: ‘Yd tad / EASTERN RAILWAY want Ud Are Sear rear, Fergal / C&W WORKSHOP, LILUAH facet faut ELECTRICAL DEPARTMENT } WEA, / File No: W/BB/WP/2023-24 fergen, feria /Liluah, Date, 26 .10.2023 a | Dy. CE (Con)-II Eastern Railway, Howrah (Through: - Dy.CME (M)/LLH) Sub: Submission of Vetted Electrical Sub-Estimate No. CAP/470/LLH/LLT/2023-24 dated 06.09,2023 for the project work “LLH- Augmentation of LHB AC Coach overhauling facilities at J - Shop” sanctioned in Umbrella Works Program 2023-24, UWB item no. 440g 23-24, under PH-42, Allocation CAP. Ref: WAO(IC)/ER/LLH’s letter no, LWAJ/E/ /PWP/Estt./32/2023-24 Dt. 16/10/2023 Reference above, detailed Electrical Sub-Estimate No, CAP/470/LLH/LLT/2023-24 dated 06.09,2023 has been vetted by associate finance. Hence, the vetted Electrical Sub-Estimate along with related documents such as vetted letter, compliance sheet is being attached and forwarded herewith for further necessary sanction from your end regarding of consolidated estimate and process for sanctioning. DA: As stated above (Original Copy) ‘ my GM Dy. CEI hie > Copy to- Dy. CME (M)/LLH- For kind information please of (Xerox Copy Attached) Gare Dy. CEE (" LH rath ~ ‘Et #./ File No W/BB/WP/2023-24 fergar, fais jLiluah, Date2s.10.2023 f847/sub: Sanction of outsourcing of work and detailed estimate bearing no. CAP/470/LLH/LLT/2023-24 dated (06.09.2023 regarding “LLH-Augmentation of LHB AC Coach overhauling facilities at J-Shop”, aadRef WAO(ICVER/LLH’s letter no. LWA/F/ PWP/Estt./32/2023-24 Dt. 16/10/2023. ‘The detailed estimate bearing no. CAP/470/LLH/LLT/2023-24 dated 06.09. .2023 has been verified & vetted by WAO(IC)ER/LLH vide letter under reference at a cost of Rs. 78,62,091.97/- with some stipulations. The remarks against the stipulations are furnished below. st no. ‘Accounts stipulations Executive remarks Sanction of the competent authority to be obtained as per serial no. 2(A){i) and 3(A) after observing and complying the laid down rules and instructions against the concerned delegation. will be obtained ‘Availability of fund to be ensured before execution of the subject work. ensured Tris to be ensured that the proposed scope of work is not included into any part of any proposal or estimate. ensured Tris to be ensured that the description of all the items as considered in the detailed estimate is same and identical in all respect with the description as mentioned in the abstract estimate as well as in the rate references as well as the materials is as par with the requirement of the subject work. noted Tris fo be ensured that Departmental charges have been considered need based and as per extant guidelines as Departmental charges has been considered on materials as well as on labour also. censured Tris to be ensured that the material is not possible to be managed from stores department of Railway, if itis so actually. Otherwise outsourcing of material portion with labour is not permitted ensured Tris fo be ensured that there is no rebate on the offered value of LOA’s, which are considered as rate reference. Otherwise; estimate to be modified and to be submitted further for vetting. censured Reasonableness of rate & quantity against each item is to be ensured in reference to LAR/LPR, in all respect. ensured Tris to be ensured that the quantity of materials and volume of labour have been considered need based and based on actual