You are on page 1of 22

NOTES:

1. ALL DIMENSIONS ARE IN MILLIMETERS.


2. DRAWING NOT TO BE SCALED WORK TO
FIGURED DIMENSIONS ONLY

DESIGN DRAWING SUBMISSION


3. ALL DIMENSIONS ARE TO BE VERIFIED
ON SITE PRIOR TO CARRYING OUT WORK.

KEY PLAN

UNIT-503

SHOP DRAWING REVIEW


A B C D
APPROVED - APPROVED WITH REVISE AND NOT REQUIRED /
COMMENTS - RESUBMIT- CANCELLED
PROCEED FOR PROCEED FOR DO NOT PROCEED
PRODUCTION PRODUCTION FOR PRODUCTION
DATE REVIEWED BY:
REVIEWED SIGN

03 MEP SUBMISSION

02 MEP SUBMISSION

01 MEP SUBMISSION

00 MEP SUBMISSION

NO. REVISION REV.BY DATE:

CLIENT

DUBAI _ JADDAF _ 164b


TEL : 04 2586673 PROJECT: OFFICE FITOUT

LOCATION : Unit 503, 1 lake plaza,


cluster-T , DUBAI - UAE

PO BOX :84973 Dubai TOTAL AREA :

MAIN CONTRACTOR

E-MAIL :info@noainterior.com

DWG.TITLE:

COVER
DATE: DRAWN: SCALE: CHECKED BY:
12/11/2023 KA ...

JOB NO: DRAWING NO: REV:


NOTES:

1. ALL DIMENSIONS ARE IN MILLIMETERS.


2. DRAWING NOT TO BE SCALED WORK TO
FIGURED DIMENSIONS ONLY
3. ALL DIMENSIONS ARE TO BE VERIFIED
ON SITE PRIOR TO CARRYING OUT WORK.

KEY PLAN

UNIT-503

SHOP DRAWING REVIEW


A B C D
APPROVED - APPROVED WITH REVISE AND NOT REQUIRED /
COMMENTS - RESUBMIT- CANCELLED
PROCEED FOR PROCEED FOR DO NOT PROCEED
PRODUCTION PRODUCTION FOR PRODUCTION
UNIT-503 DATE REVIEWED BY:
REVIEWED SIGN

03 MEP SUBMISSION

02 MEP SUBMISSION

01 MEP SUBMISSION

00 MEP SUBMISSION

NO. REVISION REV.BY DATE:

CLIENT

PROJECT: OFFICE FITOUT

LOCATION : Unit 503, 1 lake plaza,


cluster-T , DUBAI - UAE

TOTAL AREA :

MAIN CONTRACTOR

DWG.TITLE:

KEY PLAN
DATE: DRAWN: SCALE: CHECKED BY:
12/11/2023 KA ...

JOB NO: DRAWING NO: REV:


NOTES:

1. ALL DIMENSIONS ARE IN MILLIMETERS.


2. DRAWING NOT TO BE SCALED WORK TO
FIGURED DIMENSIONS ONLY
3. ALL DIMENSIONS ARE TO BE VERIFIED
ON SITE PRIOR TO CARRYING OUT WORK.

KEY PLAN

Symbol Qty Description

EXISTING BLOCK WALL

1319 UNIT-503
504

100MM FR GYPSUM BOARD PARTITION


7900

1500 12MM SINGLE GLASS PARTITION

STRUCTURE COLOMN

1700

1900
SHOP DRAWING REVIEW
A B C D
APPROVED - APPROVED WITH REVISE AND NOT REQUIRED /
8171

COMMENTS - RESUBMIT- CANCELLED


PROCEED FOR PROCEED FOR DO NOT PROCEED
PRODUCTION PRODUCTION FOR PRODUCTION

410
DATE REVIEWED BY:
REVIEWED SIGN

03 MEP SUBMISSION

02 MEP SUBMISSION

01 MEP SUBMISSION

00 MEP SUBMISSION

NO. REVISION REV.BY DATE:

1100 CLIENT

1500
PROJECT: OFFICE FITOUT

LOCATION : Unit 503, 1 lake plaza,


cluster-T , DUBAI - UAE

TOTAL AREA :

1600 MAIN CONTRACTOR


150

1664
410

5850

DWG.TITLE:

EXISTING LAYOUT
DATE: DRAWN: SCALE: CHECKED BY:
12/11/2023 KA ...

JOB NO: DRAWING NO: REV:


NOTES:

1. ALL DIMENSIONS ARE IN MILLIMETERS.


2. DRAWING NOT TO BE SCALED WORK TO
FIGURED DIMENSIONS ONLY
3. ALL DIMENSIONS ARE TO BE VERIFIED
ON SITE PRIOR TO CARRYING OUT WORK.

