Project: WP5 - 2300 STRUCTURAL OF CLUBHOUSE PROJECT, Hann Reserve Project

Location: Bamban (New Clark City), Tarlac


Subject: JOB HAZARD ANALYSIS –FORM WORK / STRIPPING AND CURING METHODOLOGY
WORK ACTIVITY PROCEDURES HAZARD SAFETY CONTROL MEASURES

Consider all potential hazards: weather, wet or slippery conditions, overhead


Unidentified and/or unmitigated hazards,
1. Mobalizations Preparing to move materials. hazards, proximity to trails and/or visitor traffic patterns/volume, slope, loose
or unsafe conditions.
footing, elevation, fatigue, hazardous insects or plants, etc

Each employee should be provided training on the safe and proper use of
the most important, primary tool their bodies (Strong, Alert, Focused,
Muscle strains, pulls and repetitive motion
Energetic, or SAFE training). Proper techniques of stretching, lifting,
injuries.
bending, moving, rolling rocks, securing good footing, the importance of
good nutrition and hydration.

Each employee will be given time on the job to properly stretch and warm-up
before and during physical activity for a period of time deemed appropriate
by the crew leader, or on-site supervisor.

Employees will be encouraged to switch hands often and vary the types of
activities performed to limit exposure to repetitive motion injuries.

The appropriate number of workers should be used to move materials. This


decision may vary between individuals.

Each employee should be provided training on the safe and proper use of
the most important, primary tool their bodies (Strong, Alert, Focused,
Muscle strains, pulls and repetitive motion
Moving materials. Energetic, or SAFE training). Proper techniques of stretching, lifting,
injuries.
bending, moving, rolling rocks, securing good footing, the importance of
good nutrition and hydration,

Employees will be encouraged to switch hands often and vary the types of
activities performed to limit exposure to repetitive motion injuries.

The appropriate number of workers should be used to move materials. This


decision may vary between individuals.

Injuries resulting from lack of Crew leaders will conduct, whenever appropriate, tailgate safety talks to
communication, or miscommunication. provide orientation, discuss project, safety concerns, assign wor

Good communication between crewmembers should reinforce individual


awareness of real and potential hazards.
Communication methods or jargon should be discussed and agreed upon
prior to moving materials

The plan of attack should be discussed before attempting to move materials.

Instructions should come from one person when working in teams of two or
more
Vehicle or machinery damage, operator Patos must be needed prior to start the work activities.
Moving materials with machinery injury, or injury to others working around Proper training of all workers involved to activity should be
machinery. required. Check list of machiner of equipment must be provided.
Patos must be needed prior to start the work activities.
Injury or death caused by dropped,
Proper training of all workers involved to activity should be
shifting, or swinging loads
required. Check list of machiner of equipment must be provided.
Assigned spotter of flagmen to all curv/blind spot.
full time supervisor of Foreman, Engineer and Safety Officer.
Clear the route of hazards and debris before moving materials.

Fill holes, build temporary structures, and explore options to maximize safety
and efficiency in moving materials, especially on steep or loose slopes.

Patos must be needed prior to start the work activities.


Inadequate training,consultation,planning
2. Form works General planning Proper training of all workers involved to activity should be
andimprovisation
required. Check list of machiner of equipment must be provided.

Effective HSE Induction


Tools box talks to be conducted prior to start of the activity.
Experience and trained personnel for the job.
Providing and using the right equipment.

Insufficient lighting,Walk into objects, Effective illumination of the working areas including enclosed ones and
slips, trips, fall & other injuries basement Removing materials from access paths
Good housekeeping
Access ways free from debris and materials
Poor Access Adequate access for the workforce
Trailing cable removed from access ways and routed properly

Ensuring adequate ground stability.


Unstable Ground, Fall from/Collapse of Trained persons are employed on the job.
Formwork. Ladders/staging platform provided to access when working at height.

Use of Basic PPE ( Hardhat,vest,safety shoes,goggles and safety jacket)

Patos must be needed prior to start the work activities.


Moving material from stacked Struck by/roll over, Use of heavy
Proper training of all workers involved to activity should be
area equipment to move materials
required. Check list of machiner of equipment must be provided.
Only permissible material is allowed to be carried by the equipment
Licensed, experienced and authorised operator to operate the equipment

Operating through designated routes


Ensuring the presence of reversing horn and revolving flash light.
Seat belt is worn during the operations.
Adequate Supervision

Use of Basic PPE ( Hardhat,vest,safety shoes,goggles and safety jacket)

Patos must be needed prior to start the work activities.


Placing Sole Plates Fall from/Collapse of Formwork Proper training of all workers involved to activity should be
required. Check list of machiner of equipment must be provided.

Well compacted and hard ground.