requirement. ensured Fill the guideline and instructions for outsoureing is to be adhered strictly during the course of execution of the activity with sanction from the competent authority as per directive of MSOP item no, 37 part A, if itis outsource finally, being obtained Page 1 of 2 ITT itisto be ensured that the entire rates references have considered in the ensured ‘estimate are latest, unrestricted and comparable, TZ 1his to be ensured that the estimate is prepared based on the same and | ensured identical material as specified by the Railway Board against the subject U.W.. item number 440g of 23-24. [5] Gredit value of realised material should realistically be assessed and to | noted be booked to the proper head of allocation, if any generated. ¢ 74 | Copy of the sanctioned estimate may please be sent to this office for | noted * . record. As respect of stipulation no. 10 of WAO(ICYER/LLH’s letter under reference, as the work will be outsourced the sanction of CWM/LLH is required as per MSOP item no. 37 part-A. Hence, submitted for the kind sanction of CWM/LLH please. Dy.CEBAWLL EASTERN RAILWAY V7 SDE IGE 2023 INDIA No. WPO/LLH/Misc/HKG Dated: Liluah, the 22" September 2023 Dy.Chief Electrical Engineer Eastern Railway, Liluah. ‘Sub: Sub: Proposal for “LLH-Augmentation of LHB AC-Coach overhauling facilities at J-shop” Sanctioned in Umbrella Works Program 2023-24, UWB Item No,440g 23-24, under PH-42, Allocation CAP. CWM/LLH from PCPO/KKK vide No.M&E/1025/L-1/RRC dt.14-07-2023,17-08-2023 and 29-08-2023. ‘They are likely to join the workshop within a fortnight. Hence the point raised regarding shortage of Man-power for which out sourcing has been proposed is likely to be mitigated. As such the proposal for out sourcing may be processed after joining of the panel as per requirement. Workshop Personnel owe ey for Chief Works Manager Eastern Railway, Liluah Regarding your noting on the above mentioned subject, it may be mentioned that three panels of 63 Nos. consisting of Asstt.TL&AC(W)/CAT-12/ER,Asstt/TL&AC/CAT-11 have been received under ud ad / EASTERN RAILWAY want ud ara feet eran, fergsit / C&W WORKSHOP, LILUAH @4IM /ELECTRICAL DEPARTMEN’ ‘WIA. / File No: W/BB/WP/2023-24 erga fe-te /Lituah, Date, 11.09.2023 , WAO(C)/ER/LLE Sub: Vetting of detailed electrical sub estimate for the work “LLH- Augmentation of LHB AC Coach overhauling facilities at J - Shop” sanctioned in Umbrella Works | Program 2023-24, UWB item no. 440g 23-24, under PH-42, Allocation CAP. Ref.: (i) Yours office letter No. LWA/F/ PWP?/ Estt./32/2023-24 Dt. 08.09.2023 | Gi) Dy.CME/plg office letter No. MPD/17/2023-24 dated 24.08.2023 | Gi) CWM/LLH letter No. LWP/2022-23/UW/LLH/J-Shop (3 Bay) dt. 28.08,2023 \ Ttemwise remarks against your observation is furnished below:- 1. Vide letter under reference (iii) connected at flag no. 3 on noting side, GM/ER has | approved the construction department as Executing Agency for the civil portion of this | work and accordingly Dy.CEE (WYLLH to arrange for preparation and finalization of Detailed Estimate of the Electrical portion for the same work. In the view of above, detailed estimate is put for finance vetting at your end. 2. Itis ensured that the detailed estimate has been prepared considering need based revised Departmental Charge in various Electrical Works estimates as per RB Letter No. 2022/E&R/3(2)/1 dt. 28.12.2022. ‘The case file