KEY PLAN

Symbol Qty Description


LOW CABINET STORAGE
UNIT-503

COMPANY LOGO
EXISTING BLOCK WALL
WALL TV

100MM FR GYPSUM BOARD PARTITION


HEIGHT-3200

12MM SINGLE GLASS PARTITION


HEIGHT-2400

STRUCTURE COLOMN

STAFF WORK STATION


WODDEN LOUVERS HEIGHT 3200

MEETING ROOM
20.4sqm

SHOP DRAWING REVIEW


A B C D
APPROVED - APPROVED WITH REVISE AND NOT REQUIRED /
COMMENTS - RESUBMIT- CANCELLED
PROCEED FOR PROCEED FOR DO NOT PROCEED
PRODUCTION PRODUCTION FOR PRODUCTION
DATE REVIEWED BY:
REVIEWED SIGN

03 MEP SUBMISSION

02 MEP SUBMISSION
MANAGER ROOM
01 MEP SUBMISSION
10.61sqm
00 MEP SUBMISSION

NO. REVISION REV.BY DATE:

CLIENT

PROJECT: OFFICE FITOUT

LOCATION : Unit 503, 1 lake plaza,


cluster-T , DUBAI - UAE

TOTAL AREA :

MAIN CONTRACTOR

LOW CABINET STORAGE

DWG.TITLE:

PROPOSED FURNITURE LAYOUT

DATE: DRAWN: SCALE: CHECKED BY:


12/11/2023 KA ...

JOB NO: DRAWING NO: REV:


NOTES:

1. ALL DIMENSIONS ARE IN MILLIMETERS.


2. DRAWING NOT TO BE SCALED WORK TO
FIGURED DIMENSIONS ONLY
3. ALL DIMENSIONS ARE TO BE VERIFIED
ON SITE PRIOR TO CARRYING OUT WORK.

KEY PLAN

Symbol Qty Description


SEC
01

EXISTING BLOCK WALL

100MM FR GYPSUM BOARD PARTITION


HEIGHT-3200
3500
UNIT-503

2300

12MM SINGLE GLASS PARTITION


HEIGHT-2400

1500
STRUCTURE COLOMN

WODDEN LOUVERS HEIGHT 3200

1800 1700

MEETING ROOM 20.4sqm 5000

1900
SHOP DRAWING REVIEW
A B C D
APPROVED - APPROVED WITH REVISE AND NOT REQUIRED /
COMMENTS - RESUBMIT- CANCELLED
PROCEED FOR PROCEED FOR DO NOT PROCEED
PRODUCTION PRODUCTION FOR PRODUCTION

410
DATE REVIEWED BY:
REVIEWED SIGN

03 MEP SUBMISSION

02 MEP SUBMISSION
3753

150
01 MEP SUBMISSION

00 MEP SUBMISSION

NO. REVISION REV.BY DATE:

CLIENT

1500
OFFICE FITOUT
MANAGER ROOM 10.61sqm PROJECT:
3200

1100 LOCATION : Unit 503, 1 lake plaza,


cluster-T , DUBAI - UAE

TOTAL AREA :
1600
150

MAIN CONTRACTOR

SEC SEC
02 02

3200
410
302

1525 4224

DWG.TITLE:

SEC PROPOSED PARTITION LAYOUT


01
DATE: DRAWN: SCALE: CHECKED BY:
12/11/2023 KA ...

JOB NO: DRAWING NO: REV:


NOTES:

1. ALL DIMENSIONS ARE IN MILLIMETERS.


2. DRAWING NOT TO BE SCALED WORK TO
FIGURED DIMENSIONS ONLY
3. ALL DIMENSIONS ARE TO BE VERIFIED
ON SITE PRIOR TO CARRYING OUT WORK.

KEY PLAN

Symbol Qty Description

Square Diffuser

Square Return
UNIT-503

Exhaust

S
AC SUPPLY GRILL

AC RETURN GRILL

EXIT
R
R

CIRCULAR Diffuser WITH


GYPSUM CEILING AREA VCD
S

LEGEND
2800MM HEIGHT
EL

Symbol Qty Description

Recessed Down light


(as Per Approved Sample)

LINEAR PENDANT LIGHT


140CM LENGTH
R

LINEAR PENDANT LIGHT


ADJUSTABLE LENGTH

RECTANGULAR PENDANT
LIGHT
S

AP
ACCESS PANEL

SHOP DRAWING REVIEW


A B C D
APPROVED - APPROVED WITH REVISE AND NOT REQUIRED /
Symbol Qty Description COMMENTS - RESUBMIT- CANCELLED

EL
PROCEED FOR PROCEED FOR DO NOT PROCEED
PRODUCTION PRODUCTION FOR PRODUCTION
Pendent sprinkler DATE REVIEWED BY:
REVIEWED SIGN

Zone control valve

03 MEP SUBMISSION
Up right sprinkler
02 MEP SUBMISSION

01 MEP SUBMISSION

00 MEP SUBMISSION

Symbol Qty Description NO. REVISION REV.BY DATE:


EL

CLIENT
EL Emergency light
S

EXIT Emergency exit

PROJECT: OFFICE FITOUT

Symbol Qty Description LOCATION : Unit 503, 1 lake plaza,


cluster-T , DUBAI - UAE

SMOKE DETECTOR TOTAL AREA :

MAIN CONTRACTOR
MCP & SPEAKER

HEAT DETECTOR

DWG.TITLE:

RCP LAYOUT

DATE: DRAWN: SCALE: CHECKED BY:


12/11/2023 KA ...

