1.0 Introduction ........................................................................................................................................ 4
1.1 Scope ................................................................................................................................................................4
1.2 Definitions and Abbreviations.....................................................................................................................6
1.3 Reference Documents...................................................................................................................................6
2.0 Design Data ........................................................................................................................................ 7
3.0 Propane Skid Process Description ............................................................................................... 9
3.1 Skid Inlet <1> ..................................................................................................................................................9
3.2 PROPANE - Liquid phase ...............................................................................................................................9
32.1 Level Control Valve .............................................................................................................................................................. 9
3.2.2 Vaporizers (FDF-3 and FDF-4) ..................................................................................................................................... 12
3.3 PROPANE - Gas phase ................................................................................................................................ 14
3.3.1 Superheater ......................................................................................................................................................................... 14
3.3.1 Horizontal Steam Superheater (EE-07 FDF-2) ....................................................................................................................... 14
3.3.2 Vertical Electric Superheater (EL-31A/32A/33/A FTG1-EH-11/12/13) <1.> ............................................................ 15
3.3.2 Pressure Control Valves ................................................................................................................................................. 16
3.3.4 Piloted Pressure Relief Valves (PSV-1385) <1.> ................................................................................................... 20
3.3.5 Vane Pack Separator <1> ............................................................................................................................................. 21
3.3.6 Duplex Filters <1> ............................................................................................................................................................. 21
3.4 Skid Outlet <1> ............................................................................................................................................ 21
4.0 Control Objective and Process Control Philosophy .................................................................. 22
4.1 Overall Control Objective .......................................................................................................................... 22
4.2 Process Control Philosophy ...................................................................................................................... 22
4.2.1 Vaporizers: Propane Liquid Level Control <1> .................................................................................................... 23
4.2.1.1 Process Logic Flow Chart: PROPANE Vaporize Control ................................................................................................. 24
4.2.2 Vaporizers: Flowrate, Pressure and Temperature Control <1>................................................................... 24
4.2.2.1 Process Logic Flow Chart: Vaporizer ..................................................................................................................................... 26
4.2.3 Heaters Selection <1> ..................................................................................................................................................... 26
4.2.3.1 Steam Heater: Temperature Control ...................................................................................................................................... 27
4.2.3.2 Electric Heater: Temperature Control .................................................................................................................................... 28
4.2.3.3 Process Logic Flow Chart: PROPANE Controil Temperature Super Heaters ...................................................... 29
4.2.4 PROPANE Pressure Control <1> ................................................................................................................................. 29
4.2.4.1 Process Logic Flow Chart: PROPANE Pressure Control ................................................................................................. 29
4.2.5 Vane Pack Separator Level Control.......................................................................................................................... 29
4.2.5.1 Process Logic Flow Chart: PROPANE Pressure Control ................................................................................................. 30
4.2.6 Filters Control <1> ............................................................................................................................................................. 30
4.2.6.1 Process Logic Flow Chart: PROPANE Pressure Control ................................................................................................. 30
5.0 ESD and Process Protection ........................................................................................................ 31
5.1 Emergency Shut-Down System (generated from Propane Skid) ....................................................... 31
5.1.1 Automatic Safe Position <1> ....................................................................................................................................... 35
5.1.2 Process Logic Flow Chart: Interlocks Vaporizes, Heaters, Separator and Filters ............................................... 36
5.2 Trip From Customer (External Request) <1> ......................................................................................... 36
5.2.1 Automatic Safe Position (External Request) <1> ................................................................................................ 37
5.2.1 Process Logic Flow Chart: PPSDr and ESD ............................................................................................................................. 39
5.3 Process Protection – PSV sizing criteria ................................................................................................. 39
5.3.1 Piping Protection upstream LCV-1351/A/B and LCV-1353/A/B ................................................................ 40
5.3.2 Vaporizer Protection <1>............................................................................................................................................... 40
5.3.2.1 Vaporizer Protection - PROPANE Side .................................................................................................................................... 40
TITLE: DOCUMENT CODE REVISION
CONTROL NARRATIVE FOR PROPANE TREATMENT SKID
NON40660 1
REVISION DESCRIPTION: PAGE MARKER SECURITY CODE
Revised where shown <1.> N/A N
ORIGINAL JOB SIZE LANGUAGE
18-JUN-2018 Click here to enter text. 4 A
THISEASWARAN
DOCUMENT IS AND MAHESH (A804)AND PROPRIETARY INFORMATION OF Nuovo Pignone Tecnologie S.r.l. WHICH SHALL NOT BE USED OR DISCLOSED TO OTHERS, EXCEPT
CONTAINS CONFIDENTIAL SHEET
WITH THE WRITTEN PERMISSION OF Nuovo Pignone Tecnologie S.r.l. . UNPUBLISHED WORK ©2016 Nuovo Pignone Tecnologie S.r.l.. ALL RIGHTS RESERVED. 2 of 92
Page 2 of 93
5.3.3 Steam Super-Heater Protection ................................................................................................................................ 42
5.3.3.1 Steam Super-Heater Protection <1> ...................................................................................................................................... 42
5.3.4 Electric Super-Heater Protection ............................................................................................................................... 42
6.0 Start-up : initial Start-up and after normal Shut-down ...........................................................44
6.1 Nitrogen Purging Procedures <1>........................................................................................................... 44
6.1.1 Process Logic Nitrogen purging ................................................................................................................................................... 47
6.2 First Filling PROPANE Liquid ..................................................................................................................... 47
6.2.1 Process Logic Flow Chart: First Filling ........................................................................................................................................ 50
6.3 Start-up from depressurized condition and warm-up <1> ................................................................ 50
6.4 Start-up from pressurized condition Warm-up <1> ............................................................................ 52
6.5 Process Logic Flow Chart – Startup and Warm-up <1> ...................................................................... 54
7.0 Normal shut-down of Unit Natural Gas Skid <1> ..................................................................... 55
8.0 Upset <1> ........................................................................................................................................57
Page 3 of 93
1.0 Introduction
1.1 Scope
Aim of the Natural Gas treatment skid is to pre-condition the PROPANE fuel gas in order to
match pressure and temperature conditions required at the GT terminal point.
PROPANE Gas treatment skid is dimensioned to feed 3 gas turbines at the time (baseload
conditions).
The PROPANE skid is equipped with 2 X100 %VAPORIZER (tag: FDF-3/FDF-4) that are
required to vaporize and heat at 83 °C the incoming liquid PROPANE. Each Vaporizer is
dimensioned to provide full duty for three turbines, with 110% margin for both flow and
power. One in operation and the other in stand-by. PROPANE will be in the shell, while
steam will be in the tube.
On PROPANE side
PROPANE level will be regulated by means of a Level Control Valve in closed loop
with a Level Transmitter
On the steam side:
steam flow rate will be regulated by means Temperature Control Valve in closed
loop with PROPANE Temperature Transmitter.
condensate level will be regulated by means of a Level Control Valve in closed loop
with a Level Transmitter.
Double superheaters (one steam heated, the other electric heated) are used to match
superheating requirement of 93°C (based on contractual PROPANE conditions and as per
GE EPE design basis document).
Each superheater is dimensioned to provide full duty for three turbines, with 110% margin
for both flow and power.
1x100% horizonthal STEAM SuperHeater (tag: FDF-2):
Gas will be in the tubes, while steam will be in the shell.
On the steam side:
steam flow rate will be regulated by means Flow Control Valve in closed loop with
PROPANE Temperature Transmitter.
condensate level will be regulated by means of a Level Control Valve in closed loop
with a Level Transmitter.
It will be possible to by-pass the Steam superheater by opening the manual bypass valve.
For maintenance, the vessel shall be isolated and depressurized (first to flare and then to
atmosphere) and eventually purged.
1x100% vertical Electric SuperHeater (tag: FTG1-EH-11/12/13)
It will be possible to by-pass the Electric Heater by opening the manual bypass valve. For
maintenance, the vessel shall be isolated and depressurized (first to flare and then to
atmosphere) and eventually purged.
Page 4 of 93
Two Pressure Control Valves (tag PCV 1363 and tag PCV 1364) mounted in parallel and in
split range to regulate the pressure at 26.5 kg/cm²g in order to match minimum pressure
requirement for GT baseload.
When 2(two) Instrments are utilized for the same measure then calculate:
* average value
* deviation (alarm if ≥±1%)
To increase the rangeability of control valves 2 (two) control valves have been installed in
parallel.
Page 5 of 93
1.2 Definitions and Abbreviations
Within the present specification, the following definitions/abbreviation shall apply:
Customer: Dangote Oil Refining Company Limited (DORC)
Contractor: General Electric / Nuovo Pignone (GENP)
BOP: Balance of plant
ESD: Emergency shutdown
PPSD: Partial depressurized shut-down
DCS: Distributed control system
PLC: Programmable logic control
SCP: Station control panel
UCP: Unit control panel
SIS: Safety integrated system
TCP: : Tyristor Control Panel
Page 6 of 93
2.0 Design Data
Contractual Natural Gas composition as per A545-681-02-DS-1801 Annexure 1.
Ambient Temperature
Description u.m. Design
Dry bulb Temperature °C 32.6
Wet bulb Temperature °C 28.5
Max Ambient Temperature °C 34.0
Ambient Temperature for MDMT °C 14.0
Gas Composition
Component Mole Fraction
Methane 0
Ethane 0.0088
Propane 0.9332
i-Butane 0.0115
n-Butane 0.0005
Nitrogen 0
H2O 0.0001
H2S 0
Propene 0.0383
i-Butene 0.0001
1-Butene 0.0075
Page 7 of 93
Conditions of PROPANE Gas at TP821 (Liquid Propane from Customer) are:
Description u.m. Operating Design
Flow Rate kg/h 9’459x3=28’487 31’336
Pressure kg/cm²g (1) 28.0 ÷ 32.0 67.0 shutoff
Temperature °C 14÷28.0 140.0
DN | Rating 4” 600#
Material Carbon Steel
(1) the Operating Pressure will be in the all range of Flow Rate, that is between 600 kg/h and
31'462 kg/h
Conditions of PROPANE Gas at TP834 (to Fuel Gas Chromatograph – SOM6770884) are:
Description u.m. Operating Design
Flow Rate kg/h 9’459x3=28’487 31’336
Pressure kg/cm²g 25.0 ÷ 28.0 31.5
Temperature °C 93.0 ÷ 110.0 120.0
DN | Rating 4” 300#
Material Stainless Steel
Conditions of Steam at TP839 (Steam Supply) are:
Description u.m. Operating Design
Flow Rate kg/h 6’137 ÷ 6’155
Pressure kg/cm²g 4 ÷ 5.5 10 / Full Vacuum
Temperature °C 170 ÷ 190 °C 250°C
DN | Rating 6” 150#
Material Carbon Steel
Conditions of Condensate at TP840 (Condensate Outlet to flash tank) are:
Description u.m. Operating Design
Flow Rate kg/h 489 ÷772
Pressure kg/cm²g 2.5 ÷ 4.0 10 / Full Vacuum
Temperature °C 100 ÷ 150 °C 250°C
DN | Rating 2” 150#
Material Carbon Steel
Conditions of Condensate at TP841 (Condensate Outlet to flash tank) are:
Description u.m. Operating Design
Flow Rate kg/h 5'648 ÷ 5’383
Pressure kg/cm²g (2) 0.3 ÷ 4.0 10 / Full Vacuum
Temperature °C 100 ÷ 150 °C 250°C
Rating 2” 150#
Material Carbon Steel
(2) To avoid flashing in the interconnecting piping between TP and flash tank , Customer flash
tank shall be placed as close as possible to TP of skid or alternatively install LCV near as
possible flash tank (in this case one line for each LCV valve).
<1.> Conditions of PROPANE Gas at TP823 are:
Description u.m. Operating Design
Flow Rate kg/h 9’459x3=28’487 (1) 31’336 (1)
TITLE: DOCUMENT CODE REVISION
CONTROL NARRATIVE FOR PROPANE TREATMENT SKID
NON40660 1
REVISION DESCRIPTION: PAGE MARKER SECURITY CODE
Revised where shown <1.> N/A N
ORIGINAL JOB SIZE LANGUAGE
18-JUN-2018 Click here to enter text. 4 A
THISEASWARAN
DOCUMENT IS AND MAHESH (A804)AND PROPRIETARY INFORMATION OF Nuovo Pignone Tecnologie S.r.l. WHICH SHALL NOT BE USED OR DISCLOSED TO OTHERS, EXCEPT
CONTAINS CONFIDENTIAL SHEET
WITH THE WRITTEN PERMISSION OF Nuovo Pignone Tecnologie S.r.l. . UNPUBLISHED WORK ©2016 Nuovo Pignone Tecnologie S.r.l.. ALL RIGHTS RESERVED. 8 of 92
Page 8 of 93
Description u.m. Operating Design
Pressure kg/cm²g 28.0 ÷ 32.0 (2) 35.2
Temperature °C 74.2 °C ÷ 80.9 °C (3) 140.0
DN | Rating 6” 300#
Material Carbon Steel
(1) in case of no consumption to Gas Turbines
(2) the Operating Pressure will be in the all range of Flow Rate, that is between 600 kg/h
and 31'462 kg/h
(3) saturated conditions
Page 9 of 93
Temperature-Enthalpy
Temperature [°C]
Really flow through valve is isentropic between the valve inlet and the vena contracta
where the pressure reach the critical Pressure and the maximum velocity, then the
pressure increase as per isenthalpic -114'299 kJ/kgmole (-2'588.69 kJ/kg) @ P= 32kg/cm² &
T=28°C.
