No. LM/M&P/Krane Shifting (KP-150) Dated, Liluah the 11th Jan’2023
Sub: Commissioning cum Completion Report for shifting of 01 No.
EOT Crane, Cap: 2T, M&P No. KP-150 (From new wheel shop/Delhi end to newly constructed A-Shop/Bay-1/LLH) at C&W Workshop, Eastern Railway, Liluah.
Ref: LOA No. LS.WC/Quotation/Crane Shifting/2022-23 dtd. 22.08.2022
Reference above, the subject work has been executed and following are observatory Notes:
Sl. Scope of work Remarks
No. 1 Shifting, Painting, Erection & commissioning of All work has been 2T EOT Crane, Span: 20 Mtr. (Approx.) (As per completed satisfactorily. exact site condition of A & HT Shop/Bay-1) 2 Dismantling of 01 No. 2T EOT Crane from wheel shop new bay (Span around 22 Mtr.) 3 Modification for reducing span around 20 Mtr. (Approx) 4 Fitment of new bay (Around 100 Mtrs. Distance) duly modification of span 5 Commissioning at new bay 6 Crane handover date (KP-150) for dismantling 10.10.2022 vide Joint Note and shifting No. LWP/MOD/2T Crane/K dtd. 10.10.2022 7 Prove out/Commissioning 21.12.2022 8 Trial run 07 days from the date of prove out. 9 Performance: (i) The firm has fitted additionally one junction box free of cost for proper cable laying. (ii) Working performance has been found satisfactorily. (iii) The firm has completed all works as per terms & condition of referred contract.
f. M/s Cranex SSE/A SE/H SSE/PH SSE/M&P SSE/Con/LLH