JOB NO: DRAWING NO: REV:


NOTES:

1. ALL DIMENSIONS ARE IN MILLIMETERS.


2. DRAWING NOT TO BE SCALED WORK TO
FIGURED DIMENSIONS ONLY
3. ALL DIMENSIONS ARE TO BE VERIFIED
ON SITE PRIOR TO CARRYING OUT WORK.

KEY PLAN

Symbol Qty Description

+3400 SSL FR GYPSUM BOARD FALSE FR GYPSUM BOARD FALSE


CEILING CEILING 10MM THICK GLASS PARTITION

+3200
UNIT-503

BRICK WALL
+2410FCL
MEP SERVICES AREA MEP SERVICES AREA

790

790
900.0000 900.0000

WALL
MOUNTED
TV

2400
+0.00FFL

3200 5000

SEC
01

SHOP DRAWING REVIEW


A B C D
APPROVED - APPROVED WITH REVISE AND NOT REQUIRED /
COMMENTS - RESUBMIT- CANCELLED
PROCEED FOR PROCEED FOR DO NOT PROCEED
PRODUCTION PRODUCTION FOR PRODUCTION
DATE REVIEWED BY:
REVIEWED SIGN

FIRE FIGHTING PIPE


03 MEP SUBMISSION
HVAC DUCTING
+3400 SSL LINEAR PENDENT LIGHT
RECEPTION BACK WALL 02 MEP SUBMISSION

01 MEP SUBMISSION
+3200
00 MEP SUBMISSION

NO. REVISION REV.BY DATE:


790

+2410FCL FCU CLIENT

COMPANY
LOGO

PROJECT: OFFICE FITOUT

LOCATION : Unit 503, 1 lake plaza,


cluster-T , DUBAI - UAE

TOTAL AREA :

MAIN CONTRACTOR

+0.00FFL

3200 2300 1800 1700

SEC
02

DWG.TITLE:

SECTION-1 LAYOUT

DATE: DRAWN: SCALE: CHECKED BY:


12/11/2023 KA ...

JOB NO: DRAWING NO: REV:


NOTES:

1. ALL DIMENSIONS ARE IN MILLIMETERS.


2. DRAWING NOT TO BE SCALED WORK TO
FIGURED DIMENSIONS ONLY
3. ALL DIMENSIONS ARE TO BE VERIFIED
ON SITE PRIOR TO CARRYING OUT WORK.

KEY PLAN

UNIT-503

Symbol Qty Description

EXISTING SCREED FINSH

CERAMIC TILES

SHOP DRAWING REVIEW


A B C D
APPROVED - APPROVED WITH REVISE AND NOT REQUIRED /
COMMENTS - RESUBMIT- CANCELLED
PROCEED FOR PROCEED FOR DO NOT PROCEED
PRODUCTION PRODUCTION FOR PRODUCTION
DATE REVIEWED BY:
REVIEWED SIGN

03 MEP SUBMISSION

02 MEP SUBMISSION

01 MEP SUBMISSION

00 MEP SUBMISSION

NO. REVISION REV.BY DATE:

CLIENT

PROJECT: OFFICE FITOUT

LOCATION : Unit 503, 1 lake plaza,


cluster-T , DUBAI - UAE

TOTAL AREA :

MAIN CONTRACTOR

DWG.TITLE:

EXISTING FLOOR LAYOUT

DATE: DRAWN: SCALE: CHECKED BY:


12/11/2023 KA ...

JOB NO: DRAWING NO: REV:


NOTES:

1. ALL DIMENSIONS ARE IN MILLIMETERS.


2. DRAWING NOT TO BE SCALED WORK TO
FIGURED DIMENSIONS ONLY
3. ALL DIMENSIONS ARE TO BE VERIFIED
ON SITE PRIOR TO CARRYING OUT WORK.

KEY PLAN

Symbol Qty Description

UNIT-503

LVT FLOOR TILES

CERAMIC TILES 30X30CM

Description

LVT FLOOR TILES

CERAMIC TILES 30X30CM

SHOP DRAWING REVIEW


A B C D
APPROVED - APPROVED WITH REVISE AND NOT REQUIRED /
COMMENTS - RESUBMIT- CANCELLED
PROCEED FOR PROCEED FOR DO NOT PROCEED
PRODUCTION PRODUCTION FOR PRODUCTION
DATE REVIEWED BY:
REVIEWED SIGN

03 MEP SUBMISSION

02 MEP SUBMISSION

01 MEP SUBMISSION

00 MEP SUBMISSION

NO. REVISION REV.BY DATE:

CLIENT

PROJECT: OFFICE FITOUT

LOCATION : Unit 503, 1 lake plaza,


cluster-T , DUBAI - UAE

TOTAL AREA :

MAIN CONTRACTOR

DWG.TITLE:

PROPOSED FLOOR LAYOUT

DATE: DRAWN: SCALE: CHECKED BY:


12/11/2023 KA ...

