Project: Pharmacy Management and Accounting System

Project Timeline: 12 Months


1. Project Initiation (2-3 DAYS)
 Define Project Scope
 Identify Stakeholders
 Develop Project Charter
 Conduct Initial Risk Assessment
2. Requirements Analysis (1-2 WEEKS)
 List Functional Requirements
 List Non-functional Requirements
 Perform Stakeholder Interviews
 Document User Stories
 Validate Requirements with Stakeholders
3. System Design (2-3 WEEKS)
 Architectural Design
 Database Design
 User Interface Design
 Workflow Design
4. Development (Month 2-9)
 Set Up Development Environment
 Implement Database Schema
 Develop Core System Functionality
 Implement User Interface
 Integrate External Systems (if any)
 Conduct Unit Testing
5. Quality Assurance (Month 10-11)
 Develop Test Plans
 Perform Functional Testing
 Conduct Integration Testing
 Execute System Testing
 Perform User Acceptance Testing (UAT)
6. Deployment (Month 11)
 Create Deployment Plan
 Install System in Production Environment
 Data Migration (if applicable)
 Conduct Post-Deployment Testing
7. Training and Documentation (Month 12)
 Develop User Manuals
 Conduct User Training Sessions
 Provide Technical Documentation
8. Maintenance and Support (Ongoing)
 Establish Support Procedures
 Monitor System Performance
 Address Bug Fixes and Enhancements
 Periodic System Audits
9. Project Management (Throughout)
 Schedule Management
 Budget Management
 Risk Management
 Communication Management
 Stakeholder Management
10. Closure (Month 13)
 Evaluate Project Success
 Conduct Post-Implementation Review
 Archive Project Documentation
 Handover to Support Team

This condensed version maintains the essential tasks and timelines in a 12-month
project schedule for a Pharmacy Management and Accounting System.
Adjustments can be made based on specific project requirements and constraints.