Adequate packings are given to bring stability
Trained and experienced people are assigned for the task.
Manual Handling, Strains, Sprains and
Two people to carry the frame for placing under the jack and maximum of 25
fractures
kg is allowed for single person
Frame not positioned correctly,Struck by
Frames are positioned correctly and supported well.
frame
Fingers trapped, Bracing not secured
Bracings are to be well secured by pin and frames in correct position.
properly
Fall from frame or bracing, Frames greasy
Clearing wet and greasy surface while doing climbing up the structure
or Wet or unstable
Only good condition planks to be used.
Unsecured/Damaged Planks, Fall from
Faulty planks to be immediately removed.
Unsecured/Damaged planks.
Planks of medium length to be supported properly

Use of Aluminium or step ladders Ladder Ladder Inspection to be done.


shifts Ladder secured properly on well compacted stable ground.
causing a fall when stepping from the Damaged ladder to be immediately removed from site.
ladder onto working platform Movement between metal frame and ladder to be restricted

Full body Safety harness with double lanyard to be provided.


Edge Protection to be provided.
Working at a height on narrow platform, Height Pass Provided for medically fit people.
Fall from Working Planks Overweight persons not to be allowed.
Body balance to be maintained.
Working during heavy wind conditions is restricted.

Tools are secured on waist belt.


Bucket used for raising spigot and other objects.
Passing up tools and equipment, Hit on the
Proper PPE Safety Helmet to be worn.
head or body by objects
Proper gripping on planks, frame or bracing.
Good coordination between the personnel

Use of Basic PPE ( Hardhat,vest,safety shoes,goggles and safety jacket)

Patos must be needed prior to start the work activities.


Erecting bearers and joist. Manual handling, Strains, sprains and fract Proper training of all workers involved to activity should be
required. Check list of machiner of equipment must be provided.
Bearers of appropriate length and as per design to be used.
Timber used should be of less weight

Use of Basic PPE ( Hardhat,vest,safety shoes,goggles and safety jacket)

Crane to be used for lifting large dimension plywood sheet.


Lifting/Manual Handling, Strains, sprains
Placing Formply Deck Third party certificates of lifting equipment and accessories to be submitted
and fractures/Tip over
QP for approval before deploying.
Competent and licensed Crane Operator to operate the equipment.
Certified rigger to oversee lifting operations.
Adequate Supervision

Use of Basic PPE ( Hardhat,vest,safety shoes,goggles and safety jacket)

Less noise producing tool to be used.


Working at height on deck.Slip or fall over
Sound absorption barrier(eg. Ply or Polystyrene) to be used for the
Popping Deck below objects on the deck, Noise, Hearing
protection of personnel in the area.
Damage
Ear plugs are provided to personnel.
Plywood splinters/particles flung out by Splash proof goggles/face protection shield to be used.
power saw. Dust mask to be used.
Eye damage from sharp splinters of plywoo Use of safety goggles
allergy Nose and mouth mask to be used.

Use of Basic PPE ( Hardhat,vest,safety shoes,goggles and safety jacket)

3. Stripping Columns Props not adequately secured, A crow Patos must be needed prior to start the work activities.
below Prop falls over hitting workforce Proper training of all workers involved to activity should be
required. Check list of machiner of equipment must be provided.
Props to be secured adequately.
Props to be effectively laced/tied in.
Adequate Monitoring
Sufficient lighting in place.
Protruding Column Clamps ,Walk into colu
Proper PPE to be worn by the personnel working.
Be aware of possible stored energy in the formwork
Stored energy/Pinch points panels
Use long pry bar and force gently on formwork
Pay attention to your surroundings.
Slips, trips and fall Remove braces from walkway at first
Store material neat and tidy as you strip
Puncture and laceration from scrap wood, Remove or bend nails as you go
nails Grip material in one location. Do not run your hand along
and screws left behind lumber.
Use proper lifting technique
Muscle strains
Ask for assistance to lift if require.

Use of Basic PPE ( Hardhat,vest,safety shoes,goggles and safety jacket)


Chip & cover protruding form
Patos must be needed prior to start the work activities.
ties
Silica fumes, flying debris Proper training of all workers involved to activity should be
Concrete imperfection repair required. Check list of machiner of equipment must be provided.
Grinding concrete

wear respirator, face shield and wet down area.


use extractor if too much fumes make
sure no other workers are too close of the are

Use of Basic PPE ( Hardhat,vest,safety shoes,goggles and safety jacket)

Patos must be needed prior to start the work activities.


