS 297.36 0 0 0 0
6/25/2022 6 28+650 Drain 31.68 23.76 0 0 0
6/25/2022 6 28+650 Drain 37.92 0 0 28.44 0
6/25/2022 9.5 10+000 PQC LHS 78.47 0 0 0 0
6/29/2022 6 28+700 Drain 31.68 23.76 0 0 0
6/29/2022 6.5 15+788 MJB 49.4 0 0 0 39.39
6/29/2022 6 28+500 Drain 37.92 0 0 28.44 0
6/29/2022 22.5 10+000 PQC LHS 185.85 0 0 0 0
7/1/2022 6 28+800 Drain 31.68 23.76 0 0 0
7/1/2022 12 28+800 Drain 75.84 0 0 56.88 0
7/1/2022 7 15+788 MJB 53.2 0 0 0 42.42
7/1/2022 18 10+000 PQC LHS 148.68 0 0 0 0
7/2/2022 6 28+750 Drain 31.68 23.76 0 0 0
7/2/2022 10 28+750,5+300 Drain 63.2 0 0 47.4 0
7/2/2022 19.5 15+788 MJB 148.2 0 0 0 118.17
7/2/2022 64.5 10+000 DLC LHS 199.95 0 0 0 0
7/3/2022 5 28+750 Drain 26.4 19.8 0 0 0
7/3/2022 12 28+800 Drain 75.84 0 0 56.88 0
7/3/2022 2 15+788 MJB 15.2 0 0 0 12.12
7/3/2022 54 10+000 PQC LHS 446.04 0 0 0 0
7/4/2022 6 28+700 Drain 37.92 0 0 28.44 0
7/4/2022 136 15+788 MJB SLAB 1115.2 0 0 0 0
7/5/2022 16 28+700 Drain 101.12 0 0 75.84 0
7/5/2022 48 10+000 PQC LHS 396.48 0 0 0 0
7/6/2022 6 28+700 Drain 31.68 23.76 0 0 0
7/6/2022 27 28+700 Drain,toe wall 170.64 0 0 127.98 0
7/6/2022 30 10+000 PQC LHS 247.8 0 0 0 0
7/7/2022 12 28+700 Drain 75.84 0 0 56.88 0
7/7/2022 18 10+000 PQC LHS 148.68 0 0 0 0
7/8/2022 28.5 28+990 Drain 180.12 0 0 135.09 0
7/8/2022 54 10+000 PQC LHS 446.04 0 0 0 0
7/9/2022 14.4 28+700,5+700 Drain,toe wall 91.01 0 0 68.26 0
7/9/2022 30 10+000 PQC LHS 247.8 0 0 0 0
7/10/2022 18 28+950 Drain 113.76 0 0 85.32 0
7/10/2022 36 10+000 PQC LHS 297.36 0 0 0 0
7/11/2022 6 28+700 Drain 37.92 0 0 28.44 0
7/11/2022 60 10+000 PQC LHS 495.6 0 0 0 0
7/12/2022 6 28+850 Drain 31.68 23.76 0 0 0
7/12/2022 17 28+700,28+444 Drain 107.44 0 0 80.58 0
7/12/2022 54 10+000 PQC LHS 446.04 0 0 0 0
7/15/2022 6 28+500 Drain 37.92 0 0 28.44 0
7/16/2022 6 28+444 Drain 31.68 23.76 0 0 0
7/16/2022 12 28+850 Drain 75.84 0 0 56.88 0
7/16/2022 90 10+000 PQC LHS 743.4 0 0 0 0
7/17/2022 12 28+540,28+325 Drain 75.84 0 0 56.88 0
7/17/2022 12 10+000 PQC LHS 99.12 0 0 0 0
7/18/2022 6 28+500 Drain 37.92 0 0 28.44 0
7/18/2022 72 10+000 PQC LHS 594.72 0 0 0 0
7/19/2022 6 28+500 Drain 37.92 0 0 28.44 0
7/19/2022 48 10+000 PQC LHS 396.48 0 0 0 0
7/21/2022 6 28+500 Drain 31.68 23.76 0 0 0
7/21/2022 12 28+700 Drain 75.84 0 0 56.88 0
7/21/2022 30 10+000 PQC LHS 247.8 0 0 0 0
7/22/2022 18 28+700 Drain 113.76 0 0 85.32 0
7/22/2022 12 28+200 MNB sec-2wall 91.2 0 0 0 79.2
7/22/2022 42 10+000 PQC LHS 346.92 0 0 0 0
7/23/2022 18 28+850 Drain 113.76 0 0 85.32 0
7/23/2022 42 10+000 PQC LHS 346.92 0 0 0 0
7/24/2022 18 28+770 Drain 113.76 0 0 85.32 0
7/24/2022 78 10+000 PQC LHS 644.28 0 0 0 0
7/25/2022 18 28+420 Drain 113.76 0 0 85.32 0
7/25/2022 47 10+000 PQC LHS 388.22 0 0 0 0
7/26/2022 18 28+645 Drain 113.76 0 0 85.32 0
7/26/2022 8.5 10+000 PQC LHS 70.21 0 0 0 0
7/29/2022 8 28+700,19+700 Drain 50.56 0 0 37.92 0
7/30/2022 7.5 28+700,19+700 Drain 47.4 0 0 35.55 0
7/30/2022 20 15+788 MJB A1 wall 152 0 0 0 132
7/31/2022 12 28+200 MNB sec-2wall 91.2 0 0 0 79.2
8/1/2022 5.5 17+100 Drain 29.04 21.78 0 0 0
8/2/2022 5 17+100 Drain 31.6 0 0 23.7 0
8/3/2022 6 28+530 Drain 31.68 23.76 0 0 0
8/3/2022 10.5 17+100 Drain 66.36 0 0 49.77 0
8/4/2022 9.5 28+630,17+107 Drain 50.16 37.62 0 0 0
8/4/2022 8.5 28+200,17+107 Drain 53.72 0 0 40.29 0
8/4/2022 6 15+315 MNB Crush barrier 49.92 0 0 0 0
8/5/2022 14 17+107,28+520 Drain 88.48 0 0 66.36 0
8/5/2022 1 15+315 MNB Crush barrier 8.32 0 0 0 0
8/6/2022 6 28+000 Drain 37.92 0 0 28.44 0
8/6/2022 60 28+200 MNB sec-2 slab 456 0 0 0 414
8/7/2022 17 17+180,28+200 Drain 107.44 0 0 80.58 0
8/8/2022 14.5 17+180,28+590 Drain 91.64 0 0 68.73 0
8/9/2022 8.75 17+180,28+400 Drain 55.3 0 0 41.48 0
8/9/2022 1 15+315 MNB Crush barrier 8.32 0 0 0 0
8/19/2022 1 17+180 Drain 6.32 0 0 4.74 0
8/19/2022 6 15+315 MNB Crush barrier 49.92 0 0 0 0
8/20/2022 4.5 28+570 Drain 28.44 0 0 21.33 0
8/23/2022 4.25 28+150 RHS MNB Crush barrier 35.36 0 0 0 0
8/23/2022 1 15+315 MNB Crush barrier 8.32 0 0 0 0
8/25/2022 6 15+315 LHSMNB Crush barrier 49.92 0 0 0 0
8/25/2022 4 28+150 RHS MNB Crush barrier 33.28 0 0 0 0
8/28/2022 1 15+315 RHS MNB Crush barrier 8.32 0 0 0 0
8/29/2022 2.75 5+300 Dhaneli 17.38 0 0 13.04 0
8/29/2022 6 15+315 RHS MNB Crush barrier 49.92 0 0 0 0
8/31/2022 6 28+400 Drain 37.92 0 0 28.44 0
9/9/2022 10.5 15+788 Mjb A1 wall 79.8 0 0 0 71.4
9/16/2022 5 6+700,17+220 Drain 26.4 19.8 0 0 0
9/16/2022 8.5 15+788 Mjb A1 wall 64.6 0 0 0 57.8
9/18/2022 3 28+440 Drain 15.84 11.88 0 0 0
9/18/2022 6 17+220 Drain 37.92 0 0 28.44 0
9/19/2022 10.3 17+230,28+440 Drain 65.1 0 0 48.82 0
9/20/2022 7.8 28+560,17+230 Drain 49.3 0 0 36.97 0
9/21/2022 3.5 17+230 Drain 18.48 13.86 0 0 0
9/22/2022 6.75 15+788 Mjb A1 cap,bracket 51.3 0 0 0 45.9
9/22/2022 9.85 28+560,17+230,5+Drain,bus shelter 62.25 0 0 44.33 0
9/23/2022 9.3 17+270,28+560 Drain 58.78 0 0 41.85 0
9/24/2022 6.5 15+788 Mjb A1 bracket,Dirt wall 49.4 0 0 0 44.2
9/24/2022 5.3 6+655,17+230 Drain 33.5 0 0 23.85 0
9/25/2022 2.7 17+270 Drain 17.06 0 0 12.15 0
9/26/2022 6.75 15+315 Mjb A1 bracket,Dirt wall 51.3 0 0 0 45.9
9/28/2022 9 17+595 MNB A1 Cap,bracket 68.4 0 0 0 61.2
10/1/2022 5.8 17+595 MNB A1 bracket,Dirt wall 44.08 0 0 0 39.44
10/2/2022 1.2 4+300 Bus shelter 7.58 0 0 5.4 0
10/3/2022 6 3+900,17+600 Drain,bus shelter 31.68 23.76 0 0 0
10/4/2022 19.7 28+150 MNB wall 149.72 0 0 0 127.26
10/4/2022 1.2 4+300 Dhaneli 7.58 0 0 5.4 0
10/5/2022 3.5 17+270 Drain 22.12 0 0 15.75 0
10/5/2022 7.7 17+595 MNB A2 Cap 58.52 0 0 0 49.74
10/6/2022 5.8 17+600,4+650 Drain,bus shelter 36.66 0 0 26.1 0
10/7/2022 6.75 17+595 MNB A2 Bracket,dirt wall 51.3 0 0 0 43.47
10/7/2022 5.5 17+270 Drain 29.04 21.78 0 0 0
10/8/2022 6 17+225 Drain 37.92 0 0 27 0
10/9/2022 1.2 6+800 Dhaneli 7.58 0 0 5.52 0
10/9/2022 6 17+200 Drain 37.92 0 0 27.6 0
10/10/2022 60 28+150 Slab 456 0 0 0 426
6+500,
10/10/2022 6 17+200 Drain 37.92 0 0 27.6 0
10/12/2022 4 17+200 Drain 25.28 0 0 18.4 0
10/13/2022 1.65 6+00 bus stop 10.43 0 0 7.59 0
10/14/2022 7.75 28+150 crass barrier M-40 64.48 0 0 0 0
10/14/2022 4.5 17+200 Drain 28.44 0 0 20.7 0
10/15/2022 4.8 28+400 Drain 25.34 19.01 0 0 0
10/15/2022 5.7 17+300 Drain 36.02 0 0 26.22 0
10/15/2022 11.5 3+700 Toe wall 69 0 51.75 0 0
10/16/2022 4.8 25+400 Drain 30.34 0 0 22.08 0
10/16/2022 3.5 17+300 Drain 22.12 0 0 16.1 0
10/16/2022 6.5 3+700 Toe wall 39 0 29.25 0 0
10/17/2022 127.5 15+788 slab 1045.5 0 0 0 0
10/18/2022 5.2 25+400 Drain 32.86 0 0 23.92 0
10/18/2022 1.5 17+225 Drain 9.48 0 0 6.9 0
10/18/2022 9.7 3+700 Toe wall 58.2 0 43.65 0 0
10/20/2022 5.7 25+400 Drain 36.02 0 0 26.22 0
10/20/2022 0.65 17+225 Drain 4.11 0 0 2.99 0
10/20/2022 1.2 11+000 utility 7.2 0 5.4 0 0
10/21/2022 118.75 15+788 Slab 973.75 0 0 0 0
10/21/2022 2.5 25+400 Drain 15.8 0 0 11.5 0
10/22/2022 12 3+600 Toe wall 72 0 54 0 0
10/22/2022 6 28+150 PCC 31.68 23.76 0 0 0
11/2/2022 10.5 15+788 PCC 55.44 41.58 0 0 0
11/2/2022 9 28+150 wall 68.4 0 0 0 51.12
11/3/2022 15 28+150 wall 114 0 0 0 108
11/4/2022 6.75 15+788 mjb 51.3 0 0 0 45.9
11/4/2022 5 17+225 Drain 26.4 19.8 0 0 0
11/4/2022 3.9 28+150 walll 29.64 0 0 0 26.52
11/5/2022 9 25+450 Drain 47.52 35.64 0 0 0
11/5/2022 5 17+225 Drain wall 31.6 0 0 23 0
11/5/2022 6.5 28+150 MNB R WALL 49.4 0 0 0 44.2
11/6/2021 26 15+788 mjb rt wall raft A2 197.6 0 0 0 171.6
11/6/2021 12 15+788 mjb rt wall Pcc 63.36 47.52 0 0 0
11/6/2021 10.5 17+250,25+450 Drain 66.36 0 0 48.3 0
11/1/2021 0 0 0 0 0
6/21/2022 0 0 0 0 0
11/1/2021 0 0 0 0 0
11/1/2021 0 0 0 0 0
6/21/2022 0 0 0 0 0
11/1/2021 0 0 0 0 0
6/21/2022 0 0 0 0 0
11/1/2021 0 0 0 0 0
11/1/2021 0 0 0 0 0
6/21/2022 0 0 0 0 0
11/1/2021 0 0 0 0 0
6/21/2022 0 0 0 0 0
11/1/2021 0 0 0 0 0
11/1/2021 0 0 0 0 0
6/21/2022 0 0 0 0 0
11/1/2021 0 0 0 0 0
6/21/2022 0 0 0 0 0
11/1/2021 0 0 0 0 0
11/1/2021 0 0 0 0 0
6/21/2022 0 0 0 0 0
11/1/2021 0 0 0 0 0
6/21/2022 0 0 0 0 0
11/1/2021 0 0 0 0 0
11/1/2021 0 0 0 0 0
6/21/2022 0 0 0 0 0
11/1/2021 0 0 0 0 0
6/21/2022 0 0 0 0 0
11/1/2021 0 0 0 0 0
11/1/2021 0 0 0 0 0
6/21/2022 0 0 0 0 0
11/1/2021 0 0 0 0 0
6/21/2022 0 0 0 0 0
11/1/2021 0 0 0 0 0
11/1/2021 0 0 0 0 0