Page 10 of 93
180
Temperature-Entropy
170
160
150
140
130
120
110
100
90
80
Temperature [°C]
70
60
50
40
30
20
10
0
-10
-20
-30
-40
-50
-60
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170
Entropy [ /( ∙ ∙° )]
With the following table we can see the vapor fraction with Isenthalpic -114'299 kJ/kgmole (-
2'588.69 kJ/kg) @ P= 32kg/cm² & T=28°C
Vapor
Mass Fraction Liquid Vapor
P Pressure Temperature Entropy
density on Mass Enthalpy Enthalpy
Basis
28.0 27.46 513.6 90.81 -2'434.17 -2'226.84
27.9 °C 0.00%
kg/cm² barg kg/m³ /( · ·° ) kJ/kg kJ/kg
28.55 28.00 513.8 90.79 -2'429.94 -2'227.18
27.9 °C 0.00%
kg/cm² barg kg/m³ /( · ·° ) kJ/kg kJ/kg
TITLE: DOCUMENT CODE REVISION
CONTROL NARRATIVE FOR PROPANE TREATMENT SKID
NON40660 1
REVISION DESCRIPTION: PAGE MARKER SECURITY CODE
Revised where shown <1.> N/A N
ORIGINAL JOB SIZE LANGUAGE
18-JUN-2018 Click here to enter text. 4 A
THISEASWARAN
DOCUMENT IS AND MAHESH (A804)AND PROPRIETARY INFORMATION OF Nuovo Pignone Tecnologie S.r.l. WHICH SHALL NOT BE USED OR DISCLOSED TO OTHERS, EXCEPT
CONTAINS CONFIDENTIAL SHEET
WITH THE WRITTEN PERMISSION OF Nuovo Pignone Tecnologie S.r.l. . UNPUBLISHED WORK ©2016 Nuovo Pignone Tecnologie S.r.l.. ALL RIGHTS RESERVED. 11 of 92
Page 11 of 93
Vapor
Mass Fraction Liquid Vapor
P Pressure Temperature Entropy
density on Mass Enthalpy Enthalpy
Basis
32.0 31.38 515.5 90.71 -2'403.27 -2'229.32
28.0 °C 0.00%
kg/cm² barg kg/m³ /( · ·° ) kJ/kg kJ/kg
35.2 34.52 517.4 90.64 -2'378.55 -2'235.47
28.1 °C 0.00%
kg/cm² barg kg/m³ /( · ·° ) kJ/kg kJ/kg
Liquid Mass
Vapor Pressure Temperature
density
The CV of Level Control Valve have been sized for liquid case (no flashing or cavitation are
present during the expansion):
o LCV-1351A (LCV-1353A) for flow rate between 3'408 kg/h ÷ 31'336 kg/h
o LCV-1351B (LCV-1353B) for flow rate between 360 kg/h ÷ 3'408 kg/h
in the range:
Operating Pressure kg/cm²g 28.0 ÷ 32.0
Operating Temperature °C 14÷28.0
Page 12 of 93
condensate will be controlled by means the level transmitter PIT-1366 and PIT-1367.
The vaporizer will be Kettle type - Tube-and-shell heat exchange device in which liquid is
vaporized on the shell side from heat transferred from Steam flowing through the tubes;
dome space allows liquid-vapor separation above the tube bundle.
VAPORIZER OPERATION
During normal operation, the PROPANE Liquid (in the shell) will be vaporized by steam (in
the tubes)
PROPANE Liquid Flow rate will be regulated by LCV-1351A/B (or LCV-1353A/B) in the
following range:
Description
u.m. Min Norm Max
PROPANE Liquid
Flow Rate kg/h 360 28’487 31’336
Pressure kg/cm²g 28.0 30.0 32.0
Temperature °C 14.0 28.0 32.6
The vaporizer will be heated with Steam at following conditions:
Description
u.m. Min Norm Max
Steam
Flow Rate kg/h 60 5144 5'659
Pressure kg/cm²g 4 4.5 5.5
Temperature °C 170 185 190
The vaporizer discharges Condensate at the following conditions:
Description
u.m. Min Norm Max
Condensate
Flow Rate kg/h 5144 5'659
Pressure kg/cm²g 0.3 2.5 4.0
Temperature °C 100 146 150
PROPANE Liquid Level and/or Steam Flow will be controlled to provide the required
vaporization rate and PROPANE minimum Temperature of 83.0 °C at maximum PROPANE
flow rate.
The PROPANE gas will be heated slightly above the temperature of dew point as shown in
the following table:
Liquid Vapor Latent Heat
Temperature Liquid Vapor
Pressure Mass Mass of
of Saturation Enthalpy Enthalpy
density density Vaporization
28.00 27.46 375.3 -2'434.2 -2'226.8
74.2 °C 73.6 kg/m³ 207.3 kJ/kg
kg/cm² barg kg/m³ kJ/kg kJ/kg
32.00 31.39 340.4 -2'403.3 -2'229.3
80.9 °C 89.5 kg/m³ 174.0 kJ/kg
kg/cm² barg kg/m³ kJ/kg kJ/kg
Steam flow will be varied by the vaporizer system match the requirements of the varying
incoming PROPANE Liquid flow. Minimum Vaporizer turndown will be greater than 88:1.
Considering that the maximum PROPANE Temperature can be equal to incoming steam
TITLE: DOCUMENT CODE REVISION
CONTROL NARRATIVE FOR PROPANE TREATMENT SKID
NON40660 1
REVISION DESCRIPTION: PAGE MARKER SECURITY CODE
Revised where shown <1.> N/A N
ORIGINAL JOB SIZE LANGUAGE
18-JUN-2018 Click here to enter text. 4 A
THISEASWARAN
DOCUMENT IS AND MAHESH (A804)AND PROPRIETARY INFORMATION OF Nuovo Pignone Tecnologie S.r.l. WHICH SHALL NOT BE USED OR DISCLOSED TO OTHERS, EXCEPT
CONTAINS CONFIDENTIAL SHEET
WITH THE WRITTEN PERMISSION OF Nuovo Pignone Tecnologie S.r.l. . UNPUBLISHED WORK ©2016 Nuovo Pignone Tecnologie S.r.l.. ALL RIGHTS RESERVED. 13 of 92
Page 13 of 93
temperature (190°C), then the mechanical design will be:
Design Design
Description u.m.
(Tube Side) (Shell Side)
Pressure kg/cm²g 10 / Full Vacuum 35.2
Temperature °C 250°C 250°C
Rating 150# 300#
Material Carbon Steel Carbon Steel
<1>
Page 14 of 93
Description
u.m. Min Norm Max
Steam
Flow Rate kg/h 11 595 772
Pressure kg/cm²g 4 4.5 5.5
Temperature °C 170 185 190
The Superheater discharges Condensate at the following conditions:
Description
u.m. Min Norm Max
Condensate
Flow Rate kg/h 595 772
Pressure kg/cm²g 0.3 2.5 4.0
Temperature °C 100 146 150
It will be possible to by-pass the Steam superheater by opening the manual bypass
valve. For maintenance, the vessel shall be isolated and depressurized (first to flare
and then to atmosphere) and eventually purged.
Page 15 of 93
Qty Item Rating
Over Temperature Controllers with door mounted digital
9
temperature display
1 Ramp Unit
1 Set Pushbuttons
Set Pilot Lights
1 Set Control Switches
1 Self regulating Space/ Anti-Condensation Heater
1 Feed for Heater Terminal Box Anti-Condensation Heater
1 RCCD for Personnel Protection at Heater ACH (30mA)
1 Interior Light
1 Set Relays/ Fuses/ Neutral Links etc.
As a new Safety feature the thyristor protection circuit (MOV and dv/dt) have been mounted
external to the assembly and away from the main devices.
For Control System see par. “4.2.3.2 PROPANE Temperature Control Electric Super-Heater”.
Page 16 of 93
180
Temperature-Enthalpy
170
160
150
140
130
120
110
100
90
80
Temperature [°C]
70
60
50
40
30
20
10
0
-10
-20
-30
-40
-50
-60
-123.000 -118.000 -113.000 -108.000 -103.000 -98.000 -93.000
Enthalpy [kJ/kgmole]
Bubble Points Hydrate
Dew Point Isenthalpic @(P=28.55 kg/cm² T= 95.9 °C)
Isobar P= 35.2 kg/cm² Isobar P= 28.55 kg/cm²
Isobar P= 25 kg/cm² P=1.03 kg/cm²
Really flow through valve is isentropic between the valve inlet and the vena contracta
where the pressure reach the critical Pressure and the maximum velocity, then the
pressure increase as per isenthalpic -95'854 kJ/kgmole (-2'170.93 kJ/kg) @ P=28.55 kg/cm²
& T= 95.9 °C.
Page 17 of 93
180
Temperature-Entropy
170
160
150
140
130
120
110
100
90
80
Temperature [°C]
70
60
50
40
30
20
10
0
-10
-20
-30
-40
-50
-60
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200
Entropy [ /( ∙ ∙° )]
Bubble Points Dew Point
Hydrate Isenthalpic @(P=28.55 kg/cm² T= 95.9 °C)
Isobar P= 35.2 kg/cm² Isobar P= 28.55 kg/cm²
Isobar P= 25 kg/cm² P=1.03 kg/cm²
You can see that during the expansion from a pressure of 32 kg/cm² (or 28.55 kg/cm²) and
temperature 100.4 °C (or 95.9 °C), the PROPANE gas, for any of PCV outlet pressure, has
always at a temperature higher than 20 °C above the dew point temperature.
Page 18 of 93
Vapor
P Mass Fraction Liquid Vapor
Pressure Temperature Entropy
kg/cm² density on Mass Enthalpy Enthalpy
Basis
1.03 1.01 3.3 164.42 -2'728.11 -2'316.29
61.4 °C 100.00%
kg/cm² barg kg/m³ /( · ·° ) kJ/kg kJ/kg
5.00 4.90 10.0 155.89 -2'648.40 -2'279.60
66.1 °C 100.00%
kg/cm² barg kg/m³ /( · ·° ) kJ/kg kJ/kg
9.76 9.57 18.6 151.58 -2'588.51 -2'256.05
71.9 °C 100.00%
kg/cm² barg kg/m³ /( · ·° ) kJ/kg kJ/kg
25.0 24.52 51.9 145.73 -2'464.20 -2'228.96
91.2 °C 100.00%
kg/cm² barg kg/m³ /( · ·° ) kJ/kg kJ/kg
28.0 27.46 59.6 145.09 -2'434.17 -2'226.84
95.1 °C 100.00%
kg/cm² barg kg/m³ /( · ·° ) kJ/kg kJ/kg
28.55 28.00 61.1 144.98 -2'429.94 -2'227.18
95.9 °C 100.00%
kg/cm² barg kg/m³ /( · ·° ) kJ/kg kJ/kg
32.0 31.38 70.5 144.37 -2'403.27 -2'229.32
100.4 °C 100.00%
kg/cm² barg kg/m³ /( · ·° ) kJ/kg kJ/kg
35.2 34.52 79.6 143.88 -2'378.55 -2'235.47
104.6 °C 100.00%
kg/cm² barg kg/m³ /( · ·° ) kJ/kg kJ/kg
67.0 65.70 172.0 140.94
138.3 °C
kg/cm² barg kg/m³ /( · ·° )
HC Dew Point Temperature
Temperature
Pressure Mass density Enthalpy
of Saturation
Page 19 of 93
You can do the same considerations with Marginated Curve 20°C (20 °C above the dew
point temperature)
70
Pressure - Temperature
PROPANE Dew Points
60
50
Pressure [barg]
40
30
20
10
0
-30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120
Temperature [°C]
Hydrate Dew Points
Marginated (20°C) Isenthalpic @(P=28.55 kg/cm² T= 95.9 °C)
P=28.55 kg/cm² T=75.9 °C
P=25 kg/cm² T=69.0 °C
The CV of Pressure Control Valve have been sized for gas case (no liquid is formed during
expansion):
o PCV-1364 for flow rate between 4'273 kg/h ÷ 31'336 kg/h
o PCV-1363 for flow rate between 576 kg/h ÷ 4'273 kg/h
in the range:
Inlet Operating Pressure kg/cm²g 28.0 ÷ 32.0
Inlet Operating Temperature °C 98.5
Outlet Operating Pressure kg/cm²g 25.7 ÷ 28.0
<1>
3.3.4 Piloted Pressure Relief Valves (PSV-1385) <1.>
The Piloted Pressure Relief Valves (PSV-1385), modulating type, having function of Relief
Valve, normally close, shall open the outlet pressure downstream regulators will go
high at predefined levels. The relief valve, installed at downstream of GT metering line,
is sized for discharging the 10% of total gas flow rate when the pressure at the control
point exceeds a given level to any temporary occurrence such as the momentary
Page 20 of 93
shutting of control valves and/or the overheating of gas with no flow requirement. This
valve is requested to open when the upstream pressure increases over 30.5 kg/cm²
(29.91 barg)
3.3.5 Vane Pack Separator <1>
The propane gas passes through the suction vane pack separator FG-3,that
removes particle liquid .
The median value of Level Transmitters (LIT 1355/A/B/C) is used to open and
close the level control valve DCV-1355; the liquids, collected at the bottom of the
Separator, will be drained automatically into Customer closed tank.
The Level Control Valve DCV-1355 (with Position Trasmitter ZY-1355) will be
opened when the LIT 1355/A/B/C reach high level LSH-1355 and will be closed
when LIT 1355/A/B/C reach low level LSL-1355.
If the valve DCV-1355 is closed in presence of “Open Command”, then the DCS
will communicate: “ALARM VALVE not Opened”. In order to avoid the ESD of
plant, manual drain will be performed.
If valve DCV-1355 is opened in absence of “Open Command”, then DCS will
communicate: “Warning, Valve Not Closed (verify the plug/seat of valve could be
dirty)”. In order to avoid gas discharge through DCV-1355 then valve XV-1398
will be closed.
If the sump experiences a High-High level, the median value of Level
Transmitters (LIT 1355/A/B/C) generates a High-High level alarm (LSHH-1355)
and consequently "Skid Shutdown" (Interlock I3).
If the sump experiences a high-high level, the median value of Level Transmitters
(LIT 1355/A/B/C) generates a Low-Low level alarm (LSHH-1355) and valve XV-
1398 will be closed.
3.3.6 Duplex Filters <1>
For Filter FG-2A/B the liquid level control is realized by the controller LIT-1357A/B
(Controller with direct action).
When the Level reaches the LAH threshold an Alarm (programmed in SCP)
provides to advise the operator to open the manual drain valves (on bottom and
top section of filter) and close the drain valves when level reach the minimum
value.
Each Filter is equipped with two Level Gauge (LG1359A/B on bottom section and
LG1358A/B on top section of filter)
3.4 Skid Outlet <1>
The following automatic valves and instrument are installed:
1. Outlet isolation valve (XV-1397), equipped with Open/Close Limit Switches (ZSH-
1397/ ZSL-1397), solenoid valve (XY-1397)
2. Inlet header blowdown valve (XV-1396), equipped with Open/Close Limit Switches (ZSH-
1396/ ZSL-1396), solenoid valve (XY-1396)
Page 21 of 93
4.0 Control Objective and Process Control Philosophy
The following loops are implemented in the Station Control Panel (SCP):
1.0 PROPANE Flow Control - Split Range
2.0 Main (Spare) PROPANE Vaporize Control (Split range PROPANE Side - Split
range Steam Side)
3.0 Main (Spare) PROPANE Temperature Control
3.1 PROPANE Temperature Control Steam Super-Heater
3.1.1 Steam condensate level control <1>
3.2 PROPANE Temperature Control Electric Super-Heater
4.0 PROPANE Pressure Control
5.0 PROPANE Vane Pack Separator Level Control
6.0 Main (Spare) PROPANE Filters Level Control
6.1 Main (Spare) PROPANE Filter Switching Logic <1>
Page 22 of 93
Signal Set Interlock Description
PSHH3-1368 34.8 kg/cm²g I3: not active SKID SHUTDOWN
PSHH4-1368 35.2 kg/cm²g I4: not active EMERGENCY DEPRESSURIZATION
31.5
PSHH-1369 I3: not active SKID SHUTDOWN
kg/cm²g
LSLL-1351
Vaporizers I1: not active VAPORIZER STEAM CUTOFF
LSLL-1353
LSHH-1351
Vaporizers I3: not active SKID SHUTDOWN
LSHH-1353
Vane pack
LSHH-1355 I3: not active SKID SHUTDOWN
Separator
Table 4.2.T2: Trip signal from process and from External Sequences
Page 23 of 93
The valves are installed in parallel and are controlled with a split range philosophy:
o The DN 1" valve (LCV-1351B or LCV-1353B if vaporizer 2 is selected) will work
between 0% and 75-80% aperture by reading the position transmitter (ZT-1351);
when the degree of opening of 75% is exceeded (the flow rate required by the
turbines is increasing) then the DN 4” Valve (LCV-1351A) will modulate and the
valve (LCV-1351B) will close.
o The valve DN4” (LCV-1351A or LCV-1353A if vaporizer 2 is selected) will continue to
maintain the SET as the flow rate required by the turbines increases. When the
required flow rate decreases and the valve (LCV-1351A) aperture reaches 20% by
reading the position transmitter (ZT-1351A), then the valve DN 1" (LCV-1351B or
LCV-1353B) will modulate and the DN 4” Valve (LCV-1351A or LCV-1353A) closes.
