Stakeholder Management

Procedure
Procedure No. 37110 Rev. 001
Stakeholder Management Procedure

1 Overview of the procedure and


clarifications for usage by SWCC
National Project Management Organization (NPMO) prepared the Stakeholder
Management Procedure. In order to adapt this procedure to SWCC, it must be read in
conjunction with the clarification presented in the table below:

Document
Document Name Clarifications for usage
Number

Project - Provides guidelines on how to develop


Stakeholder the Stakeholder Engagement Plan and
EPM-S00-PR-000001
Engagement manage stakeholders throughout the
Plan project

Procedure No. 37110 Rev. 001 Page 1 of 2


Electronic documents once printed, are uncontrolled and may become out-dated. Refer to ECMS for current revision.

This document contains information proprietary to SWCC. Any disclosure or use is expressly prohibited except upon written per mission by SWCC.
Stakeholder Management Procedure

2 References in SWCC procedures


This procedure is referred to in the following SWCC procedures:

• Project Gating System Procedure 371


• Project Execution Strategy 3712

Procedure No. 37110 Rev. 001 Page 2 of 2


Electronic documents once printed, are uncontrolled and may become out-dated. Refer to ECMS for current revision.

This document contains information proprietary to SWCC. Any disclosure or use is expressly prohibited except upon written per mission by SWCC.