Total M3 1237.8 1518.1 2680.4 3837.9 1312.8 94.4 1004.2 1873.9


91872.09 4947.11 7119.17 12684.56 22963.22
Sub Total M3 13559 0 0 0
As per As per As per cum
site Saving in Saving in Balance
site use site use cement cum use Bag Saving in % Bag
M-35 M-40 bag use Bag

0 0 14.78 14.78 3.7 3.7 20.02

0 0 28.8 43.58 7.2 10.9 20.00

0 0 28.8 72.38 7.2 18.1 20.00

0 0 28.8 101.18 7.2 25.3 20.00

0 0 25.34 126.52 6.34 31.64 20.01

0 0 28.8 155.32 7.2 38.84 20.00

0 0 14.4 169.72 3.6 42.44 20.00

0 0 28.8 198.52 7.2 49.64 20.00

0 0 28.8 227.32 7.2 56.84 20.00

0 0 31.2 258.52 7.8 64.64 20.00

0 0 28.8 287.32 7.2 71.84 20.00

0 0 26.4 313.72 6.6 78.44 20.00

0 0 31.2 344.92 7.8 86.24 20.00

0 0 28.8 373.72 7.2 93.44 20.00

0 0 31.2 404.92 7.8 101.24 20.00

0 0 31.2 436.12 7.8 109.04 20.00

0 0 31.2 467.32 7.8 116.84 20.00

0 0 31.2 498.52 7.8 124.64 20.00

0 0 26.4 524.92 6.6 131.24 20.00

0 0 31.2 556.12 7.8 139.04 20.00

0 0 31.2 587.32 7.8 146.84 20.00

0 0 28.8 616.12 7.2 154.04 20.00

0 0 31.2 647.32 7.8 161.84 20.00


0 0 31.2 678.52 7.8 169.64 20.00

0 0 28.8 707.32 7.2 176.84 20.00

0 0 31.2 738.52 7.8 184.64 20.00

0 0 31.2 769.72 7.8 192.44 20.00

0 0 19.2 788.92 4.8 197.24 20.00

0 0 21.6 810.52 5.4 202.64 20.00

0 0 21.6 832.12 5.4 208.04 20.00

0 0 21.6 853.72 5.4 213.44 20.00

0 0 23.23 876.95 5.81 219.25 20.01

0 0 31.2 908.15 7.8 227.05 20.00

0 0 31.2 939.35 7.8 234.85 20.00

0 0 31.2 970.55 7.8 242.65 20.00

0 0 14.4 984.95 3.6 246.25 20.00

0 0 31.2 1016.15 7.8 254.05 20.00

0 0 31.2 1047.35 7.8 261.85 20.00

0 0 28.8 1076.15 7.2 269.05 20.00

0 0 31.2 1107.35 7.8 276.85 20.00

0 0 28.8 1136.15 7.2 284.05 20.00

0 0 31.2 1167.35 7.8 291.85 20.00

0 0 27.46 1194.81 6.86 298.71 19.99

0 0 31.2 1226.01 7.8 306.51 20.00

0 0 31.2 1257.21 7.8 314.31 20.00

0 0 24 1281.21 6 320.31 20.00

0 0 28.8 1310.01 7.2 327.51 20.00

0 0 31.2 1341.21 7.8 335.31 20.00

0 0 31.2 1372.41 7.8 343.11 20.00

0 0 31.2 1403.61 7.8 350.91 20.00


0 0 31.2 1434.81 7.8 358.71 20.00

0 0 31.2 1466.01 7.8 366.51 20.00

0 0 31.2 1497.21 7.8 374.31 20.00

0 0 31.2 1528.41 7.8 382.11 20.00

0 0 31.2 1559.61 7.8 389.91 20.00

0 0 24 1583.61 6 395.91 20.00

0 0 31.2 1614.81 7.8 403.71 20.00

0 0 31.2 1646.01 7.8 411.51 20.00

0 0 31.2 1677.21 7.8 419.31 20.00

0 0 31.2 1708.41 7.8 427.11 20.00

0 0 31.2 1739.61 7.8 434.91 20.00

0 0 28.8 1768.41 7.2 442.11 20.00

0 0 28.8 1797.21 7.2 449.31 20.00

0 0 54.91 1852.12 13.73 463.04 20.00

0 0 27.46 1879.58 6.86 469.9 19.99

0 0 27.46 1907.04 6.86 476.76 19.99

0 0 27.46 1934.5 6.86 483.62 19.99

0 0 27.46 1961.96 6.86 490.48 19.99

0 0 31.2 1993.16 7.8 498.28 20.00

0 0 31.2 2024.36 7.8 506.08 20.00

0 0 31.2 2055.56 7.8 513.88 20.00

0 0 28.8 2084.36 7.2 521.08 20.00

0 0 28.8 2113.16 7.2 528.28 20.00

0 0 31.2 2144.36 7.8 536.08 20.00

0 0 31.2 2175.56 7.8 543.88 20.00

0 0 23.23 2198.79 5.81 549.69 20.01

0 0 31.2 2229.99 7.8 557.49 20.00


0 0 31.2 2261.19 7.8 565.29 20.00

0 0 31.2 2292.39 7.8 573.09 20.00

0 0 31.2 2323.59 7.8 580.89 20.00

0 0 31.2 2354.79 7.8 588.69 20.00

0 0 31.2 2385.99 7.8 596.49 20.00

0 0 25.2 2411.19 6.3 602.79 20.00

0 0 31.2 2442.39 7.8 610.59 20.00

0 0 31.2 2473.59 7.8 618.39 20.00

0 0 26.4 2499.99 6.6 624.99 20.00

0 0 31.2 2531.19 7.8 632.79 20.00

0 0 31.2 2562.39 7.8 640.59 20.00

0 0 31.2 2593.59 7.8 648.39 20.00

0 0 372.1 2965.69 91.5 739.89 19.74

0 0 31.2 2996.89 7.8 747.69 20.00

0 0 27.46 3024.35 6.86 754.55 19.99

0 0 31.2 3055.55 7.8 762.35 20.00

0 0 16.9 3072.45 4.22 766.57 19.98

0 0 31.2 3103.65 7.8 774.37 20.00

0 0 31.2 3134.85 7.8 782.17 20.00

0 0 31.2 3166.05 7.8 789.97 20.00

0 0 14.78 3180.83 3.7 793.67 20.02

0 0 152.5 3333.33 37.5 831.17 19.74 1847.5

0 0 130.24 3463.57 32.02 863.19 19.73 1717.26

0 0 31.2 3494.77 7.8 870.99 20.00 1686.06

0 0 387.35 3882.12 95.25 966.24 19.74 1298.71

0 0 19.2 3901.32 4.8 971.04 20.00 1279.51

0 0 39.65 3940.97 9.75 980.79 19.7 1239.86


0 0 31.2 3972.17 7.8 988.59 20.00 1208.66

0 0 54.91 4027.08 13.73 1002.32 20.00 1153.75

0 0 39.65 4066.73 9.75 1012.07 19.7 1114.1

0 0 26.4 4093.13 6.6 1018.67 20.00 1087.7

0 0 43.2 4136.33 10.8 1029.47 20.00 1044.5

0 0 411.75 4548.08 101.25 1130.72 19.74 632.75

0 0 31.2 4579.28 7.8 1138.52 20.00 601.55

0 0 19.2 4598.48 4.8 1143.32 20.00 1782.35

0 0 12 4610.48 3 1146.32 20.00 1770.35

0 0 37.82 4648.3 9.3 1155.62 19.74 1732.53

0 0 52.8 4701.1 13.2 1168.82 20.00 1679.73

