You are on page 1of 36

KEY PLAN:

GENERAL NOTES:

1. Do not scale this drawing, use figured dimensions only.


2. This drawing has been prepared based upon survey and information supplied by others. All
dimensions and levels are to be checked on site by contractors and inconsistencies reported
immediately to the Designer and Client prior to works being undertaken.
3. Contractors are to ensure that all works under their responsibility or the responsibility of their
sub-contractors are constructed and / or manufactured to comply with all relevant national and / or
local authority statutory requirements and in accordance with local building control and codes of
practice.
4. This drawing is to be read in conjunction with other relevant drawings, specifications, schedules
and so forth,relating to the project or projects from which this drawing has been prepared.
5. This drawing is also to be read in conjunction with drawings, specification, schedules and so forth
prepared by others and which are relevant to the project or project identified on this drawing.
6. This drawing is representative of design intent only, Contractor to supply for approval by the
Designer and Client, shop drawings and setting out rods to fully illustrate methods of construction
of all millworks, casegoods, joinery works and other specialist finishes and features.
7. The dimensional accuracy of this drawing as it relates to site conditions is not guaranteed. The
contractor must verify all site dimensions prior to producing shop and setting out drawings.
8. Refer to specification documents for all finish descriptions.
9. See detailed design per item; Verify actual measurement on site before installation, based on
approved materials and detailed specifications.

This drawing is the property of the Client.


Copyright is reserved by them and this drawing is issued on condition that is not copied or disclosed
by or to any anauthorized persons without the prior consent in writing of the Client.
This drawing is not to be scaled for the purposes of setting-out.
Dimension to be checked on site and verified prior to commencing the works.

ABBREVIATIONS:

F.F.L = FINISH FLOOR LEVEL


F.C.L = FINISH CEILING LEVEL
S.C.L = SCREED LEVEL

LEGEND:

CRUZ RESIDENCE
PROPOSED TWO-STOREY HOUSE
TAPULAO, ORANI, BATAAN

ARCHITECTURAL AND INTERIOR DESIGN


DRAWINGS DRAWING STATUS

00 ISSUED FOR APPROVAL 19-03-21 RB -

DRAWN CHECK
REV. DESCRIPTION DATE
BY BY

CONSULTANT:

CLIENT:

MINA S. CRUZ

PROJECT TITLE:

PROPOSED
TWO-STOREY HOUSE
TAPULAO, ORANI. BATAAN

DRAWING TITLE:

TWO-STOREY HOUSE

COVER PAGE
Initials Signed by: Date:
Drawn by: RB 19-03-21
Checked by: -
Approved by: - SHEET SIZE A3
Scale: AS SHOWN

00
KEY PLAN:

LEGEND:
EC - EXISTING COLUMN
ETB
ES
- EXISTING TIE BEAM
- EXISTING SLAB A B C D
EB - EXITING BEAM @ 1ST FLOOR
TB - NEW TIE BEAM
F1,F2,F3 - NEW FOOTING 1, 2, 3 GENERAL NOTES:
WF - NEW WALL FOOTING 1. Do not scale this drawing, use figured dimensions only.
2. This drawing has been prepared based upon survey and information supplied by others. All
1460 3825 3840
C1 - NEW COLUMN dimensions and levels are to be checked on site by contractors and inconsistencies reported
immediately to the Designer and Client prior to works being undertaken.
3. Contractors are to ensure that all works under their responsibility or the responsibility of their
1C1 - NEW COLUMN 1ST FLOOR sub-contractors are constructed and / or manufactured to comply with all relevant national and / or
local authority statutory requirements and in accordance with local building control and codes of
practice.
NC1 - COLUMN FIRST FLOOR TO MATCH EXITING 4. This drawing is to be read in conjunction with other relevant drawings, specifications, schedules
and so forth,relating to the project or projects from which this drawing has been prepared.
5. This drawing is also to be read in conjunction with drawings, specification, schedules and so forth
PC/PC1 - PLANTED COLUMN TO MATCH EXISTING F2
prepared by others and which are relevant to the project or project identified on this drawing.
6. This drawing is representative of design intent only, Contractor to supply for approval by the
Designer and Client, shop drawings and setting out rods to fully illustrate methods of construction

1
C1 PC2 of all millworks, casegoods, joinery works and other specialist finishes and features.
7. The dimensional accuracy of this drawing as it relates to site conditions is not guaranteed. The
TB ETB ETB contractor must verify all site dimensions prior to producing shop and setting out drawings.
EC EC
FOOTING SCHEDULE 8. Refer to specification documents for all finish descriptions.
9. See detailed design per item; Verify actual measurement on site before installation, based on
approved materials and detailed specifications.

This drawing is the property of the Client.

DIMENSIONS (MM) S2
Copyright is reserved by them and this drawing is issued on condition that is not copied or disclosed

1750
WF by or to any anauthorized persons without the prior consent in writing of the Client.

MARK DEPTH (M)

ETB

ETB
REINFORCEMENT TB ES S2
This drawing is not to be scaled for the purposes of setting-out.
Dimension to be checked on site and verified prior to commencing the works.

LENGTH WIDTH THICKNESS F2


C1 PC1 ABBREVIATIONS:
F1
F2
1000
800
1000
800
400
350
1
1
10 PCS - 16MMØ BOTHWAYS
8 PCS - 16MMØ BOTHWAYS
2 TB
EC EC EC F.F.L = FINISH FLOOR LEVEL
F.C.L = FINISH CEILING LEVEL
S.C.L = SCREED LEVEL

F3 600 600 300 1 6 PCS - 16MMØ BOTHWAYS LEGEND:

3 PCS - 12MMØ CONTINOUS TB


S2
ES

ETB
WF - 400 200

2830
1 W/ 10MM LATERAL TIES @

ETB
ES

0.3M O.C.
F1
BEAM SCHEDULE
REINFORCEMENT

EC
C2

NAME WIDTH DEPTH @SUPPORT@MIDSPAN STIRRUPS


2-16MMØ 2-16MMØ 10MMØ STIRRUPS
3 TB
EC EC

TOPBAR TOPBAR 1@50MM;


TB 200 300 2-16MMØ 2-16MMØ 3 @100MM
BOTTOMBAR BOTTOMBAR REST @ 200MM
3-16MMØ 2-16MMØ 10MMØ STIRRUPS
TOPBAR TOPBAR 1@50MM;
1B1 200 500 ES

ETB
2-16MMØ 3-16MMØ 3 @100MM S2
ES

3815
BOTTOMBAR BOTTOMBAR REST @ 200MM

ETB
2-16MMØ 2-16MMØ 10MMØ STIRRUPS TB
TOPBAR TOPBAR 1@50MM;
RB 150 300 2-16MMØ 2-16MMØ 3 @100MM
BOTTOMBAR BOTTOMBAR REST @ 200MM

F1
COLUMN SCHEDULE
REINFORCEMENT C2

EC

EC
NAME WIDTH DEPTH @SUPPORT STIRRUPS 4 TB
EC EC

DRAWING STATUS
10MMØ STIRRUPS
C1 200 300 4-16MMØ 2@150MM;
REST @ 250MM
ES

ETB
TB ES
2695

10MMØ STIRRUPS

ETB
S2
C2 / 1C2 200 400 6-16MMØ 2@150MM; 00 ISSUED FOR APPROVAL 19-03-21 RB -
REST @ 250MM DRAWN CHECK
REV. DESCRIPTION DATE
BY BY
F1
CONSULTANT:
10MMØ STIRRUPS
C2
C3 150 300 4-16MMØ 2@150MM;
REST @ 250MM
5 EC
ETB
EC

C3
ETB
EC
ETB
EC

CLIENT:
SLAB WF
REINFORCEMENT S2
F3 MINA S. CRUZ
NAME TYPE THICKNESS SHORT DIRECTION LONG DIRECTION
2705

WF
TB S2
PROJECT TITLE:
F3
MATCH
S1 1 WAY 10MMØ TB @300MM 10MMØ TB @300MM
F2
PROPOSED
EXISITNG SPACING SPACING WF C3

C1
TWO-STOREY HOUSE
10MMØ BB @300MM TAPULAO, ORANI. BATAAN
10MMØ BB @300MM
SPACING SPACING
6 DRAWING TITLE:

TWO-STOREY HOUSE
S2 1 WAY SLAB @ 10MMØ TB @600MM
SPACING FOUNDATION PLAN
GROUND
Initials Signed by: Date:
Drawn by: RB 19-03-21
Checked by: -
1 FOUNDATION PLAN Approved by:
Scale:
-
AS SHOWN
SHEET SIZE A3

DWG-AR-01 SCALE
DWG-AR-01 00
KEY PLAN:

LEGEND:
EC - EXISTING COLUMN
ETB
ES
- EXISTING TIE BEAM
- EXISTING SLAB A B C D
EB - EXITING BEAM @ 1ST FLOOR
TB - NEW TIE BEAM
F1,F2,F3 - NEW FOOTING 1, 2, 3 GENERAL NOTES:
WF - NEW WALL FOOTING 1. Do not scale this drawing, use figured dimensions only.
2. This drawing has been prepared based upon survey and information supplied by others. All
1460 3825 3840
C1 - NEW COLUMN dimensions and levels are to be checked on site by contractors and inconsistencies reported
immediately to the Designer and Client prior to works being undertaken.
3. Contractors are to ensure that all works under their responsibility or the responsibility of their
1C1 - NEW COLUMN 1ST FLOOR sub-contractors are constructed and / or manufactured to comply with all relevant national and / or
local authority statutory requirements and in accordance with local building control and codes of
practice.
NC1 - COLUMN FIRST FLOOR TO MATCH EXITING 4. This drawing is to be read in conjunction with other relevant drawings, specifications, schedules
and so forth,relating to the project or projects from which this drawing has been prepared.
5. This drawing is also to be read in conjunction with drawings, specification, schedules and so forth
PC/PC1 - PLANTED COLUMN TO MATCH EXISTING prepared by others and which are relevant to the project or project identified on this drawing.
6. This drawing is representative of design intent only, Contractor to supply for approval by the
Designer and Client, shop drawings and setting out rods to fully illustrate methods of construction

1
C1 P2 of all millworks, casegoods, joinery works and other specialist finishes and features.
7. The dimensional accuracy of this drawing as it relates to site conditions is not guaranteed. The
RB ERB ERB contractor must verify all site dimensions prior to producing shop and setting out drawings.
EC EC
FOOTING SCHEDULE 8. Refer to specification documents for all finish descriptions.
9. See detailed design per item; Verify actual measurement on site before installation, based on
approved materials and detailed specifications.

This drawing is the property of the Client.

DIMENSIONS (MM) RB ERB ERB Copyright is reserved by them and this drawing is issued on condition that is not copied or disclosed

1750
by or to any anauthorized persons without the prior consent in writing of the Client.

MARK DEPTH (M) REINFORCEMENT This drawing is not to be scaled for the purposes of setting-out.
Dimension to be checked on site and verified prior to commencing the works.

LENGTH WIDTH THICKNESS


C1 P1 ABBREVIATIONS:
F1
F2
1000
800
1000
800
400
350
1
1
10 PCS - 16MMØ BOTHWAYS
8 PCS - 16MMØ BOTHWAYS
2 RB
EC
ERB ERB
EC
ERB
EC F.F.L = FINISH FLOOR LEVEL
F.C.L = FINISH CEILING LEVEL
S.C.L = SCREED LEVEL

F3 600 600 300 1 6 PCS - 16MMØ BOTHWAYS LEGEND:

3 PCS - 12MMØ CONTINOUS


OPEN
WF - 400 200

2830
1 W/ 10MM LATERAL TIES @ RB
BELOW ERB OPEN
BELOW
0.3M O.C.

BEAM SCHEDULE
REINFORCEMENT

EC
1C2

NAME WIDTH DEPTH @SUPPORT@MIDSPAN STIRRUPS


2-16MMØ 2-16MMØ 10MMØ STIRRUPS
3 1B1
NC1
EB1
NC1
EB1
NC1

TOPBAR TOPBAR 1@50MM;


TB 200 300 2-16MMØ 2-16MMØ 3 @100MM
BOTTOMBAR BOTTOMBAR REST @ 200MM
3-16MMØ 2-16MMØ 10MMØ STIRRUPS
TOPBAR TOPBAR 1@50MM;
1B1 200 500 2-16MMØ 3-16MMØ 3 @100MM EB1 ES EB1

3815
BOTTOMBAR BOTTOMBAR REST @ 200MM 1B1 STAIRS ES
EB1
2-16MMØ 2-16MMØ 10MMØ STIRRUPS
TOPBAR TOPBAR 1@50MM;
RB 150 300 2-16MMØ 2-16MMØ 3 @100MM
BOTTOMBAR BOTTOMBAR REST @ 200MM

COLUMN SCHEDULE
REINFORCEMENT

NC1
1C2

NAME WIDTH DEPTH @SUPPORT STIRRUPS 4 1B1 EB1 EB1


NC1
EB1
NC1

DRAWING STATUS
10MMØ STIRRUPS
C1 200 300 4-16MMØ 2@150MM;
REST @ 250MM 2695

10MMØ STIRRUPS 1B1 S1 EB1 ES EB1 ES EB1 ES


C2 / 1C2 200 400 6-16MMØ 2@150MM; 00 ISSUED FOR APPROVAL 19-03-21 RB -
REST @ 250MM DRAWN CHECK
REV. DESCRIPTION DATE
BY BY

CONSULTANT:
10MMØ STIRRUPS
2@150MM; 1C2
C3 150 300 4-16MMØ
REST @ 250MM
5 1B1 EB1
NC1
C3
EB1
NC1
EB1
NC1

CLIENT:
SLAB
REINFORCEMENT MINA S. CRUZ
RB
RB
NAME TYPE THICKNESS SHORT DIRECTION LONG DIRECTION
2705

PROJECT TITLE:
MATCH
S1 1 WAY 10MMØ TB @300MM 10MMØ TB @300MM
PROPOSED
EXISITNG SPACING SPACING C3

C1
TWO-STOREY HOUSE
10MMØ BB @300MM TAPULAO, ORANI. BATAAN
10MMØ BB @300MM
SPACING SPACING
6 DRAWING TITLE:

TWO-STOREY HOUSE
S2 1 WAY SLAB @ 10MMØ TB @600MM
SPACING SECOND FLOOR FRAMING PLAN
GROUND
Initials Signed by: Date:
Drawn by: RB 19-03-21
Checked by: -
1 SECOND FLOOR FRAMING PLAN Approved by:
Scale:
-
AS SHOWN
SHEET SIZE A3

DWG-AR-02 SCALE
DWG-AR-02 00
KEY PLAN:

LEGEND:
EC - EXISTING COLUMN
ETB
ES
- EXISTING TIE BEAM
- EXISTING SLAB A B C D
EB - EXITING BEAM @ 1ST FLOOR
TB - NEW TIE BEAM
F1,F2,F3 - NEW FOOTING 1, 2, 3 GENERAL NOTES:
WF - NEW WALL FOOTING 1. Do not scale this drawing, use figured dimensions only.
2. This drawing has been prepared based upon survey and information supplied by others. All
C1 - NEW COLUMN dimensions and levels are to be checked on site by contractors and inconsistencies reported
immediately to the Designer and Client prior to works being undertaken.
3. Contractors are to ensure that all works under their responsibility or the responsibility of their
1C1 - NEW COLUMN 1ST FLOOR sub-contractors are constructed and / or manufactured to comply with all relevant national and / or
local authority statutory requirements and in accordance with local building control and codes of
1460 3825 3840 practice.
NC1 - COLUMN FIRST FLOOR TO MATCH EXITING 4. This drawing is to be read in conjunction with other relevant drawings, specifications, schedules
and so forth,relating to the project or projects from which this drawing has been prepared.
5. This drawing is also to be read in conjunction with drawings, specification, schedules and so forth
PC/PC1 - PLANTED COLUMN TO MATCH EXISTING prepared by others and which are relevant to the project or project identified on this drawing.
6. This drawing is representative of design intent only, Contractor to supply for approval by the
Designer and Client, shop drawings and setting out rods to fully illustrate methods of construction

1
of all millworks, casegoods, joinery works and other specialist finishes and features.
7. The dimensional accuracy of this drawing as it relates to site conditions is not guaranteed. The
contractor must verify all site dimensions prior to producing shop and setting out drawings.

