Our Ref: ACILRO/MMRDA/MANDALEDEPOT/SHE/2023/1056 Date:10. Jan.

2024

To
The Project Director,
Ayesa-Italferr-CEG-Ayesa India (AICA) Consortium,
MMRDA Office Building, Building No.1,
3rd Floor, Opp. New Wadala Truck Terminal Police Station,
Wadala East, Mumbai – 400 037

LOA No: MPIU/ML2B/C103/LOA/2020/551 dt. 6th Nov 2020


Notice to Proceed Date: dt. 20th Nov 2020

Sub: MMRDA/MMRP/L2B-C103 (Tender No: 2034): Construction of (Balance Civil Works of CA-103)
Mandale Depot [Including Architectural Finishing Works and Excluding Pre-Engineered Structure Works]
of Line 2B Corridor [D.N. Nagar to Mandale] of Mumbai Metro Rail Project of MMRDA
- Submission of Chief Safety Manager cv as per COC-103 appendix No-06 Vol-2 - special condition of
contract (including Schedules) and conditions of contract on safety, Health & Environment for your
necessary perusal and approval.

Ref: AICA/L2B/C103/OG/HSE/2023/27223 Date: 04. Dec. 2023

Dear Sir,
With reference to the above Subject matter, please find the details of qualifications & experience of
Chief
Safety Manager to be deploy at site satisfying the minimum qualification & experience requirements as
per COC-103 Appendix No - 6 Vol 2-Special conditions of contract (including Scheduled) and conditions
of contracts on Safety, Health & Environment.
This is for your review and approval.

Assuring you of our best construction services


For Ahluwalia Contracts (India) Ltd

Authorized Signatory
Encl: Submission of Chief Safety Manager cv as per COC-103 appendix No-06 Vol-2 - special condition
of contract (including Schedules) and conditions of contract on safety, Health & Environment for your
necessary perusal and approval.
CC: Director projects Metro – Line 2B, Metro PIU, MMRDA, Bandra Kurla Complex, Mumbai.