4"-Q10008.1-251432
WELLHEAD 1 4"-Q10008.2-251432 4"-Q10009.1-251432
4"-Q10009.2-251432
WELLHEAD 2 4"-Q10002.1-251432
4"-Q10002.2-251432 4"-Q10003.1-251432
4"-Q10003.2-251432
HOLD 1
4"-Q10005.1-251432
WELLHEAD 3 4"-Q10005.2-251432 4"-Q10006.1-251432
4"-Q10006.2-251432
2"-CH-0M6451-1-C252j
2"-CH-0M6451-2-C252j
2"-CH-0M6451-2-C252j 4"-Q10011-251432
2"-CH-0M6451-0-C252j
2"-CH-0M6451-0-C252j 4"-Q10010-251432
2"-Q64018-251432
2"-CH-0M6450-1.3-C252j
2"-Q64019-251432
2"-Q64014-251432
2"-Q64016-251432 2"-Q64015-251432
2"-Q64017-251432
2"-Q64011-FAB-251432
12"-HG-0M6605-0-C12i 2"-Q64012-FAB-251432
3"-HG-VENT-6-C12i
6"-HG-0V6751-3-C12i 2"-Q64013-FAB-251432
4"-HG-VENT-4-C12i
4"-HG-VENT-7-C12i
4"-HG-VENT-2-C12i
8"-HG-0V6605-2-C12i
2"-D67078.1-11432
3D Model Snapshot @ Upstream CWA H showing lines from wellheads, wellhead valve choke skids
module 1,2 & 3, allocation skids module 4, 5 & 6, seplat SDV skid module 8 and SPDC production
skid module 7
HOLD 1: Awaiting verified asbuilt co-ordinates @ API 10000 PSI Flange interface points prior to Piping Tie-ins to wellheads
Page 1 of 13
Assa North - Ohaji South Project Date: 10/07/2023
Page 2 of 13
Assa North - Ohaji South Project Date: 10/07/2023
Page 3 of 13
Assa North - Ohaji South Project Date: 10/07/2023
TABLE OF CONTENTS
1. Installation Work Pack (offsite CS Piping Pre-Fabrication work): Upstream.................................... 2
1.1 Offsite fabrication (shop welds) ........................................................................................................ 2
2. Scope of Work Description .................................................................................................................... 5
2.1 Offsite Pre-Fabrication of CS Pipes; CWA H Upstream .................................................................. 5
2.1.1 Tagging of Spools ............................................................................................................................... 6
2.2 Material Required (BOM) .................................................................................................................... 6
2.3 Estimated labor/Manpower to complete this Pack .......................................................................... 7
2.3.1 Labor Required .................................................................................................................................... 7
2.3.2 Equipment/Tools and Consumables Required ................................................................................ 7
2.4 Schedule & Controls ........................................................................................................................... 8
2.5 Permits ................................................................................................................................................. 8
3. Quality Requirement ............................................................................................................................... 8
4. HSE Requirement .................................................................................................................................... 8
5. Relevant Reference Drawings................................................................................................................ 8
6. Specification and Standards .................................................................................................................. 9
7. Tasks Labor Hour Required ................................................................................................................... 9
8. Pre-Fabricated Spools (Shop Weld) ....................................................................................................10
9. Variance/Deviation Register .................................................................................................................11