FOOTING SCHEDULE 8. Refer to specification documents for all finish descriptions.


9. See detailed design per item; Verify actual measurement on site before installation, based on
approved materials and detailed specifications.

This drawing is the property of the Client.

DIMENSIONS (MM) Copyright is reserved by them and this drawing is issued on condition that is not copied or disclosed

1750
by or to any anauthorized persons without the prior consent in writing of the Client.

MARK DEPTH (M) REINFORCEMENT This drawing is not to be scaled for the purposes of setting-out.
Dimension to be checked on site and verified prior to commencing the works.

LENGTH WIDTH THICKNESS


ABBREVIATIONS:
F1
F2
1000
800
1000
800
400
350
1
1
10 PCS - 16MMØ BOTHWAYS
8 PCS - 16MMØ BOTHWAYS
2 F.F.L = FINISH FLOOR LEVEL
F.C.L = FINISH CEILING LEVEL
S.C.L = SCREED LEVEL

F3 600 600 300 1 6 PCS - 16MMØ BOTHWAYS LEGEND:

3 PCS - 12MMØ CONTINOUS


WF - 400 200

2830
1 W/ 10MM LATERAL TIES @
0.3M O.C.

BEAM SCHEDULE
REINFORCEMENT 1C1

NAME WIDTH DEPTH @SUPPORT@MIDSPAN STIRRUPS


2-16MMØ 2-16MMØ 10MMØ STIRRUPS
3 RB
NC1
RB
NC1
RB
NC1

TOPBAR TOPBAR 1@50MM;


TB 200 300 2-16MMØ 2-16MMØ 3 @100MM
BOTTOMBAR BOTTOMBAR REST @ 200MM
3-16MMØ 2-16MMØ 10MMØ STIRRUPS
TOPBAR TOPBAR 1@50MM;
1B1 200 500 2-16MMØ 3-16MMØ 3 @100MM EB1
RB

3815
BOTTOMBAR BOTTOMBAR REST @ 200MM
2-16MMØ 2-16MMØ 10MMØ STIRRUPS RB
TOPBAR TOPBAR 1@50MM;
RB 150 300 2-16MMØ 2-16MMØ 3 @100MM
BOTTOMBAR BOTTOMBAR REST @ 200MM

COLUMN SCHEDULE
REINFORCEMENT

NC1
1C2

NAME WIDTH DEPTH @SUPPORT STIRRUPS 4 RB


NC1
RB
NC1

DRAWING STATUS
10MMØ STIRRUPS
C1 200 300 4-16MMØ 2@150MM;
REST @ 250MM 2695

10MMØ STIRRUPS RB
2@150MM; RB
C2 / 1C2 200 400 6-16MMØ 00 ISSUED FOR APPROVAL 19-03-21 RB -
REST @ 250MM DRAWN CHECK
REV. DESCRIPTION DATE
BY BY

CONSULTANT:
10MMØ STIRRUPS
2@150MM; 1C3
C3 150 300 4-16MMØ
REST @ 250MM
5 RB
NC1
RB
NC1
RB
NC1

CLIENT:
SLAB
REINFORCEMENT MINA S. CRUZ
NAME TYPE THICKNESS SHORT DIRECTION LONG DIRECTION
2705

PROJECT TITLE:
MATCH
S1 1 WAY 10MMØ TB @300MM 10MMØ TB @300MM
PROPOSED
EXISITNG SPACING SPACING
TWO-STOREY HOUSE
10MMØ BB @300MM TAPULAO, ORANI. BATAAN
10MMØ BB @300MM
SPACING SPACING
6 DRAWING TITLE:

TWO-STOREY HOUSE
S2 1 WAY SLAB @ 10MMØ TB @600MM
SPACING ROOF FRAMING PLAN
GROUND
Initials Signed by: Date:
Drawn by: RB 19-03-21
Checked by: -
1 ROOF FRAMING PLAN Approved by:
Scale:
-
AS SHOWN
SHEET SIZE A3

DWG-AR-03 SCALE
DWG-AR-03 00
KEY PLAN:

A B C D A B C D
GENERAL NOTES:

1. Do not scale this drawing, use figured dimensions only.


2. This drawing has been prepared based upon survey and information supplied by others. All
1460 3825 3840 1460 3825 3840 dimensions and levels are to be checked on site by contractors and inconsistencies reported
immediately to the Designer and Client prior to works being undertaken.
3. Contractors are to ensure that all works under their responsibility or the responsibility of their
sub-contractors are constructed and / or manufactured to comply with all relevant national and / or
local authority statutory requirements and in accordance with local building control and codes of
practice.
4. This drawing is to be read in conjunction with other relevant drawings, specifications, schedules
and so forth,relating to the project or projects from which this drawing has been prepared.
5. This drawing is also to be read in conjunction with drawings, specification, schedules and so forth
prepared by others and which are relevant to the project or project identified on this drawing.
6. This drawing is representative of design intent only, Contractor to supply for approval by the
Designer and Client, shop drawings and setting out rods to fully illustrate methods of construction

1 1
of all millworks, casegoods, joinery works and other specialist finishes and features.
7. The dimensional accuracy of this drawing as it relates to site conditions is not guaranteed. The
contractor must verify all site dimensions prior to producing shop and setting out drawings.
8. Refer to specification documents for all finish descriptions.
9. See detailed design per item; Verify actual measurement on site before installation, based on
approved materials and detailed specifications.

This drawing is the property of the Client.


BALCONY BALCONY Copyright is reserved by them and this drawing is issued on condition that is not copied or disclosed
1750

1750
by or to any anauthorized persons without the prior consent in writing of the Client.
This drawing is not to be scaled for the purposes of setting-out.
Dimension to be checked on site and verified prior to commencing the works.

ABBREVIATIONS:

2 2 F.F.L = FINISH FLOOR LEVEL


F.C.L = FINISH CEILING LEVEL
S.C.L = SCREED LEVEL

LEGEND:

BEDROOM 1 BEDROOM 1
2830

2830
LIVING LIVING

3 3
T&B T&B

DINING DINING
3815

3815
T&B T&B

UP UP

4 4 DRAWING STATUS

KITCHEN KITCHEN
BEDROOM 3 BEDROOM 2 BEDROOM 3 BEDROOM 2
2695

2695
00 ISSUED FOR APPROVAL 19-03-21 RB -

DRAWN CHECK
REV. DESCRIPTION DATE
BY BY

CONSULTANT:

5 5
CLIENT:

MINA S. CRUZ
2705

2705

PROJECT TITLE:

PROPOSED
TWO-STOREY HOUSE
TAPULAO, ORANI. BATAAN

6 6 DRAWING TITLE:

TWO-STOREY HOUSE
EXISTING WALL PARTITION PLAN
& DEMOLITION PLAN
Initials Signed by: Date:
Drawn by: RB 19-03-21
Checked by: -
1 EXISTING WALL PARTITION PLAN 2 DEMOLITION PLAN Approved by:
Scale:
-
AS SHOWN
SHEET SIZE A3

DWG-AR-04 SCALE DWG-AR-04 SCALE


DWG-AR-04 00
KEY PLAN:

A B C D A B C D
A A
DWG-AR-09a DWG-AR-09a GENERAL NOTES:

1. Do not scale this drawing, use figured dimensions only.


2. This drawing has been prepared based upon survey and information supplied by others. All
1460 3825 3840 1460 3825 3840 dimensions and levels are to be checked on site by contractors and inconsistencies reported
immediately to the Designer and Client prior to works being undertaken.
3. Contractors are to ensure that all works under their responsibility or the responsibility of their
UP ROOFING LINE ROOFING LINE sub-contractors are constructed and / or manufactured to comply with all relevant national and / or
local authority statutory requirements and in accordance with local building control and codes of
1 practice.
4. This drawing is to be read in conjunction with other relevant drawings, specifications, schedules
2 and so forth,relating to the project or projects from which this drawing has been prepared.
5. This drawing is also to be read in conjunction with drawings, specification, schedules and so forth
3 prepared by others and which are relevant to the project or project identified on this drawing.
6. This drawing is representative of design intent only, Contractor to supply for approval by the
Designer and Client, shop drawings and setting out rods to fully illustrate methods of construction

1 1
4 W4 W2 of all millworks, casegoods, joinery works and other specialist finishes and features.
7. The dimensional accuracy of this drawing as it relates to site conditions is not guaranteed. The
contractor must verify all site dimensions prior to producing shop and setting out drawings.

455
8. Refer to specification documents for all finish descriptions.
285 600 700 900 1200 1340 9. See detailed design per item; Verify actual measurement on site before installation, based on

490
approved materials and detailed specifications.

This drawing is the property of the Client.


Copyright is reserved by them and this drawing is issued on condition that is not copied or disclosed

1000

1610
1750

1750
1595
STUDY

600
by or to any anauthorized persons without the prior consent in writing of the Client.
BALCONY D1 ENTRANCE W4 This drawing is not to be scaled for the purposes of setting-out.
Dimension to be checked on site and verified prior to commencing the works.
HT 2150
1600 3440
ABBREVIATIONS:

505
1200 400 1200 2240
305

2 2
W1 W1 W1
F.F.L = FINISH FLOOR LEVEL

340
F.C.L = FINISH CEILING LEVEL
1470 600 100 600 100 600 300 1200 550 1200 2240
S.C.L = SCREED LEVEL

600 100 600 100 600


1055 150 W1 LEGEND:
1800

UP
300

DINING
2830

2830
1
LIVING W1
2

3630
3
W1
4
860

340
3 3
W2 W2
6

75
AC 1350 1200 1300 1370 1200 1120
7
OPENING
3850 3690

800

650
425mm HT
8 2100mm
2970
3480

TOP HT

1500
75
9
300

DRESSING AREA

2375
2350
450
10
2450

2820
KITCHEN
D 11
B D B
1700
1100

1400
500
12
TOILET & BATH W5
3815

3815
DWG-AR-09b DWG-AR-09a DWG-AR-09b DWG-AR-09a

3660
4720 HT 2100 2700
13 BEDROOM 4
450
2545 2175 D3 2170 150 600 1950
300

14
355

330
15 200 600 620 1400 1950
1420 D3
4990

1310
16
1160

1160

1160
HT 2100
500

500
1060

STORAGE/TREADMILL TOILET W5 865 900 515 455 355 1200 710 TOILET & BATH W5
17 4375 HT 2100
AC OPENING
D2
330

330
18 1740 1080 2005 900 250 900 320 D3 345mm HT
2550

4 4 DN
HT 2150 2100mm TOP HT

165
1585 1955 570 600 800 900 1015 900 W2
D2 D2 DRAWING STATUS
2815
965

HT 2150 HT 2150 D2

900
1750
1600

HT 2150
2700

2550

2550

2550

2550
2695

2695
600

BEDROOM 2 W6 BEDROOM 1 BALCONY


00 ISSUED FOR APPROVAL 19-03-21 RB -
2805 DRAWN CHECK

1485
REV. DESCRIPTION DATE
BY BY
1185 1000 620
900

900

965

D2 CONSULTANT:
AC OPENING 2820
HT 2150 D2 345mm HT 2735 5775
930 1000 890

5 5
HT 2150 2100mm TOP HT
50

50
260

815 685 100 900 80 W3 W3


65 455
42°

W3 CLIENT:
AC OPENING
1295
1295

10 345mm HT UP UP
00
16
2600mm TOP HT
MINA S. CRUZ
50
58 LAUNDRY AREA
2705

2705

5
BEDROOM 3 1035
PROJECT TITLE:

1230
1080

PROPOSED
1165
1115

2640
2650
TWO-STOREY HOUSE
TAPULAO, ORANI. BATAAN

6 C
6 C
DRAWING TITLE:

TWO-STOREY HOUSE
DWG-AR-09b DWG-AR-09b
PROPOSED WALL PARTITION
PLAN
Initials Signed by: Date:
Drawn by: RB 19-03-21
Checked by: -
1 PROPOSED WALL PARTITION PLAN - GROUND FLOOR 2 PROPOSED WALL PARTITION PLAN - SECOND FLOOR Approved by:
Scale:
-
AS SHOWN
SHEET SIZE A3

DWG-AR-05 SCALE DWG-AR-05 SCALE


DWG-AR-05 00
KEY PLAN:

A B C D
GENERAL NOTES:

1. Do not scale this drawing, use figured dimensions only.


2. This drawing has been prepared based upon survey and information supplied by others. All
1460 3825 3840 dimensions and levels are to be checked on site by contractors and inconsistencies reported
immediately to the Designer and Client prior to works being undertaken.
3. Contractors are to ensure that all works under their responsibility or the responsibility of their
sub-contractors are constructed and / or manufactured to comply with all relevant national and / or
local authority statutory requirements and in accordance with local building control and codes of
practice.

OVERHANG
4. This drawing is to be read in conjunction with other relevant drawings, specifications, schedules
and so forth,relating to the project or projects from which this drawing has been prepared.

1000
5. This drawing is also to be read in conjunction with drawings, specification, schedules and so forth
prepared by others and which are relevant to the project or project identified on this drawing.
6. This drawing is representative of design intent only, Contractor to supply for approval by the
Designer and Client, shop drawings and setting out rods to fully illustrate methods of construction

1
of all millworks, casegoods, joinery works and other specialist finishes and features.
7. The dimensional accuracy of this drawing as it relates to site conditions is not guaranteed. The
contractor must verify all site dimensions prior to producing shop and setting out drawings.
8. Refer to specification documents for all finish descriptions.
1000 9. See detailed design per item; Verify actual measurement on site before installation, based on
approved materials and detailed specifications.
OVERHANG
5° (DEGREE) SLOPE This drawing is the property of the Client.
Copyright is reserved by them and this drawing is issued on condition that is not copied or disclosed

1755
by or to any anauthorized persons without the prior consent in writing of the Client.
230 This drawing is not to be scaled for the purposes of setting-out.
Dimension to be checked on site and verified prior to commencing the works.

ABBREVIATIONS:

2 F.F.L = FINISH FLOOR LEVEL


F.C.L = FINISH CEILING LEVEL
S.C.L = SCREED LEVEL

LEGEND:

2830

OVERHANG
1000
3
3815

5° (DEGREE) SLOPE

230

4 DRAWING STATUS
2695

00 ISSUED FOR APPROVAL 19-03-21 RB -

DRAWN CHECK
REV. DESCRIPTION DATE
BY BY

CONSULTANT:
1000

5 OVERHANG

OVERHANG
1000
CLIENT:

MINA S. CRUZ
2705

PROJECT TITLE:

PROPOSED
230 5° (DEGREE) SLOPE
TWO-STOREY HOUSE
TAPULAO, ORANI. BATAAN
230

6 DRAWING TITLE:

TWO-STOREY HOUSE

PROPOSED ROOFING PLAN


Initials Signed by: Date:
Drawn by: RB 19-03-21
Checked by: -
1 PROPOSED ROOFING PLAN Approved by:
Scale:
-
AS SHOWN
SHEET SIZE A3

DWG-AR-06 SCALE
DWG-AR-06 00
KEY PLAN:

A B C D A B C D
GENERAL NOTES:

1. Do not scale this drawing, use figured dimensions only.


2. This drawing has been prepared based upon survey and information supplied by others. All
1460 3825 3840 1460 3825 3840 dimensions and levels are to be checked on site by contractors and inconsistencies reported
immediately to the Designer and Client prior to works being undertaken.
3. Contractors are to ensure that all works under their responsibility or the responsibility of their
UP ROOFING LINE ROOFING LINE sub-contractors are constructed and / or manufactured to comply with all relevant national and / or
local authority statutory requirements and in accordance with local building control and codes of
practice.
4. This drawing is to be read in conjunction with other relevant drawings, specifications, schedules
and so forth,relating to the project or projects from which this drawing has been prepared.
5. This drawing is also to be read in conjunction with drawings, specification, schedules and so forth
prepared by others and which are relevant to the project or project identified on this drawing.
6. This drawing is representative of design intent only, Contractor to supply for approval by the
Designer and Client, shop drawings and setting out rods to fully illustrate methods of construction

1 1
of all millworks, casegoods, joinery works and other specialist finishes and features.
7. The dimensional accuracy of this drawing as it relates to site conditions is not guaranteed. The
contractor must verify all site dimensions prior to producing shop and setting out drawings.
8. Refer to specification documents for all finish descriptions.
9. See detailed design per item; Verify actual measurement on site before installation, based on
approved materials and detailed specifications.

