1. INTRODUCTION
1.1 SCOPE
1.2 GENERAL
1.3 RECOMMENDATION
2. REFERENCES
2.1 MOBILIZATION
2.2 EQUIPMENT REQUIRED
2.3 LIST OF PERMITS REQUIRED
2.4 SAFETY
2.5 WORKMANSHIP
2.6 GENERAL
2.7 WORKING INSTRUCTIONS
2.8 QUALITY CONTROL
2.9 DEMOBILIZATION
2.10 REFERENCE DOCUMENTS
2.11 SHEATH AND PHASE IDENTIFICATION TEST
2.12 JOINT CABINET
2.13 PROCEDURE FOR OUTDOOR SEALING END ASSEMBLY
3. RISK ASSESSMENT
Cables Accessories
The purpose of this method statement is to provide safe, quality working practices for the assembly of
the cable accessories, the brief scope of work is as follows:
1.1 SCOPE
1.2 GENERAL
The method statement is to ensure that the safe and proper handling of the product at site during
assembly the cable accessories, the safety notes and work instruction provided in this method
statement must be followed in strict accordance with local safety regulations, all the instruction
should be read completely before carrying out the assembly work.
1.3 RECOMMENDATION
2.1 MOBILIZATION
a) Ensure that the approvals from concerned authorities are available for stationing of
the equipment.
b) Receive 1 set of latest “Approval for Construction” drawings.
c) Receive 1 set of Installation Manual.
d) Receive 1 set of Schematic Diagram.
Installation Equipment:
a) Heating tubes/mats.
b) AL angles for cable alignment.
c) Hydraulic press.
d) Semi-conductor removing tool.
e) Insulator removing tool for making cone.
f) Installation cutting tool.
g) Electric saw.
h) Pipe cutter.
i) Air blower.
j) Drill sets different types.
k) Connector, Crimper & Dies.
l) Hand Winch assembly.
m) LPG cylinder + hose + regulator.
Hand Tools:
a) Files set.
b) Hammers sets
c) Cutting knife sets
d) Allen key sets
e) Socket set
f) Pliers
g) Spanners set.
h) Wrenches set.
i) Torque wrench
j) Cutter knives
2.4 SAFETY
Ensure that the safety of personnel and the equipment throughout the operation in accordance
with the consultant requirements.
2.5 WORKMANSHIP
2.6 GENERAL
a) Ensure that the job is carried out according to this work instruction.
b) Record the details of the cable accessories assembly if required.
c) Notify the consultant/client at least 48hrs in advance for the inspection of the Cable accessories
arrangement and witnessing of Assembly.
After completing the work demobilize all the equipment, clean and clear the site.
Sheath test and phase identification test shall be carried out before starting of the cable
accessories assembly work and measured value shall be recorded (Not scope of Brugg)
Cable accessories assembly work shall be done inside airconditioned JB container/ Tent for
avoiding the dust, moisture etc.
The complete procedure for Cable accessories assembly work is to be carried out as per following
manufacturer instruction and recommendation.
Risk Risk
Evaluation level
Activity Hazard Consequences / Impact (H/M/L) Recommended Control Measures
P S
The risk matrix is divided into three risk categories as defined below:
PROBABILITY
A B C D E
Severity People Assets Improbable Remote Occasional Probable Frequent
High risk
Medium risk
Low risk