NOTE: the operating pressure at TP-821 will be 28÷32 kg/cm2 in the all range of
flow rate, that is between 600 kg/h and 31462 kg/h.
The propane liquid level will be reduced if:
o The propane gas temperature (TIT-1391A/B) or TIT-1382B (or TIT-1382C if vaporizer
2 is selected) exceeds 83 °C and propane gas pressure (PIT-1368A/B/C) is less than
33 kg/cm² and greater than or equal to 27.4 kg/cm²
o The propane gas pressure (PIT-1368A/B/C) exceeds 33 kg/cm² (override)
Viceversa the propane liquid level will be increased if:
o The propane gas temperature (TIT-1391A/B) or TIT-1382B (or TIT-1382C if vaporizer
2 is selected) is less 83 °C and propane gas pressure (PIT-1368A/B/C) is less than
33 kg/cm² and greater than or equal to 27.4 kg/cm²
o The propane gas temperature (TIT-1391A/B) is less than 83°C and TIT-1382B (or
TIT-1382C if vaporizer 2 is selected) is grater than or equal to 83 °C.
Page 24 of 93
o The propane vapour temperature is measured by means Temperature
Transmitter (TIT-1391A/B) that send the signal to:
the controller PIC to regulating steam flow rate
to level controller (LIC-1351 or LIC-1353A/B if Vapororizes 2 is selected) to to
regulating the liquid propane height and the propane flow rate
If the temperature (TIT-1391A/B) execeeds 83°C and the pressure is greater
than 27.4 kg/cm2 and less 33 kg/cm2 then:
reduce the steam flow rate by decreasing the aperture of TCV-1366A/B (or
TCV-1367A/B if Vapororizes 2 is selected)
reduce the liquid propane level (and flowrate) by decreasing the aperture of
LCV-1351A/B B (or LCV-1353A/B if Vapororizes 2 is selected)
Vicversa, if the temperature (TIT-1391A/B) is less 83°C and the pressure is
greater than 27.4 kg/cm2 and less 33 kg/cm2 then:
increase the steam flow rate by increasing the aperture of TCV-1366A/B (or
TCV-1367A/B if Vapororizes 2 is selected)
increase the liquid propane level (and flowrate) by increasing the aperture
of LCV-1351A/B B (or LCV-1353A/B if Vapororizes 2 is selected)
o The propane vapour pressure is measured by means Pressure Transmitter (PIT-
1368A/B/C) send the signal (P-C1) to the controller PIC.
If the pressure (PIT-1368A/B/C) exceeds 33 kg/cm² then:
1. Reduce level of propane liquid by reducing/closing the aperture of LCV-1351 (or
LCV-1353 if vaporizer 2 is selected)
2. Reduce the steam flow rate by reducing/closing the aperture of TCV-1366A/B
(or TCV-1367A/B if vaporizer 2 is selected)
3. If the pressure (PIT-1368A/B/C) exceeds 33.5 kg/cm² then open PCV-1347
modulating at set equal to 33.5 kg/cm²
The temperature/pressure contoller modulate with reverse action:
Temperature control valve DN2" (TCV-1366B or TCV-1367B if Vapororizes 2 is
selected)
Temperature control valve DN6" (TCV-1366A or TCV-1367A if Vapororizes 2 is
selected)
The valves are installed in parallel and are controlled with a split range philosophy:
The DN 2" valve (TCV-1366B or TCV-1367B if vaporizer 2 is selected) will work
between 0% and 75-80% aperture by reading the position transmitter (ZT-1366B
or ZT-1367B); when the degree of opening of 75% is exceeded (the flow rate
required by the turbines is increasing) then the DN 6” Valve (TCV-1366A) will
modulate and the valve (TCV-1367B) will close.
The valve DN6” (TCV-1366A or TCV-1367A if vaporizer 2 is selected) will continue
to maintain the SET as the flow rate required by the turbines increases. When the
required flow rate decreases and the valve (TCV-1366A or TCV-1367A) aperture
reaches 20% by reading the position transmitter (ZT-1366A or ZT-1367A), then
Page 25 of 93
the valve DN 2" (TCV-1366B or TCV-1366B) will modulate and the DN 6” Valve
(TCV-1366A or TCV-1367A) closes.
FLIM BOILING CONDITIONS:
1. inlet pressure (PIT-1362/C) is the range 28-32 kg/cm².
2. liquid Propane Level (LIT-1351A/B) is in the range, if Vaporizer 1 selected
3. liquid Propane Level (LIT-1353A/B) is in the range, if Vaporizer 2 selected
4. vaporizers oulet pressure (PIT-1368/A/B/C) lower 27.4 kg/cm²
5. vaporizers oulet temperature (TIT-1391/A/B) greater than 83°C
6. liquid Propane temperature (TIT-1382/B) greater than 83°C, if Vaporizer 1 selected
7. liquid Propane temperature (TIT-1382/C) greater than 83°C, if Vaporizer 2 selected
In case Film Boiling, if the temperatures of liquid PROPANE places on the evaporator
shell and of Temperature Transmitters TIT 1391A /B and TIT 1382B/C don’t increase
or in case PIT 1368A/B/C low pressure set point , then the Pressure Controller:
o The steam Temperature Control Valve (TCV-1366A/B or TCV 1367A/B if Vaporizer 2
selected) stop modulating and downstream pressure will be fixed (and
consequently the condensation temperature will be inferior). The condensate
pressure will be read by means (PIT-1366 or PIT-1367) located at downstream of
Vaporizer. The set pressure will be 0.6 barg at clean vaporizer (fouling factor equal
zero, note with fouling resistance: * 0.000172 m²∙K/W shell side * 0.000086 m²∙K/W
tube side no film boiling is espected)
o GT load will be regulated by modifying the set-point of propane liquid Kettle LIC
1353A/B or LIC 1351A/B; it’s also possible to act on the Condensate Level Control
Valve to regulate the condensate flow by modifying the set of level controller LIC
1399/C or LIC-1399A.
Page 26 of 93
4.2.3.1 Steam Heater: Temperature Control
Page 27 of 93
DT2 = 0 running only Steam Heater
DT1 = 0 running only Electric Heater
Page 28 of 93
4. Activate Electric Heater Start if Electric Heater selected or if it's inted to utilise Electric
Heater in serie with Steam Heater
5. Activate Electric Heater Controller in AUTO control with set Temperature equal to 99°C
(4÷20 mA signal demand)
4.2.3.3 Process Logic Flow Chart: PROPANE Controil Temperature Super Heaters
Please see Annex 1 figure 11 ÷ figure 14
The pressure is measured by PIT-1369 A/B (median) and controlled by the PIC-
1369 (Controller with reverse action) that sends the control output with a split
range philosophy. The Pressure Controller (PIC-1369) has set = 26.51 kg / cm²
(pressure read with PIT-1369 A/ B).
The DN 1½" PCV-1363 valve will work between 0% and 75-80% of the reading
value read by the position transmitter (ZT-1363); When the degree of opening of
75% is exceeded (the flow rate required by the turbines is increasing) then
checks the DN 4” Valve PCV-1364 and PCV-1363 closes.
The PCV-1364 will continue to maintain the set = 26.51 kg / cm² as the flow rate
required by the turbines increases. When the required flow rate decreases and
the PCV-1364 aperture reaches 20% (value read from the ZT-1364 transmitter),
then the DN 1½" PCV-1363 and the DN 4” Valve PCV-1364 closes.
Page 29 of 93
4.2.5.1 Process Logic Flow Chart: PROPANE Pressure Control
Please see Annex 1 figure 16
The filter group is provided of PDIT-1380 for monitoring cartridge fouling, and
perform the manual opening on the spare filter in case of high differential
pressure.
The filters group is equipped with one Differential Pressure Gauge (PDI1381).
When the differential pressure across the on-line filter reaches the PDAH
threshold (meaning dirty filter) an Alarm (programmed in SCP) provides to advise
the operator to open the spare filter and to close the on line one, acting on inlet
on/off valves.
Page 30 of 93
5.0 ESD and Process Protection
Two different procedures of shutdown/depressurization are provided:
1. Emergency Shut-Down System (generated from Propane Skid)
2. Trip From Customer (External Request)
Page 31 of 93
Signal Set Interlock Description Action
need to trigger:
• CLOSURE XV-1311B (steam
supply to Vaporizer 1)
LSLL-1351 VAPORIZER STEAM
Vaporizers I1 • CLOSURE XV-1311C (steam
LSLL-1353 CUTOFF
supply to Vaporizer 2)
• INHIBIT TO TRANSFER TO
PROPANE
need to trigger (Interlock I1 and
I2 activated):
• CLOSURE XV-1394 (liquid
propane from Customer)
• CLOSURE XV-1369 (saturated
PROPANE to Customer)
LSHH- • CLOSURE DSV-1398
1351 (automatic drain of Vanepack
Vaporizers I3 SKID SHUTDOWN
LSHH- Separator FG-3)
1353 • CLOSURE XV-1397 (PROPANE
to Gas Turbine)
• CUTOFF ELECTRIC
SUPERHEATER (FTG1-EH-
11/12/13) <1.>
• INHIBIT TO TRANSFER TO
PROPANE
need to trigger:
• CLOSURE XV-1311B (steam
supply to Vaporizer 1)
• OPEN LCV-1399B (condensate
Level Control Valve to Flash
Tank)
TSHH- STEAM VAPORIZER
140°C I • CLOSURE XV-1311C (steam
1391 CUTOFF
supply to Vaporizer 2)
• OPEN LCV-1399C (condensate
Level Control Valve to Flash
Tank)
• INHIBIT TO TRANSFER TO
PROPANE
need to trigger:
STEAM • CLOSURE XV-1311A (steam
TSHH-
140°C I2 SUPERHEATER supply to Steam Superheater)
1398
CUTOFF • INHIBIT TO TRANSFER TO
PROPANE
Page 32 of 93
Signal Set Interlock Description Action
need to trigger:
• CUTOFF ELECTRIC
ELECTRIC
TSHH- SUPERHEATER (FTG1-EH-
140°C I5 SUPERHEATER
1395 11/12/13) <1.>
CUTOFF
• INHIBIT TO TRANSFER TO
PROPANE
need to trigger (Interlock I1 and
I2 activated):
• CLOSURE XV-1394 (liquid
propane from Customer)
• CLOSURE XV-1369 (saturated
PROPANE to Customer)
• CLOSURE DSV-1398
TSHH- (automatic drain of Vanepack
120°C I3 SKID SHUTDOWN
1394 Separator FG-3)
• CLOSURE XV-1397 (PROPANE
to Gas Turbine)
• CUTOFF ELECTRIC
SUPERHEATER (FTG1-EH-
11/12/13) <1.>
• INHIBIT TO TRANSFER TO
PROPANE
Page 33 of 93
Signal Set Interlock Description Action
need to trigger (Interlock I1 and
I2 activated):
• CLOSURE XV-1394 (liquid
propane from Customer)
• CLOSURE XV-1369 (saturated
PROPANE to Customer)
• CLOSURE DSV-1398
LSHH- Vane pack (automatic drain of Vanepack
I3 SKID SHUTDOWN
1355 Separator Separator FG-3)
• CLOSURE XV-1397 (PROPANE
to Gas Turbine)
• CUTOFF ELECTRIC
SUPERHEATER (FTG1-EH-
11/12/13) <1.>
• INHIBIT TO TRANSFER TO
PROPANE
Page 34 of 93
5.1.1 Automatic Safe Position <1>
The table below lists the position of the automatic ON-OFF Valves, Control Valves and
Control Panel:
NORMAL Interlock
TAG SERVICE INTERLOCK
POSITION POSITION
Skid Inlet
XV-1394 Inlet isolation valve OPEN CLOSED I3,I4
Inlet header
XV-1395 CLOSED CLOSED I3,I4
blowdown valve
Vaporizers
Level Control Valve
LCV-1351/A Liquid Propane MODULATING CLOSED I,I1, I3,I4 <1.>
feeding
Level Control Valve
LCV-1351/B MODULATING CLOSED I,I1, I3,I4 <1.>
Propane Liquid
Inlet isolation valve
XV-1311/B OPEN CLOSED I,I1, I3,I4 <1.>
Steam Supply
Flow Control Valve
TCV-1366/A MODULATING CLOSED I,I1, I3,I4 <1.>
Steam Side
Flow Control Valve
TCV-1366/B MODULATING CLOSED I,I1, I3,I4 <1.>
Steam Side
Level Control Valve
LCV-1399/B MODULATING OPEN I,I1, I3,I4 <1.>
Condensate Side
Level Control Valve
LCV-1353/A
Liquid Propane MODULATING CLOSED I,I1, I3,I4
<1.>
feeding
LCV-1353/B Level Control Valve
MODULATING CLOSED I,I1, I3,I4
<1.> Propane Liquid
Inlet isolation valve
XV-1311/C OPEN CLOSED I,I1, I3,I4
Steam Supply
Flow Control Valve
TCV-1367/A MODULATING CLOSED I,I1, I3,I4
Steam Side
Flow Control Valve
TCV-1367/B MODULATING CLOSED I,I1, I3,I4
Steam Side
Level Control Valve
LCV-1399/C MODULATING OPEN I,I1, I3,I4
Condensate Side
Fuel Gas Steam
Heater
Inlet isolation valve
XV-1311/A OPEN CLOSED I2, I3,I4
Steam Supply
Flow Control Valve
TCV-1365/A MODULATING CLOSED I2, I3,I4
Steam Side
Flow Control Valve
TCV-1365/B MODULATING CLOSED I2, I3,I4
Steam Side
TITLE: DOCUMENT CODE REVISION
CONTROL NARRATIVE FOR PROPANE TREATMENT SKID
NON40660 1
REVISION DESCRIPTION: PAGE MARKER SECURITY CODE
Revised where shown <1.> N/A N
ORIGINAL JOB SIZE LANGUAGE
18-JUN-2018 Click here to enter text. 4 A
THISEASWARAN
DOCUMENT IS AND MAHESH (A804)AND PROPRIETARY INFORMATION OF Nuovo Pignone Tecnologie S.r.l. WHICH SHALL NOT BE USED OR DISCLOSED TO OTHERS, EXCEPT
CONTAINS CONFIDENTIAL SHEET
WITH THE WRITTEN PERMISSION OF Nuovo Pignone Tecnologie S.r.l. . UNPUBLISHED WORK ©2016 Nuovo Pignone Tecnologie S.r.l.. ALL RIGHTS RESERVED. 35 of 92
Page 35 of 93
NORMAL Interlock
TAG SERVICE INTERLOCK
POSITION POSITION
Level Control Valve
LCV-1399/A MODULATING OPEN I2, I3,I4
Condensate Side
Pressure Relief
Control Valves
Pressure Relief
PCV-1347 MODULATING CLOSE I3,I4
Control Valve
FG Electric Heater
FTG1-EH-
FG Electric Heater RUNNING TRIP I3,I4,I5
11/12/13
Pressure Control
Valves
Pressure Control
PCV-1363 MODULATING CLOSED I3,I4
Valve
Pressure Control
PCV-1364 MODULATING CLOSED I3,I4
Valve
Vane pack
Separator
XV-1398 Drain isolation Valve OPEN CLOSED I3,I4
DCV-1355 Level Control Valve MODULATING CLOSED I3,I4
Skid Outlet
Outlet header CLOSED I3
XV-1396 CLOSED I3,I4
blowdown valve OPEN I4 <1.>
Outlet isolation
XV-1397 OPEN CLOSED I3,I4
valve
5.1.2 Process Logic Flow Chart: Interlocks Vaporizes, Heaters, Separator and Filters
Please see Annex 1 figure x1 and figure x2.