along with all relevant documents is being sent for early vetting please. DA: As above als Dy.CEB@VS|LLH ward ea rafter sree, Bea, erga, ag 711204 ortchon, Ester reean aay hast ey aot alea, YS Td, YOM Ofce atthe Workshop Aecouts Ofen IC), Eastern Ralvay, it BHAT Go, 23070 uswts029-2652-6saHloeey mob:s002028/30 dscanyles@emai.com fo. No: LWAP/PWPESU/32/2023-24. ~~ Rstiaw Dated 08" Sepi. 2023. Eastern Railway, Liluah, ‘Sub: Vetting of detatied electrical sub estimaie for the work “L1.H-Augmentalion of LHB AC Coach overluuling facilities al J-Shop™ sanctioned in Umbrella Works Program 2023-24, UWB ileut nv. 440g 23-24, under PH-42, Allccation CAP. Ref: AREU.LH’s letter No, W/BH/WP/2023-24 dt. 06/07.09.2023. ~ ‘Phe subject proposal is, eal herewith Eins with the following abservat cs It is clearly slated by Dy CME (ls)tI 3 his i 24.08.2023 that constructi 2 department is couting aggncy of stage, is there any requirement Teng natsleee he ge sstinvate’al. this end, 2. Itis to be ensured that dep | charges has been considered need | been increased than abstract estimated cost. | be confirmed, .d as total coat has (e)/ anon m Railway, Liluah : gi tad / EASTERN RAILWAY wand ud Fra fen rear, fAIsMl / C&W WORKSHOP, LILUAH @ ‘WIE ¥. / File No: W/BB/WP/2023-24 Ferqan fetes /Lituah, Date, 06 09.2023 WAO(CVER/LLH Sub: Vetting of detailed clectrical sub estimate for the work “LLH- Augmentation of LHB AC Coach overhauling facilities at J - Shop” sanctioned in Umbrella Works Program 2023-24, UWB item no, 440g 23-24, under PH-42, Allocation CAP. Ref: (i) Yours office letter No. LWA/F//PWP/ PWP/ Dy.CME (M)/27/2022-23 Dt. 23.11.2023 (ii) RB letter No. 2022/M(W)/964/67Pt. Dt 07.08.2023 Gil) CWM/LLH letter no, LWP/2022-23/UW/LLH/J-Shop (3" Bay) dated 28.08.2023 Vide letter under reference (iii), it is informed the work named “LLH- Augmentation of LHB AC Coach Overhauling facilities at J - Shop” has been sanctioned under Umbrella work for Eastern Railway vide PB no — 440g of 2023-24 with proposed cost Rs.150687 /- you under allocation CAP. Also, it is requested for submitting the vetted detailed electrical sub estimate for the subject work. Accordingly, a detailed electrical sub estimate for the work “LLH- Augmentation of LHB AC Coach Overhauling facilities at J— Shop” has been framed at a cost of Rs. 78, 62,091.97/- (including. GST & Revised Departmental Charges) and the estimate is sent your end for necessary vetting please. DA: As above Dated: 13.09.2023 No: WIBBMWP/2023-24 ‘Sub: - Proposal for “LLH- Augmentation of LHB AC Coach overhauling facltles at J- Shop” sanctioned in Umbrella Works Program 2023-24, UWB item no. 440g 23-24, under PH.-42, Allocation CAP. Due to shortage of manpower, to a tune of total 15 nos. of posts the normal activities of maintenance work of PH & TS shops are {getting hampered seriously. To tackle this grave situation a Proposal for out sourcing of work activities lke LLH- Augmentation of LHB ‘AC Coach overhauling facilities at J ~ Shop has been initiated from this end. The proposed work against PH-42, CAP has been sanctioned in Umbrella Works Program 2023-24 (UWB item no, 440¢ 23-24), under Mother Umbrella Work PB item No. PB-1079/NR/ 22-23. ‘The compliance of Notes 2(b), & 3(a) against delegation of power vide sl no. 37 of Part ‘A/ MSOP, 2018 are as under:- ‘Sef | Observation Compliance Note. 2(b)_| A zero-based review of manpower