This drawing is the property of the Client.


Copyright is reserved by them and this drawing is issued on condition that is not copied or disclosed
1750

1750
1755
BALCONY ENTRANCE A
STUDY by or to any anauthorized persons without the prior consent in writing of the Client.
This drawing is not to be scaled for the purposes of setting-out.
Dimension to be checked on site and verified prior to commencing the works.

880
ABBREVIATIONS:
155

2 A A 2 F.F.L = FINISH FLOOR LEVEL


F.C.L = FINISH CEILING LEVEL
S.C.L = SCREED LEVEL
870 600
200 500 LEGEND:
SINGLE POLE POWER OUTLET (WALL
MOUNTED) @ 2100mm AFFL FOR
1 KITCHEN HOOD
DINING
2830

2830
LIVING SINGLE POLE POWER OUTLET (WALL
MOUNTED) @ 2600mm AFFL ABOVE FCL
2 FOR WATER HEATER
UP
DOUBLE POLE POWER OUTLET (WALL
A MOUNTED) @ 450mm AFFL

3 04
250 250
AC
OPENING
3 B
DOUBLE POLE POWER OUTLET (WALL
MOUNTED) @ 1100mm AFFL

425mm HT SINGLE POLE AC POWER OUTLET


1200

2100mm AC1 (WALL MOUNTED) @ 2100mm AFFL


TOP HT
A AC1
SINGLE POLE AC POWER OUTLET
2 DRESSING AREA AC2 (WALL MOUNTED) @ 2430mm AFFL
A 1 A
KITCHEN 10 14

250
07 TOILET & BATH
250
SINGLE POLE POWER OUTLET W/
COVER (WALL MOUNTED) @ 2100mm
3815

3815
AFFL
B 350
BEDROOM 4 DOUBLE POLE POWER OUTLET W/
600

COVER (WALL MOUNTED) @ 450mm


09 1A
A
AFFL

DISTRIBUTION PANEL BOARD (WALL


08 MOUNTED) @ 1350mm AFFL

1130
STORAGE/TREADMILL 250 TOILET TOILET & BATH 375
13 AC OPENING
345mm HT
15 CABLE OUTLET (WALL MOUNTED) @
450mm AFFL

4 05
A
A A 4 06 DN
2100mm TOP HT
AC1 2

DRAWING STATUS
250 235 235

200
2695

2695
BEDROOM 2 BEDROOM 1 BALCONY
00 ISSUED FOR APPROVAL 19-03-21 RB -
11
12 REV. DESCRIPTION DATE
DRAWN CHECK
BY BY

CONSULTANT:
AC OPENING
AC1

345mm HT

5 5
200

2100mm TOP HT

2
AC CLIENT:
A AC OPENING
345mm HT UP UP
2600mm TOP HT
MINA S. CRUZ
LAUNDRY AREA
2705

2705
250

BEDROOM 3 PROJECT TITLE:


2175

PROPOSED
TWO-STOREY HOUSE
TAPULAO, ORANI. BATAAN

6 6 DRAWING TITLE:

TWO-STOREY HOUSE

PROPOSED POWER LAYOUT


Initials Signed by: Date:
Drawn by: RB 19-03-21
Checked by: -
1 PROPOSED POWER LAYOUT - GROUND FLOOR 2 PROPOSED POWER LAYOUT - SECOND FLOOR Approved by:
Scale:
-
AS SHOWN
SHEET SIZE A3

DWG-AR-07a SCALE DWG-AR-07a SCALE


DWG-AR-07a 00
KEY PLAN:

A B C D A B C D
GENERAL NOTES:

1. Do not scale this drawing, use figured dimensions only.


2. This drawing has been prepared based upon survey and information supplied by others. All
dimensions and levels are to be checked on site by contractors and inconsistencies reported
immediately to the Designer and Client prior to works being undertaken.
3. Contractors are to ensure that all works under their responsibility or the responsibility of their
UP ROOFING LINE ROOFING LINE sub-contractors are constructed and / or manufactured to comply with all relevant national and / or
local authority statutory requirements and in accordance with local building control and codes of
practice.
4. This drawing is to be read in conjunction with other relevant drawings, specifications, schedules
and so forth,relating to the project or projects from which this drawing has been prepared.
5. This drawing is also to be read in conjunction with drawings, specification, schedules and so forth
prepared by others and which are relevant to the project or project identified on this drawing.
6. This drawing is representative of design intent only, Contractor to supply for approval by the
Designer and Client, shop drawings and setting out rods to fully illustrate methods of construction

1 1
of all millworks, casegoods, joinery works and other specialist finishes and features.
7. The dimensional accuracy of this drawing as it relates to site conditions is not guaranteed. The
contractor must verify all site dimensions prior to producing shop and setting out drawings.
8. Refer to specification documents for all finish descriptions.
9. See detailed design per item; Verify actual measurement on site before installation, based on
approved materials and detailed specifications.

This drawing is the property of the Client.


Copyright is reserved by them and this drawing is issued on condition that is not copied or disclosed
LT-02 by or to any anauthorized persons without the prior consent in writing of the Client.
This drawing is not to be scaled for the purposes of setting-out.
LT-02 LT-02 Dimension to be checked on site and verified prior to commencing the works.

S1 ABBREVIATIONS:
S

S
2 2

S
S2 S2
F.F.L = FINISH FLOOR LEVEL
SA F.C.L = FINISH CEILING LEVEL

S S.C.L = SCREED LEVEL

LEGEND:

SURFACE-MOUNTED
LT-01
DOWNLIGHT

LT-02 LT-02 LT-02 LT-02 LT-02 WALL LIGHT

UP
LT-03 PENDANT LIGHT

S 1-GANG LIGHT SWITCH

3 3
S1 @ 1350mm AFFL
S 2-GANG LIGHT SWITCH
S

S2 @ 1350mm AFFL
S3
LT-03 LT-03 LT-03 S 3-GANG LIGHT SWITCH
S3 @ 1350mm AFFL
TO LIGHT ON S 3-WAY 1-GANG LIGHT
2ND FLR SA SWITCH @ 1350mm AFFL
LT-01
LT-01
LT-02 LT-02
LT-01
01 LT-02

LT-01

S
S1 S2
S
LT-01 LT-01 LT-01 S LT-02
S
4 02
S2

S1 S2 4 DN
SA S1
S1

LT-03
S S 03 SS DRAWING STATUS

LT-02

S
LT-01 LT-01 LT-01 S2 00 ISSUED FOR APPROVAL 19-03-21 RB -

LT-01 DRAWN CHECK


REV. DESCRIPTION DATE
BY BY
LT-03
CONSULTANT:

S2 S
5 S1 5
S CLIENT:

UP UP
MINA S. CRUZ

LT-02 PROJECT TITLE:


LT-02
PROPOSED
TWO-STOREY HOUSE
TAPULAO, ORANI. BATAAN

6 6 DRAWING TITLE:

TWO-STOREY HOUSE

PROPOSED LIGHTING LAYOUT


Initials Signed by: Date:
Drawn by: RB 19-03-21
Checked by: -
1 PROPOSED LIGHTING LAYOU - GROUND FLOOR 2 PROPOSED LIGHTING LAYOUT - SECOND FLOOR Approved by:
Scale:
-
AS SHOWN
SHEET SIZE A3

DWG-AR-07b SCALE DWG-AR-07b SCALE


DWG-AR-07b 00
KEY PLAN:

NUMBER OF OUTLETS
CKT. VOLTAGE WATTS
C. W. POLE WIRE Conduti AMPERE
NO. LIGHT OUTLET ACU REF RANGE RATING RATING AT AF
HEATER OTHERS SIZE Size
01 13 220V 1300 2 3.5 20mmØ PVC 20 100 5.9
02 10 220V 1000 2 3.5 20mmØ PVC 20 100 4.5
03 07 220V 700 2 3.5 20mmØ PVC 20 100 3.2 GENERAL NOTES:
04 05 X 2 220V 1800 2 3.5 20mmØ PVC 20 100 3.2 1. Do not scale this drawing, use figured dimensions only.
2. This drawing has been prepared based upon survey and information supplied by others. All
05 05 X 2 220V 1800 2 3.5 20mmØ PVC 20 100 8.2 dimensions and levels are to be checked on site by contractors and inconsistencies reported
immediately to the Designer and Client prior to works being undertaken.
3. Contractors are to ensure that all works under their responsibility or the responsibility of their
06 03 X 2 220V 1080 2 3.5 20mmØ PVC 20 100 8.2 sub-contractors are constructed and / or manufactured to comply with all relevant national and / or
local authority statutory requirements and in accordance with local building control and codes of
practice.
07 01 01 220V 4000 2 8 20mmØ PVC 40 100 18.8 4. This drawing is to be read in conjunction with other relevant drawings, specifications, schedules
and so forth,relating to the project or projects from which this drawing has been prepared.
5. This drawing is also to be read in conjunction with drawings, specification, schedules and so forth
08 01 220V 2000 2 5.5 20mmØ PVC 30 100 9.1 prepared by others and which are relevant to the project or project identified on this drawing.
6. This drawing is representative of design intent only, Contractor to supply for approval by the
Designer and Client, shop drawings and setting out rods to fully illustrate methods of construction
09 01 220V 4000 2 8 25mmØ PVC 40 100 18.8 of all millworks, casegoods, joinery works and other specialist finishes and features.
7. The dimensional accuracy of this drawing as it relates to site conditions is not guaranteed. The

10 01 220V 2000 2 3.5 20mmØ PVC 30 100 9.1 contractor must verify all site dimensions prior to producing shop and setting out drawings.
8. Refer to specification documents for all finish descriptions.
9. See detailed design per item; Verify actual measurement on site before installation, based on

11 01 220V 1500 2 3.5 20mmØ PVC 20 100 6.8 approved materials and detailed specifications.

This drawing is the property of the Client.


12 01 220V 1500 2 3.5 20mmØ PVC 20 100 6.8 Copyright is reserved by them and this drawing is issued on condition that is not copied or disclosed
by or to any anauthorized persons without the prior consent in writing of the Client.
This drawing is not to be scaled for the purposes of setting-out.
13 01 220V 2000 2 5.5 20mmØ PVC 30 100 9.1 Dimension to be checked on site and verified prior to commencing the works.

14 01 220V 3500 2 8 25mmØ PVC 40 100 15.9 ABBREVIATIONS:


15 01 220V 3500 2 8 25mmØ PVC 40 100 15.9
F.F.L = FINISH FLOOR LEVEL
TOTAL 31680 143.5 F.C.L = FINISH CEILING LEVEL
S.C.L = SCREED LEVEL
PROTECTION : 150 AT / 150 AF; 2P; 60Hz; 220V Single phase
FEEDER: 2-30mm2 THW in 32mmØ conduit LEGEND:

1 LOAD SCHEDULE
DWG-AR-07c SCALE

Main
20A 150A
GF L.O. 01 POWER SUPPLY
20A 20A
FF L.O. 03 02 GF L.O.
20A 20A
GF C.O. 05 04 GF C.O.
40A 20A
RANGE & HOOD 07 06 FF C.O. DRAWING STATUS

40A 30A
KITCHEN SP.O. 09 08 REFRIGERATOR 00 ISSUED FOR APPROVAL 19-03-21 RB -

DRAWN CHECK
REV. DESCRIPTION DATE
BY BY

30A 20A
10 11
CONSULTANT:

AC - SALA GF ROOM AC
20A 30A
GF ROOM AC 12 13 FF A.C. CLIENT:

MINA S. CRUZ
40A 40A
GF WATER HEATER 14 15 GF WATER HEATER PROJECT TITLE:

PROPOSED
TWO-STOREY HOUSE
TAPULAO, ORANI. BATAAN

DRAWING TITLE:

TWO-STOREY HOUSE

LOAD SCHEDULE & RISER DIAGRAM

Initials Signed by: Date:


Drawn by: RB 19-03-21

2 RISER DIAGRAM Checked by:


Approved by:
-
- SHEET SIZE A3

DWG-AR-07c SCALE Scale: AS SHOWN

DWG-AR-07c 00
KEY PLAN:

A B C D A B C D
GENERAL NOTES:

1. Do not scale this drawing, use figured dimensions only.


2. This drawing has been prepared based upon survey and information supplied by others. All
1460 3825 3840 1460 3825 3840 dimensions and levels are to be checked on site by contractors and inconsistencies reported
immediately to the Designer and Client prior to works being undertaken.
3. Contractors are to ensure that all works under their responsibility or the responsibility of their
UP ROOFING LINE ROOFING LINE sub-contractors are constructed and / or manufactured to comply with all relevant national and / or
local authority statutory requirements and in accordance with local building control and codes of
practice.
4. This drawing is to be read in conjunction with other relevant drawings, specifications, schedules
and so forth,relating to the project or projects from which this drawing has been prepared.
5. This drawing is also to be read in conjunction with drawings, specification, schedules and so forth
prepared by others and which are relevant to the project or project identified on this drawing.
6. This drawing is representative of design intent only, Contractor to supply for approval by the
Designer and Client, shop drawings and setting out rods to fully illustrate methods of construction

1 1
of all millworks, casegoods, joinery works and other specialist finishes and features.
7. The dimensional accuracy of this drawing as it relates to site conditions is not guaranteed. The
contractor must verify all site dimensions prior to producing shop and setting out drawings.
8. Refer to specification documents for all finish descriptions.
9. See detailed design per item; Verify actual measurement on site before installation, based on
approved materials and detailed specifications.

This drawing is the property of the Client.


Copyright is reserved by them and this drawing is issued on condition that is not copied or disclosed
1750

1750
BALCONY ENTRANCE STUDY by or to any anauthorized persons without the prior consent in writing of the Client.
This drawing is not to be scaled for the purposes of setting-out.
Dimension to be checked on site and verified prior to commencing the works.

ABBREVIATIONS:

3/4" POTABLE PVC CWL


2 2 F.F.L = FINISH FLOOR LEVEL
F.C.L = FINISH CEILING LEVEL
S.C.L = SCREED LEVEL

LEGEND:

DINING
2830

2830
LIVING

UP

3 3

3/4" POTABLE PVC CWL


1/2" POTABLE PVC CWL
FD
VALVE
D.O.
@600 FFL
A VALVE
S.O.
A VALVE
S.O.
@350 FLL@200 FLL
SHOWER MIXER
@800mm FFL
DRESSING AREA
150

KITCHEN 1/2" PPR PIPE 800mm FFL


EXTENDED ABOVE CEILING FOR
WATER HEATER PROVISION

TOILET & BATH


3815

3815
BEDROOM 4
@600 FFL
D.O.
1/2" POTABLE PVC CWL 1/2" POTABLE PVC CWL 1/2" POTABLE PVC CWL
VALVE

VALVE
FD
D.O.
@350 FLL @200 FLL

@600 FFL
A VALVE
S.O.
A VALVE
S.O.