Page 36 of 93
completely depressurized until the High pressure flare backpressure.
The main reasons to have the emergency depressurised shutdown conditions are the
following:
o Detection of an abnormal process or equipment condition by Operation
personnel;
o A Fire & Gas conditions detected by Fire & Gas system by Customer;
o Manual activation by Operation personnel as a consequence of audible and
visual alarms status recognized;
PPSDr: “Partial Pressurized Emergency Shut-Down” will be manually activated by
panel operator, train fire & gas or machines protection system, in case of emergency
and consists in stopping all the equipment, isolating the gas inventory. The unit fuel
gas skid will be stopped but not depressurized.
The causes of a pressurized shutdown are listed here below.
o Detection of an abnormal process or equipment condition;
o Manual activation by Operation personnel as a consequence of audible and
visual alarms status recognized;
o Fire & Gas System
Page 37 of 93
ESDr PPSDr
NORMAL Sequence Sequence
TAG SERVICE
POSITION from NP Position from NP Position
to ESDr to PPSDr
Level Control Valve
LCV-1399B MODULATING (2) OPEN (2) OPEN
Condensate Side
Level Control Valve
LCV-1353A MODULATING (1) CLOSED (1) CLOSED
Propane Liquid
Level Control Valve
LCV-1353B MODULATING (1) CLOSED (1) CLOSED
Propane Liquid
Inlet isolation valve
XV-1311C OPEN (1) CLOSED (1) CLOSED
Steam Supply
Flow Control Valve
TCV-1367A MODULATING (2) CLOSED (2) CLOSED
Steam Side
Flow Control Valve
TCV-1367B MODULATING (2) CLOSED (2) CLOSED
Steam Side
Level Control Valve
LCV-1399C MODULATING (2) OPEN (2) OPEN
Condensate Side
Fuel Gas Steam
Heater
Inlet isolation valve
XV-1311A OPEN (1) CLOSED (1) CLOSED
Steam Supply
Flow Control Valve
TCV-1365A MODULATING (2) CLOSED (2) CLOSED
Steam Side
Flow Control Valve
TCV-1365B MODULATING (2) CLOSED (2) CLOSED
Steam Side
Level Control Valve
LCV-1399A MODULATING (2) OPEN (2) OPEN
Condensate Side
Pressure Relief
Control Valves
Pressure Relief
PCV-1347 MODULATING (2) CLOSED (2) OPEN
Control Valve
FG Electric Heater
FTG1-EH-
FG Electric Heater RUNNING (1) TRIP (1) TRIP
11/12/13
Pressure Control
Valves
Pressure Control
PCV-1363 MODULATING (2) CLOSED (2) CLOSED
Valve
Pressure Control
PCV-1364 MODULATING (2) CLOSED (2) CLOSED
Valve
Vane pack
Separator
XV-1398 Drain isolation Valve OPEN (2) CLOSED CLOSED
Page 38 of 93
ESDr PPSDr
NORMAL Sequence Sequence
TAG SERVICE
POSITION from NP Position from NP Position
to ESDr to PPSDr
DCV-1355 Level Control Valve MODULATING (2) CLOSED CLOSED
Skid Outlet
Outlet header
XV-1396 CLOSED (1) OPEN --- CLOSED
blowdown valve
Outlet isolation
XV-1397 OPEN (1) CLOSED (1) CLOSED
valve
From Normal Position Sequence (NP) to ESDr:
o Automatic / Heater Valves (1) Operate simultaneously when XV-1397
<1.> is closed (ZSL-1392) then
o follows the sequence (2)
From Normal Position Sequence (NP) to PPSDr:
o Automatic / Heater Valves (1) Operate simultaneously when XV-1397
<1.> is closed (ZSL-1392) then
o follows the sequence (2)
The control/ protective design shall detect and provide appropriate interlocks to prevent
liquid carryover (slugs), and to detect and respond to loss of heat tracing.
For extended shutdown or outage, an inert (nitrogen) static purge system will be
required for trapped fuel in fuel line between vaporizer and duct burner fuel control
valve. At ambient temperature if the system is let sit, it can draw a vacuum; this points
to the need for provision of a purge system (so don’t draw a vacuum).
Appropriate provisions for pipe draining will be required (perhaps the fuel condensate
can be returned to the vaporizer).
Page 39 of 93
Interface with the Plant vent/ flaring and drains system - to be defined
PROPANE vaporizer system shall be designed the to prevent a rapid phase transition
(RPT) situation. This is a failure mode where hot Steam and liquid PROPANE mix due to a
leak, a larger than intended volume of PROPANE evaporates rapidly, causing a sudden
pressure increase that could potentially cause the vaporizer to rupture.
PROPANE vaporizer system shall designed the with built-in safety measures/
requirements to avoid plant hazards, for example, liquid fuel, fuel vapors, electricity
sources (e.g. electrical devices, heaters (where used), static electricity, lightning strikes,
etc.), etc.
Purge gas (Nitrogen) connections shall be provided at the system interfaces depending
on final system/plant layout.
Page 40 of 93
Liquid Vapor Latent Heat
Temperature Liquid Vapor
Vapor Pressure Mass Mass of
of Saturation Enthalpy Enthalpy
density density vaporization
35.20 34.52 316.8 105.9 -2'378.6 -2'235.5
86.2 °C 143.1 kJ/kg
kg/cm² barg kg/m³ kg/m³ kJ/kg kJ/kg
38.72 37.98 281.3 129.9 -2'347.3 -2'245.7
91.5 °C 101.6 kJ/kg
kg/cm² barg kg/m³ kg/m³ kJ/kg kJ/kg
Tube Side
Temperature (In) Steam 190.0 °C
Temperature (Out) Condensate 159.0 °C
Shell Side
Temperature (In) PROPANE Liquid 28.0 °C
Temperature (Out) PROPANE Vapor 86.2 °C
LMTD 116.9 °C
Transfer Rate clean (U, W/m2-K) 5'846.9 W/m²-K
Surface 12.39 m²
8'468.0 kW
Heat Exchanged
7'282'484 kcal/h
59.184 kg/s
PROPANE Flow Rate to be discharged through PSV
213'061 kg/h
Case Liquid: Required PROPANE liquid volumetric flow rate caused by blocked in pump
of 87.66 m³/h (43’313 kg/h)
Vapor
Mass Fraction Liquid Vapor
P Pressure Temperature Entropy
density on Mass Enthalpy Enthalpy
Basis
1.03 1.01 13.3 94.05 -2'728.11 -2'316.29
-25.9 °C 33.86%
kg/cm² barg kg/m³ /( · ·° ) kJ/kg kJ/kg
9.76 9.57 501.9 91.45 -2'588.51 -2'256.05
28.0 °C 0.00%
kg/cm² barg kg/m³ /( · ·° ) kJ/kg kJ/kg
28.0 27.46 513.6 90.81 -2'434.17 -2'226.84
27.9 °C 0.00%
kg/cm² barg kg/m³ /( · ·° ) kJ/kg kJ/kg
28.55 28.00 513.8 90.79 -2'429.94 -2'227.18
27.9 °C 0.00%
kg/cm² barg kg/m³ /( · ·° ) kJ/kg kJ/kg
32.0 31.38 515.5 90.71 -2'403.27 -2'229.32
28.0 °C 0.00%
kg/cm² barg kg/m³ /( · ·° ) kJ/kg kJ/kg
35.2 34.52 517.4 90.64 -2'378.55 -2'235.47
28.1 °C 0.00%
kg/cm² barg kg/m³ /( · ·° ) kJ/kg kJ/kg
67.0 65.70 532.8 89.87
28.7 °C 0.00%
kg/cm² barg kg/m³ /( · ·° )
Page 41 of 93
Latent Heat of Vaporization at different pressures
Liquid Vapor Latent Heat
Temperature Liquid Vapor
Vapor Pressure Mass Mass of
of Saturation Enthalpy Enthalpy
density density Vaporization
1.03 1.01 603.2 -2'728.1 -2'316.3
-26.7 °C 4.6 kg/m³ 411.8 kJ/kg
kg/cm² barg kg/m³ kJ/kg kJ/kg
9.76 9.57 507.2 -2'588.5 -2'256.1
28.0 °C 21.3 kg/m³ 332.5 kJ/kg
kg/cm² barg kg/m³ kJ/kg kJ/kg
28.00 27.46 375.3 -2'434.2 -2'226.8
74.2 °C 73.6 kg/m³ 207.3 kJ/kg
kg/cm² barg kg/m³ kJ/kg kJ/kg
28.55 28.00 370.1 -2'429.9 -2'227.2
75.2 °C 75.5 kg/m³ 202.8 kJ/kg
kg/cm² barg kg/m³ kJ/kg kJ/kg
32.00 31.39 340.4 -2'403.3 -2'229.3
80.9 °C 89.5 kg/m³ 174.0 kJ/kg
kg/cm² barg kg/m³ kJ/kg kJ/kg
35.20 34.52 316.8 105.9 -2'378.6 -2'235.5
86.2 °C 143.1 kJ/kg
kg/cm² barg kg/m³ kg/m³ kJ/kg kJ/kg
38.72 37.98 281.3 129.9 -2'347.3 -2'245.7
91.5 °C 101.6 kJ/kg
kg/cm² barg kg/m³ kg/m³ kJ/kg kJ/kg
42.68 41.86 199.4 199.4 -2'283.5 -2'283.5
97.13 0.0 kJ/kg
kg/cm² barg kg/m³ kg/m³ kJ/kg kJ/kg
Page 42 of 93
certified Exe to ATEX the circuits will be Intrinsically safe (Exia) The box are
mounted alongside the main terminal box. This prevents the signals being
deformed by the electrical supply to the elements which can occur if heating
elements and detectors are terminated in the same enclosure without proper
segregation.
To avoid to reach high temperature of element for non flow or when the flow is
less than 300 kg/h one Flow Switch (FSL-1311) will be installed upstream the
electric heater.
Electric Heaters operating at Temperatures Higher than Area
Temperature Classification
For safety reasons, it is essential for the user to ensure that exposed metal
surfaces of the process vessel and/or associated pipe work whose temperature
exceeds the temperature classification of the hazardous area under the
designed operating conditions are fully acknowledged and understood. They
must be addressed by the user with the appropriate risk assessments carried
out and action taken such as the provision of suitable insulation or other
methods to prevent contact with the gas hazard. Further details are contained
within the operating and maintenance instructions supplied with the equipment
Page 43 of 93
6.0 Start-up : initial Start-up and after normal Shut-down
6.1 Nitrogen Purging Procedures <1>
Purging sequence is performed by allowing process gas to flow through the unit with
the purpose to eliminate any infiltration of ambient air (oxygen) into process system. The
purging operation will be performed each time that a start-up from depressurized
condition occurs. Purging is not required in case of partial-depressurized shut down.
To purge the system nitrogen has to be used. During the operation of pressurizing or
filling or de-pressurizing, particular attention should be given in the following cases:
Avoid variations brusque of pressure that could be
damage the cartridges, therefore open or close very
FILTER
slowly and slightly the filling or pressurizing valve or
vent valve.
LEVEL CONTROL VALVE and/or The Drain system shall operate only by means of
HAND DRAIN VALVE on Drain local opening /closing of the drain valves.
Filter or Drain Pot if any The drains have to be convoyed to Drain Tank,
The valve, partially or totally, prevents the passage
VALVE FAILURE CLOSE of flow during the operation of pressurizing or filling
or de-pressurizing.