requirement shall be |] Seaion] | Sanctioned | Existing | Actual | Vacancy done keeping in view the yardsticks/ norms circulated by | | shop _| Strength _| staff__| on Roll _| (2)-(4) Board/Headquarters vis-d-vis sanctioned/ actual strength. | [ (a) 2) @) @ (4) Power za [rar ja —*[ as House & Town supply Total 242 227, 227 15 Position as on 01.09.2023 3[a)__ | The requirement of outsourcing shall be concisely brought | Attached herewith. out in a statement jointly signed by Branch Officers of Executive and Personnel departments and the proposal | itis ensured that necessary measures will adopted to prevent should be got concurred in by Associate Finance and | violation of contract Labour Regulation and Abolition Act, 1970 approved by PHOD/DRM/CWM as applicable. The | in terms of Railway Board's Letter No. E(LL) 2005/AT/CNR/64 Personnel Officer signing the statement should not only | dated 10.11.2005 censure that the conditions at Sl.Nos.1 to 2 above are fulfilled, but also ensures that there is no violation of Contract Labour Regulation and Abolition Act, 1970 in terms of Railway Board's Letter No. E (LL) 2005/AT/CNR/64 dated 10.11.2005. As per Note 3(a) of SI. no. 37 of Part A/ MSOP 2018, a statement is required to be prepared signed jointly both by Branch Officers of Executive and Personnel departments and that proposal should be got concurred in by Associate Finance and approved by CWM . Joint statement for requirement of outsourcing for some work activities in PH &TS is as under: (As on 01.07.2023) Seaion/Shop | Sanctioned Strength Bisting Stat ‘etualon Rol Vacancy ha) i wo @ 8 @ @ Power House & 7a 2 27 rT oun Supply Total 2 EH 27 is Yi) ). CEE {nhl WPo/tLH HTTOSONT 7 aS) RT 3 B/S/e ¢ Bale 2 g “3 3 E z-le sc : 5B ele be] sncron 5 slele & |B B é eae [8 IB Ele] xf i rele AE ~[-]- of] screw |g af slefefels|elelelegre (Ele eleololele ele 5 8 “aS 5 oxsous | | ee (elel-[e[e|~ agra |e ~felel=|efelele[ mene [£]*) 22 |B fpotatate clrieiele|=fe[=[ sen [ay Te | falelelal=|=lala| sscnon | efofofele -[-[ ome [Els a B[sfelelslelele| tenny elelelefelefele] vacasay |S F elelelatelelele| se le 4 : | ole{ef-[efe]-]=| senos [ay élelé olRREE é e}-|-leofele] onrow 5 3 Blely 3): 8 | g|+[y 8| cent ~fejele|-[=] vacancy |= 3 | vacancy i . 2 e@|5)8] sanction Ie 2 | a[=[stel=le|e[s| mon 5 . ; e|efete| SRE at 5 > olololslkErz § E 2 E eS -|6 oxo. | E —E zlefe ui ff vacancy E SANCTION 2 | jelelelelelslelal amcnos esse i isms | lel |] . a rege l2lEle Eee \g\h Halse] F SRE Vele| ge easel "|ale| iF fetes] [E]ale a/°)£% yan Sie. |") | 7 RE | vacaney E YACANG | E sancti open pats) VRIOTES EVISNYSUINY) aNT VOSS yg] semua ov HQ, lecnnically Vetted Dy. Chiet Electfeal Engineer (Wy Department : Electrical Office:Dy.CEE(W)/LLH ad tt. feqer Eastern Railway, Liluah Estimate No : CAP/470/LLH/LLT/2023-24 dt. 06.09.2023 Framed by:AEE/LLH Name- LLH- Augmentation of LHB AC Coach Overhauling facilities at J - Shop. Reference Sab head] Estimated work wah Tore] Total] Contingency | Departmental | Grand Total | Original total] Allocation of work including Charge incase of st revised purchase | lab [foal a uH- Augmentation of| Z rae fobaccones sre oes) G| romes| ram | ace geen] 28 | loverhauting facilities Sasn24 | 7250 : al la Jat J-Shop. =| Funds _Rs 782,091,972 to be provided from budget for___ 2025-28 Item no, -UWE item no 440g of 2023-24 Directed or by appropriation fay x aera ora gore 