You are on page 1of 3

MKG, MKW & MAV-Welding of Stainless-steel pipes.

Item
Area Description Photo
no.

Insufficient purging during


the welding.

Line
P1MKG51BR040
Weld Nr.1
P1UMA
Weld Nr.3
1. MKG
Weld Nr.6
system

Borescope inspection to be
conducted for all roots of
the welds in the MKG
system.

Prepared by: Dragan Slafer 1/3 13:20 30.12.2023


MKG, MKW & MAV-Welding of Stainless-steel pipes.
Item
Area Description Photo
no.

Insufficient purging during


the welding.

Photos taken during


Borescope inspection for
P1UMA
cleanliness of the lines:
2. MKW
P1MKW32BR040
system
P1MKW35BR030 &
P1MKW36BR030

Borescope inspection to be
conducted for all roots of
the welds in the MKW
system.

Prepared by: Dragan Slafer 2/3 13:20 30.12.2023


MKG, MKW & MAV-Welding of Stainless-steel pipes.
Item
Area Description Photo
no.

Insufficient purging during


the welding.

Line P1MAV67BR015
P1UMA
3. MAV Borescope inspection to be
system conducted for all roots of
the welds in the MAV
system.

Prepared by: Dragan Slafer 3/3 13:20 30.12.2023