The position of automatic On-Off Valves, Control Valves and Control Panel are listed
on table 6.1.T1
Skid Inlet
XV-1394 Inlet isolation valve CLOSED
<1.>OPEN (during
pressurizing by
XV-1395 Inlet header blowdown valve nitrogen)
/CLOSED (during de-
pressurizing)
Vaporizers (2x100%)
Level Control Valve
LCV-1351A CLOSED
Liquid Propane feeding
Level Control Valve
LCV-1351B CLOSED
Propane Liquid
Inlet isolation valve
XV-1311B CLOSED
Steam Supply
Flow Control Valve
TCV-1366A CLOSED
Steam Side
Flow Control Valve
TCV-1366B CLOSED
Steam Side
Level Control Valve
LCV-1399B OPEN
Condensate Side
Page 44 of 93
TAG SERVICE POSITION
Level Control Valve
LCV-1353A CLOSED
Liquid Propane feeding
Level Control Valve
LCV-1353B CLOSED
Propane Liquid
Inlet isolation valve
XV-1311C CLOSED
Steam Supply
Flow Control Valve
TCV-1367A CLOSED
Steam Side
Flow Control Valve
TCV-1367B CLOSED
Steam Side
Level Control Valve
LCV-1399C OPEN
Condensate Side
Fuel Gas Steam Heater
Inlet isolation valve
XV-1311A CLOSED
Steam Supply
Flow Control Valve
TCV-1365A CLOSED
Steam Side
Flow Control Valve
TCV-1365B CLOSED
Steam Side
Level Control Valve
LCV-1399A OPEN
Condensate Side
Pressure Relief Control Valves
PCV-1347 Pressure Relief Control Valve CLOSED
FG Electric Heater
FTG1-EH-
FG Electric Heater TRIP
11/12/13
Pressure Control Valves
PCV-1363 Pressure Control Valve OPEN
PCV-1364 Pressure Control Valve OPEN
Vane pack Separator
<1.>OPEN (during
pressurizing by
XV-1398 Drain isolation Valve nitrogen)
/CLOSED (during de-
pressurizing)
<1.>OPEN (during
pressurizing by
DCV-1355 Level Control Valve nitrogen)
/CLOSED (during de-
pressurizing)
TITLE: DOCUMENT CODE REVISION
CONTROL NARRATIVE FOR PROPANE TREATMENT SKID
NON40660 1
REVISION DESCRIPTION: PAGE MARKER SECURITY CODE
Revised where shown <1.> N/A N
ORIGINAL JOB SIZE LANGUAGE
18-JUN-2018 Click here to enter text. 4 A
THISEASWARAN
DOCUMENT IS AND MAHESH (A804)AND PROPRIETARY INFORMATION OF Nuovo Pignone Tecnologie S.r.l. WHICH SHALL NOT BE USED OR DISCLOSED TO OTHERS, EXCEPT
CONTAINS CONFIDENTIAL SHEET
WITH THE WRITTEN PERMISSION OF Nuovo Pignone Tecnologie S.r.l. . UNPUBLISHED WORK ©2016 Nuovo Pignone Tecnologie S.r.l.. ALL RIGHTS RESERVED. 45 of 92
Page 45 of 93
TAG SERVICE POSITION
Skid Outlet
<1.>OPEN (during
pressurizing by
XV-1396 Outlet header blowdown valve nitrogen)
/CLOSED (during de-
pressurizing)
XV-1397 Outlet isolation valve CLOSED
Table 6.1.T1 Position of automatic valves and euipment during nitrogen purging
The sequence of purging and pressurizing after a depressurized shut down is described
here below.
1. Check closing of the Inlet isolation valve XV-1394
2. Check closing of the Outlet isolation valve XV-1397
3. Close the hand valve located at upstream of XV-1394
4. Close the hand valve located Valve dowstream of XV-1397
5. Open with the Pressure Controller PIC-1369 in manual mode the pressure control
valves PCV-1363 and PCV-1364
6. Verify that all main hand valves are fully open (upstream/downstream Valves
installed on: Vaporizers,Steam Heater, Electric Heater, Pressure Control Valves
and duplex Fuel Gas Filters)
7. De-pressurizing the system: open very slowly and slightly the hand vent valves
and hand drain valves (no liquid in the system and gas at atmospheric pressure).
Vent and Drain Valves installed on: Vaporizers, Steam Heater, Electric Heater,
Pressure Control Valves and duplex Fuel Gas Filters.
8. Check closing of the purge ball valves
9. Connect the customer nitrogen feeding (max pressure 5 kg/cm²g) to the natural
gas skid purge valves
10. Open the purge ball valve and start purging by slowly opening the regulating
valve on the Nitrogen Gas cylinder and bleeding the gas to the process line with a
pressure of not more that 3 kg/cm² (g)
11. When a nitrogen volume about twice the piping volume has passed, close all the
hand vent valves and hand drain valves opened previously
12. Close Inlet/Outlet header blowdown valve XV-1395 and XV-1396
a. Gradually increase the nitrogen pressure inside the pipeline up to 5 kg/cm² (g)
b. Open Inlet/Outlet header blowdown valve XV-1395 and XV-1396
c. When the pressure decrease at 0.5 kg/cm² (g), close Inlet/Outlet header
blowdown XV-1395 and XV-1396
d. Repeat this operation from points a. to d. for 4 times and when complete,
13. Close Valves XV-1395 and XV-1396
14. Check closing of all the hand vent valves and hand drain valves
TITLE: DOCUMENT CODE REVISION
CONTROL NARRATIVE FOR PROPANE TREATMENT SKID
NON40660 1
REVISION DESCRIPTION: PAGE MARKER SECURITY CODE
Revised where shown <1.> N/A N
ORIGINAL JOB SIZE LANGUAGE
18-JUN-2018 Click here to enter text. 4 A
THISEASWARAN
DOCUMENT IS AND MAHESH (A804)AND PROPRIETARY INFORMATION OF Nuovo Pignone Tecnologie S.r.l. WHICH SHALL NOT BE USED OR DISCLOSED TO OTHERS, EXCEPT
CONTAINS CONFIDENTIAL SHEET
WITH THE WRITTEN PERMISSION OF Nuovo Pignone Tecnologie S.r.l. . UNPUBLISHED WORK ©2016 Nuovo Pignone Tecnologie S.r.l.. ALL RIGHTS RESERVED. 46 of 92
Page 46 of 93
15. Gradually increase the nitrogen pressure inside the pipeline up to 5 kg/cm² (g)
16. Open the hand valve located at upstream of XV-1394
17. Before to open the hand valve located at dowstream of XV-1397 check that the
downstream pipeline has been purged with nitrogen.
At this stage the system is full of nitrogen and ready to be filled with propane liquid.
Nitrogen Initial Volume 0.637 0.869 1.098 1.314 1.395 1.711 2.008 m³
Volume PROPANE liquid 0.349 0.349 0.349 0.349 0.349 0.349 0.349 m³
Volume N₂ at end 0.288 0.521 0.750 0.966 1.046 1.363 1.659 m³
(without evaporation)
Pressure Nitrogen - 1st filling 5.00 5.00 5.00 5.00 5.00 5.00 5.00 barg
TITLE: DOCUMENT CODE REVISION
CONTROL NARRATIVE FOR PROPANE TREATMENT SKID
NON40660 1
REVISION DESCRIPTION: PAGE MARKER SECURITY CODE
Revised where shown <1.> N/A N
ORIGINAL JOB SIZE LANGUAGE
18-JUN-2018 Click here to enter text. 4 A
THISEASWARAN
DOCUMENT IS AND MAHESH (A804)AND PROPRIETARY INFORMATION OF Nuovo Pignone Tecnologie S.r.l. WHICH SHALL NOT BE USED OR DISCLOSED TO OTHERS, EXCEPT
CONTAINS CONFIDENTIAL SHEET
WITH THE WRITTEN PERMISSION OF Nuovo Pignone Tecnologie S.r.l. . UNPUBLISHED WORK ©2016 Nuovo Pignone Tecnologie S.r.l.. ALL RIGHTS RESERVED. 47 of 92
Page 47 of 93
Case 1 Case 2 Case 3 Case 4 Case 5 Case 6 Case 7
Temperature Nitrogen 15.00 15.00 15.00 15.00 15.00 15.00 15.00 °C
Molecular Weight N₂ 28 28 28 28 28 28 28 kg/kmol
Mass density Nitrogen 7.028 7.028 7.028 7.028 7.028 7.028 7.028 kg/m³
Mass Nitrogen 4.473 6.110 7.719 9.238 9.802 12.026 14.109 kg
Mass density Nitrogen at
15.543 11.734 10.297 9.565 9.371 8.826 8.505 kg/m³
end
Nitrogen Pressure at end
14.93 11.27 9.89 9.19 9.00 8.48 8.17 bar(a)
(without evaporation)
Mass Nitrogen + PROPANE 12.69 23.15 33.43 43.13 46.73 60.94 74.24 kg
Volume Vapor 0.30 0.56 0.80 1.03 1.12 1.46 1.78 m³
Mass density - End Mix 41.70 41.70 41.70 41.70 41.70 41.70 41.70 kg/m³
Molecular Weight End MIX 39.95 40.79 41.13 41.31 41.36 41.50 41.58 kg/kmol
Pressure at end 32.41 32.41 32.41 32.41 32.41 32.41 32.41 bar(a)
32.00 32.00 32.00 32.00 32.00 32.00 32.00 kg/cm²g
Page 48 of 93
TAG SERVICE POSITION
Skid Inlet
XV-1394 Inlet isolation valve OPEN
XV-1395 Inlet header blowdown valve CLOSED
Vaporizers (2x100%)
Level Control Valve
LCV-1351A CLOSED
Liquid Propane feeding
Level Control Valve MODULATING (If
LCV-1351B
Propane Liquid Vaporizer 1 selected)
Inlet isolation valve
XV-1311B CLOSED
Steam Supply
Flow Control Valve
TCV-1366A CLOSED
Steam Side
Flow Control Valve
TCV-1366B CLOSED
Steam Side
Level Control Valve
LCV-1399B OPEN
Condensate Side
Level Control Valve
LCV-1353A CLOSED
Liquid Propane feeding
Level Control Valve MODULATING (If
LCV-1353B
Propane Liquid Vaporizer 1 selected)
Inlet isolation valve
XV-1311C CLOSED
Steam Supply
Flow Control Valve
TCV-1367A CLOSED
Steam Side
Flow Control Valve
TCV-1367B CLOSED
Steam Side
Level Control Valve
LCV-1399C OPEN
Condensate Side
Fuel Gas Steam Heater
Inlet isolation valve
XV-1311A CLOSED
Steam Supply
Flow Control Valve
TCV-1365A CLOSED
Steam Side
Flow Control Valve
TCV-1365B CLOSED
Steam Side
Level Control Valve
LCV-1399A OPEN
Condensate Side
Pressure Relief Control Valves
MODULATING
PCV-1347 Pressure Relief Control Valve
SET=13 kg/cm²
Page 49 of 93
TAG SERVICE POSITION
FG Electric Heater
FTG1-EH-
FG Electric Heater TRIP
11/12/13
Pressure Control Valves
PCV-1363 Pressure Control Valve CLOSED
PCV-1364 Pressure Control Valve CLOSED
Vane pack Separator
XV-1398 Drain isolation Valve OPEN
DCV-1355 Level Control Valve MODULATING
Skid Outlet
XV-1396 Outlet header blowdown valve CLOSED
XV-1397 Outlet isolation valve CLOSED
Table 6.2.T1 Position of automatic valves and equipment during Propane first filling
Skid Inlet
XV-1394 Inlet isolation valve OPEN
OPEN at Pressure PIT-
XV-1395 Inlet header blowdown valve 1368A/B/C greater than
13 kg/cm²
Vaporizers (2x100%)
Level Control Valve
LCV-1351A CLOSED
Liquid Propane feeding
Page 50 of 93
TAG SERVICE POSITION
Level Control Valve MODULATING (If
LCV-1351B
Propane Liquid Vaporizer 1 selected)
Inlet isolation valve OPEN (If Vaporizer 1
XV-1311B
Steam Supply selected)
Flow Control Valve
TCV-1366A CLOSED
Steam Side
Flow Control Valve MODULATING (If
TCV-1366B
Steam Side Vaporizer 1 selected)
Level Control Valve MODULATING (If
LCV-1399B
Condensate Side Vaporizer 1 selected)
Level Control Valve
LCV-1353A CLOSED
Liquid Propane feeding
Level Control Valve MODULATING (If
LCV-1353B
Propane Liquid Vaporizer 2 selected)
Inlet isolation valve OPEN (If Vaporizer 1
XV-1311C
Steam Supply selected)
Flow Control Valve
TCV-1367A CLOSED
Steam Side
Flow Control Valve MODULATING (If
TCV-1367B
Steam Side Vaporizer 2 selected)
Level Control Valve MODULATING (If
LCV-1399C
Condensate Side Vaporizer 2 selected)
Fuel Gas Steam Heater
Inlet isolation valve OPEN
XV-1311A
Steam Supply (1) If Selected
Flow Control Valve
TCV-1365A CLOSED
Steam Side
Flow Control Valve MODULATING
TCV-1365B
Steam Side (If Selected)
Level Control Valve MODULATING
LCV-1399A
Condensate Side (If Selected)
Pressure Relief Control Valves
MODULATING
PCV-1347 Pressure Relief Control Valve
SET=13 kg/cm²
FG Electric Heater
FTG1-EH- MODULATING
FG Electric Heater
11/12/13 (4) If Selected
Pressure Control Valves
(3) MODULATING
PCV-1363 Pressure Control Valve
SET=12 kg/cm²
PCV-1364 Pressure Control Valve CLOSED
Page 51 of 93
TAG SERVICE POSITION
Vane pack Separator
XV-1398 Drain isolation Valve OPEN
DCV-1355 Level Control Valve MODULATING
Skid Outlet
XV-1396 Outlet header blowdown valve (3) OPEN
XV-1397 Outlet isolation valve CLOSED
Table 6.3.T1 Position of automatic valves and Equipment during warm-up
Note:
(1) if Steam Heater selected or if it's inted to utilise Electric Heater in serie with Steam Heater
(2) if Electric Heater selected or if it's inted to utilise Electric Heater in serie with Steam Heater
(3) Modulating PCV-1363 and Open XV-1396 untill temperature at upstream PCV-1363/64 reach
99°C (TIT-1398A/B or TIT-1395A/B)
At this stage the warm-up procedure can be activate as per paragraph 6.4
Skid Inlet
XV-1394 Inlet isolation valve OPEN
OPEN at Pressure PIT-
XV-1395 Inlet header blowdown valve 1368A/B/C greater than
13 ÷ 32 kg/cm² kg/cm²
Vaporizers (2x100%)
Level Control Valve
LCV-1351A CLOSED
Liquid Propane feeding
Level Control Valve MODULATING (If
LCV-1351B
Propane Liquid Vaporizer 1 selected)
Page 52 of 93
TAG SERVICE POSITION
Inlet isolation valve OPEN (If Vaporizer 1
XV-1311B
Steam Supply selected)
Flow Control Valve
TCV-1366A CLOSED
Steam Side
Flow Control Valve MODULATING (If
TCV-1366B
Steam Side Vaporizer 1 selected)
Level Control Valve MODULATING (If
LCV-1399B
Condensate Side Vaporizer 1 selected)
Level Control Valve
LCV-1353A CLOSED
Liquid Propane feeding
Level Control Valve MODULATING (If
LCV-1353B
Propane Liquid Vaporizer 2 selected)
Inlet isolation valve OPEN (If Vaporizer 1
XV-1311C
Steam Supply selected)
Flow Control Valve
TCV-1367A CLOSED
Steam Side
Flow Control Valve MODULATING (If
TCV-1367B
Steam Side Vaporizer 2 selected)
Level Control Valve MODULATING (If
LCV-1399C
Condensate Side Vaporizer 2 selected)
Fuel Gas Steam Heater
Inlet isolation valve OPEN
XV-1311A
Steam Supply (1) If Selected
Flow Control Valve
TCV-1365A CLOSED
Steam Side
Flow Control Valve MODULATING
TCV-1365B
Steam Side (If Selected)
Level Control Valve MODULATING
LCV-1399A
Condensate Side (If Selected)
Pressure Relief Control Valves
MODULATING
PCV-1347 Pressure Relief Control Valve
SET=13 ÷ 32 kg/cm²
FG Electric Heater
FTG1-EH- MODULATING
FG Electric Heater
11/12/13 (1) If Selected
Pressure Control Valves
MODULATING
PCV-1363 Pressure Control Valve
SET=12 ÷ 26.5 kg/cm²
PCV-1364 Pressure Control Valve CLOSED
Vane pack Separator
Page 53 of 93
TAG SERVICE POSITION
XV-1398 Drain isolation Valve OPEN
DCV-1355 Level Control Valve MODULATING
Skid Outlet
XV-1396 Outlet header blowdown valve OPEN
XV-1397 Outlet isolation valve CLOSED
Table 6.4.T1 Position of automatic valves and Equipment during warm-up
Note:
(1) if Steam Heater selected or if it's inted to utilise Electric Heater in serie with Steam
Heater
(2) if Electric Heater selected or if it's inted to utilise Electric Heater in serie with Steam
Heater
When the warm-up procedure is completed then:
* close Inlet header blowdown valve XV-1395
* close Outlet header blowdown valve XV-1396
Page 54 of 93
7.0 Normal shut-down of Unit Natural Gas Skid <1>
The following steps have to be followed to shut down the main fuel gas skid when the al
four gas turbines are no running and all Customer fuel gas users don’t require fuel gas.