0 0 61.92 4763.02 15.48 1184.3 20.00 1617.81

0 0 39.65 4802.67 9.75 1194.05 19.7 1578.16

0 0 21.6 4824.27 5.4 1199.45 20.00 1556.56

0 0 91.5 4915.77 22.5 1221.95 19.74 1465.06

0 0 8.64 4924.41 2.16 1224.11 20.00 1456.42

0 0 28.8 4953.21 7.2 1231.31 20.00 1427.62

0 0 31.2 4984.41 7.8 1239.11 20.00 1396.42

0 0 295.85 5280.26 72.75 1311.86 19.74 1100.57

0 0 79.3 5359.56 19.5 1331.36 19.74 1021.27

0 0 3.36 5362.92 0.84 1332.2 20.00 1017.91

0 0 39.65 5402.57 9.75 1341.95 19.74 978.26

0 0 31.2 5433.77 7.8 1349.75 20.00 1587.06

0 0 10.56 5444.33 2.64 1352.39 20.00 1576.5

0 0 150.67 5595 37.05 1389.44 19.74 1425.83

0 0 24 5619 6 1395.44 20.00 1401.83

0 0 23.23 5642.23 5.81 1401.25 20.01 1378.6


0 0 19.2 5661.43 4.8 1406.05 20.00 1359.4

0 0 112.85 5774.28 27.75 1433.8 19.74 1246.55

0 0 24 5798.28 6 1439.8 20.00 1222.55

0 0 88.8 5887.08 22.2 1462 20.00 1133.75

0 0 54 5941.08 13.5 1475.5 20.00 1079.75

0 0 31.2 5972.28 7.8 1483.3 20.00 1048.55

0 0 31.2 6003.48 7.8 1491.1 20.00 1017.35

0 0 109.8 6113.28 27 1518.1 19.74 907.55

0 0 25.68 6138.96 6.42 1524.52 20.00 881.87

0 0 39.65 6178.61 9.75 1534.27 19.74 842.22

0 0 31.2 6209.81 7.8 1542.07 20.00 811.02


0 0 112.85 6322.66 27.75 1569.82 19.74 698.17

0 0 69.6 6392.26 17.4 1587.22 20.00 628.57

0 0 58.08 6450.34 14.52 1601.74 20.00 570.49

0 0 148.61 6598.95 37.15 1638.89 20.00 421.88

0 0 28.8 6627.75 7.2 1646.09 20.00 393.08

0 0 61 6688.75 15 1661.09 19.74 332.08

0 0 62.4 6751.15 15.6 1676.69 20.00 269.68

0 0 74 6825.15 13.4 1690.09 15.33 195.68

0 0 42 6867.15 7.4 1697.49 15.0 958

0 0 44.16 6911.31 11.04 1708.53 20.00 913.84

0 0 22.18 6933.49 5.54 1714.07 19.99 891.66

0 0 60 6993.49 15 1729.07 20.00 831.66

0 0 294 7287.49 51.8 1780.87 14.98 537.66

0 0 146 7433.49 25 1805.87 14.62 391.66

0 0 42 7475.49 7.4 1813.27 15.0 349.66

0 0 22.8 7498.29 5.7 1818.97 20.00 326.86


0 0 42 7540.29 7.4 1826.37 15.0 284.86

211.12 0 211.12 7751.41 0 1826.37 0.00 73.74

0 0 50.4 7801.81 12.6 1838.97 20.00

0 0 19.2 7821.01 4.8 1843.77 20.00

0 0 89 7910.01 9.8 1853.57 9.92

0 0 27 7937.01 3.4 1856.97 11.18

0 0 31 7968.01 8 1864.97 20.51


0 0 131 8099.01 17.2 1882.17 11.61
0 0 31 8130.01 8 1890.17 20.51
0 0 17 8147.01 2 1892.17 10.53
450.66 0 450.66 8597.67 0 1892.17 0.00
0 0 68 8665.67 8 1900.17 10.53
30.45 0 30.45 8696.12 0 1900.17 0.00
0 0 12 8708.12 3 1903.17 20.00
0 0 16.8 8724.92 4.2 1907.37 20.00
51.16 0 51.16 8776.08 0 1907.37 0.00
0 0 105 8881.08 6.72 1914.09 6.02
0 0 19.52 8900.6 4.8 1918.89 19.74
0 0 27.6 8928.2 6.9 1925.79 20.00
0 0 14.4 8942.6 3.6 1929.39 20.00
0 0 21.6 8964.2 5.4 1934.79 20.00
0 0 22.08 8986.28 5.52 1940.31 20.00
0 0 12 8998.28 3 1943.31 20.00
0 0 31.2 9029.48 7.8 1951.11 20.00
0 0 21.6 9051.08 5.4 1956.51 20.00
0 0 19.2 9070.28 4.8 1961.31 20.00
0 0 8.64 9078.92 2.16 1963.47 20.00
0 0 26.4 9105.32 6.6 1970.07 20.00
0 0 21.6 9126.92 5.4 1975.47 20.00
0 0 26.4 9153.32 6.6 1982.07 20.00
0 0 24 9177.32 6 1988.07 20.00
0 0 30 9207.32 0 1988.07 0.00
0 0 30 9237.32 0 1988.07 0.00
0 0 20 9257.32 1.12 1989.19 5.30
0 0 33 9290.32 7.8 1996.99 19.12
0 0 21 9311.32 6 2002.99 22.22
0 0 23 9334.32 4 2006.99 14.81
0 0 10 9344.32 2 2008.99 16.67
0 0 27 9371.32 3 2011.99 10.00
0 0 25 9396.32 2 2013.99 7.41
0 0 100 9496.32 11.72 2025.71 10.49
0 0 13 9509.32 2.2 2027.91 14.47
0 0 13 9522.32 2.84 2030.75 17.93
0 0 25 9547.32 5 2035.75 16.67
0 0 130 9677.32 18.2 2053.95 12.28
0 0 35 9712.32 7 2060.95 16.67
0 0 55.2 9767.52 13.8 2074.75 20.00
0 0 14.4 9781.92 3.6 2078.35 20.00
0 0 15 9796.92 0.2 2078.55 1.32 (hdpe pipe leackage)
0 0 9.6 9806.52 2.4 2080.95 20.00
0 0 21.6 9828.12 5.4 2086.35 20.00
0 0 16.8 9844.92 4.2 2090.55 20.00
0 0 33.6 9878.52 8.4 2098.95 20.00
0 0 14.4 9892.92 3.6 2102.55 20.00
0 0 19.2 9912.12 4.8 2107.35 20.00
0 0 9.6 9921.72 2.4 2109.75 20.00
0 0 93 10014.72 2 2111.75 2.11
0 0 7 10021.72 0.6 2112.35 7.89
0 0 21.12 10042.84 5.28 2117.63 20.00
0 0 16.8 10059.64 4.2 2121.83 20.00
0 0 88 10147.64 3.2 2125.03 3.51
0 0 24 10171.64 6 2131.03 20.00
0 0 21.12 10192.76 5.28 2136.31 20.00
0 0 21.12 10213.88 5.28 2141.59 20.00
0 0 40.8 10254.68 10.2 2151.79 20.00
0 0 21.12 10275.8 5.28 2157.07 20.00
0 0 23.7 10299.5 7.9 2164.97 25.00
0 0 21.12 10320.62 5.28 2170.25 20.00
0 0 40.29 10360.91 13.43 2183.68 25.00
0 0 71.1 10432.01 23.7 2207.38 25.00
0 0 23.7 10455.71 7.9 2215.28 25.00
0 0 21.12 10476.83 5.28 2220.56 20.00
0 0 33.6 10510.43 8.4 2228.96 20.00
0 0 33.18 10543.61 11.06 2240.02 25.00