69500) CAR: WALLAIConract 2171011220 OT fot.05.15 wth 10% exch 7] 0) 7 "73 Pce = 800] of — a0] a ae rated PVC ar eae 10 nd areT ee 00 V rade coin Te (Pt 188 vi lest amerdnen | Mit nn, St tes, ae Ke) i ‘ool | —Tro0] of 330000) Ce a ae Kay cra fr assstant lecial Ege? Page 2 astem Railway Electical Dopartment deren soning dea eximated cost under lan Hed 2, Alocaton-CAP Under UW fem moO of 23:24 7 Fp Saya mateUTOPE PaaS PC or eae ame oom w] Hp | SY OY OSE = TSP Jaro 100 V rade & eonomingio 7058 Pu 188 wih est amendmen ake: i ces, Gost, Havel, Pah, KE yy = : [soa rvaned OFS Pad, PIC ode canbed te TZ amos cl wis] Ae S10) | ONO 0) 0) eat ceN Pcs = 0 ge nig 8) SH Wh st anne [se ves, ob, KE) a 75 ining, cores, gk conser TU sae | Ti) Ss) 20850) 0) BOAR sbove 2 sq) age allen or ude ss by neesarycangigarargenri Wnuecontactt an fein ekg ad termination wth ear ening where necessary (ca shel be lovss ot 06.03.18 win rode of sonmxéan MS. Fis) a > potesen, Baan] rao] 0] —— PaT| AR WAL Conar 101729 date —ans2002 Ta aero] a9] 0] > Bono fwittvconeacurraner ores at. 05.03.16 win pesca, Ec wriconrctristr lavas eozosanze | Zale] _——88] 0] ssa lwuriconsaePtsosr |e) Fe) a a Page 3 Electrical Department 1-42, Alocain-CAP Under UWB tem no 440g 173.24 we] a aaa Te ter eae lwaLticonractrtasar| 7 et 05.03.2024 wit 05 % Jscin. [Ssety fing test and commissoning of 45 WattLED: 7 BsGO0|AR- lwaLHconractrntstsan| 33 dt02.08.2000 [Supply oF 780 me swoop. ph. Bracket ype Ar oulatr wit wel 71ST 618 ato Gott Labour AR wntticontacuPrisoay Joriaas ct 05.03.18, ~ T1394 nos | — 65] fos] 17760) [Scppl, hstalton, ting commissioning and connec sheet enclosure wih proper hing arengement, or connection of cables bot incoming and cutgeing (Haves Cat No, IHCOAODOE. or &. fra. | 29) Page 4 Eastern Rey, Elctical Department Statement shoving deta estimated cost under Plan Head: 42, Allocaon-CAP Under UN Rem no.40g 73.04 Fos] eae] aay —«S TER Si] yp |wnLtHiContactPrtsoay [oTr44s ct 06.03.18 wah ov esc, = oojn | 252} se) 75600} 10800) a) 7 86400] AR WittHiContaciProer Jori44s ct 05.03.18 wen lor esch, set [TEs] TaTTe| 7 ofea6687 7 LAR: z Wa.tHiContaciPrtss207) zat [397 t. 09.10.18 wih 158% 1 les ats |e] 6] — Tey a] 4 ETE2|CAR- ON SROPLL tecHancaL w.uusor zou Jove 4503115 ao.01. 201 wih 5 xc. conduit pipe to contol te Pages Eestem Rata, ‘Stclement showing dell estimated cot unde lan Hea acient lcaton-CAP Under UWB em no Ad of 3-04 ben aera facet SAR Assistant Electrical Engineer wa Ty Tea a) 0] 2m] 7a Te] S5] 35000) 7 varias ot 28.0818 wah ZZ |tsthescn es) Dal] am) TH) oo 7 7 B00 al) a0) 77a] ca a HPN DB box= 3190 Rate [rom Lar pice st, bow | rctetsunay aa] | — aa] 7 Tari] a) — Tee] Ta ‘SEL Cenaed PTET] 30 si22020 oo maze foo heavy dy hinge CL. pice] song wi harenl and satnside the eat pt Pages et, GT roe Ectical Department ‘Statement showing deta estate cost under Plan Head- 42, loca CAP Under UWE fem nadie 3.24 Z a] ay 7 aac TY sce sr2070 wens ec. 7] 7 Freah Lara TBST sr orc2 02016 wen 0 ec | 7 fosmaring of wing, panels, OSL ee je | 0] 25000) 0) san a] 7 acters | Frannie OST Saree) wean Fa etree Gage Me sr TERESA arg Conrgeney hae Te TRTeERE| etn Charges © 7.706 cdg Oe Enon rated Work 01% Spots TEE) | RSE lewopnent cas) o (GRAND TOTAL ao TBST] 7 Les Cet onreeased mater = Rs 2500 /-(Appo#) dean were Hach HHP ‘Assistant Electical Engineer qi tat Rat Easter Raiay, Luan Statement showing Dey 42 /CAP" Overhauling facilities at J - shop" : 'partmental Charges of electrical detail estimate PH- Electrical sub estimate for LLH- Augmentation of LHB AC Coach under UWB item no. 440g of 23-24 Break up of Departmental Charges Establishment HQ Org 1430 % 104357. 