The skid is considered to remain pressurized.
1. Ensure that all Gas turbines are in stop condition
2. Stop Fuel Gas Steam Heater:
a. Put manual model Level Controller, LIC-1397 and open the control valves LCV-1397
b. Put manual model Temperature Controller and close the control valves FCV-
1338/A and FCV-1338/A
c. Close steam supply valve XV-1384
3. Stop Electric heater FTG1-EH-1/2/3/4
4. Put manual model Pressure controller, PIC-1362. and close the control valves PCV-
1344 PCV-1345 and PCV-1346.
5. Close Inlet isolation valve XV-1399
6. Close Outlet isolation valve XV-1392
7. Full Depressurised condition can be achieved by the Operation personnel just
opening the blow down valves BDV-..
The final position of automatic On-Off Valves, Control Valves and Control Panel are
listed on Table 7.0.T1
Normal Stop (NS)
NORMAL
TAG SERVICE POSITION Sequence
(NP) from NP Position
to NS
Skid Inlet
XV-1394 Inlet isolation valve OPEN (2) CLOSED
XV-1395 Inlet header blowdown valve CLOSED --- CLOSED
Vaporizers
LCV-
MODULATING (1) CLOSED
1351/A Propane Liquid
LCV-
MODULATING (1) CLOSED
1351/B Propane Liquid
Inlet isolation valve
XV-1311/B OPEN (1) CLOSED
Steam Supply
TCV- Flow Control Valve
MODULATING (1) CLOSED
1366/A Steam Side
TCV- Flow Control Valve
MODULATING (1) CLOSED
1366/B Steam Side
LCV- Level Control Valve
MODULATING (1) OPEN
1399/B Condensate Side
LCV-
MODULATING (1) CLOSED
1351/A Propane Liquid
TITLE: DOCUMENT CODE REVISION
CONTROL NARRATIVE FOR PROPANE TREATMENT SKID
NON40660 1
REVISION DESCRIPTION: PAGE MARKER SECURITY CODE
Revised where shown <1.> N/A N
ORIGINAL JOB SIZE LANGUAGE
18-JUN-2018 Click here to enter text. 4 A
THISEASWARAN
DOCUMENT IS AND MAHESH (A804)AND PROPRIETARY INFORMATION OF Nuovo Pignone Tecnologie S.r.l. WHICH SHALL NOT BE USED OR DISCLOSED TO OTHERS, EXCEPT
CONTAINS CONFIDENTIAL SHEET
WITH THE WRITTEN PERMISSION OF Nuovo Pignone Tecnologie S.r.l. . UNPUBLISHED WORK ©2016 Nuovo Pignone Tecnologie S.r.l.. ALL RIGHTS RESERVED. 55 of 92
Page 55 of 93
Normal Stop (NS)
NORMAL
TAG SERVICE POSITION Sequence
(NP) from NP Position
to NS
LCV-
MODULATING (1) CLOSED
1351/B Propane Liquid
Inlet isolation valve
XV-1311/C OPEN (1) CLOSED
Steam Supply
TCV- Flow Control Valve
MODULATING (1) CLOSED
1367/A Steam Side
TCV- Flow Control Valve
MODULATING (1) CLOSED
1367/B Steam Side
LCV- Level Control Valve
MODULATING (1) OPEN
1399/C Condensate Side
Fuel Gas Steam Heater
Inlet isolation valve
XV-1311/A OPEN (1) CLOSED
Steam Supply
TCV- Flow Control Valve
MODULATING (1) CLOSED
1365/A Steam Side
TCV- Flow Control Valve
MODULATING (1) CLOSED
1365/B Steam Side
LCV- Level Control Valve
MODULATING (1) OPEN
1399/A Condensate Side
Pressure Relief Control
Valves
MODULATING
if Pressure PIT-
PCV-1347 Pressure Relief Control Valve MODULATING (2)
1368 increase
32 kg/cm²
FG Electric Heater
FTG1-EH-
FG Electric Heater RUNNING (1) TRIP
11/12/13
Pressure Control Valves
PCV-1363 Pressure Control Valve MODULATING (2) CLOSED
PCV-1364 Pressure Control Valve MODULATING (2) CLOSED
Skid Outlet
Outlet header blowdown
XV-1396 CLOSED --- CLOSED
valve
XV-1397 Outlet isolation valve OPEN (2) CLOSED
Table 7.0.T1 Position of automatic valves and equipment
Page 56 of 93
8.0 Upset <1>
If the final delivery Pressure (read with PIT-1369A/B) tends to decrease, the following
actions are reccommended:
1. Ensure that the blowdown valves, XV-1395 and XV-1391 are closed and PCV-1347 is
modulating for pressure set greater than 32 kg/cm².
2. Ensure that the skid inlet pressure, read with PIT-1362/C is the range 28÷32 kg/cm².
3. If PIT-1362/C is in the normal range check flim boiling condition (see paragraph 4.2.2):
3.1. Check Pressure PIT-1368/A/B/C lower 27.4 kg/cm²
3.2. Check temperature TIT-1391/A/B greater than 83°C
3.3. Check liquid Propane temperature TIT-1382/B greater than 83°C, if Vaporizer 1
selected
3.4. Check liquid Propane temperature (TIT-1382/C) greater than 83°C, if Vaporizer 2
selected
If the final delivery Temperature (TIT-1394A/B) tends to decrease, the following actions are
reccommended:
1. Ensure that the blowdown valves, XV-1395 and XV-1396 are closed and PCV-1347 is
modulating for pressure set greater than 32 kg/cm².
2. Ensure that the skid inlet temperature (TIT-1381/C) is the range 14-28°C.
3. Ceck Steam Supply Temperature (TIT-1399) is the range 170-190°C, if Vaporizer 1
selected
4. Ceck Steam Supply Temperature (TIT-1397) is the range 170-190°C, if Vaporizer 2
selected
5. Ceck Steam Supply Temperature (TIT-1396) is the range 170-190°C, if Steam
Superheater selected
6. Ceck Steam Supply Pressure (PIT-1366) is the out of range 2.5-5.5 kg/cm², if Vaporizer 1
selected
7. Ceck Steam Supply Pressure (PIT-1366) is the out of range 2.5-5.5 kg/cm², if Vaporizer 2
selected
8. Ceck Steam Supply Pressure (PIT-1371) is the out of range 2.8-5.5 kg/cm², if Steam
Superheater selected
9. Check incoming Electrical supply, read “kW signal” incoming from Electric Heater, if
Electric heater selected
Page 57 of 93
External Sequences Propane Flow Control
VAPORIZER
Start Sequence
(Propane Selected)
Propane Facility
Permission to Start from
Propane Facility (Pumps
& Propane Storage)
AND
Shutdown or Trip
active?
No
Yes
GT Control
Inhibit to transfer
Inhibit to
to propane
transfer to
propane
X
Interlock I
fig.x2
A.1
X1 fig.1.1
Interlock I1
fig.x1
OR
X2
Interlock I2
fig.x1
X3
Interlock I3
fig.x1
X4
Interlock I4
fig.x1
X5
Figure 1
18-JUN-2018
Interlock I5
fig.x2
EASWARAN MAHESH (A804)
Page 58 of 93
A.1
External Sequences fig.1
Propane Control
Yes
fA1 Nitrogen
6.1 Nitrogen Purging
fig.f1 purging?
fA1.1
fig.f1 No
No
fA2.1 Flag1=0
fig.f1.1 Flag2=0
No
fA3.1
fig.f9
fA4.1 No
fig.f9.1
A Vaporizer Control
fig.1.2
Normal Opertation
O
Temperature Control
fig.11
PPSDr
Partial Pressurized xA6
Emergency Shut- fig.x3 T
fig.15 Pressure Control
Down
ESDr V
Separator & Filter Control
Emergency Shut- xA7 fig.16
Down and complete fig.x4
depressurization
Figure 1.1
Page 59 of 93
A Propane Flow Control
External Sequences
Fig.1.1 VAPORIZER
SKID INLET:
XV-1394: OPEN
XV-1395: CLOSED
VAPORIZER 2(if selected):
READ:
LCV-1351A: CLOSED
PIT-1362/C
LCV-1351B: CLOSED
XV-1311B: OPEN Inlet Pressure
TCV-1366A: CLOSED out of range
TCV-1366B: CLOSED
LCV-1399B: OPEN
VAPORIZER 1 (if selected): 28.0 ≤ PIT-1362
LCV-1353A: CLOSED No ≤ 32.0 kg/cm²
LCV-1353B: CLOSED
XV-1311C: OPEN Yes
TCV-1367A: CLOSED
TCV-1367B: CLOSED READ:
LCV-1399C: OPEN TIT-1362
STEAM HEATER(if selected): 14.0 ≤ T≤ 33.0 °C
XV-1311A: OPEN
TCV-1365A: CLOSED
READ:
TCV-1365B: CLOSED
* TIT-1382/B (Vaporizer 1)
LCV-1399A: OPEN
* TIT-1382/C (Vaporizer 2)
PRESSURE RELIEF CONTROL VALVES:
PCV-1347: MODULATING
ELECTRIC HEATER (if selected):
FTG1-EH-11/12/13: RUNNING Read TIT-1391/A/B
PRESSURE CONTROL VALVES: TSHH-1391
PCV-1363: CLOSED
PCV-1364: CLOSED
Read
VANE PACK SEPARATOR: PIT-1368/A/B/C)
XV-1398: OPEN
DCV-1355: MODULATING Yes
SKID OUTLET: X4
I4 PSHH4-1368
XV-1396: CLOSED fig.x1
XV-1397: OPEN No
X3 Yes
I3 PSHH3-1368
fig.x1
X1
No
fig.x1
Yes No
X2
I2 PSHH2-1368 PSHH1-1368 I1
fig.x1
Yes
No
No
A6
Fig.2
Figure 1.2
18-JUN-2018
EASWARAN MAHESH (A804)
Page 60 of 93
A6 4.2.1 Vaporizers: Propane Liquid
External Sequences Level Control
Fig.2
Vaporizer 1
EE-008 Vaporizer 2
SELECT EE-009
FDF-3
VAPORIZER FDF-4
Interlock I1 E E E V1
LSLL-1351 M M M V2
fig.4 fig.5 fig.6 fig.15 fig.9
LSLL-1353 fig.8 fig.10 fig.15
Yes Yes
LSH-1351 LSH-1353
No
No Alarm
Alarm No
No Set Level
LSH-1351 Set Level reached?
LSH-1353 reached?
Yes
Yes
C D
Vaporizer 1 Vaporizer 2
fig.3 fig.7
O Super Super O
fig.11 Heater Heater fig.11
T T
Pressure Pressure
fig.15 fig.15
Control Control
Figure 2
Page 61 of 93
External Sequences 4.2.2 Vaporizer 1: Flowrate, Pressure and
C
fig.2 Temperature Control
oE oE oE G
fig.4 fig.5 fig.6 fig.x1
READ TIT-1382/B
(Propane Liquid – Vaporizer 1) Yes
Input Temperature Set (= 83°C)
(Vaporizer Controller)
PIT-1368
≥ 33.8 kg/cm²
Read PIT-1368/A/B/C
(Propane Gas) No
Alarm
No PSH-1368
28.0 ≤ PIT-1368/A/B/C < 33.0
kg/cm²
Alarm
PSH-1368 Yes
X No PIT-1368(A/B/C
fig.x2 ≥ 33.5 kg/cm²
Read TIT-1391/A/B
(Propane Gas)
Yes
Yes
No ACTIVATE PRESSURE CONTROL
TIT-1391/A/B ≥140°C
OPEN PCV-1347
Set= 33.5 kg/cm²
TIT-1391/A/B > by means I/P PY-1347
83°C Yes
Interlock I
TSHH-1391 Yes
No
TIT-1391/A/B>
120°C No
Page 62 of 93
iT Override 4.2.2 Vaporizer 1: Flowrate, Pressure
External Sequences and Temperature Control
fig.5
F oF1
fig.3 fig.3
READ TIT-1391A/B
READ LIT-1399/B
IF LSH-1399B: ALARM
IF LSL-1399B: ALARM
Yes
TIT-1391A/B > 83 °C
Yes No
No Set Level
reached?
READ PIT-1368A/B/C
(Propane Gas) I
fig.5
[(PIT-1382)-(PIT-1368)]
No ≤ 0.6 kg/cm²
OR
27.4 ≤ (PIT-1368) < 33
PIT-1368A/B/C kg/cm²
< 27.4 kg/cm² Yes
AND
TIT-1382B≥83 °C Yes
PIT-1368A/B/C L
fig.6 DECREASE LIQUID
> 33.0 kg/cm² PROPANE LEVEL
Yes
No
dE
fig.2
Increase
INCREASE LIQUID iE
aperture of
PROPANE LEVEL fig.2
TCV-1366A/B
Figure 4
18-JUN-2018
EASWARAN MAHESH (A804)
Page 63 of 93
External Sequences 4.2.2 Vaporizer 1: Flowrate, Pressure and
Temperature Control
I
fig.4
PIT-1368A/B/C Yes
< 27.4 kg/cm² L
AND FILM BOILING
fig.6
TIT-1382B≥83°C
No
Yes
E PIT-1368A/B/C
fig.3 > 33.0 kg/cm²
No Increase
iT
aperture of
fig.6
TCV-1366A/B
INCREASE LIQUID
PROPANE LEVEL
iE
fig.2
Figure 5
18-JUN-2018
EASWARAN MAHESH (A804)
Page 64 of 93
External Sequences L L 4.2.2 Vaporizer 1: Flowrate, Pressure and
fig.4 fig.5 Temperature Control
FILM BOILING
ACTIVATE LEVEL CONTROL
Input Level Set LIC-1399B
Condensate Vaporizer 1
* LCV-1399B by means I/P LY-1399B
ACTIVATE PRESSURE CONTROL Feed back ZT-1399B
Steam Pressure Set= 0.6÷2.5 kg/cm²g
Valves in Parallel: READ LIT-1399/B
* TCV-1366A by means I/P TY-1366A IF LSH-1399B: Alarm
Feed back ZT-1366A IF LSL-1399B: Alarm
* TCV-1366B by means I/P TY-1366B
Feed back ZT-1366B
Yes No
Set Level
reached?