0 0 105 10648.61 3.68 2243.7 3.39


0 0 15.84 10664.45 5.28 2248.98 25.00 balance0
0 0 46 10710.45 3.4 2252.38 6.88
0 0 26.07 10736.52 8.69 2261.07 25.00
0 0 47 10783.52 2.4 2263.47 4.86
0 0 30.81 10814.33 10.27 2273.74 25.00
0 0 25.74 10840.07 8.58 2282.32 25.00
0 0 51.48 10891.55 17.16 2299.48 25.00
0 0 23.4 10914.95 7.8 2307.28 25.00
0 0 29.25 10944.2 9.75 2317.03 25.00
0 0 41.58 10985.78 13.86 2330.89 25.00
0 0 46 11031.78 3.4 2334.29 6.88
0 0 61.62 11093.4 20.54 2354.83 25.00
0 0 29.25 11122.65 9.75 2364.58 25.00
0 0 30.81 11153.46 10.27 2374.85 25.00
0 0 85.79 11239.25 28.6 2403.45 25.00
0 0 19.8 11259.05 6.6 2410.05 25.00
0 0 48.35 11307.4 16.11 2426.16 24.99
0 0 22.5 11329.9 7.5 2433.66 25.00
0 0 29.25 11359.15 9.75 2443.41 25.00
0 0 23.7 11382.85 7.9 2451.31 25.00
0 0 23.76 11406.61 7.92 2459.23 25.00
0 0 45.54 11452.15 15.18 2474.41 25.00
0 0 30.81 11482.96 10.27 2484.68 25.00
0 0 19.8 11502.76 6.6 2491.28 25.00
0 0 92.43 11595.19 30.81 2522.09 25.00
0 0 45.54 11640.73 15.18 2537.27 25.00
0 0 28.44 11669.17 9.48 2546.75 25.00
0 0 25.74 11694.91 8.58 2555.33 25.00
0 0 21.78 11716.69 7.26 2562.59 25.00
0 0 61.62 11778.31 20.54 2583.13 25.00
0 0 25.74 11804.05 8.58 2591.71 25.00
0 0 61.62 11865.67 20.54 2612.25 25.00
0 0 30.81 11896.48 10.27 2622.52 25.00
0 0 51.48 11947.96 17.16 2639.68 25.00
0 0 25.74 11973.7 8.58 2648.26 25.00
0 0 61.62 12035.32 20.54 2668.8 25.00
0 0 19.8 12055.12 6.6 2675.4 25.00
0 0 25.74 12080.86 8.58 2683.98 25.00
0 0 29.25 12110.11 9.75 2693.73 25.00
0 0 61.62 12171.73 20.54 2714.27 25.00
0 0 25.74 12197.47 8.58 2722.85 25.00
0 0 25.74 12223.21 8.58 2731.43 25.00
0 0 120.87 12344.08 40.29 2771.72 25.00
0 0 30.81 12374.89 10.27 2781.99 25.00
0 0 92.43 12467.32 30.81 2812.8 25.00
0 0 33.66 12500.98 11.22 2824.02 25.00
0 0 51.48 12552.46 17.16 2841.18 25.00
0 0 61.62 12614.08 20.54 2861.72 25.00
0 0 58.5 12672.58 19.5 2881.22 25.00
0 0 30.81 12703.39 10.27 2891.49 25.00
0 0 61.62 12765.01 20.54 2912.03 25.00
0 0 21.78 12786.79 7.26 2919.29 25.00
0 0 123.24 12910.03 41.08 2960.37 25.00
0 0 21.78 12931.81 7.26 2967.63 25.00
0 0 390 13321.81 104 3071.63 21.05
0 0 30.81 13352.62 10.27 3081.9 25.00
0 0 29.25 13381.87 9.75 3091.65 25.00
0 0 59.25 13441.12 19.75 3111.4 25.00
0 0 25.74 13466.86 8.58 3119.98 25.00
0 0 61.62 13528.48 20.54 3140.52 25.00
0 0 92.43 13620.91 30.81 3171.33 25.00
0 0 51.48 13672.39 17.16 3188.49 25.00
0 0 61.62 13734.01 20.54 3209.03 25.00
0 0 51.48 13785.49 17.16 3226.19 25.00
0 0 25.74 13811.23 8.58 3234.77 25.00
0 0 61.62 13872.85 20.54 3255.31 25.00
0 0 259.35 14132.2 86.45 3341.76 25.00
0 0 92.43 14224.63 30.81 3372.57 25.00
0 0 41.58 14266.21 13.86 3386.43 25.00
0 0 120.87 14387.08 40.29 3426.72 25.00
0 0 61.62 14448.7 20.54 3447.26 25.00
0 0 29.25 14477.95 9.75 3457.01 25.00
0 0 25.74 14503.69 8.58 3465.59 25.00
0 0 92.43 14596.12 30.81 3496.4 25.00
0 0 19.8 14615.92 6.6 3503 25.00
0 0 29.25 14645.17 9.75 3512.75 25.00
0 0 25.74 14670.91 8.58 3521.33 25.00
0 0 123.24 14794.15 41.08 3562.41 25.00
0 0 123.24 14917.39 41.08 3603.49 25.00
0 0 92.43 15009.82 30.81 3634.3 25.00
0 0 58.5 15068.32 19.5 3653.8 25.00
0 0 25.74 15094.06 8.58 3662.38 25.00
0 0 25.74 15119.8 8.58 3670.96 25.00
0 0 73.26 15193.06 24.42 3695.38 25.00
0 0 61.62 15254.68 20.54 3715.92 25.00
0 0 54.51 15309.19 18.17 3734.09 25.00
0 0 29.25 15338.44 9.75 3743.84 25.00
0 0 25.74 15364.18 8.58 3752.42 25.00
0 0 79.04 15443.22 19.76 3772.18 20.00
0 0 61.62 15504.84 20.54 3792.72 25.00
0 0 370.5 15875.34 123.5 3916.22 25.00
0 0 13.86 15889.2 4.62 3920.84 25.00
0 0 123.24 16012.44 41.08 3961.92 25.00
0 0 25.74 16038.18 8.58 3970.5 25.00
0 0 58.5 16096.68 19.5 3990 25.00
0 0 49.77 16146.45 16.59 4006.59 25.00
0 0 118 16264.45 30.2 4036.79 20.38
0 0 113.76 16378.21 37.92 4074.71 25.00
0 0 447.45 16825.66 149.15 4223.86 25.00
0 0 61.62 16887.28 20.54 4244.4 25.00
0 0 78.21 16965.49 26.07 4270.47 25.00
0 0 25.74 16991.23 8.58 4279.05 25.00
0 0 29.25 17020.48 9.75 4288.8 25.00
0 0 106.65 17127.13 35.55 4324.35 25.00
0 0 22.5 17149.63 7.5 4331.85 25.00
0 0 78 17227.63 19.66 4351.51 20.13
0 0 92.43 17320.06 30.81 4382.32 25.00 46
0 0 6.75 17326.81 2.25 4384.57 25.00
0 0 43.56 17370.37 14.52 4399.09 25.00
0 0 61.62 17431.99 20.54 4419.63 25.00
0 0 118 17549.99 30.2 4449.83 20.38
0 0 29.25 17579.24 9.75 4459.58 25.00
0 0 123.24 17702.48 41.08 4500.66 25.00
0 0 29.25 17731.73 9.75 4510.41 25.00
0 0 92.43 17824.16 30.81 4541.22 25.00
0 0 123.24 17947.4 41.08 4582.3 25.00
0 0 35.64 17983.04 11.88 4594.18 25.00
0 0 29.25 18012.29 9.75 4603.93 25.00
0 0 49.77 18062.06 16.59 4620.52 25.00
0 0 92.43 18154.49 30.81 4651.33 25.00
0 0 29.25 18183.74 9.75 4661.08 25.00
0 0 123.24 18306.98 41.08 4702.16 25.00
0 0 124.8 18431.78 23.4 4725.56 15.79 ppc use
0 0 77.22 18509 25.74 4751.3 25.00
0 0 30.81 18539.81 10.27 4761.57 25.00
0 0 29.25 18569.06 9.75 4771.32 25.00
0 0 49.77 18618.83 16.59 4787.91 25.00
0 0 58.5 18677.33 19.5 4807.41 25.00
0 0 45.54 18722.87 15.18 4822.59 25.00
0 0 29.25 18752.12 9.75 4832.34 25.00
0 0 185.25 18937.37 61.75 4894.09 25.00
0 0 30.81 18968.18 10.27 4904.36 25.00
0 0 259.35 19227.53 86.45 4990.81 25.00
0 0 92.43 19319.96 30.81 5021.62 25.00
0 0 92.43 19412.39 30.81 5052.43 25.00
0 0 85.14 19497.53 28.38 5080.81 25.00
0 0 123.24 19620.77 41.08 5121.89 25.00
0 0 118.56 19739.33 29.64 5151.53 20.00
0 0 92.43 19831.76 30.81 5182.34 25.00
0 0 92.43 19924.19 30.81 5213.15 25.00
0 0 125.61 20049.8 41.87 5255.02 25.00
0 0 9.9 20059.7 3.3 5258.32 25.00
0 0 120.69 20180.39 30.17 5288.49 20.00
0 0 83.25 20263.64 27.75 5316.24 25.00
0 0 30.81 20294.45 10.27 5326.51 25.00
0 0 25.74 20320.19 8.58 5335.09 25.00
0 0 51.48 20371.67 17.16 5352.25 25.00
0 0 9 20380.67 3 5355.25 25.00
0 0 25.74 20406.41 8.58 5363.83 25.00
0 0 120.87 20527.28 40.29 5404.12 25.00
0 0 118.56 20645.84 29.64 5433.76 20.00
0 0 59.25 20705.09 19.75 5453.51 25.00
0 0 27 20732.09 9 5462.51 25.00
0 0 29.25 20761.34 9.75 5472.26 25.00 0 Balance
0 0 27 20788.34 9 5481.26 25.00
0 0 41 20829.34 11.06 5492.32 21.24
0 0 80.58 20909.92 26.86 5519.18 25.00
0 0 273.6 21183.52 91.2 5610.38 25.00
0 0 115.52 21299.04 28.88 5639.26 20.00
0 0 30.81 21329.85 10.27 5649.53 25.00
0 0 27 21356.85 9 5658.53 25.00
0 0 29.25 21386.1 9.75 5668.28 25.00
0 0 59.25 21445.35 19.75 5688.03 25.00
0 0 36.4 21481.75 9.2 5697.23 20.18
0 0 39.5 21521.25 9.9 5707.13 20.04
0 0 19.8 21541.05 6.6 5713.73 25.00
0 0 27 21568.05 9 5722.73 25.00
0 0 56.88 21624.93 18.96 5741.69 25.00
0 0 37.62 21662.55 12.54 5754.23 25.00
0 0 47.5 21710.05 0 5754.23 0.00
0 0 21.78 21731.83 7.26 5761.49 25.00
0 0 29.25 21761.08 9.75 5771.24 25.00
0 0 118 21879.08 30.2 5801.44 20.38
0 0 28.44 21907.52 9.48 5810.92 25.00
0 0 19.8 21927.32 6.6 5817.52 25.00
0 0 37.62 21964.94 12.54 5830.06 25.00
0 0 29.25 21994.19 9.75 5839.81 25.00
0 0 124.74 22118.93 41.58 5881.39 25.00
0 0 22.5 22141.43 7.5 5888.89 25.00
0 0 76 22217.43 19 5907.89 20.00
0 0 28.44 22245.87 9.48 5917.37 25.00
0 0 79.4 22325.27 26.46 5943.83 25.00
0 0 17 22342.27 0.1 5943.93 0.58
0 0 25.74 22368.01 8.58 5952.51 25.00
