DATE: DECEMBER 2, 2023

TWO REGIS
ACTIVITIES: ISSUES: REMARKS:

ARCHITECTURAL:
1. INSPECTION OF HALLWAY CEILING BALANCE AREA AT
FRAME ELEVATION 1. ELEVATOR LOBBY
2. ACCESS HALLWAY TO POOL AREA
NOT INCLUDING FRAMING SYSTEM

FROM 80 POINTS
AT AREA 1 FROM PT 1-18 - NO
CORRECTION
AT AREA 2 FROM PT 19 - 58 - NO
CORRECTION
(NOT THAT BALANCE AREA AT ACTIVITY
TILE)
AT AREA 3 FROM PT 60-80
1. PT 77 AT 1562MM
2. PT 76 AT 1564MM