JOB NO: DRAWING NO: REV:


NOTES:

1. ALL DIMENSIONS ARE IN MILLIMETERS.


2. DRAWING NOT TO BE SCALED WORK TO
FIGURED DIMENSIONS ONLY
3. ALL DIMENSIONS ARE TO BE VERIFIED
ON SITE PRIOR TO CARRYING OUT WORK.

KEY PLAN

UNIT-503

Symbol Qty Description

OPEN CEILING

FR GYPSUM CEILING AREA

FR GYPSUM CEILING AREA


2800MM HEIGHT

SHOP DRAWING REVIEW


A B C D
APPROVED - APPROVED WITH REVISE AND NOT REQUIRED /

OPEN CEILING AREA PROCEED FOR


PRODUCTION
COMMENTS -
PROCEED FOR
PRODUCTION
RESUBMIT-
DO NOT PROCEED
FOR PRODUCTION
CANCELLED

3350MM HEIGHT DATE


REVIEWED
REVIEWED BY:
SIGN

03 MEP SUBMISSION

02 MEP SUBMISSION

FR GYPSUM CEILING AREA 01 MEP SUBMISSION

00 MEP SUBMISSION

NO. REVISION REV.BY DATE:

CLIENT

FR GYPSUM CEILING AREA

FR GYPSUM CEILING AREA PROJECT: OFFICE FITOUT

2800MM HEIGHT LOCATION : Unit 503, 1 lake plaza,


cluster-T , DUBAI - UAE

TOTAL AREA :

MAIN CONTRACTOR

FR GYPSUM CEILING AREA

DWG.TITLE:

PROPOSED CEILING LAYOUT

DATE: DRAWN: SCALE: CHECKED BY:


12/11/2023 KA ...

JOB NO: DRAWING NO: REV:


NOTES:

1. ALL DIMENSIONS ARE IN MILLIMETERS.


2. DRAWING NOT TO BE SCALED WORK TO
FIGURED DIMENSIONS ONLY
3. ALL DIMENSIONS ARE TO BE VERIFIED
ON SITE PRIOR TO CARRYING OUT WORK.

KEY PLAN

UNIT-503

Symbol Qty Description

Pendent sprinkler

Upright sprinkler

Zone control valve

SHOP DRAWING REVIEW


A B C D
APPROVED - APPROVED WITH REVISE AND NOT REQUIRED /
COMMENTS - RESUBMIT- CANCELLED
PROCEED FOR PROCEED FOR DO NOT PROCEED
PRODUCTION PRODUCTION FOR PRODUCTION
DATE REVIEWED BY:
REVIEWED SIGN

03 MEP SUBMISSION

02 MEP SUBMISSION

01 MEP SUBMISSION

00 MEP SUBMISSION

NO. REVISION REV.BY DATE:

CLIENT

PROJECT: OFFICE FITOUT

LOCATION : Unit 503, 1 lake plaza,


cluster-T , DUBAI - UAE

TOTAL AREA :

MAIN CONTRACTOR

DWG.TITLE:

EXISTING FIRE FIGHTING LAYOUT

DATE: DRAWN: SCALE: CHECKED BY:


12/11/2023 KA ...

JOB NO: DRAWING NO: REV:


NOTES:

1. ALL DIMENSIONS ARE IN MILLIMETERS.


2. DRAWING NOT TO BE SCALED WORK TO
FIGURED DIMENSIONS ONLY
3. ALL DIMENSIONS ARE TO BE VERIFIED
ON SITE PRIOR TO CARRYING OUT WORK.

KEY PLAN

Symbol Qty Description

Pendent sprinkler

Upright sprinkler UNIT-503

Zone control valve

SHOP DRAWING REVIEW


A B C D
APPROVED - APPROVED WITH REVISE AND NOT REQUIRED /
COMMENTS - RESUBMIT- CANCELLED
PROCEED FOR PROCEED FOR DO NOT PROCEED
PRODUCTION PRODUCTION FOR PRODUCTION
DATE REVIEWED BY:
REVIEWED SIGN

03 MEP SUBMISSION

02 MEP SUBMISSION

01 MEP SUBMISSION

00 MEP SUBMISSION

NO. REVISION REV.BY DATE:

CLIENT

PROJECT: OFFICE FITOUT

LOCATION : Unit 503, 1 lake plaza,


cluster-T , DUBAI - UAE

TOTAL AREA :

MAIN CONTRACTOR

DWG.TITLE:

PROPOSED FIRE FIGHTING LAYOUT

DATE: DRAWN: SCALE: CHECKED BY:


12/11/2023 KA ...

JOB NO: DRAWING NO: REV:


NOTES:

1. ALL DIMENSIONS ARE IN MILLIMETERS.


2. DRAWING NOT TO BE SCALED WORK TO
FIGURED DIMENSIONS ONLY
3. ALL DIMENSIONS ARE TO BE VERIFIED
ON SITE PRIOR TO CARRYING OUT WORK.