0 0 12.38 22380.39 4.12 5956.63 24.97
0 0 112 22492.39 28.6 5985.23 20.34
0 0 42.75 22535.14 14.25 5999.48 25.00
0 0 11.88 22547.02 3.96 6003.44 25.00
0 0 59.25 22606.27 19.75 6023.19 25.00
0 0 63 22669.27 21 6044.19 25.00
0 0 76 22745.27 19 6063.19 20.00
0 0 45.6 22790.87 0 6063.19 0.00
0 0 94.8 22885.67 31.6 6094.79 25.00
0 0 75.24 22960.91 25.08 6119.87 25.00
0 0 94.05 23054.96 31.35 6151.22 25.00
0 0 26.07 23081.03 8.69 6159.91 25.00
0 0 185.25 23266.28 61.75 6221.66 25.00
0 0 22.8 23289.08 7.6 6229.26 25.00
0 0 56.25 23345.33 18.75 6248.01 25.00
0 0 112 23457.33 28.6 6276.61 20.34
0 0 59.25 23516.58 19.75 6296.36 25.00
0 0 54.51 23571.09 18.17 6314.53 25.00
0 0 71.28 23642.37 23.76 6338.29 25.00
0 0 76 23718.37 19 6357.29 20.00
0 0 36.4 23754.77 9.2 6366.49 20.18
0 0 25.74 23780.51 8.58 6375.07 25.00
0 0 83.25 23863.76 27.75 6402.82 25.00
0 0 74.66 23938.42 24.88 6427.7 24.99
0 0 73 24011.42 18.2 6445.9 19.96
0 0 56.25 24067.67 18.75 6464.65 25.00
0 0 76 24143.67 19 6483.65 20.00
0 0 28.44 24172.11 9.48 6493.13 25.00
0 0 356.25 24528.36 118.75 6611.88 25.00
0 0 56.88 24585.24 18.96 6630.84 25.00
0 0 87.69 24672.93 29.23 6660.07 25.00
0 0 45.54 24718.47 15.18 6675.25 25.00
0 0 21.38 24739.85 7.13 6682.38 25.01
0 0 69.92 24809.77 23.3 6705.68 24.99
0 0 22.5 24832.27 7.5 6713.18 25.00
0 0 39.9 24872.17 13.3 6726.48 25.00
0 0 39.6 24911.77 13.2 6739.68 25.00
0 0 342 25253.77 114 6853.68 25.00
0 0 23.76 25277.53 7.92 6861.6 25.00
0 0 28.44 25305.97 9.48 6871.08 25.00
0 0 19.8 25325.77 6.6 6877.68 25.00
0 0 74.7 25400.47 24.9 6902.58 25.00
0 0 49 25449.47 0.4 6902.98 0.81
0 0 75 25524.47 18.86 6921.84 20.09
0 0 47.52 25571.99 15.84 6937.68 25.00
0 0 17.82 25589.81 5.94 6943.62 25.00
0 0 20.15 25609.96 6.71 6950.33 24.98
0 0 248 25857.96 71.2 7021.53 22.31
0 0 124.43 25982.39 41.47 7063 25.00
682.08 0 682.08 26664.47 0 7063 0.00
0 0 146.94 26811.41 48.98 7111.98 25.00
0 0 19.8 26831.21 6.6 7118.58 25.00
0 0 72 26903.21 19.2 7137.78 21.05
0 0 81 26984.21 20.08 7157.86 19.87
0 0 19.8 27004.01 6.6 7164.46 25.00 33balance
638.4 0 638.4 27642.41 43.68 7208.14 6.40
0 0 73 27715.41 18.2 7226.34 19.96
0 0 28.44 27743.85 9.48 7235.82 25.00
0 0 98.36 27842.21 32.78 7268.6 25.00
0 0 23.76 27865.97 7.92 7276.52 25.00
0 0 410.4 28276.37 136.8 7413.32 25.00
0 0 36.5 28312.87 9.1 7422.42 19.96
0 0 35.64 28348.51 11.88 7434.3 25.00
0 0 27 28375.51 9 7443.3 25.00
0 0 85.32 28460.83 28.44 7471.74 25.00
0 0 47.4 28508.23 15.8 7487.54 25.00
0 0 27 28535.23 9 7496.54 25.00
0 0 121.6 28656.83 30.4 7526.94 20.00
0 45.6 45.6 28702.43 4.32 7531.26 8.65 M-30 origna
0 0 49.77 28752.2 16.59 7547.85 25.00
0 0 15.84 28768.04 5.28 7553.13 25.00
0 0 74.18 28842.22 18.54 7571.67 20.00
0 0 35.64 28877.86 11.88 7583.55 25.00
0 0 85.32 28963.18 28.44 7611.99 25.00
0 0 71.1 29034.28 23.7 7635.69 25.00
0 41.8 41.8 29076.08 3.96 7639.65 8.65 M-30 origna
0 0 273.6 29349.68 91.2 7730.85 25.00
0 0 88.16 29437.84 22.04 7752.89 20.00
0 0 56.88 29494.72 18.96 7771.85 25.00
0 0 359.1 29853.82 119.7 7891.55 25.00
0 0 48.59 29902.41 16.19 7907.74 24.99
0 0 68.4 29970.81 22.8 7930.54 25.00
0 49.4 49.4 30020.21 4.68 7935.22 8.65 M-30 origna
0 0 27 30047.21 9 7944.22 25.00
0 0 80.26 30127.47 20.06 7964.28 20.00
0 0 13.04 30140.51 4.34 7968.62 24.97
0 0 49.5 30190.01 16.5 7985.12 25.00
0 15.2 15.2 30205.21 1.44 7986.56 8.65 M-30 origna
0 0 72.96 30278.17 18.24 8004.8 20.00
0 0 56.88 30335.05 18.96 8023.76 25.00
0 0 27 30362.05 9 8032.76 25.00
0 0 28.44 30390.49 9.48 8042.24 25.00
0 0 35.64 30426.13 11.88 8054.12 25.00
0 0 74.18 30500.31 18.54 8072.66 20.00
0 0 52.14 30552.45 17.38 8090.04 25.00
0 0 72.96 30625.41 18.24 8108.28 20.00
0 0 13.86 30639.27 4.62 8112.9 25.00
0 0 28.44 30667.71 9.48 8122.38 25.00
0 0 36.48 30704.19 9.12 8131.5 20.00
0 0 270.75 30974.94 90.25 8221.75 25.00
0 0 127.68 31102.62 31.92 8253.67 20.00
0 60.8 60.8 31163.42 5.76 8259.43 8.65 M-30 origna
0 0 6.08 31169.5 1.52 8260.95 20.00
0 0 75.39 31244.89 18.85 8279.8 20.00
0 0 72.76 31317.65 24.25 8304.05 25.00
0 0 28.44 31346.09 9.48 8313.53 25.00
0 0 72.96 31419.05 18.24 8331.77 20.00
0 26.6 26.6 31445.65 2.52 8334.29 8.65 M-30 orignal
0 0 74.18 31519.83 18.54 8352.83 20.00
0 0 21.28 31541.11 5.32 8358.15 20.00
0 0 40.29 31581.4 13.43 8371.58 25.00
0 0 21.15 31602.55 7.05 8378.63 25.00
0 0 23.76 31626.31 7.92 8386.55 25.00
0 0 83.3 31709.61 20.82 8407.37 20.00
0 0 28.44 31738.05 9.48 8416.85 25.00
0 0 16.88 31754.93 5.62 8422.47 24.98
0 0 68.4 31823.33 22.8 8445.27 25.00
0 0 111.87 31935.2 27.97 8473.24 20.00
0 0 28.44 31963.64 9.48 8482.72 25.00
0 0 47.4 32011.04 15.8 8498.52 25.00
0 0 76 32087.04 19 8517.52 20.00
0 0 13.5 32100.54 4.5 8522.02 25.00
0 0 72.96 32173.5 18.24 8540.26 20.00
0 0 54.72 32228.22 13.68 8553.94 20.00
0 0 31.68 32259.9 10.56 8564.5 25.00
0 0 28.44 32288.34 9.48 8573.98 25.00
0 53.2 53.2 32341.54 5.04 8579.02 8.65 M-30 orignal
0 14.44 14.44 32355.98 1.37 8580.39 8.67 M-30 origna
0 0 72.96 32428.94 18.24 8598.63 20.00
0 0 97.28 32526.22 24.32 8622.95 20.00
0 0 23.7 32549.92 7.9 8630.85 25.00
0 0 26.07 32575.99 8.69 8639.54 25.00 0 balance
0 0 21.78 32597.77 7.26 8646.8 25.00
0 0 12.38 32610.15 4.12 8650.92 24.97
0 0 34.2 32644.35 11.4 8662.32 25.00
0 0 82.08 32726.43 20.52 8682.84 20.00
0 0 267.9 32994.33 89.3 8772.14 25.00
0 0 72.96 33067.29 18.24 8790.38 20.00
0 41.8 41.8 33109.09 3.96 8794.34 8.65 M-30 orignal
0 0 21.28 33130.37 5.32 8799.66 20.00
0 0 79.04 33209.41 19.76 8819.42 20.00
0 0 11.85 33221.26 3.95 8823.37 25.00
0 0 18.96 33240.22 6.32 8829.69 25.00
0 0 41.58 33281.8 13.86 8843.55 25.00
0 0 72.96 33354.76 18.24 8861.79 20.00
0 22.2 22.2 33376.96 2.76 8864.55 11.06
0 0 11.85 33388.81 3.95 8868.5 25.00
0 0 79.04 33467.85 19.76 8888.26 20.00
0 0 28.4 33496.25 9.6 8897.86 25.26
0 0 11.85 33508.1 3.95 8901.81 25.00
0 0 82.08 33590.18 20.52 8922.33 20.00
0 11.4 11.4 33601.58 1.08 8923.41 8.65 M-30 orignal
0 0 77.52 33679.1 19.38 8942.79 20.00
0 0 11.85 33690.95 3.95 8946.74 25.00
0 0 28.44 33719.39 9.48 8956.22 25.00
0 0 79.04 33798.43 19.76 8975.98 20.00
0 0 258.44 34056.87 87.36 9063.34 25.26
0 0 83.16 34140.03 27.72 9091.06 25.00
0 0 38.91 34178.94 9.73 9100.79 20.00
0 0 54.51 34233.45 18.17 9118.96 25.00
0 0 76 34309.45 19 9137.96 20.00
0 0 19.88 34329.33 6.72 9144.68 25.26
0 0 47.52 34376.85 15.84 9160.52 25.00
0 0 16.83 34393.68 5.61 9166.13 25.00
0 0 20.25 34413.93 6.75 9172.88 25.00
0 0 27.49 34441.42 9.17 9182.05 25.01
0 0 75.84 34517.26 15.36 9197.41 16.84 M-20 orignal
0 0 11.36 34528.62 3.84 9201.25 25.26
0 0 65.2 34593.82 10.8 9212.05 14.21
0 0 74.26 34668.08 15.04 9227.09 16.84 M-20 orignal
0 0 31.68 34699.76 10.56 9237.65 25.00
0 0 88.16 34787.92 22.04 9259.69 20.00
0 0 11.88 34799.8 3.96 9263.65 25.00 0Balance
0 0 124.64 34924.44 31.16 9294.81 20.00
0 0 18 34942.44 6 9300.81 25.00
0 0 54.51 34996.95 18.17 9318.98 25.00
0 0 76 35072.95 19 9337.98 20.00
0 0 56.64 35129.59 18.88 9356.86 25.00
0 0 9 35138.59 3 9359.86 25.00
0 0 56.88 35195.47 18.96 9378.82 25.00
0 0 7.92 35203.39 2.64 9381.46 25.00
0 0 76 35279.39 19 9400.46 20.00
0 0 9 35288.39 3 9403.46 25.00