14 Field Org 440} % 323099.34] [Audit & Accounts 0.620] % 45243.15| Stores 0.300] % 21891.85 Traffic 0.750 % 10945.92 Personnel 0.0700 % 5108.10} Medical 0.0700 % 5108.10) Vigilance 0.080 %| 4378.37] Total a) % 521025.96| [Environmental related Work 0.500} 4% 3648641 [Sports development 0.400} % 7287-28 Grand Total 774 % '564809.65| z wears Were frorch SPR Assiste-at Electrical Engineer | Eastern Railway, Liluah Justification- For the work LLH- Augmentation of LHB AC Coach Overhauling faci ies at J - Shop, needs desmentaling of existing electrical plnels etc and to be needed new wiring with panels, busbar, with proper illumination , cable laying, provision of 110v, 220v, 415v for smooth operation of the shop. Further the work “LLH- Augmentation of LHB AC Coach Overhauling facilities at J - Shop” has been has been sanctioned under Umbrella work for Eastern Railway vide PB no ~ 440g of 2023-24 with proposed cost Rs.150687 /- thou under allocation CAP Hence for the work work LLH- Augmentation of LHB AC Coach Overhauling facilities at J - Shop an detailed electrica sub - Estimate has been framed at a cost of Rs,7862091.97/- (including GST & Revised Departmental Charges) under allocation CAP. Office of the by. Chief Works Manager | Carriage and Wagon Workshop, Eastern Railway, Liluah % | Howrah ~ 711 204 Rms Fax No.:033 26549357. Atadig Email: dycmemilher@gmail.com Amrit ahotsav No: LwP/2022-23/UW/LLH/I-Shop (3 Bay) Date: 28.08.2023 CAO (Con)/ER/HQ. Subt Preparation, finalization and sanctioning of Detailed estimate of the sanctioned work ““LLH- Augmentation of LHB AC Coach OVH facilities at J-Shop” (i) EDME (EnHM & Proj)/RB’s letter no. 2022/ M(W)/964/67Pt.3 dtd. 07.08.23 ) Dy.CME (Plg)/ER/HQ letter no. MPD/17/2023-24 dtd. 24.08.23 (ii) UW item no. 440g of 23-24 Ref: In ref (i) above, Rly. Board has sanctioned the subject work. In ref. (ii) above, GM/ER has approved the Construction Department as Executing Agency for the civil portion of the above work. Details of the ) work are appended below. ____ Fig. in thou of Rs. Sl. | Itemno. Name of the work ] Plan Head | Approved cost No. {Allocation 1 | | a eSmTTTRN Cran EERE? "150687 | of Shop” In view of the above, your kind interventional is solicited for sarictioning the detailed Estimate, finalization of tender and start the work at earliest. DA: HQLetter cc: Dy.CME (M)/ER/LLH- for information and n/a please. Dy.CEE (W)/ER/LLH- for your information and requested to arrange for preparation, finalization and sanctioning the Detaited Estimate of the Electrical portion of the work. ¢ . EASTERN RAILWAY . INo.MPD'1712023-24 Kolkata dated 24:08,2023 ' Sub: Nomination of Executing Agency for work costing more than Rs.10 Crore undor PH'42 Ref : (i) ED(W)/RB's letter 0.2017/W-l/Genl /Policy dated 05.12.2018 (i) EOME(EnHM & Proj)/RB's letter no.2022/M(W)/964/67Pt3 dated 07.08.2023 (ii) Dy.CME(M)/LLH's letter no, LWP/2022-23/UMILLHIJ Shop(3rd Bay) dated 10.08,2023 (iv) This office Note Nlo.ER-HQOMECH(PH42)/6/2023 dated 17.08.23 1. Vide reference (i), Board has decided that works costing more than Rs.10 crore should be generally ea be carried out by Construction Organisation and the works of value less than Rs.10 crore should generally be executed by Open Line Organization. 