Sub: Elecy- 110/22 KV Kamatchipuram SS 16 MVA Power


Transformer II–Pre-Commissioning report-Submission-Reg.

********************************

I herewith submit the Pre-Commissioning test result of 16 MVA


Power Transformer [Make:VEI] in Kamatchipuram SS. The test results are
found satisfactory.

This is for your kind information please.

ASSISTANT EXECUTIVE ENGINEER


METER AND RELAY TEST
THENI

ENCL: Sheets
Copy submitted to The Superintending Engineer/GCC/Theni
Copy submitted to The Executive Engineer/Distribution/Chinnamanur
Copy to The Assistant Executive Engineer/Kamatchipuram
Date: 110/22KV POWER TRANSFORMER

After conducting necessary Pre-Commissioning tests in


VENKATESWARA Make 16 MVA POWER TRANFORMER, the Power
Transformer was charged successfully at Hrs on
in presence of

PT values were measured are given below.

Tap position RY YB BR RN YN BN