READ TIT-1382B
Decrease Increase
dE iE
Read PIT-1366 fig.2 fig.2
(Condensate Side)
Yes TIT-1382B ≥ 83°C OR No
Interlock I X TIT-1391A/B ≥ 83°C
TSHH-1391 READ TIT-1391/A/B
fig.x2
Inibhit to Yes
Transfer to TIT-1391A/B ≥ 140°C
Propane ACTIVATE LEVEL CONTROL
Level Set LIC-1351:
No * LCV-1351A by means I/P
LY-1351A
READ PIT-1368A/B/C Feed back ZT-1351A
* LCV-1351B by means I/P
(Propane Gas) LY-1351B
Feed back ZT-1351B
oE No Yes
fig.3 LSLL-1351
X3 No
PIT-1368A/B/C
≥ 33.0No
kg/cm² fig.x1
Yes
LSHH-1351
Yes
Yes No
No TIT-1382B ≥ 83°C OR
TIT-1391A/B ≥ 83°C
LSH-1351
No
Increase
Level ALARM
* Decrease Steam *Increase Steam
Pressure Pressure Set Level
* Increase Propane * Decrease Propane reached?
Decrease No
liquid level liquid level Level
Figure 6
Decrease Increase
18-JUN-2018 Pressure Pressure
EASWARAN MAHESH (A804)
Page 65 of 93
External Sequences 4.2.2 Vaporizer 2: Flowrate, Pressure and
D
fig.2 Temperature Control
oM oM oM H
READ TIT-1382/B fig.8 fig.9 fig.10 fig.x1
(Propane Liquid – Vaporizer 1)
Input Temperature Set (= 83°C)
(Vaporizer Controller) Yes
PIT-1368
Read PIT-1368A/B/C ≥ 33.8 kg/cm²
(Propane Gas)
No
Alarm
No PSH-1368
28.0 ≤ PIT-1368A/B/C < 33.0
kg/cm²
Alarm
PSH-1368 Yes
X No PIT-1368A/B/C
fig.x2 ≥ 33.5 kg/cm²
Read TIT-1391A/B
(Propane Gas)
Yes
Yes
No ACTIVATE PRESSURE CONTROL
TIT-1391A/B ≥140°C
OPEN PCV-1347
Set= 33.5 kg/cm²
by means I/P PY-1347
TIT-1391A/B > 83°C
Interlock I Yes
TSHH-1391 Yes
No
TIT-1391/A/B>
120°C No
Page 66 of 93
iT Override 4.2.2 Vaporizer 2: Flowrate, Pressure
External Sequences
fig.9 and Temperature Control
N oN1
fig.7 fig.7
READ TIT-1382C
READ LIT-1399C
IF LSH-1399C: ALARM
IF LSL-1399C: ALARM
READ TIT-1391A/B
TSHH-1391 Yes No
Set Level
reached?
Yes
TIT-1391A/B > 83 °C
No
J
fig.9
[(PIT-1382)-(PIT-1368)]
No ≤ 0.6 kg/cm²
READ PIT-1368A/B/C
AND
(Propane Gas) 27.4 ≤ (PIT-1368) < 33
kg/cm²
Yes
PIT-1368A/B/C Yes
< 27.4 kg/cm² Decrease
AND aperture of
TIT-1382/B≥83°C
TCV-1366A/B
No
FILM BOILING
oM DECREASE LIQUID
fig.7 PROPANE LEVEL
K
PIT-1368A/B/C fig.10
Yes > 33.0 kg/cm²
dM
fig.2
No
18-JUN-2018
EASWARAN MAHESH (A804)
Page 67 of 93
External Sequences 4.2.2 Vaporizer 2: Flowrate, Pressure and
Temperature Control
J
fig.8
PIT-1368A/B/C Yes
< 27.4 kg/cm² K
FILM BOILING
AND fig.10
TIT-1382C≥83°C
No
M Yes PIT-1368A/B/C
fig.7 > 33.0 kg/cm²
No
Increase
iT
aperture of
fig.8
TCV-1367A/B
INCREASE LIQUID iM
PROPANE LEVEL fig.2
Figure 9
18-JUN-2018
EASWARAN MAHESH (A804)
Page 68 of 93
External Sequences K K 4.2.2 Vaporizer 2: Flowrate, Pressure and
fig.8 fig.9 Temperature Control
FILM BOILING
ACTIVATE LEVEL CONTROL
Input Level Set LIC-1399C
Condensate Vaporizer 1
* LCV-1399B by means I/P LY-1399B
ACTIVATE PRESSURE CONTROL Feed back ZT-1399B
Steam Pressure Set= 0.6÷2.5 kg/cm²g
Valves in Parallel: READ LIT-1399/B
* TCV-1367A by means I/P TY-1367A IF LSH-1399B: Alarm
Feed back ZT-1367A IF LSL-1399B: Alarm
* TCV-1367B by means I/P TY-1367B
Feed back ZT-1367B
Yes No
Set Level
reached?
READ TIT-1382B
Decrease Increase
dM iM
Read PIT-1366 fig.7 fig.7
(Condensate Side)
TIT-1382B ≥ 83°C OR
Interlock I X Yes TIT-1391A/B ≥ 83°C
READ TIT-1391/A/B No
TSHH-1391 fig.x2
Inibhit to Yes
Transfer to TIT-1391A/B ≥ 140°C
Propane ACTIVATE LEVEL CONTROL
Level Set LIC-1353:
No * LCV-1353A by means I/P
LY-1353A
READ PIT-1368A/B/C Feed back ZT-1353A
* LCV-1353B by means I/P
(Propane Gas) LY-1353B
Feed back ZT-1353B
oM No Yes
fig.T LSLL-1353
PIT-1368A/B/C X3 No
Yes ≥ 33.0 kg/cm² fig.x1
No LSHH-1353
Yes
Yes No
No TIT-1382B ≥ 83°C OR
TIT-1391A/B ≥ 83°C
LSH-1353
No
Increase
Level ALARM
* Decrease Steam *Increase Steam
Pressure Pressure Set Level
* Increase Propane * Decrease Propane reached?
Decrease No
liquid level liquid level Level
Figure 10
Decrease Increase
18-JUN-2018 Pressure Pressure
EASWARAN MAHESH (A804)
Page 69 of 93
External Sequences O
fig.2
4.2.3 HEATERS SELECTION
READ: PIT-1368A/B/C)
(Propane Gas)
READ: TIT-1391A/B
INTERLOCK I: X (Propane Gas)
TSHH-1391 fig.x2
Yes
TIT-1391A/B ≥140°C
No
READ: PIT-1369A/B
(Propane Gas)
READ: TIT-1394A/B
INTERLOCK I3: X3 (Propane Gas)
TSHH-1394 fig.x1
Yes No
READ: TIT-1398A/B
TIT-1394A/B ≥120°C
(Propane Gas)
INTERLOCK I2: X2
TSHH-1398 fig.x1
Yes
TIT-1398A/B ≥140°C
INTERLOCK I5: X5 No
TSHH-1395 fig.x2
R S
fig.13 fig.14
No
Figure 11
18-JUN-2018
P
fig.12
EASWARAN MAHESH (A804)
Page 70 of 93
External Sequences P
4.2.3.1 Steam Heater: Temperature Control
fig.11 (EE-07/A - FDF-2)
No Yes
READ: PIT-1371
TIT-1366 > 190 °C
(Steam Supply)
ALARM
TSH-1390
ALARM Yes
PSL-1371 PIT-1371 <2.8 kg/cm²
ALARM
No PSH-1371
Yes
PIT-1371 >5.5kg/cm²
No
READ LIT-1399A
IF LSH-1399/A: ALARM
READ: TIT-1398A/B
IF LSL-1399/A: ALARM
(Propane Gas)
INTERLOCK I2: X2
TSHH-1398 fig.x1
Yes Yes No
Set Level
TIT-1398A/B ≥ 140 °C reached?
No
READ: TIT-1394A/B
(Propane Gas) Yes
INTERLOCK I3: X3 PIT-1371 <3 kg/cm²
TSHH-1394 fig.x1
Yes No
No
TIT-1394A/B ≥120 °C
No
TIT-1394A/B ≥96.0 °C
Yes
Yes
T
18-JUN-2018 TIT-1394A/B ≥96.0 °C
fig.15
No
EASWARAN MAHESH (A804)
Page 71 of 93
External Sequences 4.2.3.1 Steam Heater: Temperature Control
Q
(EE-07/A - FDF-2) (Electric Heater in series)
fig.11
ACTIVATE
DIFFERENTIAL TEMPERATURE CONTROL
Temperature Set= 91.0 °C (TIT-1398) ACTIVATE LEVEL CONTROL
Valves in Parallel: Input Level Set LIC-1399A
* TCV-1366A by means I/P TY-1366A Condensate Vaporizer 1
Feed back ZT-1366/A * LCV-1399A by means I/P LY-1399A
* TCV-1366B by means I/P TY-1366B Feed back ZT-1399A
Feed back ZT-1366B
Yes
TIT-1398A/B ≥ 140 °C Yes No
Set Level
reached?
No
READ: TIT-1394A/B
(Propane Gas)
INTERLOCK I3: X3
TSHH-1394 fig.x1
No
Yes Yes
TIT-1394A/B ≥120 °C PIT-1371 <3 kg/cm²
No
No
TIT-1394A/B ≥96.0 °C
Yes
No Yes
R
TIT-1394A/B ≥ 91.0 °C
fig.11
Figure 13
18-JUN-2018
EASWARAN MAHESH (A804)
Page 72 of 93
External Sequences
S 4.2.3.2 Electric Heater: Temperature Control
fig.11 (FTG1-EH-11/12/13)
HEATER
(to TCP)
Temperature Set= 99°C (TIT-1394)
START
HEATER
ENABLE
FSL-1311 ≥ min Flow (to DCS)
20mA=100% Power
4-20 mA Demand
4mA= 0% Power
Yes
HEATER
(to TCP)
Signal
No READY
(to DCS)
FSL-1311:
NO FLOW
(to TCP)
HEATER STOP
(HEATER CUT-OFF)
(to TCP)
ALARM RESET
AND
(to TCP)
FIELD EMERGENCY
STOP (to TCP)
4-20 mA
kW Signal
READ: TIT-1398A/B (to DCS)
INTERLOCK I5: X5 (Propane Gas)
TSHH-1395 fig.x2 HEATER TRIP
(to DCS)
Yes
TIT-1395A/B ≥ 140 °C SCR Common
Ground Fault
No (to DCS)
INTERLOCK I3:
TSHH-1394 X3 READ: TIT-1394A/B
fig.x1 (Propane Gas)
Yes
TIT-1394A/B ≥120 °C
No
No
TIT-1394A/B ≥99 °C
Yes
Figure 14
18-JUN-2018 T
fig.15
EASWARAN MAHESH (A804)
Page 73 of 93
External Sequences
T T T 4.2.4 PROPANE Pressure Control
fig.2 fig.12 fig.14
READ: PIT-1369A/B
(Propane Gas)
INTERLOCK I3: X3
PSHH-1369 No
fig.x1
Yes
PIT-1369A/B ≥31.5 kg/cm²
No
ALARM:
PIT-1369A/B ≥30.5 kg/cm²
PSH-1369
Yes
No
No
PIT-1369A/B =26.5 kg/cm²
Yes
Yes No
VAPORIZER 1 is
Working?
V1 V V V2
fig.2 fig.16 fig.16 fig.2
Figure 15
18-JUN-2018
EASWARAN MAHESH (A804)
Page 74 of 93
4.2.5 Vane Pack Separator Level Control
External Sequences V V
fig.2 fig.15 4.2.6 Filters Control
Yes
LSHH-1355
ALARM:
LSH-1355
No
Yes
OPEN DCV-1355 LSH-1355
No
ALARM:
LSL-1355 Yes
LSL-1355
No
CLOSE DCV-1355 No
Yes
ALARM:
LSLL-1355 LSLL-1355
No
CLOSE DCV-1355
FILTER FG-2A (GN-30A)
READ: LIT-1357A
Yes No
ALARM:
LSH-1357A
LSH-1357A
Yes No
ALARM:
LSH-1357B
LSH-1357B
Yes No
ALARM:
18-JUN-2018 PDT-1380 ≥ 0.7kg/cm²
PDSH-1380
EASWARAN MAHESH (A804)
Page 75 of 93
External Sequences 7.0 Normal Shut-down
fA5 Normal Stop
fig.1.1 Sequence
Ensure that all Gas turbines
are in stop condition
Stop Vaporizer 1 (if selected):
* Put manual model Level Controller,
LIC-1351 and close the control valves
LCV-1351A/B
STEAM Side - Vaporizer 1
* Put manual model Temperature
Controller and close the control valves Stop Fuel Gas Steam Heater:
TCV-1366A and TCV-1366B * Put manual model Level Controller,
*Put manual model Level Controller LIC-1399 and open the control valves
and open LCV-1399B LCV-1399/A
* Close steam supply valve XV-1311B * Put manual model Temperature
Controller and close the control valves
Stop Vaporizer 2 (if selected): TCV-1365/A and TCV-1365/B
* Put manual model Level Controller, * Close steam supply valve XV-1311/A
LIC-1353 and close the control valves
LCV-1353A/B
STEAM Side - Vaporizer 2
* Put manual model Temperature
Controller and close the control valves
TCV-1367A and TCV-1367B
*Put manual model Level Controller Stop Electric Heater
and open LCV-1399C FTG1-EH-11/12/13
* Close steam supply valve XV-1311C
No Yes
De-pressurize
downstream PCV-
1363/64
Open Inlet header
Yes blowdown valve XV-1392
Figure 18
Page 76 of 93
External Sequences G H INTERLOCKS
fig.3 fig.7 VAPORIZERS, HEATERS, SEPARATOR & FILTERS
No
33.8 ≤ PIT-1368 < 34.2 kg/cm²
No
PSHH2-1368
33.8 ≤ PIT-1368 < 34.0 kg/cm²
PSHH1-1368 Yes X2
INTERLOCK I1:
PSHH1-1368 X1 X1 fig.11
Yes
fig.2 fig.4
X1
X2 X2
fig.1 I1 I2
X1 fig. 2 fig.12
Inibhit to
Transfer to fig.8 X2
Propane fig.1 X2
33.0 ≤ PIT-1368 <33.8 kg/cm² fig.13
INTERLOCK I1: PSHH1-1368
INTERLOCK I2: 33.8 ≤ PIT1368 <34.8 kg/cm²
PSHH2-1368 INTERLOCK I2: PSHH2-1368
X3 X3 X3 X3 X3 X3 X3
X3 fig.2 fig.4 fig.5 fig.6 fig.8 fig.9 fig.10
fig.1
INTERLOCK I3:
PSHH3-1368 X3 X3 X3 X3 X3 X3
I3
fig.11 fig.12 fig.13 fig.14 fig.15 fig.16
Inibhit to Yes
34.8 ≤ PIT-1368 <35.2 kg/cm²
Transfer to
INTERLOCK I3: PSHH3-1368 34.8 ≤ PIT-1368 <35.2 kg/cm²
Propane
PSHH2-1368
X4
No
X4 X4 fig...
fig.1 Fig.2.