FD
STORAGE/TREADMILL TOILET TOILET & BATH
150

4 4
@350 FLL @200 FLL
@600 FFL S.O. S.O. @900mm FFL
D.O. A VALVE A VALVE SHOWER MIXER
VALVE

DN

WATER SUPPLY PIPE TO FROM


WATER SUPPLY PIPE TO 1ST FLOOR T&B

MAIN SUPPLY LINE AT GROUND


1/2" PPR PIPE 800mm FFL
EXTENDED ABOVE CEILING FOR
WATER HEATER PROVISION
DRAWING STATUS
2695

2695
BEDROOM 2 BEDROOM 1 BALCONY

4"
3
00 ISSUED FOR APPROVAL 19-03-21 RB -

DRAWN CHECK
4"

REV. DESCRIPTION DATE


3

BY BY

CONSULTANT:

5 5
3/4" POTABLE PVC CWL

CLIENT:

UP UP
MINA S. CRUZ
LAUNDRY AREA
2705

2705

BEDROOM 3 PROJECT TITLE:

PROPOSED
@1200 FFL
D.O.
VALVE

TWO-STOREY HOUSE
TAPULAO, ORANI. BATAAN

6 6 DRAWING TITLE:

TWO-STOREY HOUSE

PROPOSED WATER SUPPLY LAYOUT

Initials Signed by: Date:


Drawn by: RB 19-03-21
Checked by:
PROPOSED WATER SUPPLY LAYOUT - GROUND FLOOR PROPOSED WATER SUPPLY LAYOUT - SECOND FLOOR
-
1 2 Approved by: - SHEET SIZE A3
Scale: AS SHOWN
DWG-AR-08a SCALE DWG-AR-08a SCALE
DWG-AR-08a 00
KEY PLAN:

A B C D A B C D

BARANGAY
DRAINAGE
4" WP TO 4" WP
4" CO
GENERAL NOTES:

4" CO 1. Do not scale this drawing, use figured dimensions only.


2. This drawing has been prepared based upon survey and information supplied by others. All
1460 3825 3840 1460 3825 3840 dimensions and levels are to be checked on site by contractors and inconsistencies reported
immediately to the Designer and Client prior to works being undertaken.

WP
3. Contractors are to ensure that all works under their responsibility or the responsibility of their
UP ROOFING LINE sub-contractors are constructed and / or manufactured to comply with all relevant national and / or

4"
local authority statutory requirements and in accordance with local building control and codes of
practice.
4. This drawing is to be read in conjunction with other relevant drawings, specifications, schedules
and so forth,relating to the project or projects from which this drawing has been prepared.
5. This drawing is also to be read in conjunction with drawings, specification, schedules and so forth
prepared by others and which are relevant to the project or project identified on this drawing.
6. This drawing is representative of design intent only, Contractor to supply for approval by the
Designer and Client, shop drawings and setting out rods to fully illustrate methods of construction

1 1
of all millworks, casegoods, joinery works and other specialist finishes and features.
7. The dimensional accuracy of this drawing as it relates to site conditions is not guaranteed. The
4" CO contractor must verify all site dimensions prior to producing shop and setting out drawings.
8. Refer to specification documents for all finish descriptions.
9. See detailed design per item; Verify actual measurement on site before installation, based on
approved materials and detailed specifications.

4" WP
This drawing is the property of the Client.
Copyright is reserved by them and this drawing is issued on condition that is not copied or disclosed
1755

1750
BALCONY ENTRANCE STUDY by or to any anauthorized persons without the prior consent in writing of the Client.
This drawing is not to be scaled for the purposes of setting-out.
Dimension to be checked on site and verified prior to commencing the works.

ABBREVIATIONS:

2 2

4" WP
F.F.L = FINISH FLOOR LEVEL
F.C.L = FINISH CEILING LEVEL
S.C.L = SCREED LEVEL

LEGEND:

DINING
2830

2830
LIVING

UP

4" WP
3 4" SP TO SEPTIC TANK
3
4" CO
4" SP TO SEPTIC TANK DRESSING AREA
2" DP 590
KITCHEN
FDFD OPENING FD

4" SP TO SEPTIC TANK


2" DP

@500mm FFL TOILET & BATH FD


3815

3815
725

BEDROOM 4

4" WP
3" WP 3" WP
FCO
FD FD

2" DP 2" DP
OPENING OPENING 4" SP 3" VENT UP 550
3" VENT UP
TO ROOF
FD
TOILET
STORAGE/TREADMILL
@5000mm FFL @500mm FFL 300
TOILET & BATH TO ROOF
& 4" SOIL

600
& 4" SOIL

300
4 PIPE DOWN
4" CO TO SEPTIC
TANK
4 DN
4" CO

2" DP
PIPE DOWN
TO SEPTIC
TANK DRAWING STATUS
OPENING
4" WP

@500mm FFL
2695

2695
BEDROOM 2 BEDROOM 1 BALCONY
00 ISSUED FOR APPROVAL 19-03-21 RB -

DRAWN CHECK
REV. DESCRIPTION DATE
BY BY

CONSULTANT:

5 5
4" WP

FD
4" CO CLIENT:

UP UP
MINA S. CRUZ
LAUNDRY AREA
2705

2705

BEDROOM 3 PROJECT TITLE:

PROPOSED
TWO-STOREY HOUSE
TAPULAO, ORANI. BATAAN

6 6 DRAWING TITLE:

TWO-STOREY HOUSE

PROPOSED DRAINAGE LAYOUT


Initials Signed by: Date:
Drawn by: RB 19-03-21
Checked by: -
1 PROPOSED DRAINAGE LAYOUT - GROUND FLOOR 2 PROPOSED DRAINAGE LAYOUT - SECOND FLOOR Approved by:
Scale:
-
AS SHOWN
SHEET SIZE A3

DWG-AR-08b SCALE DWG-AR-08b SCALE


DWG-AR-08b 00
KEY PLAN:

GENERAL NOTES:

LEGEND FOR WATER SUPPLY: LEGEND FOR DRAINAGE: 1. Do not scale this drawing, use figured dimensions only.
2. This drawing has been prepared based upon survey and information supplied by others. All
dimensions and levels are to be checked on site by contractors and inconsistencies reported
immediately to the Designer and Client prior to works being undertaken.
3. Contractors are to ensure that all works under their responsibility or the responsibility of their
sub-contractors are constructed and / or manufactured to comply with all relevant national and / or
local authority statutory requirements and in accordance with local building control and codes of
practice.
4. This drawing is to be read in conjunction with other relevant drawings, specifications, schedules

SP - Soil Pipe (4" Sanitary PVC)


and so forth,relating to the project or projects from which this drawing has been prepared.
5. This drawing is also to be read in conjunction with drawings, specification, schedules and so forth

- Shower Mixer, 800mm from FFL


prepared by others and which are relevant to the project or project identified on this drawing.
6. This drawing is representative of design intent only, Contractor to supply for approval by the
Designer and Client, shop drawings and setting out rods to fully illustrate methods of construction
SHOWER MIXER of all millworks, casegoods, joinery works and other specialist finishes and features.
@900mm FFL 7. The dimensional accuracy of this drawing as it relates to site conditions is not guaranteed. The
contractor must verify all site dimensions prior to producing shop and setting out drawings.

Right Cold Supply - supply by 21 " PVC DP - Drain Pipe (2" Sanitary PVC) 8. Refer to specification documents for all finish descriptions.

150 9. See detailed design per item; Verify actual measurement on site before installation, based on
approved materials and detailed specifications.

from main water line and with TEE


This drawing is the property of the Client.
Copyright is reserved by them and this drawing is issued on condition that is not copied or disclosed

WP - Waste Pipe (3" Sanitary PVC & 4" Sanitary


by or to any anauthorized persons without the prior consent in writing of the Client.
This drawing is not to be scaled for the purposes of setting-out.
Dimension to be checked on site and verified prior to commencing the works.

connection to extended pipe to ceiling ABBREVIATIONS:

(water heater supply provision) ; PVC) F.F.L = FINISH FLOOR LEVEL


F.C.L = FINISH CEILING LEVEL

Left Hot Supply - Supply to hot by 21"


PPR
S.C.L = SCREED LEVEL

pipe from 800mm FFL to Ceiling FD - Floor drain (connected to 2" P trap) LEGEND:

(provision for water heater installation)


FCO - Floor Clean Out (Clean out accessible form FFL)
- 1/2 " Angle Valve Single Outlet,
CO - Clean Out
A VALVE
S.O.
@500 FLL 350mm from FFL for Bidet / Sprayer NOTES :
- COVER ALL OPENING OF PIPES TO PREVENT UNNECESSARY
VALVE - 1/2 " Angle Valve Double Outlet, MATERIALS FROM ENTERING, REMOVE COVERS ONLY AT THE
D.O.
@500 FFL 600mm from FFL for Sink supply TIME OF FIXTURES INSTALLATION.
- SANITY LINE TO HAVE 1CM IS TO 40CM SLOPE
A VALVE
- 1/2 " Angle Valve Single Outlet, - CENTER OF SOIL PIPE OPENING FOR WATER CLOSET TO BE
S.O.
@250 FLL 200mm from FFL for WC supply 300MM FROM WALL
- SOIL PIPE FROM 1ST FLOOR TO BE EXTENDED UP WITH 3" PIPE
- 1/2 " Valve
FOR VENT TO ROOF DRAWING STATUS

- ALL SANITARY PIPES TO BE LEAK TEST AND BATHROOM


- 1/2 " PVC Potable Supply Pipe
FLOORS TO BE FLOOD TESTED FOR 24HRS AFTER CURING OF
00 ISSUED FOR APPROVAL 19-03-21 RB -

- 3/4 " PVC Potable Supply Pipe WATERPROOF COATING REV. DESCRIPTION DATE
DRAWN CHECK
BY BY

CONSULTANT:

NOTES :
- COVER ALL OPENING OF PIPES TO PREVENT CLIENT:

MINA S. CRUZ
UNNECESSARY MATERIALS FROM ENTERING,
REMOVE COVERS ONLY AT THE TIME OF PROJECT TITLE:

FIXTURES INSTALLATION. PROPOSED


TWO-STOREY HOUSE
- PRESSURE AND LEAK TEST TO BE CONDUCTED TAPULAO, ORANI. BATAAN

BEFORE COVERING THE PIPES W/ PLASTER DRAWING TITLE:

TWO-STOREY HOUSE
LEGEND FOR WATER
SUPPLY & DRAINAGE
Initials Signed by: Date:
Drawn by: RB 19-03-21
Checked by: -
Approved by: - SHEET SIZE A3
Scale: AS SHOWN

DWG-AR-08c 00
KEY PLAN:

GENERAL NOTES:

1. Do not scale this drawing, use figured dimensions only.


2. This drawing has been prepared based upon survey and information supplied by others. All
dimensions and levels are to be checked on site by contractors and inconsistencies reported
immediately to the Designer and Client prior to works being undertaken.
3. Contractors are to ensure that all works under their responsibility or the responsibility of their
sub-contractors are constructed and / or manufactured to comply with all relevant national and / or
local authority statutory requirements and in accordance with local building control and codes of
practice.
4. This drawing is to be read in conjunction with other relevant drawings, specifications, schedules
and so forth,relating to the project or projects from which this drawing has been prepared.
5. This drawing is also to be read in conjunction with drawings, specification, schedules and so forth
prepared by others and which are relevant to the project or project identified on this drawing.
6. This drawing is representative of design intent only, Contractor to supply for approval by the
Designer and Client, shop drawings and setting out rods to fully illustrate methods of construction
of all millworks, casegoods, joinery works and other specialist finishes and features.
7. The dimensional accuracy of this drawing as it relates to site conditions is not guaranteed. The
contractor must verify all site dimensions prior to producing shop and setting out drawings.
8. Refer to specification documents for all finish descriptions.
9. See detailed design per item; Verify actual measurement on site before installation, based on
approved materials and detailed specifications.

This drawing is the property of the Client.


Copyright is reserved by them and this drawing is issued on condition that is not copied or disclosed
by or to any anauthorized persons without the prior consent in writing of the Client.
This drawing is not to be scaled for the purposes of setting-out.
Dimension to be checked on site and verified prior to commencing the works.

ABBREVIATIONS:

F.F.L = FINISH FLOOR LEVEL


F.C.L = FINISH CEILING LEVEL
S.C.L = SCREED LEVEL

LEGEND:

DRAWING STATUS

00 ISSUED FOR APPROVAL 19-03-21 RB -

DRAWN CHECK
REV. DESCRIPTION DATE
BY BY

CONSULTANT:

CLIENT:

MINA S. CRUZ

PROJECT TITLE:

PROPOSED
TWO-STOREY HOUSE
TAPULAO, ORANI. BATAAN

DRAWING TITLE:

TWO-STOREY HOUSE
PLUMBING 3D REFERENCE -
EXTERNAL PIPING ELEVATION
Initials Signed by: Date:
Drawn by: RB 19-03-21
Checked by: -
Approved by: - SHEET SIZE A3
Scale: AS SHOWN

DWG-AR-08d 00
KEY PLAN:

GENERAL NOTES:

1. Do not scale this drawing, use figured dimensions only.


2. This drawing has been prepared based upon survey and information supplied by others. All
dimensions and levels are to be checked on site by contractors and inconsistencies reported
immediately to the Designer and Client prior to works being undertaken.
3. Contractors are to ensure that all works under their responsibility or the responsibility of their
sub-contractors are constructed and / or manufactured to comply with all relevant national and / or
local authority statutory requirements and in accordance with local building control and codes of
practice.
4. This drawing is to be read in conjunction with other relevant drawings, specifications, schedules
and so forth,relating to the project or projects from which this drawing has been prepared.
5. This drawing is also to be read in conjunction with drawings, specification, schedules and so forth
prepared by others and which are relevant to the project or project identified on this drawing.
6. This drawing is representative of design intent only, Contractor to supply for approval by the
Designer and Client, shop drawings and setting out rods to fully illustrate methods of construction
of all millworks, casegoods, joinery works and other specialist finishes and features.
7. The dimensional accuracy of this drawing as it relates to site conditions is not guaranteed. The
contractor must verify all site dimensions prior to producing shop and setting out drawings.
8. Refer to specification documents for all finish descriptions.
9. See detailed design per item; Verify actual measurement on site before installation, based on
approved materials and detailed specifications.

This drawing is the property of the Client.


Copyright is reserved by them and this drawing is issued on condition that is not copied or disclosed
by or to any anauthorized persons without the prior consent in writing of the Client.
This drawing is not to be scaled for the purposes of setting-out.
Dimension to be checked on site and verified prior to commencing the works.