KEY PLAN

UNIT-503

TO EXISTING BUILDING LOOP

Symbol Qty Description

smoke detector

MCP & SPEAKER

HEAT DETECTOR

SHOP DRAWING REVIEW


A B C D
APPROVED - APPROVED WITH REVISE AND NOT REQUIRED /
COMMENTS - RESUBMIT- CANCELLED
PROCEED FOR PROCEED FOR DO NOT PROCEED
PRODUCTION PRODUCTION FOR PRODUCTION
DATE REVIEWED BY:
REVIEWED SIGN

03 MEP SUBMISSION

02 MEP SUBMISSION

01 MEP SUBMISSION

00 MEP SUBMISSION

NO. REVISION REV.BY DATE:

CLIENT

PROJECT: OFFICE FITOUT

LOCATION : Unit 503, 1 lake plaza,


cluster-T , DUBAI - UAE

TOTAL AREA :

MAIN CONTRACTOR

DWG.TITLE:

EXISTING SMOKE DETECTOR LAYOUT

DATE: DRAWN: SCALE: CHECKED BY:


12/11/2023 KA ...

JOB NO: DRAWING NO: REV:


NOTES:

1. ALL DIMENSIONS ARE IN MILLIMETERS.


2. DRAWING NOT TO BE SCALED WORK TO
FIGURED DIMENSIONS ONLY
3. ALL DIMENSIONS ARE TO BE VERIFIED
ON SITE PRIOR TO CARRYING OUT WORK.

KEY PLAN

Symbol Qty Description

smoke detector

UNIT-503

MCP & SPEAKER

HEAT DETECTOR

TO EXISTING BUILDING LOOP

SHOP DRAWING REVIEW


A B C D
APPROVED - APPROVED WITH REVISE AND NOT REQUIRED /
COMMENTS - RESUBMIT- CANCELLED
PROCEED FOR PROCEED FOR DO NOT PROCEED
PRODUCTION PRODUCTION FOR PRODUCTION
DATE REVIEWED BY:
REVIEWED SIGN

03 MEP SUBMISSION

02 MEP SUBMISSION

01 MEP SUBMISSION

00 MEP SUBMISSION

NO. REVISION REV.BY DATE:

CLIENT

PROJECT: OFFICE FITOUT

LOCATION : Unit 503, 1 lake plaza,


cluster-T , DUBAI - UAE

TOTAL AREA :

MAIN CONTRACTOR

DWG.TITLE:

PROPOSED SMOKE DETECTOR LAYOUT

DATE: DRAWN: SCALE: CHECKED BY:


12/11/2023 KA ...

JOB NO: DRAWING NO: REV:


NOTES:

1. ALL DIMENSIONS ARE IN MILLIMETERS.


2. DRAWING NOT TO BE SCALED WORK TO
FIGURED DIMENSIONS ONLY
3. ALL DIMENSIONS ARE TO BE VERIFIED
ON SITE PRIOR TO CARRYING OUT WORK.

KEY PLAN

UNIT-503

EXIT
Symbol Qty Description

EL Emergency light

EXIT Emergency exit


SHOP DRAWING REVIEW
A B C D
APPROVED - APPROVED WITH REVISE AND NOT REQUIRED /
COMMENTS - RESUBMIT- CANCELLED
PROCEED FOR PROCEED FOR DO NOT PROCEED
EL PRODUCTION PRODUCTION FOR PRODUCTION
DATE REVIEWED BY:
REVIEWED SIGN

03 MEP SUBMISSION

02 MEP SUBMISSION

01 MEP SUBMISSION

00 MEP SUBMISSION

NO. REVISION REV.BY DATE:

CLIENT

PROJECT: OFFICE FITOUT

LOCATION : Unit 503, 1 lake plaza,


cluster-T , DUBAI - UAE

TOTAL AREA :

MAIN CONTRACTOR

DWG.TITLE:

EXISTING EMERGENCY LIGHTING

DATE: DRAWN: SCALE: CHECKED BY:


12/11/2023 KA ...

JOB NO: DRAWING NO: REV:


NOTES:

1. ALL DIMENSIONS ARE IN MILLIMETERS.


2. DRAWING NOT TO BE SCALED WORK TO
FIGURED DIMENSIONS ONLY
3. ALL DIMENSIONS ARE TO BE VERIFIED
ON SITE PRIOR TO CARRYING OUT WORK.

KEY PLAN

UNIT-503

Symbol Qty Description

EXIT
EL Emergency light

EXIT
EL

Emergency exit

SHOP DRAWING REVIEW


A B C D
APPROVED - APPROVED WITH REVISE AND NOT REQUIRED /
COMMENTS - RESUBMIT- CANCELLED
PROCEED FOR PROCEED FOR DO NOT PROCEED
EL PRODUCTION PRODUCTION FOR PRODUCTION
DATE REVIEWED BY:
REVIEWED SIGN

03 MEP SUBMISSION

02 MEP SUBMISSION

01 MEP SUBMISSION

00 MEP SUBMISSION

NO. REVISION REV.BY DATE:

CLIENT
EL

PROJECT: OFFICE FITOUT

LOCATION : Unit 503, 1 lake plaza,


cluster-T , DUBAI - UAE

TOTAL AREA :

MAIN CONTRACTOR

DWG.TITLE:

PROPOSED EMERGENCY LIGHTING

DATE: DRAWN: SCALE: CHECKED BY:


12/11/2023 KA ...

