You are on page 1of 1

RSCS-CON-

Doc No
09
Quality Page 1 of 1

Management System Rev 02


Date 12/07/2022

Precast Beam Post Concrete Inspection


Division: Contract No.:
Contract Name:
Beam No.:

Pre-Concrete Inspection No:

Type (Inner or Edge):

Date Cast:

Code: A: Acceptable B: Repairable C: Rejected

RSCS
Engineer
Item Representative Remarks
Code Date Code Date
Curing
Surface cracks
Spalling
Honey comb
Cold joints
Edges
Blemish
Floating
Line & Level
Squareness
Chamfers
Joints
Cubes taken (Strength)
Built in items
Ducts cleaned
Prestressing
Cover tested (Average)

Approval
RSCS
Representative Name & Surname Signature Date Time

Engineer
Name & Surname Signature Date Time
Client
Acceptance Name & Surname Signature Date Time

Section 4 Quality System Documentation

You might also like