ABBREVIATIONS:

F.F.L = FINISH FLOOR LEVEL


F.C.L = FINISH CEILING LEVEL
S.C.L = SCREED LEVEL

LEGEND:

1 EXTERIOR ELEVATION A
DWG-AR-09a SCALE

DRAWING STATUS

00 ISSUED FOR APPROVAL 19-03-21 RB -

DRAWN CHECK
REV. DESCRIPTION DATE
BY BY

CONSULTANT:

AC OPENING 425mm
HT 2100mm TOP HT

CLIENT:

MINA S. CRUZ

PROJECT TITLE:

PROPOSED
TWO-STOREY HOUSE
TAPULAO, ORANI. BATAAN

DRAWING TITLE:

TWO-STOREY HOUSE
PROPOSED EXTERIOR
ELEVATIONS
Initials Signed by: Date:
Drawn by: RB 19-03-21
Checked by: -
2 EXTERIOR ELEVATION B Approved by:
Scale:
-
AS SHOWN
SHEET SIZE A3

DWG-AR-09a SCALE
DWG-AR-09a 00
KEY PLAN:

AC OPENING 345mm
HT 2100mm TOP HT

GENERAL NOTES:

1. Do not scale this drawing, use figured dimensions only.


2. This drawing has been prepared based upon survey and information supplied by others. All
dimensions and levels are to be checked on site by contractors and inconsistencies reported
immediately to the Designer and Client prior to works being undertaken.
3. Contractors are to ensure that all works under their responsibility or the responsibility of their
sub-contractors are constructed and / or manufactured to comply with all relevant national and / or
local authority statutory requirements and in accordance with local building control and codes of
practice.
4. This drawing is to be read in conjunction with other relevant drawings, specifications, schedules
and so forth,relating to the project or projects from which this drawing has been prepared.
5. This drawing is also to be read in conjunction with drawings, specification, schedules and so forth
prepared by others and which are relevant to the project or project identified on this drawing.
6. This drawing is representative of design intent only, Contractor to supply for approval by the
Designer and Client, shop drawings and setting out rods to fully illustrate methods of construction
of all millworks, casegoods, joinery works and other specialist finishes and features.
7. The dimensional accuracy of this drawing as it relates to site conditions is not guaranteed. The
contractor must verify all site dimensions prior to producing shop and setting out drawings.
8. Refer to specification documents for all finish descriptions.
9. See detailed design per item; Verify actual measurement on site before installation, based on
approved materials and detailed specifications.
AC OPENING 345mm
HT 2100mm TOP HT This drawing is the property of the Client.
Copyright is reserved by them and this drawing is issued on condition that is not copied or disclosed
by or to any anauthorized persons without the prior consent in writing of the Client.
This drawing is not to be scaled for the purposes of setting-out.
Dimension to be checked on site and verified prior to commencing the works.

ABBREVIATIONS:

F.F.L = FINISH FLOOR LEVEL


F.C.L = FINISH CEILING LEVEL
S.C.L = SCREED LEVEL

LEGEND:

1 EXTERIOR ELEVATION C
DWG-AR-09b SCALE

DRAWING STATUS

00 ISSUED FOR APPROVAL 19-03-21 RB -

DRAWN CHECK
REV. DESCRIPTION DATE
BY BY

CONSULTANT:

CLIENT:

MINA S. CRUZ

PROJECT TITLE:

PROPOSED
TWO-STOREY HOUSE
TAPULAO, ORANI. BATAAN

DRAWING TITLE:

TWO-STOREY HOUSE
PROPOSED EXTERIOR
ELEVATIONS
Initials Signed by: Date:
Drawn by: RB 19-03-21
Checked by: -
2 EXTERIOR ELEVATION D Approved by:
Scale:
-
AS SHOWN
SHEET SIZE A3

DWG-AR-09b SCALE
DWG-AR-09b 00
KEY PLAN:

W1 W2 W3 W4 W5 W6

400
1000

1000

1000
GENERAL NOTES:
500 1. Do not scale this drawing, use figured dimensions only.

600
2. This drawing has been prepared based upon survey and information supplied by others. All
1500

dimensions and levels are to be checked on site by contractors and inconsistencies reported
immediately to the Designer and Client prior to works being undertaken.
3. Contractors are to ensure that all works under their responsibility or the responsibility of their
sub-contractors are constructed and / or manufactured to comply with all relevant national and / or
local authority statutory requirements and in accordance with local building control and codes of
practice.
4. This drawing is to be read in conjunction with other relevant drawings, specifications, schedules
2100

2100

2100

2100

2100
and so forth,relating to the project or projects from which this drawing has been prepared.
5. This drawing is also to be read in conjunction with drawings, specification, schedules and so forth
prepared by others and which are relevant to the project or project identified on this drawing.

1200 1000 600 6. This drawing is representative of design intent only, Contractor to supply for approval by the
Designer and Client, shop drawings and setting out rods to fully illustrate methods of construction

1700

1700
of all millworks, casegoods, joinery works and other specialist finishes and features.
7. The dimensional accuracy of this drawing as it relates to site conditions is not guaranteed. The
contractor must verify all site dimensions prior to producing shop and setting out drawings.
8. Refer to specification documents for all finish descriptions.
9. See detailed design per item; Verify actual measurement on site before installation, based on
1100 approved materials and detailed specifications.

1100

1100

1100
This drawing is the property of the Client.
Copyright is reserved by them and this drawing is issued on condition that is not copied or disclosed

600 by or to any anauthorized persons without the prior consent in writing of the Client.
This drawing is not to be scaled for the purposes of setting-out.
Dimension to be checked on site and verified prior to commencing the works.
600

ABBREVIATIONS:

FINISH FLOOR LEVEL F.F.L = FINISH FLOOR LEVEL


F.C.L = FINISH CEILING LEVEL
S.C.L = SCREED LEVEL
200

200

200

200

200

200
BALCONY FLOOR LEVEL
LEGEND:

QTY: 6 nos. QTY: 4 nos. QTY: 3 nos. QTY: 2 nos. QTY: 3 nos. QTY: 1 no.
TYPE: CASEMENT SWING TYPE: CASEMENT SWING TYPE: CASEMENT SWING TYPE: CASEMENT SWING TYPE: AWNING TYPE: SLIDING
FINISH: CLEAR GLASS W/ FINISH: CLEAR GLASS W/ FINISH: CLEAR GLASS W/ FINISH: CLEAR GLASS W/ FINISH: CLEAR GLASS W/ FINISH: CLEAR GLASS W/
WHITE ALUMINUM FRAME W/ WHITE ALUMINUM FRAME W/ WHITE ALUMINUM FRAME W/ WHITE ALUMINUM FRAME W/ WHITE ALUMINUM FRAME W/ WHITE ALUMINUM FRAME W/
COMPLETE GASKET AND COMPLETE GASKET AND COMPLETE GASKET AND COMPLETE GASKET AND COMPLETE GASKET AND COMPLETE GASKET AND
SEAL TO PREVENT WATER SEAL TO PREVENT WATER SEAL TO PREVENT WATER SEAL TO PREVENT WATER SEAL TO PREVENT WATER SEAL TO PREVENT WATER
INGRESS INGRESS INGRESS INGRESS INGRESS INGRESS

NOTE: ALL DIMENSIONS TO BE MEASURED AND 1 WINDOW SCHEDULE


DWG-AR-10 SCALE
CONFIRMED ON SITE BEFORE PRODUCTION

D1 D2 D3
900 600
1000

DRAWING STATUS

00 ISSUED FOR APPROVAL 19-03-21 RB -


2150

2100
DRAWN CHECK
REV. DESCRIPTION DATE
BY BY
2150

CONSULTANT:

CLIENT:

MINA S. CRUZ

PROJECT TITLE:
FINISH FLOOR LEVEL
PROPOSED
200

200

BALCONY FLOOR LEVEL


TWO-STOREY HOUSE
TAPULAO, ORANI. BATAAN
QTY: 1 no. QTY: 6 nos. QTY: 3 nos.
TYPE: SWING TYPE: SWING TYPE: SWING
DRAWING TITLE:
FINISH: SOLID WOOD IN WHITE FINISH: SOLID WOOD IN WHITE FINISH: ALUMINUM
TWO-STOREY HOUSE
PAINT FINISH (KILN/SUN-DRIED, PAINT FINISH (KILN/SUN-DRIED, COMPLETE FITTINGS
NO WARPING) NO WARPING) WINDOW & DOOR SCHEDULE
COMPLETE FITTINGS AND DOOR COMPLETE FITTINGS AND DOOR
KNOB W/ KEYS KNOB W/ KEYS Initials Signed by: Date:
Drawn by: RB 19-03-21
Checked by: -

NOTE: ALL DIMENSIONS TO BE MEASURED AND 2 DOOR SCHEDULE Approved by:


Scale:
-
AS SHOWN
SHEET SIZE A3

DWG-AR-10 SCALE
CONFIRMED ON SITE BEFORE PRODUCTION DWG-AR-10 00
KEY PLAN:

A B C D A B C D
GENERAL NOTES:

1. Do not scale this drawing, use figured dimensions only.


2. This drawing has been prepared based upon survey and information supplied by others. All
1460 3825 3840 1460 3825 3840 dimensions and levels are to be checked on site by contractors and inconsistencies reported
immediately to the Designer and Client prior to works being undertaken.
3. Contractors are to ensure that all works under their responsibility or the responsibility of their
UP ROOFING LINE ROOFING LINE sub-contractors are constructed and / or manufactured to comply with all relevant national and / or
local authority statutory requirements and in accordance with local building control and codes of
practice.
4. This drawing is to be read in conjunction with other relevant drawings, specifications, schedules
and so forth,relating to the project or projects from which this drawing has been prepared.
5. This drawing is also to be read in conjunction with drawings, specification, schedules and so forth
prepared by others and which are relevant to the project or project identified on this drawing.
6. This drawing is representative of design intent only, Contractor to supply for approval by the
Designer and Client, shop drawings and setting out rods to fully illustrate methods of construction

1 1
of all millworks, casegoods, joinery works and other specialist finishes and features.
7. The dimensional accuracy of this drawing as it relates to site conditions is not guaranteed. The
contractor must verify all site dimensions prior to producing shop and setting out drawings.
8. Refer to specification documents for all finish descriptions.
9. See detailed design per item; Verify actual measurement on site before installation, based on
BENCH approved materials and detailed specifications.
SEWING MACHINE
This drawing is the property of the Client.
Copyright is reserved by them and this drawing is issued on condition that is not copied or disclosed
1750

1750
SHOE by or to any anauthorized persons without the prior consent in writing of the Client.
BALCONY ENTRANCE CABINET STUDY This drawing is not to be scaled for the purposes of setting-out.
Dimension to be checked on site and verified prior to commencing the works.

ABBREVIATIONS:

2 2
BOOKSHELF

F.F.L = FINISH FLOOR LEVEL


F.C.L = FINISH CEILING LEVEL
TV S.C.L = SCREED LEVEL

LEGEND:

LIVING
2830

2830
DINING
UP

3 3 SHELF CABINET DRAWERS


SHELF
STUDY/
BAR
VANITY
CABINET TABLE

CABINET
FD

KITCHEN DRESSING AREA


3815

3815
TOILET & BATH
BEDROOM 4 CABINET
FRIDGE

FD

TOILET & BATH

STORAGE/TREADMILL CABINET
TOILET
SHELF

4 CABINET
4 DN
FD

FD

DRAWING STATUS

BEDROOM 2 BEDROOM 1
CABINET CABINET
2695

2695
BALCONY
00 ISSUED FOR APPROVAL 19-03-21 RB -

DRAWN CHECK
REV. DESCRIPTION DATE
SHELF SHELF BY BY

CONSULTANT:

SHELF CABINET

5 5
CLIENT:

BEDROOM 3 UP UP
MINA S. CRUZ
LAUNDRY AREA
2705

2705

PROJECT TITLE:

WASHING MACHINE
SHELF
PROPOSED
SHELF
TWO-STOREY HOUSE
TAPULAO, ORANI. BATAAN

6 6 DRAWING TITLE:

TWO-STOREY HOUSE
PROPOSED FURNITURE
LAYOUT
Initials Signed by: Date:
Drawn by: RB 19-03-21
Checked by: -
1 PROPOSED FURNITURE LAYOUT- GROUND FLOOR 2 PROPOSED FURNITURE LAYOUT - SECOND FLOOR Approved by:
Scale:
-
AS SHOWN
SHEET SIZE A3

DWG-ID-01 SCALE DWG-ID-01 SCALE


DWG-ID-01 00
KEY PLAN:

A B C D A B C D
GENERAL NOTES:

1. Do not scale this drawing, use figured dimensions only.


2. This drawing has been prepared based upon survey and information supplied by others. All
1460 3825 3840 1460 3825 3840 dimensions and levels are to be checked on site by contractors and inconsistencies reported
immediately to the Designer and Client prior to works being undertaken.
3. Contractors are to ensure that all works under their responsibility or the responsibility of their
UP ROOFING LINE ROOFING LINE sub-contractors are constructed and / or manufactured to comply with all relevant national and / or
local authority statutory requirements and in accordance with local building control and codes of
practice.
4. This drawing is to be read in conjunction with other relevant drawings, specifications, schedules
and so forth,relating to the project or projects from which this drawing has been prepared.
5. This drawing is also to be read in conjunction with drawings, specification, schedules and so forth
prepared by others and which are relevant to the project or project identified on this drawing.
6. This drawing is representative of design intent only, Contractor to supply for approval by the
Designer and Client, shop drawings and setting out rods to fully illustrate methods of construction

1 1
of all millworks, casegoods, joinery works and other specialist finishes and features.
7. The dimensional accuracy of this drawing as it relates to site conditions is not guaranteed. The
contractor must verify all site dimensions prior to producing shop and setting out drawings.
8. Refer to specification documents for all finish descriptions.
CH 2970 9. See detailed design per item; Verify actual measurement on site before installation, based on

605
approved materials and detailed specifications.

805
795

1720 1720
1795 1830 600 980 This drawing is the property of the Client.
Copyright is reserved by them and this drawing is issued on condition that is not copied or disclosed
1750

1750
LT-02 CH 2770 by or to any anauthorized persons without the prior consent in writing of the Client.
This drawing is not to be scaled for the purposes of setting-out.
LT-02 LT-02 Dimension to be checked on site and verified prior to commencing the works.

