Professional Documents
Culture Documents
ETAP
Electrical Fault Current/short circuit current calculation, Electrical load flow analysis, Protection relay coordination,
Motor starting
AUTO CAD (for electrical drawing preparation)
DIALUX
Types of Cables
Construction of Cable, Components of cable & Code for designating cable
Power Cables, Control Cables & Instrumentation Cables: Selection and Specification
Load Details Calculation/ motor load list preparation
Cable Selection Based on Current Rating of feeder
Cable installation method at site & maximum permissible bending radius of cable at site
Cable tray & cable conduit sizing, Cable termination Gland selection, cable marker
Cable Sizing Calculation
(Minimum cable size for fault current & full load current, Installed cable Current Rating calculation, Voltage Drop
Institute for Engineering Training and Placement
Contact us: +91 9354439397, Web: IETPCENTER.COM
Calculation of cable, number of cables per phase calculation, Cable Impedances, Maximum Permissible Voltage
Drop & Calculating Maximum Cable Length due to Voltage Drop)
Cable schedule & cable site routing layout
INDUSTRIAL CASE STUDY:
Discussion of Case studies for reason for Cable Failure / damage at Site
Transmission line Overhead conductor & underground power cable brief comparison
APPLICABLE STANDARD:
IS 1554 (1& 2)-: Specification for PVC insulated
IS 7098 (Part 1 & 2): Specification for Cross-linked polyethylene insulated
IS 1255: Code of practice for installation and maintenance of power cables
Transmission Planning, Indian Electricity Rules and State Regulations for transmission line, Choice of Route
of transmission line, Overhead transmission line Clearance
Selection of conductors for transmission line and Selection Insulator and fittings
Spacing of Conductors in transmission lines
Calculation of SAG and Tension
Selection of transmission line towers
Overhead transmission line lightning Calculation
Institute for Engineering Training and Placement
Contact us: +91 9354439397, Web: IETPCENTER.COM
Factors Influencing the choice of earthed and unearthed systems & Why earthing required
Earthing method for Industry & Building
Earthing method for Substations or Switchyard
Earthing method for Power Plants
Earthing calculation for substation or switchyard
Calculation Of minimum Earthing Strip/Conductor Size, Tolerable & Acceptable Touch & Step Voltage calculation, Grid
Resistance Calculation, Grid Current Calculation & GPR calculation
Earthing calculation for Industry & Building
earthing conductor sizing calculation, number of earth pit calculation and earthing pit resistance calculation
Earthing calculation for Power Plant
earth conductor sizing calculation, number of earth pit calculation and earthing pit resistance calculation
Electrical equipment
Designing based on Indian & International guideline (IEC & IEEE) from 11kV to 765 KV voltage level.
Type of Substation, why substation required, process involved in developing of substation
AIS & GIS substations
Selection of bus bar scheme & types of bus-bar schemes in substation for
11kv,33kv,66kv,110kv,132kv,220kv,400kv, 765kv substation
Substation equipment sequence for interconnection
Electrical Clearance (Ground, Ph to Ph, Ph to Earth, Safety Clearance) selection
Substation Layout Plan & Section Layout drawing preparation
Control Room building Layout
Substation Automation system design
Selection of PLC Communication protocol
Benefits of Substation Automation system
Cabling of Switchyard
Direct Lightning Protection Calculation (DSLP)
Substation switching scheme
Institute for Engineering Training and Placement
Contact us: +91 9354439397, Web: IETPCENTER.COM
Selection and Calculation based on latest industrial practice from 415V to 765 KV (Highest operational voltage)
voltage level.
Incoming & outgoing transmission line bay, Bay control Unit (BCU)
Lightning arrestor or surge arrestor
Current transformer & Voltage transformer (PT, CVT, CCVT, EMVT)
Wave trap/line trap & power-line carrier communication requirement
Isolator, tandem arrangement of isolator & location & requirement of earth switch
Circuit Breaker
(Pre-insert resister switching, Control switching device CSD, Auto reclosing requirement)
Insulators, Motor, Diesel Generator, Battery
Selection of Transformers, two winding transformer, three winding transformer & auto transformer
requirement of tertiary winding in transformer
Transformer vector group presentation
Transformer cooling type
Standard Practice for selection of transformer % impedance
Transformer sizing
Industrial Practice for selection of Transformer rating for power house & substations from 11KV Voltage
level to 765 KV Voltage level
Differential Protection of transformer
Restricted Earth Fault Protection (REF) protection of transformer & SEF protection
Difference between REF & differential protection of transformer
Internal & External Fault in transformer & protection of transformers
Institute for Engineering Training and Placement
Contact us: +91 9354439397, Web: IETPCENTER.COM
Transformer name plate data study
Transformer inspection check list required for factory inspection
Transformer vendor data Review
IETP Training program provides opportunities for the accelerated develo pment in an
engineering career. Technical engineering leaders will personally mentor and coach your
development throughout the program. Upon completion, you will have implanted the
values to take the next steps in your engineering career. The training syllabus is
designed to professionally develop future leaders in the field of electrical engineeri ng by
giving young graduates to gain practical exposure to the diverse essentials of electrical
& power system design engineering best in the industry