Arches are normally fabricated on-site. After the building of abutments (and piers,
if the bridge is multiarch), a falsework is constructed. For a concrete arch, metal or
wooden falsework and forms hold the cast concrete and are later removed. For steel
arches, a cantilevering method is standard. Each side of an arch is built out toward
the other, supported by temporary cables above or by falsework below until the
ends meet. At this point the arch becomes self-supporting, and the cables or
falsework are removed.
Suspension bridges
Cantilever bridges
Forth Railway Bridge
Construction of the Forth Railway Bridge, designed by John Fowler and Benjamin Baker on the
cantilever principle, crossing the Firth of Forth in Scotland, c. 1880s.(more)
Like suspension bridges, steel cantilever bridges generally carry heavy loads over
water, so their construction begins with the sinking of caissons and the erection of
towers and anchorages. For steel cantilever bridges, the steel frame is built out
from the towers toward the centre and the abutments. When a shorter central span
is required, it is usually floated out and raised into place. The deck is added last.