C1
9815
C2
4
A-304
10970
C2.1 C3 C3.1 C3.2
10970
1
A-304 C4
4
A-201
10970
4
A-204
C5
3
A-304 C5.1
10970
2
A-304 C5.2 C5.3 C6 C6.1 C6.2
10970
C7 C7.1 C7.2
9815
C7.3 C8 C8.1
A-119
9815 8770 2200 3384 7586 10970 5445 2140 545 2840 2005 3482 5483 2975 1935 1935 2970 2000
23 7 6 1
C-ST1-1.1
REPRODUCED OR REVISED WITHOUT WRITTEN PERMISSION BY ZZAP CONSULTING INC. THE
CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS AND REPORT ALL ERRORS AND
CA
OMISSIONS PRIOR TO COMMENCING. THIS DRAWING IS NOT TO BE SCALED
STAIR #1 STAMP
E5.2 C-ST1-1 E5.2 E4.2
CA.1 TRUE
4020
2600 2600 2600 2600 3
E4.2 E5.2 A-553
E3.1
CB 4
A-205
CB.1
6963
1520
1 1
A-303 A-303
CC STAMP
1255
860
C100J.1
C100H.1
CE
1255
E5.2
E5.2 JAN.
C100A.2
STAIR #2 C100K
C-ST2-1 COMS. ELEV. E4.3
1520
5615
E5.2
C100L
C100F.1
2 2
4020
A-303 A-303
EXIT OFFICE
STORAGE E1.1
CORRIDOR C100F E4.1 C100D CACF
C100G C100C
E1.4 E1.4
CG
C100G.2
2140
2
2000
E4.2 E4.2 E1.2 E4.2 E4.2 E4.2 5 E1.2 E1.2 E1.2 E4.2 E1.2
2 E3.1 6 7 8
A-553 1 A-205 3 CONSULTANTS
A-553 A-553 A-553 A-553
CH
4 1 3 2
A-304 A-304 A-304 C5.1 A-304
4 2
A-203 A-204
1 3
B1 B1.1 B1.2 A-302 B1.3 B2 B2.1 B3 B3.1 B3.2 B4 B4.1 B4.2 B5 A-302 B6 B6.1 B6.2 B7 B7.1
9815 10970 10970 10970 10970 9815
2975 1975 1890 2975 10530 440 3365 4765 2840 2960 4645 3365 10970 4865 3131 1820 2000
1 2
A-115 E1.2 E1.2 E1.2 E1.2 E1.2 E1.2
A-115
BA B100H.2
E1.1
UNIT
B108
EXIT LOBBY
3165
CORRIDOR B100B
4070
UNIT B100J
BB B107 UNIT UNIT
B109 B110 UNIT BA.1
B111
BB.1 E1.3
1495
2 3 2
A-302 A-302
STAIR #2 B100A.1
B-ST2-1 2 A-205
BC
1250
ELEC. E2.1
1
B100K
860
1 1 CORRIDOR 3 3
A-201 A-203 BD B100D A-203 A-201
860
E3.1
BE
1250
UNIT UNIT
B104 ELEV. VEST. ELEC.
UNIT 104 B103 STAIR #1 UNIT
1495
A100F B100E
BE.1 E1.2
B105 B-ST1-1 B101
UNIT
BF B106
4070
E1.1
4 EXIT LAUNDRY 4
A-302 CORRIDOR ROOM A-302
B100H B100G
BG
B100G.2
E1.2 E1.2 E1.2 E1.2 E1.2 E1.2
1 3
A-302 A-302
4 2
A-202 A-203
1 3
A1 A1.1 A-301 A2 A2.1 A3 A3.1 A3.2 A4 A4.1 A4.2 A5 A5.2 A-301 A6 A6.1 A6.2 A7 A7.1
9815 10970 10970 10970 10970 9815
1 4950 4865 10530 440 3365 4765 2840 2960 4645 3365 440 10530 4865 3130 1820 2000
2
A-111
A-111
E1.2 E1.2 E1.2 E1.2 E1.2 E1.2
A100H.2
AA E1.1
1 5
EXIT LOBBY
3165
A-551 A-551 2 A100B
CORRDIOR
4070
A-551
A100J
AB UNIT AA.1
A107
UNIT 3
A108 UNIT E1.3 3
AB.1
1495
STAIR #2 A110
VEST. A-551
A-ST2-1 UNIT 2 A-205
A109 A100A A100A.1
AC
1250
E2.1
2 1 2
ELEC.
A-301 A100K E3.1 A-301
860
1 3
A-202 AD CORRIDOR
A100D A-202
860
6 7
12
AE A-551
1250
A-551
A-551
UNIT UNIT ELEC.
ELEV. A103 STAIR #1 VEST.