1005
805
800

CH 2970
S1 ABBREVIATIONS:
S

S
2 2

S
S2 S2
F.F.L = FINISH FLOOR LEVEL
SA F.C.L = FINISH CEILING LEVEL

S S.C.L = SCREED LEVEL

1340
LEGEND:

WHITE PAINT FINISH ON


1080 1500 2500 1500 1100 PT-01
CEILING SLAB AND BEAM
2830

2830
LT-02 LT-02 LT-02 LT-02 WHITE PAINT FINISH ON
PT-02
PLYWOOD CEILING

UP SURFACE-MOUNTED

1340
CH 2770 LT-01
DOWNLIGHT
CH 2770
LT-02 WALL LIGHT

3 3 LT-03 PENDANT LIGHT


S

S3
LT-03 LT-03 LT-03
1050

S 1-GANG LIGHT SWITCH


550 650 650 550

1475
S1 @ 1350mm AFFL

1830
TO LIGHT ON 1085 1085
800

S 2-GANG LIGHT SWITCH


2ND FLR CH 2770 1545 2145 S2 @ 1350mm AFFL
LT-01
700

2225 1625
1410 1410 S 3-GANG LIGHT SWITCH
1200 LT-01 1200
1200

CH 2770 LT-02 S3 @ 1350mm AFFL


LT-02
3815

3815
CH 2400
1125

LT-01

875
S 3-WAY 1-GANG LIGHT
700

480 480 LT-02 CH 2400 SA SWITCH @ 1350mm AFFL

LT-01 CH 0000 CEILING HEIGHT

S
S1

1830
S2
S
575

580
CH 2400
530

1275 1275 600x600mm ACCESS


1410

460 1200 1200


PANEL
705 S CH 2400
LT-01 LT-01 CH 2770 CH 2770 LT-01 LT-02
575

580
S
530

530

4 S2

S1 S2 4 DN
SA S1
S1

LT-03 1410
S S SS 1410 DRAWING STATUS

975
CH 2770
1275

1275

1275

1365

540 540 1700 1105 1100 1720


CH 2770 LT-02

S
2695

2695
1085

EQ
LT-01 LT-01 LT-01 CH 2400 S2 00 ISSUED FOR APPROVAL 19-03-21 RB -
CH 2770 DRAWN CHECK
LT-01 REV. DESCRIPTION DATE
BY BY
1275

1275

1275

CH 2770
LT-03
975

CONSULTANT:

EQ
S2 S
5 S1 5
S CLIENT:
1295
1425

UP UP
520 520 MINA S. CRUZ
1510
2705

2705

LT-02 PROJECT TITLE:


LT-02
CH 2770
CH 2570 PROPOSED
TWO-STOREY HOUSE
TAPULAO, ORANI. BATAAN

6 6 DRAWING TITLE:

TWO-STOREY HOUSE
PROPOSED REFLECTED
CEILING PLAN
Initials Signed by: Date:
Drawn by: RB 19-03-21
Checked by: -
1 PROPOSED REFLECTED CEILING PLAN- GROUND FLOOR 2 PROPOSED REFLECTED CEILING PLAN - SECOND FLOOR Approved by:
Scale:
-
AS SHOWN
SHEET SIZE A3

DWG-ID-02 SCALE DWG-ID-02 SCALE


DWG-ID-02 00
KEY PLAN:

A B C D A B C D
GENERAL NOTES:

1. Do not scale this drawing, use figured dimensions only.


2. This drawing has been prepared based upon survey and information supplied by others. All
1460 3825 3840 1460 3825 3840 dimensions and levels are to be checked on site by contractors and inconsistencies reported
immediately to the Designer and Client prior to works being undertaken.
3. Contractors are to ensure that all works under their responsibility or the responsibility of their
UP ROOFING LINE ROOFING LINE sub-contractors are constructed and / or manufactured to comply with all relevant national and / or
local authority statutory requirements and in accordance with local building control and codes of
practice.
4. This drawing is to be read in conjunction with other relevant drawings, specifications, schedules
and so forth,relating to the project or projects from which this drawing has been prepared.
5. This drawing is also to be read in conjunction with drawings, specification, schedules and so forth
prepared by others and which are relevant to the project or project identified on this drawing.
6. This drawing is representative of design intent only, Contractor to supply for approval by the
Designer and Client, shop drawings and setting out rods to fully illustrate methods of construction

1 1
of all millworks, casegoods, joinery works and other specialist finishes and features.
7. The dimensional accuracy of this drawing as it relates to site conditions is not guaranteed. The
contractor must verify all site dimensions prior to producing shop and setting out drawings.
8. Refer to specification documents for all finish descriptions.
9. See detailed design per item; Verify actual measurement on site before installation, based on
approved materials and detailed specifications.
AREA: 11 sqm
This drawing is the property of the Client.
Copyright is reserved by them and this drawing is issued on condition that is not copied or disclosed
F.F.L F.F.L
1750

1750
BALCONY ENTRANCE STUDY by or to any anauthorized persons without the prior consent in writing of the Client.
This drawing is not to be scaled for the purposes of setting-out.
-0.20 m ±0.00 m Dimension to be checked on site and verified prior to commencing the works.

TL 01a TL 01a TL 01b


ABBREVIATIONS:

2 2 F.F.L = FINISH FLOOR LEVEL


F.C.L = FINISH CEILING LEVEL
S.C.L = SCREED LEVEL
F.F.L
±0.00 m LEGEND:
400X400mm CERAMIC TILE
TL 01b TL-01a WOOD DESIGN - BROWN
(FLOOR)
DINING
2830

2830
LIVING 600X600mm CERAMIC TILE
TL-01b WOOD DESIGN - BROWN
(FLOOR)

UP 400X400mm CERAMIC TILE


TL-02 WOOD DESIGN - LIGHT BROWN
(FLOOR)
400X400mm CERAMIC TILE
TL-03 WOOD DESIGN - BROWN

3 3 TL-04
(FLOOR)

300X300mm CERAMIC TILE -


LIGHT GRAY (FLOOR)

300X300mm CERAMIC TILE -


TL-05 DARK GRAY (WALL & FLOOR)
AREA: 57 sqm
400X400mm CERAMIC TILE -
FD
DRESSING AREA TL-06 MOSAIC PATTERN (WALL &
F.F.L FD FLOOR)
KITCHEN F.F.L ±0.00 m F.F.L TL 04 300X300mm CERAMIC TILE -
TL-07a LIGHT GRAY (WALL)
TL 01b ±0.00 m AREA: 12.5 sqm TOILET & BATH ±0.00 m F.F.L
3815

3815
F.F.L
TL 05 ±0.00 m 300X300mm CERAMIC TILE -
-0.02 m BEDROOM 4 AREA: 24 sqm TL-07b LIGHT GRAY (FLOOR)

F.F.L F.F.L FD
FLOOR DRAIN
+0.01 m FD +0.01 m FD
F.F.L FD TL 04 F.F.L
TL 07
±0.00 m AREA: 11 sqm -0.02 m TL 00 FLOOR FINISH CODE
STORAGE/TREADMILL TOILET
TL 01b
AREA: 7 sqm F.F.L TOILET & BATH
F.F.L
TL 06 ±0.00 m FD ±0.00 m
FINISH FLOOR LEVEL

4 F.F.L F.F.L
F.F.L
+0.01 m 4 DN
FD

FD
FD

DRAWING STATUS

±0.00 m ±0.00 m F.F.L F.F.L


F.F.L F.F.L
±0.00 m +0.01 m
±0.00 m TL 03 TL 02 ±0.00 m
TL 01a
2695

2695
TL 01b
BEDROOM 2 BEDROOM 1 BALCONY
AREA: 22 sqm 00 ISSUED FOR APPROVAL 19-03-21 RB -

DRAWN CHECK
TL 01a REV. DESCRIPTION DATE
BY
AREA: 7.2 sqm AREA: 7.2 sqm BY

CONSULTANT:
TL 02

5 AREA: 4 sqm
5
F.F.L CLIENT:
TL 01a
±0.00 m UP UP
MINA S. CRUZ
LAUNDRY AREA
2705

2705

F.F.L
BEDROOM 3 -0.20 m
PROJECT TITLE:

AREA: 9.7 sqm


PROPOSED
TWO-STOREY HOUSE
TAPULAO, ORANI. BATAAN

6 6 DRAWING TITLE:

TWO-STOREY HOUSE
PROPOSED FLOORING
LAYOUT
Initials Signed by: Date:
Drawn by: RB 19-03-21
Checked by: -
1 PROPOSED FLOORING LAYOUT- GROUND FLOOR 2 PROPOSED FLOORING LAYOUT - SECOND FLOOR Approved by:
Scale:
-
AS SHOWN
SHEET SIZE A3

DWG-ID-03 SCALE DWG-ID-03 SCALE


DWG-ID-03 00
KEY PLAN:

50 x 50 mm SQUARE

50
GENERAL NOTES:
TUBULAR BLACK METAL 50 x 50 mm SQUARE
TUBULAR BLACK METAL 1. Do not scale this drawing, use figured dimensions only.
50 2. This drawing has been prepared based upon survey and information supplied by others. All
dimensions and levels are to be checked on site by contractors and inconsistencies reported
2150

100
immediately to the Designer and Client prior to works being undertaken.
3. Contractors are to ensure that all works under their responsibility or the responsibility of their

100
sub-contractors are constructed and / or manufactured to comply with all relevant national and / or

BALCONY FLOOR LEVEL 50 local authority statutory requirements and in accordance with local building control and codes of
practice.

100
4. This drawing is to be read in conjunction with other relevant drawings, specifications, schedules

100

5 5 5 5 5 5 50
and so forth,relating to the project or projects from which this drawing has been prepared.
5 mm THK x 30 mm WIDTH 5. This drawing is also to be read in conjunction with drawings, specification, schedules and so forth

100 100 100


prepared by others and which are relevant to the project or project identified on this drawing.

100
BLACK METAL FLAT BAR 6. This drawing is representative of design intent only, Contractor to supply for approval by the

100

100 100 100


Designer and Client, shop drawings and setting out rods to fully illustrate methods of construction
5 mm THK x 30 mm WIDTH of all millworks, casegoods, joinery works and other specialist finishes and features.

900
7. The dimensional accuracy of this drawing as it relates to site conditions is not guaranteed. The
BLACK METAL FLAT BAR contractor must verify all site dimensions prior to producing shop and setting out drawings.
8. Refer to specification documents for all finish descriptions.
9. See detailed design per item; Verify actual measurement on site before installation, based on

900
approved materials and detailed specifications.

This drawing is the property of the Client.


Copyright is reserved by them and this drawing is issued on condition that is not copied or disclosed
by or to any anauthorized persons without the prior consent in writing of the Client.
This drawing is not to be scaled for the purposes of setting-out.
Dimension to be checked on site and verified prior to commencing the works.

220
GROUND LEVEL BALCONY FLOOR LEVEL ABBREVIATIONS:

F.F.L = FINISH FLOOR LEVEL


F.C.L = FINISH CEILING LEVEL
S.C.L = SCREED LEVEL

1 HANDRAIL DETAIL - STEP 2 HANDRAIL DETAIL - BALCONY LEGEND:

DWG-ID-04 SCALE DWG-ID-04 SCALE

DRAWING STATUS

00 ISSUED FOR APPROVAL 19-03-21 RB -

DRAWN CHECK
REV. DESCRIPTION DATE
BY BY

CONSULTANT:

CLIENT:

MINA S. CRUZ

PROJECT TITLE:

3D REFERENCE FOR BALCONY HANDRAIL 3D REFERENCE FOR STAIRS HANDRAIL PROPOSED


TWO-STOREY HOUSE
TAPULAO, ORANI. BATAAN

DRAWING TITLE:

TWO-STOREY HOUSE

HANDRAIL DETAILS
Initials Signed by: Date:
Drawn by: RB 19-03-21
Checked by: -
Approved by: - SHEET SIZE A3
Scale: AS SHOWN
NOTE: ALL DIMENSIONS TO BE MEASURED AND CONFIRMED ON SITE BEFORE PRODUCTION
DWG-ID-04 00
KEY PLAN:

NOTE: ALL DIMENSIONS TO BE MEASURED AND CONFIRMED ON SITE BEFORE PRODUCTION


C
-
CABINET MATERIAL: PLYWOOD PLASTERED, SANDED, AND PAINTED IN DARK GRAY SEMI-GLOSS
COUNTERTOP MATERIAL: SYNTHETIC SOLID SURFACE OR GRANITE (LIGHT GRAY)
2550
600 1950
HINGES: FULL AND HALF OVERLAY HINGES
400
20 GENERAL NOTES:

1. Do not scale this drawing, use figured dimensions only.


2. This drawing has been prepared based upon survey and information supplied by others. All

20
dimensions and levels are to be checked on site by contractors and inconsistencies reported
immediately to the Designer and Client prior to works being undertaken.
3. Contractors are to ensure that all works under their responsibility or the responsibility of their
sub-contractors are constructed and / or manufactured to comply with all relevant national and / or

70
400

local authority statutory requirements and in accordance with local building control and codes of
practice.

30
4. This drawing is to be read in conjunction with other relevant drawings, specifications, schedules

30
600
and so forth,relating to the project or projects from which this drawing has been prepared.
5. This drawing is also to be read in conjunction with drawings, specification, schedules and so forth
prepared by others and which are relevant to the project or project identified on this drawing.
OPEN SHELF 6. This drawing is representative of design intent only, Contractor to supply for approval by the
350

960
Designer and Client, shop drawings and setting out rods to fully illustrate methods of construction
of all millworks, casegoods, joinery works and other specialist finishes and features.
7. The dimensional accuracy of this drawing as it relates to site conditions is not guaranteed. The
contractor must verify all site dimensions prior to producing shop and setting out drawings.
8. Refer to specification documents for all finish descriptions.
9. See detailed design per item; Verify actual measurement on site before installation, based on
1350 600
A OVERHEAD CABINET OVERHEAD CABINET approved materials and detailed specifications.

360
OPEN SHELF This drawing is the property of the Client.
Copyright is reserved by them and this drawing is issued on condition that is not copied or disclosed
-
FOR HOOD by or to any anauthorized persons without the prior consent in writing of the Client.
This drawing is not to be scaled for the purposes of setting-out.
Dimension to be checked on site and verified prior to commencing the works.

ABBREVIATIONS:

2450
640
- 2550 5 5
F.F.L = FINISH FLOOR LEVEL
F.C.L = FINISH CEILING LEVEL
S.C.L = SCREED LEVEL
B

5
30 20
LEGEND:

50
50
350

1200

30
600

600
250

1100
1050
250

2550

D
- KITCHEN COUNTER TOP BAR COUNTER TOP

1 P L A N 5 ELEVATION D 6 FINGER-PULL HANDLE DETAIL


DWG-ID-05a SCALE DWG-ID-05a SCALE DWG-ID-05a SCALE
150

150

150

150
OPEN SHELF
DRAWING STATUS
OPEN SHELF
840

840

840
OPEN SHELF
1090
1120

1120

1120

1120

1120
OPEN SHELF
OPEN SHELF 00 ISSUED FOR APPROVAL 15-02-21 RB -
30

DRAWN CHECK
REV. DESCRIPTION DATE
BY BY
600 CONSULTANT:
OPEN SHELF
30

30
620
2770

400 400

2770
2550
400

400
600 1350 600 600 65 600 360 640 600
600

600
CLIENT:
50

200 50

50
MINA S. CRUZ
30 200 30 200 30

30
150

150

30 150
250
150 150 150

150

125
510 510
1780

20

20

20
30

DRAWER DRAWER

30
PROJECT TITLE:
260 REMOVABLE

200
530 EQ EQ 510 510 PANEL 305
DRAWER DRAWER DRAWER W/
PROPOSED
1100

1100
920

30
PROVIDE

1050
MAGNETIC TWO-STOREY HOUSE
670
750

750
2-LEVEL
900

900

900
880

PULL-OUT 630 620 LATCH


DRAWER TAPULAO, ORANI. BATAAN
FOR
460

460
METAL RACK
330

CABINET CABINET GAS


500 600 600 245 355 50 TANK 50 DRAWING TITLE:

TWO-STOREY HOUSE
100

100

100

100
DETAIL - KITCHEN & BAR
BUILT-IN CABINET
ELEVATION A ELEVATION B ELEVATION C
Signed by:
2 3 4 Drawn by:
Initials
RB
Date:
15-02-21

DWG-ID-05a SCALE DWG-ID-05a SCALE DWG-ID-05a SCALE


Checked by: -
Approved by: - SHEET SIZE A3
Scale: AS SHOWN

DWG-ID-05a 00
KEY PLAN:

GENERAL NOTES:

1. Do not scale this drawing, use figured dimensions only.


2. This drawing has been prepared based upon survey and information supplied by others. All
dimensions and levels are to be checked on site by contractors and inconsistencies reported
immediately to the Designer and Client prior to works being undertaken.
3. Contractors are to ensure that all works under their responsibility or the responsibility of their
sub-contractors are constructed and / or manufactured to comply with all relevant national and / or
local authority statutory requirements and in accordance with local building control and codes of
practice.
4. This drawing is to be read in conjunction with other relevant drawings, specifications, schedules
and so forth,relating to the project or projects from which this drawing has been prepared.
5. This drawing is also to be read in conjunction with drawings, specification, schedules and so forth
prepared by others and which are relevant to the project or project identified on this drawing.
6. This drawing is representative of design intent only, Contractor to supply for approval by the
Designer and Client, shop drawings and setting out rods to fully illustrate methods of construction
of all millworks, casegoods, joinery works and other specialist finishes and features.
7. The dimensional accuracy of this drawing as it relates to site conditions is not guaranteed. The
contractor must verify all site dimensions prior to producing shop and setting out drawings.
8. Refer to specification documents for all finish descriptions.
9. See detailed design per item; Verify actual measurement on site before installation, based on
approved materials and detailed specifications.

This drawing is the property of the Client.