INTERLOCK I4: I4
PSHH4-1368
SKID SHUTDOWN
(Interlock I1 and I2 activated): PIT-1368 35.2≥ kg/cm²
Inibhit to * CLOSURE XV-1394 INTERLOCK I4: PSHH4-1368
Transfer to (liquid propane from Customer)
Propane * CLOSURE XV-1369
(saturated PROPANE to Customer)
* CLOSURE DSV-1398
(automatic drain of Vanepack Separator) SKID SHUTDOWN
FG-3) (Interlock I1,I2 and I3 activated):
* CLOSURE XV-1397 * OPEN XV-1395
(PROPANE to Gas Turbine) (Automatic Vent Valve to Flare)
* CUTOFF ELECTRIC SUPERHEATER * OPEN XV-1396
(Automatic Vent Valve to Flare)
Figure x1
(FTG1-EH-4/5/6)
18-JUN-2018
* Inibhit to Transfer to Propane * Inibhit to Transfer to Propane
EASWARAN MAHESH (A804)
Page 77 of 93
External Sequences INTERLOCKS
VAPORIZERS, HEATERS, SEPARATOR & FILTERS
X X X X X
fig.3 fig.6 fig.7 fig.10 fig.11
18-JUN-2018
EASWARAN MAHESH (A804)
Page 78 of 93
Partial Pressurized Emergency
External Sequences PPSDr Shut-Down (PPSDr)
xA6 Partial Pressurized
fig.1.1 Emergency Shut-
Down
Close Inlet isolation
valve XV-1395
Yes
De-pressurize No
downstream PCV-
1363/64 Open Inlet header
blowdown valve XV-1395
Yes
Figure x3
Page 79 of 93
External Sequences ESDr Emergency Shut-Down and
xA7 Emergency Shut- complete depressurization (ESDr)
fig.1.1 Down and complete
depressurization
Close Inlet isolation
valve XV-1395
De-pressurization
18-JUN-2018
EASWARAN MAHESH (A804)
Page 80 of 93
External Sequences fA1 PURGING with 6.1 Nitrogen Purging
fig.1.1 nitrogen
CLOSE:
CLOSE Valves:
* hand valve upstream XV-1394
XV-1394
* hand valve downstream XV-1397
XV-1397
Read
PIT-1362C, OPEN Vent Valve:
PIT-1368A/B/C, XV-1395
PIT-1369A/B XV-1396
Read
PIT-1362C, PRESSURIZE with nitrogen
PIT-1368A/B/C, at Pressure 5 kg/cm²
PIT-1369A/B
Yes
Read
PIT-1362C,
PIT-1368A/B/C,
PURGING with Yes PIT-1369A/B
No nitrogen 4 times?
PIT-1362C, No
PIT-1368A/B/C,
PIT-1369A/B EQUAL TO
5 kg/cm²
Figure f1
18-JUN-2018 fA1.1
EASWARAN MAHESH (A804)
fig.1.1
Yes
Page 81 of 93
External Sequences 6.2 First filling of liquid
fA2 First filling of Propane
fig.1.1 liquid Propane
READ LIT-1351A/B
IF LSL-1351: ALARM X3 READ LIT-1353A/B
IF LSLL-1351: ALARM fig.x1 X3 IF LSL-1353: ALARM
IF LSLL-1353: ALARM
fig.x1
Yes
LSHH-1351 I3
Yes
No I3 LSHH-1353
Alarm Alarm
LSH-1351 No
Alarm
Yes
LSH-1351 LSH-1353
Alarm Yes
LSH-1353 No No
Yes Yes
fA2.1 fA2.1
fig.1.1 fig.1.1
Read PIT-1368/A/B/C
ACTIVATE PRESSURE CONTROL
Alarm (Propane Gas)
PCV-1347 - Set= 13 kg/cm² g
PSH-1368 by means I/P PY-1347
Yes
13.0 < PIT-1368/A/B/C < 33.8
kg/cm² g
No
Figure f1.1
No G PIT-1368/A/B/C= 13.0
kg/cm² g Yes
Alarm fig.x1
18-JUN-2018
PSH-1368
EASWARAN MAHESH (A804)
Page 82 of 93
External Sequences fA3 fA4
Start-up and warm-up
fig.f1.1 fig.f1.1
Yes Yes
LSHH-1351 I3 I3 LSHH-1353
No
No
Alarm
Alarm Yes
LSH-1351
LSH-1353
LSH-1351 No
Yes
No
Alarm
Alarm
Set Level No No Set Level
LSH-1353
reached? reached?
Yes No
13.0 < PIT-1368A/B/C < 33.8
kg/cm² g PIT-1368A/B/C= 13.0
kg/cm² g
Figure f2
Yes
Alarm No G
18-JUN-2018
PSH-1368 fig.x1
EASWARAN MAHESH (A804)
Page 83 of 93
External Sequences
VAPORIZER 1 (Warm-up)
fC
fig.f2
fV
fig.f9
No
PIT-1368/A/B/C= 13.0
READ LIT-1399B kg/cm² g
(Condensate Side – Vaporizer 1)
Yes
Yes
Interlock I Yes
TIT-1391A/B ≥140°C TIT-1391A/B > 83°C
TSHH-1391
No
No
X
fig.x2
Inibhit to
TIT-1391A/B ≥120°C
Figure f3
Transfer to
Propane No
18-JUN-2018
Alarm Yes
EASWARAN MAHESH (A804) PSH-1368
Page 84 of 93
External Sequences
VAPORIZER 2 (Warm-up)
fD
fig.f2
fV
fig.f9
No
PIT-1368A/B/C= 13.0
READ LIT-1399C kg/cm² g
(Condensate Side – Vaporizer 2)
Yes
Read TIT-1391/A/B
No Yes (Propane Gas)
Set Level
reached?
Yes
Yes
Interlock I TIT-1391A/B ≥140°C TIT-1391A/B > 83°C
TSHH-1391
No
No
X
fig.x2
Inibhit to
TIT-1391A/B ≥120°C
Figure f4
Transfer to
Propane No
18-JUN-2018
Alarm Yes
EASWARAN MAHESH (A804) PSH-1368
Page 85 of 93
External Sequences PROPANE TEMPERATURE
fO
CONTROL SUPER HEATERS
fig.f2
(WARM-UP)
READ: PIT-1368A/B/C)
(Propane Gas)
READ: TIT-1391A/B
INTERLOCK I: X (Propane Gas)
TSHH-1391 fig.x2
Yes
TIT-1391A/B ≥140°C
No
READ: PIT-1369A/B
(Propane Gas)
READ: TIT-1394A/B
INTERLOCK I3: X3 (Propane Gas)
TSHH-1394 fig.x1
Yes No
READ: TIT-1398A/B
TIT-1394A/B ≥120°C
(Propane Gas)
INTERLOCK I2: X2
TSHH-1398 fig.x1
Yes
TIT-1398A/B ≥140°C
INTERLOCK I5: X5 No
TSHH-1395 fig.x2
fR fS
fig.f7 fig.f8
No
Figure f5
18-JUN-2018
fP
fig.f6
EASWARAN MAHESH (A804)
Page 86 of 93
Propane Temperature Control
External Sequences
Steam Super Heater (EE-07/A - FDF-2)
fP (WARM-UP)
fig.f5
READ LIT-1399A
READ: TIT-1398A/B IF LSH-1399A: ALARM
(Propane Gas) IF LSL-1399A: ALARM
INTERLOCK I2: X2
TSHH-1398 fig.x1
Yes
TIT-1398A/B ≥ 140 °C
Yes No
Set Level
No
reached?
READ: TIT-1394A/B
(Propane Gas)
INTERLOCK I3: X3
TSHH-1394 fig.x1
Yes No
TIT-1394A/B ≥120 °C
Yes
PIT-1371 <3 kg/cm²
No
TIT-1394A/B ≥96.0 °C
No
Yes
No Yes
fT
TIT-1394A/B ≥ 99.0 °C
Figure f6
fig.f9
18-JUN-2018
EASWARAN MAHESH (A804)
Page 87 of 93
Propane Temperature Control
External Sequences
Steam Super Heater (EE-07/A - FDF-2)
Q (Electric Heater in series - WARM-UP)
fig.f5
ACTIVATE
DIFFERENTIAL TEMPERATURE CONTROL
Temperature Set= 91.0 °C (TIT-1398) ACTIVATE LEVEL CONTROL
Valves in Parallel: Input Level Set LIC-1399A
* TCV-1366A by means I/P TY-1366A Condensate Vaporizer 1
Feed back ZT-1366A * LCV-1399A by means I/P LY-1399A
* TCV-1366B by means I/P TY-1366B Feed back ZT-1399A
Feed back ZT-1366B
INTERLOCK I2: X2
TSHH-1398 fig.x1 Yes No
Set Level
Yes reached?
TIT-1398A/B ≥ 140 °C
No
READ: TIT-1394A/B
(Propane Gas)
INTERLOCK I3: X3
TSHH-1394 fig.x1
No
Yes Yes
TIT-1394A/B ≥120 °C PIT-1371 <3 kg/cm²
No
No
TIT-1394A/B ≥96.0 °C
Yes
No Yes
Figure f7
TIT-1398A/B ≥ 91.0 °C R
18-JUN-2018 fig.f5
EASWARAN MAHESH (A804)
Page 88 of 93
External Sequences
fS Propane Temperature Control
fig.f5 Electric Super Heater (FTG1-EH-11/12/16)
HEATER
(to TCP)
Temperature Set= 99°C (TIT-1394)
START
HEATER
ENABLE
FSL-1311 ≥ min Flow (to DCS)
20mA=100% Power
4-20 mA Demand
4mA= 0% Power
Yes
HEATER
(to TCP)
Signal
No READY
(to DCS)
FSL-1311:
NO FLOW
(to TCP)
HEATER STOP
(HEATER CUT-OFF)
(to TCP)
ALARM RESET
AND
(to TCP)
FIELD EMERGENCY
STOP (to TCP)
4-20 mA
kW Signal
READ: TIT-1398A/B (to DCS)
INTERLOCK I5: X5 (Propane Gas)
TSHH-1395 fig.x2 HEATER TRIP
(to DCS)
Yes
TIT-1395/A/B ≥ 140 °C SCR Common
Ground Fault
No (to DCS)
INTERLOCK I3:
TSHH-1394 X3 READ: TIT-1394A/B
fig.x1 (Propane Gas)
Yes
TIT-1394A/B ≥120 °C
No
No
TIT-1394A/B ≥99 °C
Yes
Figure f8
18-JUN-2018 fT
fig.f9
EASWARAN MAHESH (A804)
Page 89 of 93
External Sequences fT fY1 fT fT Propane Pressure Control
fig.f6 fig.f2 fig.f2 fig.f8 (Pressurization with Propane)
Yes
PIT-1368/A/B/C≤ SET Close PCV-1347 Open XV-1396
(Outlet blowdown Valve)
No
Yes Yes
TIT-1391A/B ≥140°C TIT-1391A/B > 83°C
Interlock I
TSHH-1391
No
READ: PIT-1369A/B
INTERLOCK I3: (Propane Gas)
X3
PSHH-1369 fig.x1
Yes
PIT-1369A/B ≥31.5 kg/cm²
No
fA3.1 No
Yes PIT-1369A/B =13. kg/cm²
fig.f1.1
No continue
warm-up?
Yes
Yes No
VAPORIZER 1 is
Working?
Figure f9
18-JUN-2018 fV fV fV fV
fig.f3 fig.f9.1 fig.f4 fig.f9.1
EASWARAN MAHESH (A804)
Page 90 of 93
External Sequences Propane Pressure Control
(Pressurization with Propane)
fV
fig.f9
Yes Continue No
warm-up fA4.1
downstream of fig.f1.1
XV-1363?
Yes
PIT-1368A/B/C≤ Set Close PCV-1347 Open XV-1396
No
No Yes
PIT-1368A/B/C ≥ G Close XV-1397
33.8 kg/cm² g fig.x1
Alarm
PSHH-1368
Yes Yes
Interlock I TIT-1391A/B ≥140°C TIT-1391A/B > 83°C
TSHH-1391
No
Inibhit to
Transfer to
ACTIVATE PRESSURE CONTROL (PIC-1369)
Propane * close PCV-1364
* PCV-1363 by means I/P PY-1363 Feed back ZT-1363
** IF Flag1=1 then Pressure Set= 12 kg/cm²
** IF Flag2=1 Pressure Set= 12÷26.5 kg/cm²
READ: PIT-1369A/B
INTERLOCK I3: X3 (Propane Gas)
PSHH-1369 fig.x1
Yes
PIT-1369A/B ≥31.5 kg/cm²
No
ALARM:
PIT-1369A/B ≥30.5 kg/cm²
PSH-1369
Yes
No
No
PIT-1369A/B =13. kg/cm²
Yes
Figure f9.1
fZ
18-JUN-2018
fig.f9
EASWARAN MAHESH (A804)
Page 91 of 93
External Sequences LEVEL CONTROL
fV Drain Level Control Valve on Vane Pack Separator
fig.f2 Level Transmitters on simple stage Scrubbers
READ: LIT-1355A/B/C
ALARM:
LSH-1355
Yes
LSHH-1355
OPEN DCV-1355
No
Yes
ALARM: LSH-1355
LSL-1355
No
No
LSH-1357A
Yes
ALARM:
LSH-1357A
Yes No
ALARM:
Figure f10
LSH-1357B LSH-1357B
18-JUN-2018
EASWARAN MAHESH (A804)
Page 92 of 93
No Comments
18-JUN-2018