0 0 9 35297.39 3 9406.46 25.00


0 0 76 35373.39 19 9425.46 20.00
0 0 15.41 35388.8 5.13 9430.59 24.98
0 0 66.08 35454.88 20.72 9451.31 23.87
0 0 158.08 35612.96 39.52 9490.83 20.00
0 0 323.76 35936.72 109.44 9600.27 25.26
0 0 45.03 35981.75 15.01 9615.28 25.00
0 0 37.62 36019.37 12.54 9627.82 25.00
0 0 79.92 36099.29 31.68 9659.5 28.39
0 0 171.57 36270.86 72.4 9731.9 29.68
0 0 79.04 36349.9 19.76 9751.66 20.00
0 0 23.76 36373.66 7.92 9759.58 25.00
0 0 73.84 36447.5 24.96 9784.54 25.26
0 0 72.96 36520.46 18.24 9802.78 20.00
0 0 61.62 36582.08 20.54 9823.32 25.00
0 0 91.56 36673.64 38.64 9861.96 29.68
0 0 52.27 36725.91 17.43 9879.39 25.01
0 0 42.66 36768.57 14.22 9893.61 25.00
0 0 150.24 36918.81 32.16 9925.77 17.63
0 0 148.24 37067.05 62.56 9988.33 29.68
0 0 47.4 37114.45 15.8 10004.13 25.00
0 0 37.05 37151.5 12.35 10016.48 25.00
0 0 226.72 37378.22 95.68 10112.16 29.68
0 0 31.68 37409.9 10.56 10122.72 25.00
0 0 41.24 37451.14 13.74 10136.46 24.99
0 0 108.3 37559.44 36.1 10172.56 25.00
0 0 187.48 37746.92 79.12 10251.68 29.68
0 0 23.76 37770.68 7.92 10259.6 25.00
0 0 63.52 37834.2 21.17 10280.77 25.00
0 0 122.08 37956.28 51.52 10332.29 29.68
0 0 51.19 38007.47 17.07 10349.36 25.01
0 0 27.36 38034.83 9.12 10358.48 25.00
0 0 47.4 38082.23 15.8 10374.28 25.00
0 0 59.47 38141.7 12.73 10387.01 17.63
0 0 51.48 38193.18 17.16 10404.17 25.00
0 0 40.29 38233.47 13.43 10417.6 25.00
0 0 66.88 38300.35 16.72 10434.32 20.00
0 0 23.7 38324.05 7.9 10442.22 25.00
581 0 581 38905.05 99.6 10541.82 14.63
0 0 63.99 38969.04 21.33 10563.15 25.00
0 0 35.64 39004.68 11.88 10575.03 25.00
0 0 31.3 39035.98 6.7 10581.73 17.63
0 0 39.9 39075.88 13.3 10595.03 25.00
0 0 273.6 39349.48 91.2 10686.23 25.00
0 0 37.68 39387.16 7.92 10694.15 17.37
0 0 34.13 39421.29 11.37 10705.52 24.99
0 0 342 39763.29 114 10819.52 25.00
0 0 28.44 39791.73 9.48 10829 25.00
0 0 66.88 39858.61 16.72 10845.72 20.00
0 0 48.35 39906.96 16.11 10861.83 24.99
0 0 18.9 39925.86 6.3 10868.13 25.00
0 0 36.48 39962.34 9.12 10877.25 20.00
0 0 18 39980.34 6 10883.25 25.00
0 0 40.82 40021.16 8.58 10891.83 17.37
0 0 79.04 40100.2 19.76 10911.59 20.00
0 0 9 40109.2 3 10914.59 25.00
0 0 23.7 40132.9 7.9 10922.49 25.00
0 0 19.38 40152.28 6.46 10928.95 25.00
0 0 133.99 40286.27 42.36 10971.31 24.02
0 0 13.38 40299.65 3.34 10974.65 19.98
0 0 6.75 40306.4 2.25 10976.9 25.00
0 0 21.33 40327.73 7.11 10984.01 25.00
0 0 188.28 40516.01 59.52 11043.53 24.02
0 0 69.92 40585.93 17.48 11061.01 20.00
0 0 17.06 40602.99 5.69 11066.7 25.01
0 0 263.59 40866.58 83.33 11150.03 24.02
0 0 16.2 40882.78 5.4 11155.43 25.00
0 0 28.44 40911.22 9.48 11164.91 25.00
0 0 301.25 41212.47 95.23 11260.14 24.02
0 0 22.75 41235.22 7.59 11267.73 25.02 64 bag vari
0 0 36.48 41271.7 9.12 11276.85 20.00
0 0 338.9 41610.6 107.14 11383.99 24.02
0 0 23.7 41634.3 7.9 11391.89 25.00
0 0 79.04 41713.34 19.76 11411.65 20.00
0 0 103.36 41816.7 25.84 11437.49 20.00 87 bag vari
0 0 420.49 42237.19 132.93 11570.42 24.02
0 0 14.26 42251.45 4.75 11575.17 24.99
0 0 85.12 42336.57 21.28 11596.45 20.00
0 0 301.25 42637.82 95.23 11691.68 24.02
0 0 54 42691.82 18 11709.68 25.00
887.04 0 887.04 43578.86 146.16 11855.84 14.15
0 0 244.76 43823.62 77.38 11933.22 24.02
0 0 18 43841.62 6 11939.22 25.00
0 0 39.63 43881.25 7.87 11947.09 16.57
0 0 304.39 44185.64 96.22 12043.31 24.02
0 0 23.76 44209.4 7.92 12051.23 25.00
0 0 18.96 44228.36 6.32 12057.55 25.00
0 0 379.7 44608.06 120.03 12177.58 24.02
596.4 0 596.4 45204.46 92.4 12269.98 13.41
0 0 5.94 45210.4 1.98 12271.96 25.00
0 0 37.92 45248.32 12.64 12284.6 25.00
0 0 273.01 45521.33 86.3 12370.9 24.02
0 0 224.64 45745.97 72.72 12443.62 24.46
0 0 27 45772.97 9 12452.62 25.00
0 0 289.68 46062.65 97.92 12550.54 25.26
0 0 21.15 46083.8 7.05 12557.59 25.00
0 0 27.49 46111.29 9.17 12566.76 25.01
0 0 272.64 46383.93 92.16 12658.92 25.26
0 0 336.96 46720.89 109.08 12768 24.46
0 0 12.76 46733.65 2.44 12770.44 16.05
0 0 24.17 46757.82 8.06 12778.5 25.01
0 0 299.52 47057.34 96.96 12875.46 24.46
0 0 63.36 47120.7 21.12 12896.58 25.00
0 0 43.07 47163.77 8.23 12904.81 16.04 360
0 0 17.06 47180.83 5.69 12910.5 25.01
0 0 78.78 47259.61 20.02 12930.52 20.26 380
0 0 28.44 47288.05 9.48 12940 25.00
0 0 230.88 47518.93 74.74 13014.74 24.46
0 0 45.54 47564.47 15.18 13029.92 25.00
0 0 78.78 47643.25 20.02 13049.94 20.26
0 0 28.44 47671.69 9.48 13059.42 25.00
0 0 75.75 47747.44 19.25 13078.67 20.26 380
0 0 113.76 47861.2 37.92 13116.59 25.00
0 0 119.69 47980.89 30.41 13147 20.26 380
0 0 272.64 48253.53 92.16 13239.16 25.26
916.32 0 916.32 49169.85 104.58 13343.74 10.24 10.50%
0 0 28.44 49198.29 9.48 13353.22 25.00
0 0 56.25 49254.54 18.75 13371.97 25.00
0 0 28.44 49282.98 9.48 13381.45 25.00
0 0 36.36 49319.34 9.24 13390.69 20.26 380
0 0 23.76 49343.1 7.92 13398.61 25.00
0 0 74.88 49417.98 24.24 13422.85 24.46
0 0 443.04 49861.02 149.76 13572.61 25.26
0 0 27 49888.02 9 13581.61 25.00
0 0 302.64 50190.66 97.97 13679.58 24.46
0 0 71.57 50262.23 23.86 13703.44 25.00
0 0 19.8 50282.03 6.6 13710.04 25.00
0 0 87.87 50369.9 22.33 13732.37 20.26
0 0 224.64 50594.54 72.72 13805.09 24.46
0 0 40.5 50635.04 13.5 13818.59 25.00
0 0 28.44 50663.48 9.48 13828.07 25.00
0 0 50 50713.48 12.7 13840.77 20.26
0 0 18.81 50732.29 6.27 13847.04 25.00
0 0 39.11 50771.4 13.03 13860.07 24.99
0 0 60.6 50832 15.4 13875.47 20.26
0 0 23.76 50855.76 7.92 13883.39 25.00
0 0 27 50882.76 9 13892.39 25.00
0 0 43.94 50926.7 11.16 13903.55 20.25
0 0 13.5 50940.2 4.5 13908.05 25.00
0 0 39.34 50979.54 13.12 13921.17 25.01
0 0 117.26 51096.8 29.8 13950.97 20.26
0 0 124.23 51221.03 31.57 13982.54 20.26
0 0 68.73 51289.76 22.91 14005.45 25.00
0 0 27 51316.76 9 14014.45 25.00
0 0 56.88 51373.64 18.96 14033.41 25.00
0 0 11.88 51385.52 3.96 14037.37 25.00
0 0 13.5 51399.02 4.5 14041.87 25.00
0 0 42.66 51441.68 14.22 14056.09 25.00
0 0 118.17 51559.85 30.03 14086.12 20.26
0 0 6.75 51566.6 2.25 14088.37 25.00
0 0 42.66 51609.26 14.22 14102.59 25.00
0 0 15.75 51625.01 5.25 14107.84 25.00
0 0 51.48 51676.49 17.16 14125 25.00
0 0 82.95 51759.44 27.65 14152.65 25.00
919.8 0 919.8 52679.24 113.4 14266.05 10.98
0 0 27.72 52706.96 9.24 14275.29 25.00
0 0 52.14 52759.1 17.38 14292.67 25.00
0 0 27 52786.1 9 14301.67 25.00
0 0 380.56 53166.66 128.64 14430.31 25.26
0 0 27 53193.66 9 14439.31 25.00
0 0 43.56 53237.22 14.52 14453.83 25.00
0 0 24.75 53261.97 8.25 14462.08 25.00
0 0 55.7 53317.67 18.56 14480.64 24.99