Copyright is reserved by them and this drawing is issued on condition that is not copied or disclosed
by or to any anauthorized persons without the prior consent in writing of the Client.
This drawing is not to be scaled for the purposes of setting-out.
Dimension to be checked on site and verified prior to commencing the works.

ABBREVIATIONS:

F.F.L = FINISH FLOOR LEVEL


F.C.L = FINISH CEILING LEVEL
S.C.L = SCREED LEVEL

LEGEND:

DRAWING STATUS

00 ISSUED FOR APPROVAL 15-02-21 RB -

DRAWN CHECK
REV. DESCRIPTION DATE
BY BY

CONSULTANT:

CLIENT:

MINA S. CRUZ
1 3D VIEW 1 2 3D VIEW 2
DWG-ID-05b SCALE DWG-ID-05b SCALE
PROJECT TITLE:

PROPOSED
TWO-STOREY HOUSE
TAPULAO, ORANI. BATAAN

DRAWING TITLE:

TWO-STOREY HOUSE
DETAIL - KITCHEN & BAR
BUILT-IN CABINET
NOTE: ALL DIMENSIONS TO BE MEASURED AND CONFIRMED ON SITE BEFORE PRODUCTION Initials Signed by: Date:
Drawn by: RB 15-02-21
CABINET MATERIAL: PLYWOOD SANDED AND PAINTED IN DARK GRAY SEMI-GLOSS Checked by: -
Approved by: - SHEET SIZE A3
COUNTERTOP MATERIAL: SYNTHETIC SOLID SURFACE OR GRANITE (LIGHT GRAY) Scale: AS SHOWN

DWG-ID-05b 00
KEY PLAN:

NOTE: ALL DIMENSIONS


B C D
TO BE MEASURED AND
- - -
CONFIRMED ON SITE
2550
50 BEFORE PRODUCTION
1500 1050
30 20

30
CABINET PANEL, GENERAL NOTES:

80
CARCASS, BED, AND 1. Do not scale this drawing, use figured dimensions only.
2. This drawing has been prepared based upon survey and information supplied by others. All

100
dimensions and levels are to be checked on site by contractors and inconsistencies reported

400
SHELVES MATERIAL:

50
immediately to the Designer and Client prior to works being undertaken.

20
3. Contractors are to ensure that all works under their responsibility or the responsibility of their

30
600

sub-contractors are constructed and / or manufactured to comply with all relevant national and / or

30
PLYWOOD PLASTERED,
local authority statutory requirements and in accordance with local building control and codes of
practice.
4. This drawing is to be read in conjunction with other relevant drawings, specifications, schedules
and so forth,relating to the project or projects from which this drawing has been prepared.

200
SANDED, AND PAINTED 5. This drawing is also to be read in conjunction with drawings, specification, schedules and so forth
prepared by others and which are relevant to the project or project identified on this drawing.
6. This drawing is representative of design intent only, Contractor to supply for approval by the
Designer and Client, shop drawings and setting out rods to fully illustrate methods of construction

IN WHITE SEMI-GLOSS of all millworks, casegoods, joinery works and other specialist finishes and features.
7. The dimensional accuracy of this drawing as it relates to site conditions is not guaranteed. The
contractor must verify all site dimensions prior to producing shop and setting out drawings.
8. Refer to specification documents for all finish descriptions.
9. See detailed design per item; Verify actual measurement on site before installation, based on
approved materials and detailed specifications.

A CABINET - UPPER PANEL 20 CABINET INNER This drawing is the property of the Client.
Copyright is reserved by them and this drawing is issued on condition that is not copied or disclosed
by or to any anauthorized persons without the prior consent in writing of the Client.

SHELVING: MELAMINE

240
This drawing is not to be scaled for the purposes of setting-out.
- Dimension to be checked on site and verified prior to commencing the works.

50 1000
WHITE ABBREVIATIONS:

2820

50
20
F.F.L = FINISH FLOOR LEVEL

1910
F.C.L = FINISH CEILING LEVEL
HINGES: FULL AND HALF

2420
S.C.L = SCREED LEVEL
30
OVERLAY HINGES LEGEND:

30
DRAWER GUIDE: BALL

100
BEARING DRAWER
SLIDE GUIDE
310

CABINET - LOWER PANEL 20


BED DRAWER

P L A N FINGER-PULL HANDLE DETAIL

50
1 6

20
DWG-ID-07a SCALE DWG-ID-07a SCALE

CABINET - DRAWER
20

20

20
40

40

40
400

400

400
470

470

470
DRAWING STATUS
100

100

100
50
30

30

30
300

445

445
00 ISSUED FOR APPROVAL 21-01-21 RB -
630

630
DRAWN CHECK
50

REV. DESCRIPTION DATE


BY BY

CONSULTANT:

20

20
300
1120

1120

1120
20

20
50

2630

2630
350

350
2770

2770

2770

2770
300

2730
CLIENT:

MINA S. CRUZ
50

20

20
2150

2150

2150
30

30

30
300

350

350
1645

PROJECT TITLE:
1700

1700
20

20
DRAWER
PROPOSED
180 180

DRAWER
TWO-STOREY HOUSE
350

350
1000

1000

1000
20

DRAWER DRAWER TAPULAO, ORANI. BATAAN


700
20

20
900

20
80

DRAWER
30

DRAWING TITLE:
350

350
300

DRAWER
TWO-STOREY HOUSE
450

DRAWER
100 240

DETAIL - BEDROOM 1
20
20

20

20
100

100

100

100

100
BUILT-IN CABINET & BED
Initials Signed by: Date:
Drawn by: RB 21-01-21

2 SECTION A 3 OPEN ELEVATION - CABINET 4 SECTION B 5 SECTION C Checked by:


Approved by:
-
- SHEET SIZE A3

DWG-ID-07a SCALE DWG-ID-07a SCALE DWG-ID-07a SCALE DWG-ID-07a SCALE Scale: AS SHOWN

DWG-ID-07a 00
KEY PLAN:

470

470
400 400

50

50
300

300
GENERAL NOTES:

50

50
1. Do not scale this drawing, use figured dimensions only.

300

300
2. This drawing has been prepared based upon survey and information supplied by others. All
dimensions and levels are to be checked on site by contractors and inconsistencies reported
immediately to the Designer and Client prior to works being undertaken.
3. Contractors are to ensure that all works under their responsibility or the responsibility of their
50 sub-contractors are constructed and / or manufactured to comply with all relevant national and / or

50
local authority statutory requirements and in accordance with local building control and codes of
practice.
4. This drawing is to be read in conjunction with other relevant drawings, specifications, schedules
and so forth,relating to the project or projects from which this drawing has been prepared.
2770

2770
300

300
5. This drawing is also to be read in conjunction with drawings, specification, schedules and so forth
prepared by others and which are relevant to the project or project identified on this drawing.
6. This drawing is representative of design intent only, Contractor to supply for approval by the
Designer and Client, shop drawings and setting out rods to fully illustrate methods of construction
50

50
of all millworks, casegoods, joinery works and other specialist finishes and features.
7. The dimensional accuracy of this drawing as it relates to site conditions is not guaranteed. The
contractor must verify all site dimensions prior to producing shop and setting out drawings.
8. Refer to specification documents for all finish descriptions.
300

300
9. See detailed design per item; Verify actual measurement on site before installation, based on
400 400 approved materials and detailed specifications.

This drawing is the property of the Client.


Copyright is reserved by them and this drawing is issued on condition that is not copied or disclosed
by or to any anauthorized persons without the prior consent in writing of the Client.
This drawing is not to be scaled for the purposes of setting-out.
2420 2420 Dimension to be checked on site and verified prior to commencing the works.

200 1910 310 200 1910 310


ABBREVIATIONS:
50 EQ 50 EQ 50 EQ 50 50 EQ 50 EQ 50 EQ 50
900

900

30
F.F.L = FINISH FLOOR LEVEL
80

F.C.L = FINISH CEILING LEVEL


30

S.C.L = SCREED LEVEL


DRAWER DRAWER DRAWER
270
450

450
240

LEGEND:
100

1 BUILT-IN BED & SHELVES SIDE ELEVATION 2 SECTION D


DWG-ID-07b SCALE DWG-ID-07b SCALE

DRAWING STATUS

00 ISSUED FOR APPROVAL 21-01-21 RB -

DRAWN CHECK
REV. DESCRIPTION DATE
BY BY

CONSULTANT:

CLIENT:

MINA S. CRUZ

PROJECT TITLE:

PROPOSED
TWO-STOREY HOUSE
TAPULAO, ORANI. BATAAN

DRAWING TITLE:

TWO-STOREY HOUSE
DETAIL - BEDROOM 1
BUILT-IN CABINET & BED
Initials Signed by: Date:
Drawn by: RB 21-01-21
Checked by: -

3 3D VIEW Approved by:


Scale:
-
AS SHOWN
SHEET SIZE A3

DWG-ID-07b SCALE
DWG-ID-07b 00
KEY PLAN:

D C B NOTE: ALL DIMENSIONS


- - - TO BE MEASURED AND
2550 CONFIRMED ON SITE
1050
450 600
1500
50 BEFORE PRODUCTION
50 50 20

30
CABINET PANEL,

50
GENERAL NOTES:

80
CARCASS, BED, AND 1. Do not scale this drawing, use figured dimensions only.

40 30
2. This drawing has been prepared based upon survey and information supplied by others. All
dimensions and levels are to be checked on site by contractors and inconsistencies reported
400

SHELVES MATERIAL:

50
immediately to the Designer and Client prior to works being undertaken.

20
60 3. Contractors are to ensure that all works under their responsibility or the responsibility of their

80
600
sub-contractors are constructed and / or manufactured to comply with all relevant national and / or

30
PLYWOOD PLASTERED,
local authority statutory requirements and in accordance with local building control and codes of
practice.
4. This drawing is to be read in conjunction with other relevant drawings, specifications, schedules
and so forth,relating to the project or projects from which this drawing has been prepared.
200

30 570
SANDED, AND PAINTED 5. This drawing is also to be read in conjunction with drawings, specification, schedules and so forth
prepared by others and which are relevant to the project or project identified on this drawing.

30 6. This drawing is representative of design intent only, Contractor to supply for approval by the
Designer and Client, shop drawings and setting out rods to fully illustrate methods of construction

IN WHITE SEMI-GLOSS of all millworks, casegoods, joinery works and other specialist finishes and features.
7. The dimensional accuracy of this drawing as it relates to site conditions is not guaranteed. The
contractor must verify all site dimensions prior to producing shop and setting out drawings.
8. Refer to specification documents for all finish descriptions.
9. See detailed design per item; Verify actual measurement on site before installation, based on
approved materials and detailed specifications.

A CABINET - TWO-PANEL 20 CABINET INNER This drawing is the property of the Client.
Copyright is reserved by them and this drawing is issued on condition that is not copied or disclosed
by or to any anauthorized persons without the prior consent in writing of the Client.

SHELVING: MELAMINE

240
This drawing is not to be scaled for the purposes of setting-out.
- Dimension to be checked on site and verified prior to commencing the works.

WHITE ABBREVIATIONS:

2805

50
20
1000 50 F.F.L = FINISH FLOOR LEVEL
1910

F.C.L = FINISH CEILING LEVEL


OPEN SHELVES: WOOD
2405

10 S.C.L = SCREED LEVEL

20 LAMINATE/MELAMINE AS LEGEND:

PER APPROVED SAMPLE

20
100
HINGES: FULL AND HALF
30
OVERLAY HINGES

DRAWER GUIDE: BALL


295

FULL HEIGHT 20 BEARING DRAWER


BED DRAWER CABINET - PANEL SLIDE GUIDE
P L A N FINGER-PULL HANDLE DETAIL

50
1 6

20
DWG-ID-08a SCALE DWG-ID-08a SCALE

CABINET - DRAWER
20

20

20
40

40

40

40
220

320

320
20 EQ

20 EQ
DRAWING STATUS
20

20
450

SHELF

20 EQ

20 EQ
1070

1070

1070
320

320
1080
50

20

20
00 ISSUED FOR APPROVAL 21-01-21 RB -

20 EQ

20 EQ
DRAWN CHECK
320

320
REV. DESCRIPTION DATE
450
350

BY BY
SHELF
CONSULTANT:
80

80
50

30
50

50
2650

2650
2630

2630
450

510

450
350

510

450

350
510
2770

2770

2770

2770
SHELF SHELF SHELF SHELF

2730
CLIENT:

MINA S. CRUZ
50

50
30
80

80
300

320

320
1645

PROJECT TITLE:
1700

1700
PROPOSED
20

20
DRAWER
180 180

DRAWER
1080

TWO-STOREY HOUSE
1070

1070

1070
320

320
20

DRAWER DRAWER TAPULAO, ORANI. BATAAN


700
900

20

20

20
80

DRAWER
30

DRAWING TITLE:
300
320

320
DRAWER
TWO-STOREY HOUSE
450

DRAWER
100 240

DETAIL - BEDROOM 2
20
20

20

20
100

100

100

100

100

100
BUILT-IN CABINET & BED
Initials Signed by: Date:
Drawn by: RB 21-01-21

2 SECTION A 3 OPEN ELEVATION - CABINET 4 SECTION B 5 SECTION C Checked by:


Approved by:
-
- SHEET SIZE A3

DWG-ID-08a SCALE DWG-ID-08a SCALE DWG-ID-08a SCALE DWG-ID-08a SCALE Scale: AS SHOWN

DWG-ID-08a 00
KEY PLAN:

220

220
400

450

450
GENERAL NOTES:

450

450
1. Do not scale this drawing, use figured dimensions only.
2. This drawing has been prepared based upon survey and information supplied by others. All
dimensions and levels are to be checked on site by contractors and inconsistencies reported
immediately to the Designer and Client prior to works being undertaken.
3. Contractors are to ensure that all works under their responsibility or the responsibility of their
sub-contractors are constructed and / or manufactured to comply with all relevant national and / or
local authority statutory requirements and in accordance with local building control and codes of
practice.
4. This drawing is to be read in conjunction with other relevant drawings, specifications, schedules

450

450
and so forth,relating to the project or projects from which this drawing has been prepared.

2770

2770
5. This drawing is also to be read in conjunction with drawings, specification, schedules and so forth
prepared by others and which are relevant to the project or project identified on this drawing.
6. This drawing is representative of design intent only, Contractor to supply for approval by the
Designer and Client, shop drawings and setting out rods to fully illustrate methods of construction
of all millworks, casegoods, joinery works and other specialist finishes and features.
7. The dimensional accuracy of this drawing as it relates to site conditions is not guaranteed. The
contractor must verify all site dimensions prior to producing shop and setting out drawings.
8. Refer to specification documents for all finish descriptions.

300

300
9. See detailed design per item; Verify actual measurement on site before installation, based on
400 400 approved materials and detailed specifications.

This drawing is the property of the Client.


Copyright is reserved by them and this drawing is issued on condition that is not copied or disclosed
by or to any anauthorized persons without the prior consent in writing of the Client.
This drawing is not to be scaled for the purposes of setting-out.
2405 2420 Dimension to be checked on site and verified prior to commencing the works.

