Professional Documents
Culture Documents
com
+91-9994488425
VAITHYANATHAN S
Contact:
1762, Manojiappa St, Phone No: +919994488425
Thanjavur-613009. Optional No: +918667681545
Email id: saimani0603@gmail.com
Objective
To take up more challenging tasks that can give me ample experience to learn more and to
gain supplementary knowledge so that I can paint the organization with my creativity.
Scholastic Record
Work Experience:
Angarai Technology India Private Limited
Information Communication Technology
Executive
(04-Jan-2021-Present)
Responsibilities:
• Installing and configuring computer hardware, software, systems, networks, printers and
scanners
• Monitoring and maintaining computer systems and networks
• Responding in a timely manner to service issues and requests
• Providing technical support across the company (in person or over the call/)
• Setting up accounts for new users
• Repairing and replacing equipment as necessary
• Testing new technology
• New software’s installation (QuickBooks, Tally Prime, Adobe etc)
Saimani0603@gmail.com
+91-9994488425
Gojan School of Business and Technology
LAB Instructor & Placement Officer
(12/2017- 07/2018)
Responsibilities:
• Planning, setting up and
undertaking controlled
• Maintaining, Calibrating,
Cleaning, and Testing
Equipment
TECHNICAL SKILLS
Project Title:
Phase 1: Grid-Connected PMSG-Based Wind Turbine using Fuzzy Logic Controller (2019)
Phase 2: Grid Connected Transformer Less PV Inverter using DC-DC Converter (2020)
Project Duration: M. Tech
Description:
Phase 1: Wind Energy is increasingly becoming the most promising technology for the nearest
future because of its environment friendliness and its huge potential to produce large amounts of
power at minimal cost:
• Clear the any Fault Quickly.
• Stability and reliability of grid.
• Generator Cost is low.
This approach will be use Wind as reliable resource.
Phase 2: Transformer less inverters for grid connected PV system are familiar due to their low cost
and small in size. Developed single-phase grid-connected PV array depends upon the number of phases
associated with the capacity of the systems.:
• Active power Oscillations.
• Stability and reliability of grid.
• Quality of injected power
This approach will be use Sun as reliable resource.
Roles and Responsibilities:
• Analyzed the current issue and proposed my own implementation change with
Saimani0603@gmail.com
+91-9994488425
better solution.
• Single handily done both the phase implementation and presented to external and internal
staff.
• Best and good quality idea has proposed from my side to improve the lags on the three-
phase invertors/grid.
Project Title: PMDC Based Bicycle Pedal Power Generating System (2017)
Project Duration: B.E
Description:
We are running our day-to-day life like a cycle; this type of situation starts from food to bed. Most
of the peoples are spending their valuable times in gyms for a healthy outfit. This project is to
Generate Power Using Bi-Cycle Pedal Systems so that the power wasted in gym can be utilized
during power crisis.
Extracurricular Activities
Personal Ability
Declaration