0 0 23.76 53341.43 7.92 14488.56 25.00
0 0 27 53368.43 9 14497.56 25.00
0 0 56.88 53425.31 18.96 14516.52 25.00
0 0 6.06 53431.37 1.54 14518.06 20.26
0 0 225.94 53657.31 71.42 14589.48 24.02
0 0 28.44 53685.75 9.48 14598.96 25.00
0 0 47.52 53733.27 15.84 14614.8 25.00
0 0 50.63 53783.9 16.87 14631.67 24.99
0 0 46.22 53830.12 15.4 14647.07 24.99
0 0 133.92 53964.04 58.28 14705.35 30.32
0 0 336.96 54301 109.08 14814.43 24.46
0 0 14.22 54315.22 4.74 14819.17 25.00
0 0 125.75 54440.97 31.95 14851.12 20.26
0 0 108 54548.97 47 14898.12 30.32
0 0 23.76 54572.73 7.92 14906.04 25.00
0 0 9.95 54582.68 3.32 14909.36 25.02
0 0 105.84 54688.52 46.06 14955.42 30.32
935.85 0 935.85 55624.37 109.65 15065.07 10.49
0 0 47.52 55671.89 15.84 15080.91 25.00
0 0 14.69 55686.58 4.9 15085.81 25.01
0 0 174.72 55861.3 56.56 15142.37 24.46
0 0 78.21 55939.51 26.07 15168.44 25.00
0 0 14.22 55953.73 4.74 15173.18 25.00
0 0 45.45 55999.18 11.55 15184.73 20.26
0 0 101.52 56100.7 44.18 15228.91 30.32
0 0 23.76 56124.46 7.92 15236.83 25.00
0 0 74.89 56199.35 24.97 15261.8 25.01
0 0 108 56307.35 47 15308.8 30.32
0 0 249.6 56556.95 80.8 15389.6 24.46
0 0 86.4 56643.35 37.6 15427.2 30.32
0 0 47.52 56690.87 15.84 15443.04 25.00
0 0 95.27 56786.14 31.76 15474.8 25.00
0 0 18.72 56804.86 6.06 15480.86 24.46
0 0 75.84 56880.7 25.28 15506.14 25.00
0 0 162 57042.7 70.5 15576.64 30.32
0 0 19.8 57062.5 6.6 15583.24 25.00
0 0 45.03 57107.53 15.01 15598.25 25.00
0 0 72.72 57180.25 18.48 15616.73 20.26
0 0 146.88 57327.13 63.92 15680.65 30.32
0 0 224.64 57551.77 72.72 15753.37 24.46
0 0 23.76 57575.53 7.92 15761.29 25.00
0 0 28.44 57603.97 9.48 15770.77 25.00
0 0 59.28 57663.25 19.19 15789.96 24.46
0 0 23.76 57687.01 7.92 15797.88 25.00
0 0 39.39 57726.4 10.01 15807.89 20.26
0 0 28.44 57754.84 9.48 15817.37 25.00
0 0 140.4 57895.24 45.45 15862.82 24.46
0 0 23.76 57919 7.92 15870.74 25.00
0 0 56.88 57975.88 18.96 15889.7 25.00
0 0 42.42 58018.3 10.78 15900.48 20.26
0 0 112.32 58130.62 36.36 15936.84 24.46
0 0 23.76 58154.38 7.92 15944.76 25.00
0 0 47.4 58201.78 15.8 15960.56 25.00
0 0 118.17 58319.95 30.03 15990.59 20.26
0 0 139.32 58459.27 60.63 16051.22 30.32
0 0 19.8 58479.07 6.6 16057.82 25.00
0 0 56.88 58535.95 18.96 16076.78 25.00
0 0 12.12 58548.07 3.08 16079.86 20.26
0 0 336.96 58885.03 109.08 16188.94 24.46
0 0 28.44 58913.47 9.48 16198.42 25.00
990.08 0 990.08 59903.55 125.12 16323.54 11.22
0 0 75.84 59979.39 25.28 16348.82 25.00
0 0 299.52 60278.91 96.96 16445.78 24.46
0 0 23.76 60302.67 7.92 16453.7 25.00
0 0 127.98 60430.65 42.66 16496.36 25.00
0 0 187.2 60617.85 60.6 16556.96 24.46
0 0 56.88 60674.73 18.96 16575.92 25.00
0 0 112.32 60787.05 36.36 16612.28 24.46
0 0 135.09 60922.14 45.03 16657.31 25.00
0 0 336.96 61259.1 109.08 16766.39 24.46
0 0 68.26 61327.36 22.75 16789.14 25.00
0 0 187.2 61514.56 60.6 16849.74 24.46
0 0 85.32 61599.88 28.44 16878.18 25.00
0 0 224.64 61824.52 72.72 16950.9 24.46
0 0 28.44 61852.96 9.48 16960.38 25.00
0 0 374.4 62227.36 121.2 17081.58 24.46
0 0 23.76 62251.12 7.92 17089.5 25.00
0 0 80.58 62331.7 26.86 17116.36 25.00
0 0 336.96 62668.66 109.08 17225.44 24.46
0 0 28.44 62697.1 9.48 17234.92 25.00
0 0 23.76 62720.86 7.92 17242.84 25.00
0 0 56.88 62777.74 18.96 17261.8 25.00
0 0 561.6 63339.34 181.8 17443.6 24.46
0 0 56.88 63396.22 18.96 17462.56 25.00
0 0 74.88 63471.1 24.24 17486.8 24.46
0 0 28.44 63499.54 9.48 17496.28 25.00
0 0 449.28 63948.82 145.44 17641.72 24.46
0 0 28.44 63977.26 9.48 17651.2 25.00
0 0 299.52 64276.78 96.96 17748.16 24.46
0 0 23.76 64300.54 7.92 17756.08 25.00
0 0 56.88 64357.42 18.96 17775.04 25.00
0 0 187.2 64544.62 60.6 17835.64 24.46
0 0 85.32 64629.94 28.44 17864.08 25.00
0 0 79.2 64709.14 12 17876.08 13.16
0 0 262.08 64971.22 84.84 17960.92 24.46
0 0 85.32 65056.54 28.44 17989.36 25.00
0 0 262.08 65318.62 84.84 18074.2 24.46
0 0 85.32 65403.94 28.44 18102.64 25.00
0 0 486.72 65890.66 157.56 18260.2 24.46
0 0 85.32 65975.98 28.44 18288.64 25.00
0 0 293.28 66269.26 94.94 18383.58 24.46
0 0 85.32 66354.58 28.44 18412.02 25.00
0 0 53.04 66407.62 17.17 18429.19 24.46
0 0 37.92 66445.54 12.64 18441.83 25.00
0 0 35.55 66481.09 11.85 18453.68 25.00
0 0 132 66613.09 20 18473.68 13.16
0 0 79.2 66692.29 12 18485.68 13.16
0 0 21.78 66714.07 7.26 18492.94 25.00
0 0 23.7 66737.77 7.9 18500.84 25.00
0 0 23.76 66761.53 7.92 18508.76 25.00
0 0 49.77 66811.3 16.59 18525.35 25.00
0 0 37.62 66848.92 12.54 18537.89 25.00
0 0 40.29 66889.21 13.43 18551.32 25.00
0 45.6 45.6 66934.81 4.32 18555.64 8.65
0 0 66.36 67001.17 22.12 18577.76 25.00
0 7.6 7.6 67008.77 0.72 18578.48 8.65
0 0 28.44 67037.21 9.48 18587.96 25.00
0 0 414 67451.21 42 18629.96 9.21
0 0 80.58 67531.79 26.86 18656.82 25.00
0 0 68.73 67600.52 22.91 18679.73 25.00
0 0 41.48 67642 13.82 18693.55 24.99
0 7.6 7.6 67649.6 0.72 18694.27 8.65
0 0 4.74 67654.34 1.58 18695.85 25.00
0 45.6 45.6 67699.94 4.32 18700.17 8.65
0 0 21.33 67721.27 7.11 18707.28 25.00
0 32.3 32.3 67753.57 3.06 18710.34 8.65
0 7.6 7.6 67761.17 0.72 18711.06 8.65
0 45.6 45.6 67806.77 4.32 18715.38 8.65
0 30.4 30.4 67837.17 2.88 18718.26 8.65
0 7.6 7.6 67844.77 0.72 18718.98 8.65
0 0 13.04 67857.81 4.34 18723.32 24.97
0 45.6 45.6 67903.41 4.32 18727.64 8.65
0 0 28.44 67931.85 9.48 18737.12 25.00
0 0 71.4 68003.25 8.4 18745.52 10.53
0 0 19.8 68023.05 6.6 18752.12 25.00
0 0 57.8 68080.85 6.8 18758.92 10.53
0 0 11.88 68092.73 3.96 18762.88 25.00
0 0 28.44 68121.17 9.48 18772.36 25.00
0 0 48.82 68169.99 16.28 18788.64 25.01
0 0 36.97 68206.96 12.33 18800.97 25.01
0 0 13.86 68220.82 4.62 18805.59 25.00
0 0 45.9 68266.72 5.4 18810.99 10.53
0 0 44.33 68311.05 17.92 18828.91 28.79
0 0 41.85 68352.9 16.93 18845.84 28.80
0 0 44.2 68397.1 5.2 18851.04 10.53
0 0 23.85 68420.95 9.65 18860.69 28.81
0 0 12.15 68433.1 4.91 18865.6 28.78
0 0 45.9 68479 5.4 18871 10.53
0 0 61.2 68540.2 7.2 18878.2 10.53
0 0 39.44 68579.64 4.64 18882.84 10.53
0 0 5.4 68585.04 2.18 18885.02 28.76
0 0 23.76 68608.8 7.92 18892.94 25.00
0 0 127.26 68736.06 22.46 18915.4 15.00
0 0 5.4 68741.46 2.18 18917.58 28.76
0 0 15.75 68757.21 6.37 18923.95 28.80
0 0 49.74 68806.95 8.78 18932.73 15.00
0 0 26.1 68833.05 10.56 18943.29 28.81
0 0 43.47 68876.52 7.83 18951.12 15.26
0 0 21.78 68898.3 7.26 18958.38 25.00
0 0 27 68925.3 10.92 18969.3 28.80
0 0 5.52 68930.82 2.06 18971.36 27.18
0 0 27.6 68958.42 10.32 18981.68 27.22
0 0 426 69384.42 30 19011.68 6.58