2. Vide reference (i, Board has been sanctioned following work under PH-42 which cost is more than Rs.10crore: * ’ — (Fig in thou of Rs.) _ [SN [UWBitem Description of work Alloc | Approved |__| n0.23-24 7 o cost 124 | 440g | LLH-Augmentation of LHB AC Coach Overhauling facilties | CAP | 180687" is atJ-Shop ee eee 3. GINER kindly epproved Construction Department is the Executing Agency of the above new sanctioned sub- umbrella work. . Itis requested to sanction the Detailed Estimate, finalization of Tender and start the work early, i Endlo : Note under reference (iv) e\22 _ (hwy Dy. Chief Mechanical Engineer | Plg 2ozasm(w)/964767PC3 1307413572023 ‘GOVERNMENT OF INDIA. MINISTRY OF RAILWAYS (RAILWAY BOARD) No. 2022/M(W)/964/67Pt.3 New Delt, dated 08.2023 ‘The General Manager, Eastern Railway South Central Railway Southern Ratlway Sub: Approval for Individual works under Umbrella Works 2022-23 of PH-42. Ref: i) Board's Letter No. 2022-B-106 dated 16.06.2022 ii) Board’s Letter No. 2022-B-106 dated 09.05.2022 ill) Board’s Letter No, 2023-B-104 dated 22.06.2023 Approval of Board {M(T&RS), MF & CRB) is hereby communicated for the following individual works under Umbrella Works 2022-23 of Plan Head 42: I. Name of the Umbrella Work: Augmentation of freight maintenance facilities (PB- 1077/NR/2022-23) (Fig_in Thousands of Rupees) sy EBT) Rly] Name of work Alloc,}APRFOved) Remarks 120224 2B 7] 655e] _ |Vijayawada Wagon Depot-| CAP| 77761 SCR|Augmentation of infrastructure facilities for Imaintenance of wagons. 7, | 659e| _[Bitragunta— Development | CAP | 110083 7 scnlof freight trains Provision of lexamination facilities for computer and ICC rake maintenance, inkjet printer has been deleted from Mech, sub estimate, 3. | 659e| [Kakinada Development | CAP | 116075, Soe ca een Pepertmentl facilities for CC ruke Imuintenance, lbeon revised, Further, computers and printer have beet) ldeleted from 2O22/m(w)/964/67PL3 Mech. sub jestimate, : ip at diesel T.Name of the Umbrella Work: Crention of Infrastructure & test set WP AE" sheds for homing of electric tocomotives(? -LO7AINT/2022 3) ign of Rupees) Approved. Name of work Cost land Test setup for homing of electric CAP, | 38439 | locos. M1 Name of the Umbrella Work: Infiastructure development for SNE ag periodic overhauling cyele time of rolling stock workshops (Fig, in Thousands of Rupees) ‘SR | DSU/ERS-Creation of infrastructure Ay ved Name of work Aloe. [APRN KPAW: carriage: Repair/rerouting oF CAP | 29453 trains to avoid perennial flooding in traversers, pit-lines, shop-floor, roadsete. afiecting POH out | IKPAW : Heavy duty Flooring & Roofing of ) R hvheet stop in carriage complex. CAP | 58181 amalpur-~Development of Stripping Sheds! CAP | $3007 for Wayon POH, ‘This issues with he concurrence of Finance Directorate t istry of Ratlways, 4 Signed’ by Shale Ka Sin nara) Executive Director MelRALG a Aan Ce aie: 27:00 ‘No, 2022/M/(W)/964/67.P | New Dell, dated .08,2023 ~ Copy tor) PFA-ER, SCR & SR 2022/m(w)/964/67Pt.3 il) Principal Director of Audit, ER, SCR & SR il) Deputy Comptroller and Auditor General of India/Railways, Room No.224, Rail Bhawan, New Dethi, Signed by Sanjay Kumar Singh Date Fa Mewen623°93:50:21 Copy to: F(X) Il and Budget Branches of Railway Board

You might also like