E1.2 UNIT A104 A100E UNIT
AE.1
1495
UNIT
AF A106 1
0
ISSUED FOR TENDER
ISSUED FOR PERMIT
14 JUNE 2023
05 MAY 2023
E1.1
4
LAUNDRY 4 ID REVISION DATE
4070
A-301
ROOM A-301
EXIT PROJECT
A100F
CORRIDOR
A100H WERKLIV LAMBE'S LANE
AG
A100G.2
ST. JOHN'S, NL
E1.1 E1.1 E1.1 9 E1.1 E1.1 E1.1
10 11
A-551 DRAWING TITLE
A-551 A-551
2
A-202 SCALE: DRAWN BY:
1 : 100 LTG
2 PROJECT #: CHECKED BY:
A-201 22-2650-01 TNB
ISSUED DATE:
14 JUNE 2023
A-101
A-101
SCALE: 1 : 100
Level 06 Revisions 4
A-304
1
A-304
A-201
4
4
A-204
3
A-304
2
A-304
C1 C2 C2.1 C3 C3.1 C3.2 C4 C5 C5.1 C5.2 C5.3 C6 C6.1 C6.2 C7 C7.1 C7.2 C7.3 C8 C8.1
9815 10970 10970 10970 10970 10970 9815
1 9815 8770 2200 2467 918 7586 10970 5445 2140 545 2840 2005 3482 5483 2975 1935 1935 2970 2000
2
A-122
E1.1 E1.1 E1.1 E1.1 E1.1 E1.1 E1.1 A-122 Copyright 2022. ZZAP CONSULTING INC. All Rights Reserved
THIS DRAWING AND DESIGN IS COPYRIGHT PROTECTED WHICH SHALL NOT BE USED,
REPRODUCED OR REVISED WITHOUT WRITTEN PERMISSION BY ZZAP CONSULTING INC. THE
CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS AND REPORT ALL ERRORS AND
CA
OMISSIONS PRIOR TO COMMENCING. THIS DRAWING IS NOT TO BE SCALED
STAMP
CA.1 TRUE
4020
E1.2
CB UNIT
B600QQQQ
CB.1
1520
1 1
A-303 A-303
CC STAMP
1255
860
1 3
A-204 CD A-204
860
CE
1255
ELEV. E1.1
1520
C707
CE.1
CLIENT
CF
2 2
4020
A-303 A-303
CG
2000
BA
UNIT
B605
4070
BB M&E
B600G E1.2
E1.2 CW3-B E1.2 E2.2 UNIT
B604 BA.1
BB.1
1495
2 STAIR #2 2
A-302 B-ST2-6 A-302
UNIT
BC
1250
E2.2
B606
B600A.1
ELEC.
AMENITY B600B
860
E1.1
1 1 SPACE CORRIDOR 3 3
A-201 A-203 BD B600C B600A
UNIT A-203 A-201
860
VEST. B601
B600D
BE
1250
ELEV.
A600M STAIR #1
1495
BE.1 B-ST1-6
UNIT
BF STORAGE CW1-B E1.2 CW2-B E1.2 E2.2
B603
UNIT
4070
B600E B602
4 4
A-302 A-302
E1.2
BG
E1.2 E1.2 E1.2
1 3
A-302 A-302
4 2
A-202 A-203
1 3
A1 A1.1 A-301 A2 A2.1 A3 A3.1 A3.2 A4 A4.1 A4.2 A5 A5.2 A-301 A6 A6.1 A6.2 A7 A7.1
9815 10970 10970 10970 10970 9815
1 4950 4865 10530 440 3365 4765 2840 2960 4645 3365 440 10530 4865 3130 1820 2000
A-114 2
E1.2 E1.2 E1.2 A-114
AA
STOR.
4070
E1.2
UNIT A600E
A605
AB
E1.2 CW2-A E1.2 CW1-A
AA.1
UNIT
AB.1 STAIR #2
1495
AC
1250
2 ELEC. 2
JAN.
A-301 A600B A600F A-301
860
1 AMENITY 3
A-202 AD 1
A-552 A600C A-202
860
A600A.1
AE
1250
E1.1 2
UNIT 5 A-552
UNIT A601 ELEV.
STAIR #1
AE.1
1495
9
AF E1.2
UNIT
A603
A-552 6 E2.2
7 8 E1.1 CW3-A M&E
1
0
ISSUED FOR TENDER
ISSUED FOR PERMIT
14 JUNE 2023
05 MAY 2023
A-552 A-552 A-552 A600G
4 4 ID REVISION DATE
4070
AG
ST. JOHN'S, NL
E1.1 E1.1 E1.1
DRAWING TITLE
2
A-202 SCALE: DRAWN BY:
1 : 100 LTG
2 PROJECT #: CHECKED BY:
A-201 22-2650-01 TNB
ISSUED DATE:
14 JUNE 2023
A-104
A-104
SCALE: 1 : 100