JOB NO: DRAWING NO: REV:


NOTES:

1. ALL DIMENSIONS ARE IN MILLIMETERS.


2. DRAWING NOT TO BE SCALED WORK TO
FIGURED DIMENSIONS ONLY
3. ALL DIMENSIONS ARE TO BE VERIFIED
ON SITE PRIOR TO CARRYING OUT WORK.

KEY PLAN

chilled water supply

chilled water return


Symbol Qty Description
UNIT-503

Exhaust

S
AC SUPPLY GRILL

FCU -10
R
AC RETURN GRILL

CIRCULAR Diffuser WITH


VCD

SHOP DRAWING REVIEW


A B C D
APPROVED - APPROVED WITH REVISE AND NOT REQUIRED /
COMMENTS - RESUBMIT- CANCELLED
PROCEED FOR PROCEED FOR DO NOT PROCEED
PRODUCTION PRODUCTION FOR PRODUCTION
DATE REVIEWED BY:
REVIEWED SIGN

03 MEP SUBMISSION

02 MEP SUBMISSION

01 MEP SUBMISSION

00 MEP SUBMISSION

NO. REVISION REV.BY DATE:

CLIENT

PROJECT: OFFICE FITOUT

LOCATION : Unit 503, 1 lake plaza,


cluster-T , DUBAI - UAE

TOTAL AREA :

MAIN CONTRACTOR

DWG.TITLE:

EXISTING HVAC LAYOUT

DATE: DRAWN: SCALE: CHECKED BY:


12/11/2023 KA ...

JOB NO: DRAWING NO: REV:


NOTES:

1. ALL DIMENSIONS ARE IN MILLIMETERS.


2. DRAWING NOT TO BE SCALED WORK TO
FIGURED DIMENSIONS ONLY
3. ALL DIMENSIONS ARE TO BE VERIFIED
ON SITE PRIOR TO CARRYING OUT WORK.

KEY PLAN

UNIT-503

Symbol Qty Description

Exhaust

300X350
300X350
R
S

S
AC SUPPLY GRILL
200X350

R
AC RETURN GRILL
T
CIRCULAR Diffuser WITH
VCD
VCD VCD
VCD

FCU -10
400X350 500X350
R
S

SHOP DRAWING REVIEW


A B C D
APPROVED - APPROVED WITH REVISE AND NOT REQUIRED /
COMMENTS - RESUBMIT- CANCELLED
PROCEED FOR PROCEED FOR DO NOT PROCEED
VCD VCD VCD PRODUCTION PRODUCTION FOR PRODUCTION
DATE REVIEWED BY:
REVIEWED SIGN

03 MEP SUBMISSION

02 MEP SUBMISSION

300X350
300X350

01 MEP SUBMISSION

00 MEP SUBMISSION

NO. REVISION REV.BY DATE:

CLIENT
200X350

PROJECT: OFFICE FITOUT

LOCATION : Unit 503, 1 lake plaza,


S

cluster-T , DUBAI - UAE


R

TOTAL AREA :

MAIN CONTRACTOR

DWG.TITLE:

PROPOSED HVAC LAYOUT

DATE: DRAWN: SCALE: CHECKED BY:


12/11/2023 KA ...

JOB NO: DRAWING NO: REV:


NOTES:

1. ALL DIMENSIONS ARE IN MILLIMETERS.


2. DRAWING NOT TO BE SCALED WORK TO
FIGURED DIMENSIONS ONLY
3. ALL DIMENSIONS ARE TO BE VERIFIED
ON SITE PRIOR TO CARRYING OUT WORK.

KEY PLAN

LEGEND

Symbol Qty Description


UNIT-503

Recessed Down light


(as Per Approved Sample)

LINEAR PENDANT LIGHT


140CM LENGTH

LINEAR PENDANT LIGHT


ADJUSTABLE LENGTH

RECTANGULAR PENDANT
GYPSUM CEILING AREA LIGHT
2800MM HEIGHT

AP
ACCESS PANEL

SWITCH

SHOP DRAWING REVIEW


A B C D
APPROVED - APPROVED WITH REVISE AND NOT REQUIRED /
COMMENTS - RESUBMIT- CANCELLED
PROCEED FOR PROCEED FOR DO NOT PROCEED
PRODUCTION PRODUCTION FOR PRODUCTION
DATE REVIEWED BY:
REVIEWED SIGN

03 MEP SUBMISSION

02 MEP SUBMISSION

01 MEP SUBMISSION

00 MEP SUBMISSION

NO. REVISION REV.BY DATE:

CLIENT

PROJECT: OFFICE FITOUT

LOCATION : Unit 503, 1 lake plaza,


cluster-T , DUBAI - UAE

TOTAL AREA :

MAIN CONTRACTOR

DWG.TITLE:

PROPOSED LIGHTING LAYOUT

DATE: DRAWN: SCALE: CHECKED BY:


12/11/2023 KA ...

