25.00 PLOT
21.00 BUILDING DEPARTMENT
PLOT LIMT 6.80 3.60 6.30 4.30 PLOT LIMT ادارة المباني
2.00
2.00
2.00
قطاع الشؤون الهندسية
H 12.30
2.00 H MUNICIPALITY ENGINEER APPROVAL:
6.10 1.20 2.75
2.80
2.80
STORE D.KITCHEN
3.00
3.00
3.80
3.80
18 m² 8 m²
+ 0.60
+ 0.60
G 6.10 G
3.95
CONSALTANT SIGNATURE AND STAMP:
3.40
C.KITCHEN
14.30
13 m²
3.80
0.20
DUCT
5.30
5.30
1.00 2.75
1.40
BATH
1.40
1.40
3 m²
2.35
2.50
F F
2.50
2.50
MAID ROOM
+ 0.60
PLOT 10 m²
PLOT
3.50
3.50
2.50
2.50
16.40
8.70
23.80
23.80
+ 0.60 2.00
0.25
E E
30.00
30.00
2.00
DUCT SITTING
4.40 3.40 4.62
5.00
+ 0.53 21 m²
CEO
2.70
BATH
3.40
5 m²
3.60
3.60
+ 0.60
3.55
ENG : MAJED MOHAMMED SAEED ALNUAIMI
0.20 + 0.60 + 0.60
0.90 0.80 DUCT
5.15
GUESTROOM NOTE:
23 m² 4.15
5
2.00
D DRESING D
0.50
2.25
4 m²
1.40
1.70
0.20
0.20
2.00 LOBBY
0.80 1.00 7 m²
9.70
3.90
3.70
3.70
0.20
0.20 0.20
0.95 1.50 0.95
1.80
BEDROOM 6.05
SINK LAUNDRY KAYED ALMUTAWA ALMUTAWA
3.40 0.20 3 m² 8 m²
24 m²
3.70
0.80 0.80
C C
30
3.90
29 1
+ 0.60 28 2
1.80 2.00 PLOT NO: SECTOR: DISTRECT:
2.10
1.70
1.70
2.00
total area MAIN ENTR
27
26
3
4 W.C + 0.60 1707 Southern Mohamed Bin
1.90
0.78 2.00 3.73 25 5 3 m²
2.00
sqm B 24
23
6
7
0.42 0.38 0.47 1.00 0.53
1.00
3
2 B Zayed 1
+ 0.15 22 8
1
PROJECT DESCREPTION:
ground floor 268 1.20 1.20
2.20
2.20
9
+ 0.15
1.65
6.38 6.20
1.20
1.40
21 20 19 18 17 16 15 14 13 12 11 10
+ 0.15
first floor 314 3 6.05 + 1.95
CAR SHED
A 2 A
0.600.60
roof floor 34
8.00
1.20
DRAWING TITLE:
1 5.40
car shade area 29.16 GROUND FLOOR
6.10
5.40
5.70
total area 646.16
4.20
4.20
2.70 2.70 ARCH.ENG STRUC.ENG M.E.P. ENG
compound wall 110 m
3.23
3.23