10. Checklist ............................................................................................................................................ 12
9.1 Quality Checklist ............................................................................................................................... 12
11. Closeout Feedback / Completion ....................................................................................................13
12. Attachment Fabrication Isometric Drawings ...................................................................................13
13. Attachment P&ID’s (PEFS) ............................................................................................................. 13
Page 4 of 13
Assa North - Ohaji South Project Date: 10/07/2023
Page 5 of 13
Assa North - Ohaji South Project Date: 10/07/2023
Page 6 of 13
Assa North - Ohaji South Project Date: 10/07/2023
Page 7 of 13
Assa North - Ohaji South Project Date: 10/07/2023
Special Considerations
Name Yes No N/A Name Yes No N/A
Confined Space ☐ × × Shutdown ☐ × ☐
Critical Lift ☐ × × IDLH ☐ × ☐
Hot Tap × ☐ ☐ Other: Working at Heights ☐ × ☐
2.5 Permits
Permits Issued By
A (General Permit) × ☐ ☐ ☐ ×
B (Hot Work) × ☐ ☐ ☐ ×
3. Quality Requirement
Blasting, Painting and Coating Procedure doc no; ANG-NG01020709-GEN-QA-1060-
0040-C02
Welder Qualification Procedure doc no; ANG-NG01020709-GEN-QA-6050-00004_C01
DEP; 30.10.60.18_Gen
Complete Weld Map Log and submit with the completed IWP (See attached)
Complete Punch List (if Required) prior to submitting completed IWP
4. HSE Requirement
JHA for DSS CS SS AG Piping Works
Daily Tool box meeting will be conducted
Page 8 of 13
Assa North - Ohaji South Project Date: 10/07/2023
Page 9 of 13
Assa North - Ohaji South Project Date: 10/07/2023
Page 10 of 13
Assa North - Ohaji South Project Date: 10/07/2023
Material OTY
Drawing / Isometric Rev No of Spl Description Size UOM
Code (pcs)
Piping Isometric Drawing; 6"-HG-0V6751-3-C12i 0 ASTM A106 Gr. B 2 Prefabricated Pipe Spool 6” 2 Pcs
Piping Isometric Drawing; 4"-HG-VENT-7-C12i 0 ASTM A106 Gr. B 1 Prefabricated Pipe Spool 4” 1 Pcs
Piping Isometric Drawing; 3"-HG-VENT-6-C12i 0 ASTM A106 Gr. B 1 Prefabricated Pipe Spool 3” 1 Pcs
Piping Isometric Drawing; 4"-HG-VENT-4-C12i 0 ASTM A106 Gr. B 1 Prefabricated Pipe Spool 4” 1 Pcs
Piping Isometric Drawing; 4"-HG-VENT-2-C12i 0 ASTM A106 Gr. B 1 Prefabricated Pipe Spool 4” 1 Pcs
Piping Isometric Drawing; 8"-HG-0V6605-2-C12i 2 ASTM A106 Gr. B 5 Prefabricated Pipe Spool 8” 5 Pcs
Piping Isometric Drawing; 2"-HL-0M6751-0-C12i 0 ASTM A106 Gr. B 5 Prefabricated Pipe Spool 2” 5 Pcs
Piping Isometric Drawing; 2"-HL-0M6751-0-C12i 0 ASTM A106 Gr. B 5 Prefabricated Pipe Spool 2” 5 Pcs
Piping Isometric Drawing; 4"-CH-104AS-1-C252j 1 ASTM A106 Gr. B 3 Prefabricated Pipe Spool 4” 3 Pcs
Piping Isometric Drawing; 4"-Q10006.1-251432 C02 ASTM A106 Gr. B 1 Prefabricated Pipe Spool 4” 1 Pcs
Piping Isometric Drawing; 4"-Q10005.1-251432 C02 ASTM A106 Gr. B 1 Prefabricated Pipe Spool 4” 1 Pcs
Piping Isometric Drawing; 4"-Q10002.1-251432 C02 ASTM A106 Gr. B 1 Prefabricated Pipe Spool 4” 1 Pcs
Piping Isometric Drawing; 4"-Q10003.1-251432 C02 ASTM A106 Gr. B 1 Prefabricated Pipe Spool 4” 1 Pcs
Piping Isometric Drawing; 4"-Q10008.1-251432 C02 ASTM A106 Gr. B 1 Prefabricated Pipe Spool 4” 1 Pcs
Piping Isometric Drawing; 4"-Q10009.1-251432 C02 ASTM A106 Gr. B 1 Prefabricated Pipe Spool 4” 1 Pcs
Piping Isometric Drawing; 4"-CH-104AS-1-C252j 0 ASTM A106 Gr. B 5 Prefabricated Pipe Spool 4” 5 Pcs
Piping Isometric Drawing; 4"-CH-104AS-1-C252j 0 ASTM A106 Gr. B 3 Prefabricated Pipe Spool 4” 3 Pcs
Piping Isometric Drawing; 2"-D67078-11432 C01 ASTM A106 Gr. B 5 Prefabricated Pipe Spool 2” 5 Pcs
9. Variance/Deviation Register
Any variance from Piping Isometric drawings are to be record here.
