PART A
18. Explain conditions under which a person in charge of work can remove CME without the
consent of the system Control Engineer.
27 What is the difference between a Circuit Main Earth and Temporary Earths?
28 What is an Integral Earth?
29 What are Safety clearances for 11kV, 33kV, 88kV and 132kV?
30. What is artificial respiration? Explain how it is done.
31. Explain how in-door and out-door HV CBs are rendered inoperative.
PART B
1. Draw detailed Schematic Diagrams for the following Substations:
33/11kV s/s
2. In each of the substation stated above, on the schematic diagram include
the following:
(a) C.T. ratios for the Transformers(both HV and LV)
(b) CT ratios for all feeders
(c) O/C and Thermal O/L settings
3. What precautions are to be taken when working on feeders that have Auto-Reclosers?
5. You are required to take out T1, 33/11kV Transformer at a substation of your choice
33/11kV s/s. Write a required detailed Switching Schedule. Show clearly the earthing points.
Assuming after working and restoring supply, it is discovered that there is an imbalance in Tx
currents on T1 and T2, what could be the possible cause and how would you go about solving the
problem?
6. What is the function of the CT in the Neutral of a power transformer?
End