JOB NO: DRAWING NO: REV:


NOTES:

1. ALL DIMENSIONS ARE IN MILLIMETERS.


2. DRAWING NOT TO BE SCALED WORK TO
FIGURED DIMENSIONS ONLY
3. ALL DIMENSIONS ARE TO BE VERIFIED
ON SITE PRIOR TO CARRYING OUT WORK.

KEY PLAN

LEGEND:
CODE/SYMBOL DESCRIPTION
DOUBLE 13 AMP
SOCKET OUTLET, 400mm @
CENTER FROM THE FLOOR

AC ISOLATOR
UNIT-503

DB BOARD

SHOP DRAWING REVIEW


A B C D
APPROVED - APPROVED WITH REVISE AND NOT REQUIRED /
COMMENTS - RESUBMIT- CANCELLED
PROCEED FOR PROCEED FOR DO NOT PROCEED
PRODUCTION PRODUCTION FOR PRODUCTION
DATE REVIEWED BY:
REVIEWED SIGN

03 MEP SUBMISSION

02 MEP SUBMISSION

01 MEP SUBMISSION

00 MEP SUBMISSION

NO. REVISION REV.BY DATE:

CLIENT

PROJECT: OFFICE FITOUT

LOCATION : Unit 503, 1 lake plaza,


cluster-T , DUBAI - UAE

TOTAL AREA :

MAIN CONTRACTOR

printer

DWG.TITLE:

PROPOSED POWER LAYOUT

DATE: DRAWN: SCALE: CHECKED BY:


12/11/2023 KA ...

JOB NO: DRAWING NO: REV:


NOTES:

1. ALL DIMENSIONS ARE IN MILLIMETERS.


2. DRAWING NOT TO BE SCALED WORK TO
FIGURED DIMENSIONS ONLY
3. ALL DIMENSIONS ARE TO BE VERIFIED
ON SITE PRIOR TO CARRYING OUT WORK.

KEY PLAN

UNIT-503

DB-FC 22

PROJECT: 1 LAKE PLAZA PLOT NO.: BV


DB No.: OFFICE 503 PROPOSED LAOD SCHADULE LOAD DISTRIBUTION SCHEDULE LOCATION: 5TH FLOOR
FEED FROM : SMDB-T(2F TO 15F) (3 - PHASE) PAGE : 1/1

RATING OF RATING OF MCB RTG. CCT ECC CONNECTED LOADS/POINTS WATT / LOAD PER CIRCUIT- W REMARKS
INCOMER ELCB IN AMP WIRE WIRE
SIZE SIZE LTG PANT COVE HANGIN G 13A 13A T W/H 15A 13A Floor box 20A Outlet FCU SH ISO OTHE R UNIT
SL NO CIRNo. ROOM / AREA DENT LIGHT LTG S/O D//O S/O FLEX D/S +DP
mm2 mm2
O/L SWITCH R Y B

1 R1 10 2.5 2.5 OFFICE AREA 6 PROVISION LIGTING 100 600


2 Y1 10 2.5 2.5 OFFICE AREA 9 PROVISION LIGTING 100 900
40A
100mA 3 B1 10 2.5 2.5 OFFICE AREA 4 PROVISION LIGTING 100 400
ELCB-1 4 R2 10 2.5 2.5 PANTRY 5 PROVISION LIGTING 100 500
5 Y2 10 2.5 2.5 SPARE 0 SHOP DRAWING REVIEW
6 B2 10 2.5 2.5 SPARE 7 100 700 A B C D
APPROVED - APPROVED WITH REVISE AND NOT REQUIRED /
7 R3 20 4.0 4.0 SPARE 200 400 COMMENTS - RESUBMIT- CANCELLED
PROCEED FOR PROCEED FOR DO NOT PROCEED
8 Y3 20 4.0 4.0 OFFICE AREA PROVISION LIGTING 200 1200 PRODUCTION PRODUCTION FOR PRODUCTION
40A 20 4 4 DATE REVIEWED BY:
9 B3 20 4.0 4.0 OFFICE AREA PROVISION LIGTING 200 1200 REVIEWED
40A TP ISOLATOR

SIGN
100mA
ELCB-2 10 R4 20 4.0 4.0 TOILET 1200 1200
11 Y4 20 4.0 4.0 SPARE 200 400 03 MEP SUBMISSION

12 B4 20 4.0 4.0 PANTRY 200 400 02 MEP SUBMISSION

10 R5 20 4.0 4.0 SPARE 01 MEP SUBMISSION


40A
30mA 11 Y5 20 4 4 OFFICE AREA 200 200 00 MEP SUBMISSION

ELCB-3 NO. REVISION REV.BY DATE:


