IRAQI DRILLING COMPANY DAILY REPORT

INTEGRATED MANGEMENT SYSTEM (IDCWI-1-F5)

Daily Operation Report Date: 25-09-2022 Project: EXXON MOBIL Location: WEST QURNA/1 ROW : 95 Country : IRAQ
Rig: IDC-143 Well No.: WQ1:223 Conductor :20" RT - GL: 5.8 Activity: WORKOVER Spud Date: 23/09/2022 Obj: RIH NEW
ESP&PKR Planned Depth: 2484 m POB: 43 Report No.: 4 . Planned Days: 20 GL Elev: 1.8M Start Of Moving Date :
06/09/2022 End Of Moving Date : 08/09/2022 Days Of Acc : 12 .
Depth MD (m) TVD (m) Bit current previous BHA Amount ID (in) OD (in) Total (m)
00:00 hrs Make
Serial #
18:00 hrs

Run #
24:00 hrs

Meterage Diameter(in)

Lithology Top(m) Bottom(m) Model


Dibdibba
Nozzles (in)
L-faris
GHAR Mts Drilled
Dammam Oper. hrs
RUS
IADC
UM RADHUMA

TAYARAT Depth in
RTKP
shiranish DULL Grading
Bit no.
BHA
SaDI
0.00
POOH and L/D 3 1/2" TBG old completion single by single on pipe rack
24 PM situation
to depth 1748 m. K.D

POOH and L/D 3 1/2" TBG old completion single by single on pipe rack
06 AM situation T.D TON MILE = 358
to depth 1285 m
Casing Depth (m) F.C (m) D.V (m) TVD (m) Angle Azimuth Closure (m) Severity (deg/30m)
pre.
Current
Mud Type: Density In : g/cc Density Out: Temp. In : degC Formation Tests Material tons Stock
Sand : ECD : g/cm3 Ca= Temp. Out: degC EMW Test g/cm3 Camp fuel(L)
Gel 0: Gel = API Cake: PP EMW g/cm3
600 / 300 = API Vol. Cm3 AV = Choride: mg/L FP EMW g/cm3
Viscosity = sec.
RIG FUEL: 14.4 M³/CONSUMER FUEL: 900 L
PV YP = Water:
pH = Fil Sand : Solids : oil :
Weight on Bit : ton. SPM1 = SPM2 =
Achievement Ratio For Workover OPS. 8 %
R.P.M =. Liner Size1: 5"

Stand pipe Pressure = psi Liner Size2: 5''


DRILL DATE : 25-09-2022 TIME: 09:30 AM
Torque: AMP Flow Rate: L/m
Koomy: Manifold: 1500psi Accumulator:3000psi Annular: 1000psi
Wt. of string: Ton Annular Velocity: Rental Crane 30 TON 0 Hrs 1 ALI HABEEB
pump press. = psi
Rental Fork Lift 10 ton 0 Hrs 1 KADIM OBEADI

ATTEMPTS, R/D KELLY, WAITING, HOUSEKEEPING, PJSM, RELEASE ANCHOR, RE-LATCH ANCHOR, PUMPING, R/U&P/T SL,RIH SL,SET
Summary of Previous Day:
FWG&POOH,R/D SL.
TIME H CODE Operations

00:00 - 01:00 1 22.1 Open the TBG to the waste tank, It was some gas flowing (without pressure), stopped flowing, OK.

Release the anchor:


-Disconnect the TBG hose and L/D 4.5" VT FOSV.
-While trying to pull the string, got a well kick from the TBG side, Secured the well by connect 3.5" VT FOSV and close it, close the pipe ram.
01:30 - 03:00 2.5 22.1 -L/U the surface line to the TBG, read pressure, zero psi, open to the waste, it was gas and crude oil flowing.
-Open the pipe ram, pumped from TBG (zero SPP), returned from BOP, close BOP.
-PT TBG side with 1000 psi, the annulus held the pressure in the same time, no pressure dropping for the both sides, bleed to zero.
-Discuss with the SL supervisor, Hall was not okay with release plug prong.

Forward circulation:
-pumped 3 m3 of 85 sec high vis.
03:00 - 05:00 1.5 22.1 -Pumped 45 m3 of fresh water.
-SPP= zero psi.
-Return was clean and same the pumped weight (8.33 PPG).

05:00 - 09:30 4.5 22.1 Keep open the well to the waste tank for the flow checking, no flow ( the well monitor)
09:30 - 10:00 0.5 22.1 Released the anchor with straight pull (string weight did'nt go above 26 ton meanining the string is no longer latched ).
10:00 - 10:30 0.5 22.1 B/O & L/D 3* 3 1/2'' pup joints . Noticed the coming joint is contaminated with oil on the outside .

10:30 - 12:30 2 22.1 Normal circulation for cleaning the well by pumping 50 m3.
12:30 - 17:00 4.5 23.2 Stopped operation due to high wind speed (62 km/hr)
17:00 - 00:00 7 22.1 Change the shift , HPJSM & started POOH and L/D 3 1/2" TBG old completion single by single on pipe rack to depth 1748 m.

24

TIME H CODE 6 AM Operations For The Day 25-09-2022

00:00 - 06:00 6 22.1 Cont. POOH and L/D 3 1/2" TBG old completion single by single on pipe rack to depth 1285 m……. In progress.

Remaining M³ Item Received Accumulate M3 Safety Coord. Bashar / Idreas

Quantity Of
Liquids In Mud : Ind. WATER R.O water 10 60 Ahmed Jassim
Medic