FROM DOSING PAC
.
001 . .
FROM LINE BALACING RWT-01 & MT-01 . .
FROM DOSING NAOCL
.
. .
FROM DOSING PC-191
.
. .
FROM DOSING N-7408

B B
.
002 .
DRAIN .
FROM LINE BALANCING RWT-01 & MT-01 010 .
TO DOMESTIK TANK

.
. 007
TO HEADER DYNALON 2

C C

.
009 .
FROM POMPA PD-311

DRAIN DRAIN

D D

E E

F F

G G
.
. 011
TO REJECT BUFFER WTP 1

A REQUEST FOR REVIEW ADITYA IRFAN DANI EDI H. 31/10/2023


REV DESCRIPTION DRAWN DESIGN CHECKD APPRD DATE
.
. 008
TO RO BUFFER WTP 1
CLIENT:
PT. WILMAR NABATI INDONESIA
JL. KAPTEN DARMO SUGONDO NO.59,
H . 012
.
KEL. INDRO, KEC. KEBOMAS, GRESIK, JAWA TIMUR H
TO DEGASIFIER 1
TELP. (031)3989985-3989101 / FAX. (031)3975601

. 013
.

TO DEGASIFIER 2
PROJECT TITLE:

.
014 .
RO DYNALON #1 (RO #1)
FROM CIP RO YAHUA (RODEM #2)

I I
DRAWING TITLE:

PIPING & INSTRUMENT DIAGRAM


WATER TREATMENT PLANT #1

J SHEET DATE SIZE SCALE REV J


5 OF 13 31/10/'23 A3 NTS A
DRAIN
DRAWING NO ----
DOCUMENT NO IDNI-08-01-111-ME-PID-202-01