4. Curing of Concrete Hand laceration Proper training of all workers involved to activity should be
required. Check list of machiner of equipment must be provided.
Use of safety gloves while using of hand tools
Proper postrure of the body, stretch the body before proceeding to the
back pain
activity
Hausekeeping, signage(slippery/tripping area), eliminate all obstacles and
Slipping and tripping
proper use of safety shoes
Temporary shelter, take abreak if necessary, drink of plenty water. involve
Heat exposure worker must be check the BP., assigned a first aider. toolbox meeting, patos
prior to start the work activity

Use of Basic PPE ( Hardhat,vest,safety shoes,goggles and safety jacket)

5. Lifting works using Patos must be needed prior to start the work activities.
Loading and unloading
of mobile and tower Load falling: Proper training of all workers involved to activity should be
materials required. Check list of machiner of equipment must be provided.
crane
securing and properly bracing structures securing loose material such as
plywood, iron sheets and off-cuts against the wind using chutes when
placing debris into a skip below the work area erecting perimeter
containment screens

Trained and experienced people are assigned for the task.


Two people to carry the frame for placing under the jack and maximum of 25
kg is allowed for single person
Competent and licensed Crane Operator to operate the equipment.
Certified rigger to oversee lifting operations.
Adequate Supervision
install of signages for other proper communications

Use of Basic PPE ( Hardhat,vest,safety shoes,goggles and safety jacket)

Make sure the lifting area has been isolated with appropriate siagnes. Patos
Unauthorize entry / Toolbox meeting to all workers on the site must be prior to start the activity
ti be aware to the work activity.
Full time supervisor of Foreman, Engineer and Safety Officer while doing the
lifting works activity.

Proper observation to the working place, eliminate all abstacles ath the area,
Strip,slip and fall house keeping must be prior to start the work activity. Make sure the lifting
belt/chain are in good condition and 100% tied in to the materials being lift.

This might include putting sensors on equipment that cause it to cut out if
Hitting and crushing
workers are detected in the area
Avoid workers from entering certain places by using barriers and warning
signs.
provide detailed, step-by-step instructions to workers on how to use the
item/equipment safely.
Ensure that they know where to stand when using equipment controls, to
avoid coming into contact with machinery
full time supervisor of Foreman, Engineer and Safety Officer.

Use of Basic PPE ( Hardhat,vest,safety shoes,goggles and safety jacket)

Hire Professional and Trained Crane Operators Handling, managing, and


navigating cranes isn’t for an unskilled person. Companies with crane
equipment must employ highly trained individuals for this task. Your
Crane toppling
operator’s expertise will directly translate into better and improved crane
safety. Some of the main skills that you must look for in a crane operator
include

Assess and Manage Material


full time supervisor of Foreman, Engineer and Safety Officer.

Use of Basic PPE ( Hardhat,vest,safety shoes,goggles and safety jacket)

Ensuring only appropriately licensed or registered electricians carry out


Electrical hazards
electrical work.
Providing safe and suitable electrical equipment, for example, not using
leads and tools in damp or wet conditions unless they are specially designed
for those conditions.
Not working on live equipment, isolation and multi-lock system shall be
followed.

Electrical switches or access to them shall not block by any material.

full time supervisor of Foreman, Engineer and Safety Officer.

Use of Basic PPE ( Hardhat,vest,safety shoes,goggles and safety jacket)


Regular inspections. Whether it’s a chainsaw or a multimillion-dollar crane,
Equipment failure it’s common sense that thoroughly inspecting equipment before each use is
the best way to ensure that it won’t fail during operation.

Reactive maintenance
full time supervisor of Foreman, Engineer and Safety Officer.
Daily proper inspection of tower crane and mobile crane prior to start the
work activity.
make sure the equipment is over all tested with 3rd party inspection prior to
use.
Use of proper and appropriate equipment checklist daily with signed of crane
oerator and supervisor.
Patos must be needed prior to start the work activities.
Human error Proper training of all workers involved to activity should be
required. Check list of machiner of equipment must be provided.
Trained and experienced people are assigned for the task. Assigned a
inspector to over see the possible iminent danger.

Design plant and equipment to reduce error possibilities – poorly designed


displays and ambiguous instructions
Examine and reduce social or organizational stressors (insufficient staffing
levels, peer pressure)
Examine and reduce workplace stressors (noise, poor lighting), increasing
the frequency of errors
Ensure that there are effective training arrangements.
Repetitive motion or other ergonomic Perform a last minute risk assessment before performing any material
6.) Housekeeping Poor Housekeeping
concerns handling task.
Make sure to check the path of travel for any obstacles before moving any
Heavy manual lifting/moving
materials.
Perform a proper warm up and stretch before performing any material
handling task.

The PPE required for any material handling tasks are: Safety glasses,
appropriate gloves and appropriate non slip footwear. Additional PPE may
be required depending upon environment conditions.

Nothing follows