Approved-Rebar and Anchor Voult Installation
Approved-Rebar and Anchor Voult Installation
1. Joint Site
Inspection, Planning Check the intended route and point
Slips, Trips & Falls Crush Injury
and Prepare the site of placement
for work
Dust inhalation
Heat exposure
Fatigue
Unauthorized work
Unwanted/loosed materials can
cause personal injury.
Unauthorized entry
Presence of hazardous
atmosphere.
Inspect the area immediately around the load and the route for clearance and tripping hazards. Clear
movable objects from the route. Check for uneven terrain. Clean up spills that could affect foot
traction.
Hausekeeping before and after the work activity. Install of dusty area signage. Use of face mask at all
times, maintain the water apraying for the affected area.
Drink regularly a plenty water, observe break time if necessary. Provision of temporay shelter. Use of
safety jacket.
If the load must be carried for a long distance, find location(s) load can be placed to allow for a rest
break. If possible, keep load elevated to avoid lifting the object to resume moving it.
Permit Issuer and permit receiver conduct the job site inspection.
All Equipment’s operators shall be certified by Saudi Aramco and record shall be submitted to HSE
Department
for approval.
Provide caution tape , barricade around the area.
Approved work permit shall be available before proceeding with the job. During construction period
work permit system will be applied.
Job supervisor shall ensure that housekeeping has been conducted on the area prior to starting
activity.
Personnel assigned to the tasks shall be experienced workers.