12 B5 20 4 4 SPARE
CLIENT
13 R6 32 4 4
14 Y6 20 4 4
15 B6 20 4 4
2700 2700 2700
8.1KW PROJECT: OFFICE FITOUT
CABLE SIZE:1x4Cx 10mm2 CU.PVC/XLPE/SWA/LSF + 1x1C x25mm2 CU.PVC.ECC C.FAN=Ceiling fan, EX. FAN=Exhaust Fan, SH. S/O='shaver socket outlet
LOCATION : Unit 503, 1 lake plaza,
W/H=water heater, H/D=Hand Dryer, 'W'=Window type & 'S' = Split type, T= Twin Socket cluster-T , DUBAI - UAE

TOTAL AREA :

MAIN CONTRACTOR

DWG.TITLE:

EXISTING LOAD SCHADULE

DATE: DRAWN: SCALE: CHECKED BY:


12/11/2023 KA ...

JOB NO: DRAWING NO: REV:


NOTES:

1. ALL DIMENSIONS ARE IN MILLIMETERS.


2. DRAWING NOT TO BE SCALED WORK TO
FIGURED DIMENSIONS ONLY
3. ALL DIMENSIONS ARE TO BE VERIFIED
ON SITE PRIOR TO CARRYING OUT WORK.

KEY PLAN

UNIT-503

DB-FC 22

PROJECT: 1 LAKE PLAZA PLOT NO.: BV


DB No.: OFFICE 503 PROPOSED LAOD SCHADULE LOAD DISTRIBUTION SCHEDULE LOCATION: 5TH FLOOR
FEED FROM : SMDB-T(2F TO 15F) (3 - PHASE) PAGE : 1/1

RATING OF RATING OF MCB RTG. CCT ECC CONNECTED LOADS/POINTS WATT / LOAD PER CIRCUIT- W REMARKS
INCOMER ELCB IN AMP WIRE WIRE
SIZE SIZE LTG PANT COVE HANGIN G 13A 13A T W/H 15A 13A Floor box 20A Outlet FCU SH ISO OTHE R UNIT
SL NO CIRNo. ROOM / AREA DENT LIGHT LTG S/O D//O S/O FLEX D/S +DP
mm2 mm2
O/L SWITCH R Y B

1 R1 10 2.5 2.5 WORK STATION 12 30 360


2 Y1 10 2.5 2.5 MEETING ROOM 16 25 400
40A
100mA 3 B1 10 2.5 2.5 MANAGER ROOM 13 80 1040
ELCB-1 4 R2 10 2.5 2.5 Emergency lighting 3 50 150
5 Y2 10 2.5 2.5 SPARE 50 SHOP DRAWING REVIEW
A B C D
6 B2 10 2.5 2.5 SPARE 50
APPROVED - APPROVED WITH REVISE AND NOT REQUIRED /
7 R3 20 4.0 4.0 FCU 1 200 200 COMMENTS - RESUBMIT- CANCELLED
PROCEED FOR PROCEED FOR DO NOT PROCEED
8 Y3 20 4.0 4.0 RECIPTION 4 200 800 RING PRODUCTION PRODUCTION FOR PRODUCTION
DATE REVIEWED BY:
40A 20 4 4 ` REVIEWED SIGN
9 B3 20 4.0 4.0 WORKSTATION 2 200 400
40A TP ISOLATOR

100mA
ELCB-2 10 R4 20 4.0 4.0 WORKSTATION & MANAGER ROOM 4 200 800 RING
03 MEP SUBMISSION
11 Y4 20 4.0 4.0 MEETING ROOM 6 200 1200 RING
02 MEP SUBMISSION
12 B4 20 4.0 4.0 WORKSTATION 6 200 1200 RING
01 MEP SUBMISSION
10 R5 20 4.0 4.0 PANTRY 6 200 1200 RING
40A 00 MEP SUBMISSION
30mA 11 Y5 20 4 4 ONTC 2 200 400
NO. REVISION REV.BY DATE:
ELCB-3
12 B5 20 4 4 SPARE 4 200 CLIENT

40A 13 R6 32 4 4 SPARE 2 2 1 200


30 mA 14 Y6 20 4 4 SPARE 4 1 200
ELCB-4 15 B6 20 4 4 SPARE 4 1 200
2710 2800 2640
PROJECT: OFFICE FITOUT
8.1KW
CABLE SIZE:1x4Cx 10mm2 CU.PVC/XLPE/SWA/LSF + 1x1C x25mm2 CU.PVC.ECC C.FAN=Ceiling fan, EX. FAN=Exhaust Fan, SH. S/O='shaver socket outlet LOCATION : Unit 503, 1 lake plaza,
cluster-T , DUBAI - UAE
W/H=water heater, H/D=Hand Dryer, 'W'=Window type & 'S' = Split type, T= Twin Socket
TOTAL AREA :

MAIN CONTRACTOR

DWG.TITLE:

PROPOSED LOAD SCHADULE

DATE: DRAWN: SCALE: CHECKED BY:


12/11/2023 KA ...

JOB NO: DRAWING NO: REV: