You are on page 1of 8

Institute for Engineering Training and Placement

Contact us: +91 9354439397, Web: IETPCENTER.COM

TRAINING SYLLABUS FOR ELECTRICAL & POWER SYSTEM DESIGN ENGINEERING

 ETAP
Electrical Fault Current/short circuit current calculation, Electrical load flow analysis, Protection relay coordination,
Motor starting
 AUTO CAD (for electrical drawing preparation)
 DIALUX

 Preparing the major equipment bill of quantity for a substation/switchyard project


 Preparing the erection hardware equipment bill of quantity for a substation project
 Equipment supply & installation costs
 Total cost estimation for substation & switchyards projects & Rate Analysis sheet preparation

 Types of Cables
 Construction of Cable, Components of cable & Code for designating cable
 Power Cables, Control Cables & Instrumentation Cables: Selection and Specification
 Load Details Calculation/ motor load list preparation
 Cable Selection Based on Current Rating of feeder
 Cable installation method at site & maximum permissible bending radius of cable at site
 Cable tray & cable conduit sizing, Cable termination Gland selection, cable marker
 Cable Sizing Calculation
(Minimum cable size for fault current & full load current, Installed cable Current Rating calculation, Voltage Drop
Institute for Engineering Training and Placement
Contact us: +91 9354439397, Web: IETPCENTER.COM
Calculation of cable, number of cables per phase calculation, Cable Impedances, Maximum Permissible Voltage
Drop & Calculating Maximum Cable Length due to Voltage Drop)
 Cable schedule & cable site routing layout
INDUSTRIAL CASE STUDY:
 Discussion of Case studies for reason for Cable Failure / damage at Site
 Transmission line Overhead conductor & underground power cable brief comparison
APPLICABLE STANDARD:
 IS 1554 (1& 2)-: Specification for PVC insulated
 IS 7098 (Part 1 & 2): Specification for Cross-linked polyethylene insulated
IS 1255: Code of practice for installation and maintenance of power cables

 Transmission Planning, Indian Electricity Rules and State Regulations for transmission line, Choice of Route
of transmission line, Overhead transmission line Clearance
 Selection of conductors for transmission line and Selection Insulator and fittings
 Spacing of Conductors in transmission lines
 Calculation of SAG and Tension
 Selection of transmission line towers
 Overhead transmission line lightning Calculation
Institute for Engineering Training and Placement
Contact us: +91 9354439397, Web: IETPCENTER.COM

 Factors Influencing the choice of earthed and unearthed systems & Why earthing required
 Earthing method for Industry & Building
 Earthing method for Substations or Switchyard
 Earthing method for Power Plants
Earthing calculation for substation or switchyard
 Calculation Of minimum Earthing Strip/Conductor Size, Tolerable & Acceptable Touch & Step Voltage calculation, Grid
Resistance Calculation, Grid Current Calculation & GPR calculation
Earthing calculation for Industry & Building
 earthing conductor sizing calculation, number of earth pit calculation and earthing pit resistance calculation
Earthing calculation for Power Plant
 earth conductor sizing calculation, number of earth pit calculation and earthing pit resistance calculation
Electrical equipment

 Transformer, Towers, CT/PT, CB, LA, Wave Trap


Earthing drawing preparation/ Earth mat layout drawing preparation for substation
INDUSTRIAL CASE STUDY:
 Refinement of preliminary design for Substation/switchyard earthing
Institute for Engineering Training and Placement
Contact us: +91 9354439397, Web: IETPCENTER.COM

Designing based on Indian & International guideline (IEC & IEEE) from 11kV to 765 KV voltage level.
 Type of Substation, why substation required, process involved in developing of substation
 AIS & GIS substations
 Selection of bus bar scheme & types of bus-bar schemes in substation for
11kv,33kv,66kv,110kv,132kv,220kv,400kv, 765kv substation
 Substation equipment sequence for interconnection
 Electrical Clearance (Ground, Ph to Ph, Ph to Earth, Safety Clearance) selection
 Substation Layout Plan & Section Layout drawing preparation
 Control Room building Layout
 Substation Automation system design
 Selection of PLC Communication protocol
 Benefits of Substation Automation system
 Cabling of Switchyard
 Direct Lightning Protection Calculation (DSLP)
 Substation switching scheme
Institute for Engineering Training and Placement
Contact us: +91 9354439397, Web: IETPCENTER.COM

Selection and Calculation based on latest industrial practice from 415V to 765 KV (Highest operational voltage)
voltage level.
 Incoming & outgoing transmission line bay, Bay control Unit (BCU)
 Lightning arrestor or surge arrestor
 Current transformer & Voltage transformer (PT, CVT, CCVT, EMVT)
 Wave trap/line trap & power-line carrier communication requirement
 Isolator, tandem arrangement of isolator & location & requirement of earth switch
 Circuit Breaker
 (Pre-insert resister switching, Control switching device CSD, Auto reclosing requirement)
 Insulators, Motor, Diesel Generator, Battery

 Substation Single Line Diagram Preparation


 For 11kV,33 kV,66 kV,110 kV,132 kV,220 kV,400 kV,765 kV Voltage
 Protection & Metering Line Diagram Preparation/ protection relay selection for substation
 For 11kV,33 kV,66 kV,110 kV,132 kV,220 kV,400 kV,765 kV Voltage
 Transmission Line Protection Relay selection
 Standard Protection Schemes for transmission line /feeder bay for from 11 KV to 132 KV
Institute for Engineering Training and Placement
Contact us: +91 9354439397, Web: IETPCENTER.COM
 Standard Protection Schemes for transmission line/feeder bay for above 132 KV to 765 KV
 Standard Protection Schemes for Power Transformer bay for above 132 to 765 KV
 Standard Protection Schemes for Bus Bar
 Standard Protection Schemes for Bus coupler/bus sectionalize Bay
 Number and location of CTs & PTs – application wise, class of CTs

 Selection of Transformers, two winding transformer, three winding transformer & auto transformer
requirement of tertiary winding in transformer
 Transformer vector group presentation
 Transformer cooling type
 Standard Practice for selection of transformer % impedance
 Transformer sizing
 Industrial Practice for selection of Transformer rating for power house & substations from 11KV Voltage
level to 765 KV Voltage level
 Differential Protection of transformer
 Restricted Earth Fault Protection (REF) protection of transformer & SEF protection
 Difference between REF & differential protection of transformer
 Internal & External Fault in transformer & protection of transformers
Institute for Engineering Training and Placement
Contact us: +91 9354439397, Web: IETPCENTER.COM
 Transformer name plate data study
 Transformer inspection check list required for factory inspection
 Transformer vendor data Review

 Lux level selection Lux level calculation by Software DIALUX


 Prepare single line diagram for load distribution, Electrical layout in residential building using Auto CAD
 Selection of house wiring Sizing and selection of conduit
 Sizing and selection of low voltage switchgears (MCB, MCCB, RCB, MPCB)
 Layout drawings preparation for house wiring Cable route layout Conduit layout & Power socket layout
 Indian standard study
 Method of lightning protection & Basic consideration for protection
 Calculations for evaluating the need for protection
Calculation of protective angles and zone of protection for various forms of air termination.

 Electrical System study involved in a Thermal Power Plants


 Electrical System study involved in Solar Plants
 Electrical System study involved in a Hydro Plants
Institute for Engineering Training and Placement
Contact us: +91 9354439397, Web: IETPCENTER.COM

The 2.5-months program consists of 14 modules with industrial meaningful assignments


and projects for the electrical business Unit Areas as listed above. These modules will
include exposure in: System planning, electrical software, estimation of electrical
projects & detail design engineering with focus on training -on-the-live project experience
that is able to groom and build a strong engineering foundation for the grad uate.

IETP Training program provides opportunities for the accelerated develo pment in an
engineering career. Technical engineering leaders will personally mentor and coach your
development throughout the program. Upon completion, you will have implanted the
values to take the next steps in your engineering career. The training syllabus is
designed to professionally develop future leaders in the field of electrical engineeri ng by
giving young graduates to gain practical exposure to the diverse essentials of electrical
& power system design engineering best in the industry

You might also like