0 0 27.6 69412.02 10.32 19022 27.22


0 0 18.4 69430.42 6.88 19028.88 27.22
0 0 7.59 69438.01 2.84 19031.72 27.23
0 58.9 58.9 69496.91 5.58 19037.3 8.65
0 0 20.7 69517.61 7.74 19045.04 27.22
0 0 19.01 69536.62 6.33 19051.37 24.98
0 0 26.22 69562.84 9.8 19061.17 27.21
0 0 51.75 69614.59 17.25 19078.42 25.00
0 0 22.08 69636.67 8.26 19086.68 27.22
0 0 16.1 69652.77 6.02 19092.7 27.22
0 0 29.25 69682.02 9.75 19102.45 25.00
938.4 0 938.4 70620.42 107.1 19209.55 10.24
0 0 23.92 70644.34 8.94 19218.49 27.21
0 0 6.9 70651.24 2.58 19221.07 27.22
0 0 43.65 70694.89 14.55 19235.62 25.00
0 0 26.22 70721.11 9.8 19245.42 27.21
0 0 2.99 70724.1 1.12 19246.54 27.25
0 0 5.4 70729.5 1.8 19248.34 25.00
855 0 855 71584.5 118.75 19367.09 12.20
0 0 11.5 71596 4.3 19371.39 27.22
0 0 54 71650 18 19389.39 25.00
0 0 23.76 71673.76 7.92 19397.31 25.00
0 0 41.58 71715.34 13.86 19411.17 25.00
0 0 51.12 71766.46 17.28 19428.45 25.26
0 0 108 71874.46 6 19434.45 5.26
0 0 45.9 71920.36 5.4 19439.85 10.53
0 0 19.8 71940.16 6.6 19446.45 25.00
0 0 26.52 71966.68 3.12 19449.57 10.53
0 0 35.64 72002.32 11.88 19461.45 25.00
0 0 23 72025.32 8.6 19470.05 27.22
0 0 44.2 72069.52 5.2 19475.25 10.53
0 0 171.6 72241.12 26 19501.25 13.16
0 0 47.52 72288.64 15.84 19517.09 25.00
0 0 48.3 72336.94 18.06 19535.15 27.22
0 0 0 72336.94 0 19535.15 #DIV/0!
0 0 0 72336.94 0 19535.15 #DIV/0!
0 0 0 72336.94 0 19535.15 #DIV/0!
0 0 0 72336.94 0 19535.15 #DIV/0!
0 0 0 72336.94 0 19535.15 #DIV/0!
0 0 0 72336.94 0 19535.15 #DIV/0!
0 0 0 72336.94 0 19535.15 #DIV/0!
0 0 0 72336.94 0 19535.15 #DIV/0!
0 0 0 72336.94 0 19535.15 #DIV/0!
0 0 0 72336.94 0 19535.15 #DIV/0!
0 0 0 72336.94 0 19535.15 #DIV/0!
0 0 0 72336.94 0 19535.15 #DIV/0!
0 0 0 72336.94 0 19535.15 #DIV/0!
0 0 0 72336.94 0 19535.15 #DIV/0!
0 0 0 72336.94 0 19535.15 #DIV/0!
0 0 0 72336.94 0 19535.15 #DIV/0!
0 0 0 72336.94 0 19535.15 #DIV/0!
0 0 0 72336.94 0 19535.15 #DIV/0!
0 0 0 72336.94 0 19535.15 #DIV/0!
0 0 0 72336.94 0 19535.15 #DIV/0!
0 0 0 72336.94 0 19535.15 #DIV/0!
0 0 0 72336.94 0 19535.15 #DIV/0!
0 0 0 72336.94 0 19535.15 #DIV/0!
0 0 0 72336.94 0 19535.15 #DIV/0!
0 0 0 72336.94 0 19535.15 #DIV/0!
0 0 0 72336.94 0 19535.15 #DIV/0!
0 0 0 72336.94 0 19535.15 #DIV/0!
0 0 0 72336.94 0 19535.15 #DIV/0!
0 0 0 72336.94 0 19535.15 #DIV/0!
0 0 0 72336.94 0 19535.15 #DIV/0!
0 0 0 72336.94 0 19535.15 #DIV/0!
0 0 0 72336.94 0 19535.15 #DIV/0!
0 0 0 72336.94 0 19535.15 #DIV/0!
0 0 0 72336.94 0 19535.15 #DIV/0!

9683.76 716.84 72336.94 19535.15 19535.15 21.26


0 0