Description/Drawing No Location Date Remark
(CWA H)
Enerflex Drawing Sht 45 Replaced with AUF-TPG-ASNG1-MP-2343-00066-001_Rev C03 Upstream EWP_Rev A04
Enerflex Drawing Sht 46 Replaced with AUF-TPG-ASNG1-MP-2343-00067-001_Rev C03 Upstream EWP_Rev A04
Enerflex Drawing Sht 44 Replaced with AUF-TPG-ASNG1-MP-2343-00068-001_Rev C04 Upstream EWP_Rev A04
Enerflex Drawing Sht 43 Replaced with AUF-TPG-ASNG1-MP-2343-00069_001-Rev C04 Upstream EWP_Rev A04
Enerflex Drawing Sht 47 Replaced with AUF-TPG-ASNG1-MP-2343-00070_001-Rev C03 Upstream EWP_Rev A04
Enerflex Drawing Sht 48 Replaced with AUF-TPG-ASNG1-MP-2343-00071_001-Rev C03 Upstream EWP_Rev A04
Enerflex Drawing Sht 73 Replaced with AUF-TPG-ASNG1-MP-2343-00084_001-Rev C02 Upstream EWP_Rev A04
Enerflex Drawing Sht 56 Replaced with AUF-TPG-ASNG1-MP-2343-00011_001-Rev C02 Upstream EWP_Rev A04
Enerflex Drawing Sht 52 Replaced with AUF-TPG-ASNG1-MP-2343-00010_001-Rev C02 Upstream EWP_Rev A04
Enerflex Drawing Sht 74 Replaced with AUF-TPG-ASNG1-MP-2343-00083_001-Rev C02 Upstream EWP_Rev A04
Enerflex Drawing Sht 75 Replaced with AUF-TPG-ASNG1-MP-2343-00081_001-Rev C02 Upstream EWP_Rev A04
Enerflex Drawing Sht 57 Replaced with AUF-TPG-ASNG1-MP-2343-00009_001-Rev C02 Upstream EWP_Rev A04
Enerflex Drawing Sht 53 Replaced with AUF-TPG-ASNG1-MP-2343-00008_001-Rev C02 Upstream EWP_Rev A04
Enerflex Drawing Sht 76 Replaced with AUF-TPG-ASNG1-MP-2343-00082_001-Rev C02 Upstream EWP_Rev A04
Enerflex Drawing Sht 77 Replaced with AUF-TPG-ASNG1-MP-2343-00079_001-Rev C02 Upstream EWP_Rev A04
Enerflex Drawing Sht 58 Replaced with AUF-TPG-ASNG1-MP-2343-00007_001-Rev C02 Upstream EWP_Rev A04
Enerflex Drawing Sht 54 Replaced with AUF-TPG-ASNG1-MP-2343-00006_001-Rev C02 Upstream EWP_Rev A04
Enerflex Drawing Sht 78 Replaced with AUF-TPG-ASNG1-MP-2343-00080_001-Rev C02 Upstream EWP_Rev A04
Enerflex Drawing Sht 59 Replaced with AUF-TPG-ASNG1-MP-2343-01044_001-Rev C01 Upstream EWP_Rev A04
Enerflex Drawing Sht 61 Replaced with AUF-TPG-ASNG1-MP-2343-01045_001-Rev C01 Upstream EWP_Rev A04
Enerflex Drawing Sht 60 Replaced with AUF-TPG-ASNG1-MP-2343-01046_001-Rev C01 Upstream EWP_Rev A04
Enerflex Drawing Sht 81 Replaced with AUF-TPG-ASNG1-MP-2343-00044_001-Rev C01 Upstream EWP_Rev A04
Marked up drawing piping isometric drawings, are to be included and cross-reference in the above
table.
Page 11 of 13
Assa North - Ohaji South Project Date: 10/07/2023
10. Checklist
Pipe Pre-Fabrication Check List CWA H
Location. CWA H
Piping Isometric Drawing Nos See attached Drawings
No. Items to be Checked OK N/A Punch List
1 Identify Piping Isometric Drawing-CS (CWA H)
2 Ensured that drawings Updated and Approved by SPDC
3 Ensure using latest Drawing Revision
4 Spooling of Piping Isometric Drawings
5 Ensure all Dimensions are clearly stated in MM unless noted otherwise
6 Ensure all Dimensions are verified
7 Materials as per Specification, sizes and type
8 Material Availability (MTO), Pipes and Fittings
9 Tools Required
10 Equipment Availability
11 Personnel Required
12 Total Number of Joints Updated (SW & FW)
13 Welding Consumables Availability
14 Tagging Completed
15 Punch List
Completed By Accepted By Comments / Remarks:
Signature:
Name:
Date:
Company:
Page 12 of 13
Assa North - Ohaji South Project Date: 10/07/2023
Page 13 of 13