295 1910 200 310 1910 200


ABBREVIATIONS:
50 EQ 50 EQ 50 EQ 50 50 EQ 50 EQ 50 EQ 50

900

900
30
F.F.L = FINISH FLOOR LEVEL

80
F.C.L = FINISH CEILING LEVEL

30
S.C.L = SCREED LEVEL
DRAWER DRAWER DRAWER

270

450

450
240
LEGEND:

100
1 BUILT-IN BED & SHELVES SIDE ELEVATION 2 SECTION D
DWG-ID-08b SCALE DWG-ID-08b SCALE

DRAWING STATUS

00 ISSUED FOR APPROVAL 21-01-21 RB -

DRAWN CHECK
REV. DESCRIPTION DATE
BY BY

CONSULTANT:

CLIENT:

MINA S. CRUZ

PROJECT TITLE:

PROPOSED
TWO-STOREY HOUSE
TAPULAO, ORANI. BATAAN

DRAWING TITLE:

TWO-STOREY HOUSE
DETAIL - BEDROOM 2
BUILT-IN CABINET & BED
Initials Signed by: Date:
Drawn by: RB 21-01-21
Checked by: -

3 3D VIEW Approved by:


Scale:
-
AS SHOWN
SHEET SIZE A3

DWG-ID-08b SCALE
DWG-ID-08b 00
KEY PLAN:

NOTE: ALL DIMENSIONS TO BE MEASURED


AND CONFIRMED ON SITE BEFORE
PRODUCTION
20
B CABINET PANEL, CARCASS, BED, AND
GENERAL NOTES:
- SHELVES MATERIAL: PLYWOOD PLASTERED,
1. Do not scale this drawing, use figured dimensions only.

SANDED, AND PAINTED IN WHITE 2. This drawing has been prepared based upon survey and information supplied by others. All

50
dimensions and levels are to be checked on site by contractors and inconsistencies reported

20
immediately to the Designer and Client prior to works being undertaken.
1566
SEMI-GLOSS 3. Contractors are to ensure that all works under their responsibility or the responsibility of their
sub-contractors are constructed and / or manufactured to comply with all relevant national and / or
local authority statutory requirements and in accordance with local building control and codes of
practice.
4. This drawing is to be read in conjunction with other relevant drawings, specifications, schedules
and so forth,relating to the project or projects from which this drawing has been prepared.
5. This drawing is also to be read in conjunction with drawings, specification, schedules and so forth

CABINET INNER SHELVING: MELAMINE


prepared by others and which are relevant to the project or project identified on this drawing.
6. This drawing is representative of design intent only, Contractor to supply for approval by the
Designer and Client, shop drawings and setting out rods to fully illustrate methods of construction
of all millworks, casegoods, joinery works and other specialist finishes and features.

WHITE 7. The dimensional accuracy of this drawing as it relates to site conditions is not guaranteed. The
contractor must verify all site dimensions prior to producing shop and setting out drawings.
8. Refer to specification documents for all finish descriptions.

600
9. See detailed design per item; Verify actual measurement on site before installation, based on
approved materials and detailed specifications.

20 This drawing is the property of the Client.

HINGES: FULL AND HALF OVERLAY HINGES Copyright is reserved by them and this drawing is issued on condition that is not copied or disclosed
by or to any anauthorized persons without the prior consent in writing of the Client.
This drawing is not to be scaled for the purposes of setting-out.
Dimension to be checked on site and verified prior to commencing the works.

967

1550
ABBREVIATIONS:
DRAWER GUIDE: BALL BEARING DRAWER

50
20
SLIDE GUIDE F.F.L = FINISH FLOOR LEVEL
F.C.L = FINISH CEILING LEVEL
950
S.C.L = SCREED LEVEL

A LEGEND:
-

30
600

30
20
1 P L A N
DWG-ID-09a SCALE

CABINET - PANEL
50
20

6 FINGER-PULL HANDLE DETAIL 7 3D VIEW


DWG-ID-09a SCALE DWG-ID-09a SCALE
CABINET - DRAWER
250

250

250

250
20

20
40

40

40

40

40

40
DRAWING STATUS
20 300 20 300 20 300 20 300 20 300 20 300

20 300 20 300 20 300 20 300 20 300 20 300

20 300 20 300 20 300 20 300 20 300 20 300


328

328

328
20

20

20
00 ISSUED FOR APPROVAL 21-01-21 RB -
348

348

348
DRAWN CHECK
1270

1270
REV. DESCRIPTION DATE
BY BY
20

20

20
CONSULTANT:
2770

2770

2770

2770
2420

2420

2420

2420

2420

2420
2400

2360

2360

2400

2360
CLIENT:
2520

30

30
MINA S. CRUZ
1645

1645

1645
PROJECT TITLE:
1700

1700

1700
DRAWER DRAWER PROPOSED

180 180
DRAWER
1100

1100
TWO-STOREY HOUSE

20
DRAWER DRAWER TAPULAO, ORANI. BATAAN

700
DRAWER

20
440

440

440
DRAWING TITLE:

300
DRAWER DRAWER
DRAWER TWO-STOREY HOUSE
DETAIL - BEDROOM 3

20
20

20

20

20

20

20
100

100

100

100

100

100

100

100
BUILT-IN CABINET & BED
Initials Signed by: Date:
Drawn by: RB 21-01-21

SECTION A OPEN ELEVATION (SECTION A) SECTION B OPEN ELEVATION (SECTION B)


Checked by: -
2 3 4 5 Approved by: - SHEET SIZE A3
AS SHOWN
DWG-ID-09a SCALE DWG-ID-09a SCALE DWG-ID-09a SCALE DWG-ID-09a SCALE
Scale:

DWG-ID-09a 00
KEY PLAN:

B
-

987 NOTE: ALL DIMENSIONS


50
TO BE MEASURED AND
CONFIRMED ON SITE

30
GENERAL NOTES:

BEFORE PRODUCTION

400

80
1. Do not scale this drawing, use figured dimensions only.
2. This drawing has been prepared based upon survey and information supplied by others. All
dimensions and levels are to be checked on site by contractors and inconsistencies reported
immediately to the Designer and Client prior to works being undertaken.
3. Contractors are to ensure that all works under their responsibility or the responsibility of their
sub-contractors are constructed and / or manufactured to comply with all relevant national and / or
1378 local authority statutory requirements and in accordance with local building control and codes of

EQ
CABINET PANEL, practice.

30
4. This drawing is to be read in conjunction with other relevant drawings, specifications, schedules
and so forth,relating to the project or projects from which this drawing has been prepared.

CARCASS, BED, AND


5. This drawing is also to be read in conjunction with drawings, specification, schedules and so forth
prepared by others and which are relevant to the project or project identified on this drawing.
6. This drawing is representative of design intent only, Contractor to supply for approval by the
50 1000 50 Designer and Client, shop drawings and setting out rods to fully illustrate methods of construction

1100 SHELVES MATERIAL: of all millworks, casegoods, joinery works and other specialist finishes and features.
7. The dimensional accuracy of this drawing as it relates to site conditions is not guaranteed. The
contractor must verify all site dimensions prior to producing shop and setting out drawings.
8. Refer to specification documents for all finish descriptions.

PLYWOOD PLASTERED, 9. See detailed design per item; Verify actual measurement on site before installation, based on
approved materials and detailed specifications.

SANDED, AND PAINTED This drawing is the property of the Client.


Copyright is reserved by them and this drawing is issued on condition that is not copied or disclosed
by or to any anauthorized persons without the prior consent in writing of the Client.
This drawing is not to be scaled for the purposes of setting-out.
IN WHITE SEMI-GLOSS

2657
Dimension to be checked on site and verified prior to commencing the works.

240
ABBREVIATIONS:
2290

1910

CABINET INNER F.F.L = FINISH FLOOR LEVEL


F.C.L = FINISH CEILING LEVEL

A SHELVING: MELAMINE S.C.L = SCREED LEVEL

- WHITE LEGEND:

HINGES: FULL AND HALF


OVERLAY HINGES
100
EQ

DRAWER GUIDE: BALL


BEARING DRAWER SLIDE
1291
GUIDE
BED DRAWER
1 P L A N 5 FINGER-PULL HANDLE DETAIL
DWG-ID-09b SCALE DWG-ID-09b SCALE

6 3D VIEW
DWG-ID-09b SCALE
470

470

470
DRAWING STATUS
400 400
50

50

50
300

300

300
00 ISSUED FOR APPROVAL 21-01-21 RB -
50

50

50
DRAWN CHECK
REV. DESCRIPTION DATE
BY BY
300

300

300
CONSULTANT:
50

50

50
2770

2770

2770
300

300

300
CLIENT:
50

50

50
MINA S. CRUZ
300

300

300
400 400
PROJECT TITLE:

2283 2283 PROPOSED


EQ 1910 EQ EQ 1910 EQ
TWO-STOREY HOUSE
50 EQ 50 EQ 50 EQ 50 TAPULAO, ORANI. BATAAN
900

900

900

30
80

80
30

30

DRAWING TITLE:
270

DRAWER DRAWER DRAWER


450

450

450
100 240

240

DRAWER TWO-STOREY HOUSE


DETAIL - BEDROOM 3
100

BUILT-IN CABINET & BED


Initials Signed by: Date:
Drawn by: RB 21-01-21

SECTION A BUILT-IN BED & SHELVES SIDE ELEVATION SECTION B


Checked by: -
2 3 4 Approved by: - SHEET SIZE A3
AS SHOWN
DWG-ID-09b SCALE DWG-ID-09b SCALE DWG-ID-09b SCALE
Scale:

DWG-ID-09b 00
KEY PLAN:
3660
1030 1600 1030
515
NOTE: ALL DIMENSIONS TO BE MEASURED AND CONFIRMED ON SITE BEFORE
PRODUCTION
CABINET PANEL AND CARCASS MATERIAL: PLYWOOD PLASTERED, SANDED, AND
PAINTED IN WHITE SEMI-GLOSS
CABINET INNER SHELVING: MELAMINE WHITE

570
600

OPEN SHELVES: PLYWOOD PLASTERED, SANDED, AND PAINTED IN DARK GRAY GENERAL NOTES:

SEMI-GLOSS 1. Do not scale this drawing, use figured dimensions only.


2. This drawing has been prepared based upon survey and information supplied by others. All
dimensions and levels are to be checked on site by contractors and inconsistencies reported
immediately to the Designer and Client prior to works being undertaken.
40 355 40
40 435 40
HINGES: FULL AND HALF OVERLAY HINGES 3. Contractors are to ensure that all works under their responsibility or the responsibility of their
sub-contractors are constructed and / or manufactured to comply with all relevant national and / or
local authority statutory requirements and in accordance with local building control and codes of
practice.
4. This drawing is to be read in conjunction with other relevant drawings, specifications, schedules
and so forth,relating to the project or projects from which this drawing has been prepared.
5. This drawing is also to be read in conjunction with drawings, specification, schedules and so forth
- - - prepared by others and which are relevant to the project or project identified on this drawing.
6. This drawing is representative of design intent only, Contractor to supply for approval by the
Designer and Client, shop drawings and setting out rods to fully illustrate methods of construction
of all millworks, casegoods, joinery works and other specialist finishes and features.
7. The dimensional accuracy of this drawing as it relates to site conditions is not guaranteed. The
A 1 P L A N A B contractor must verify all site dimensions prior to producing shop and setting out drawings.
8. Refer to specification documents for all finish descriptions.
9. See detailed design per item; Verify actual measurement on site before installation, based on

DWG-ID-10a SCALE approved materials and detailed specifications.

This drawing is the property of the Client.


Copyright is reserved by them and this drawing is issued on condition that is not copied or disclosed
by or to any anauthorized persons without the prior consent in writing of the Client.
This drawing is not to be scaled for the purposes of setting-out.
Dimension to be checked on site and verified prior to commencing the works.

ABBREVIATIONS:
50

50
40
100

40
F.F.L = FINISH FLOOR LEVEL
F.C.L = FINISH CEILING LEVEL
S.C.L = SCREED LEVEL

455
LEGEND:
SHELF

40 240 40 240 40
1350

SHELF

SHELF
2250

2170
2250
2400

515
100

SHELF

40 240 40 200 40
800

SHELF

SHELF

40
100

100

2 ELEVATION (CLOSED PANEL) 7 3D VIEW


DWG-ID-10a SCALE DWG-ID-10a SCALE

DRAWING STATUS
50

50

50

50

50
70

90
20 300 20 300 20 300 20 300 20 300 20 300 20 290 20

20 300 20 300 20 300 20 300 20 300 20 300 20 290 20


40

40
100

40

40
00 ISSUED FOR APPROVAL 21-01-21 RB -
455

455
DRAWN CHECK
REV. DESCRIPTION DATE
BY BY

SHELF SHELF
10 CONSULTANT:
40 240 40 240 40

40 240 40 240 40
20

1350
1250

SHELF SHELF

20
CLIENT:

SHELF SHELF MINA S. CRUZ


30
2250

2170
2250

2250

2250

2170
2250
2210
2400

2400

2400
PROJECT TITLE:
515

515
100

PROPOSED
SHELF SHELF
FULL HEIGHT CABINET TWO-STOREY HOUSE
PANEL FINGER-PULL
40 240 40 200 40

40 240 40 200 40
TAPULAO, ORANI. BATAAN
800

SHELF SHELF
HANDLE DRAWING TITLE:

TWO-STOREY HOUSE
SHELF SHELF 6 DETAIL DETAIL - BEDROOM 4 BUILT-IN
DWG-ID-10a SCALE HEADBOARD CABINET
40

40
100

100

100

100

100

100
Initials Signed by: Date:
Drawn by: RB 21-01-21
Checked by: -
Approved by: - SHEET SIZE A3
3 ELEVATION (OPEN) 4 SECTION A 5 SECTION B Scale: AS SHOWN

DWG-ID-10a SCALE DWG-ID-10a SCALE DWG-ID-10a SCALE


DWG-ID-10a 00
MARCH
WEEK 1 WEEK 2 WEEK 3 WEEK 4
MON TUE WED THUR FRI SAT SUN MON TUE WED THUR FRI SAT SUN MON TUE WED THUR FRI SAT SUN MON TUE WED THUR FRI SAT SUN MON TUE WED THUR FRI SAT SUN
Activities 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18
01 Material delivery
02 Area Clearing
03 Marking and Layout
6 6 4
04 Demolition of kitchen area
05 excavation
06 Footing & column rebar works
2 4
07 Footing rebar placement
08 Footing concrete pouring * 6 6
09 Column Form works
6 6 2
10 Column rebark Works
11 Column concrete pouring* 4 6 6 6
12 Beam, slab & Stairs form works
13 Beam, slab & Stairs rebar works 6 6 6 6 6 6
14 Concret pouring Beam, slab & Stairs
15 Column rebark Works
6 6 2
6 Column Form works
17 Column concrete pouring 4 6 6 6
18 Ground Masonry (Firewall)
19 1st Floor Masonry w/ elec coduit layout
20 Roof Beam rebar works
21 Roof Beam form works
22 Roof Beam Pouring
wall Demolition tiles removal &
23
embankment of extended area
24
Plumbing Layout & pressure & leak test
25 Slab Rebars works on extended area
26 concret pouring on extended area
27 1st Floor Plastering
28 ground floor plastering
29 Ground Roofing Works
30 1st Roofing Works
31 T&B, Balcony, fire wall proofing
32 Flood Test
33 1st floor tiling
34 ground floor tiling (slab roof part)
35 ground floor tiling (roof part)
36 Kitchen Cabinet fixing
37 Windows installation
38 1st floor ceiling
39 ground floor ceiling
40 electrical
41 doors, lights and fixtures
APRIL MAY
WEEK 5 WEEK 6 WEEK 7 WEEK 8 WEEK 9 WEEK 1
MON TUE WED THUR FRI SAT SUN MON TUE WED THUR FRI SAT SUN MON TUE WED THUR FRI SAT SUN MON TUE WED THUR FRI SAT SUN MON TUE WED THUR FRI SAT SUN
Activities 20 21 22 23 24 25 26 27 28 29 30 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 20 21 22 23 24 25
01 Material delivery
02 Area Clearing
03 Marking and Layout
04 Demolition of kitchen area
05 excavation
06 Footing & column rebar works
07 Footing rebar placement
08 Footing concrete pouring *
09 Column Form works
10 Column rebark Works
11 Column concrete pouring*
12 Beam, slab & Stairs form works
13 Beam, slab & Stairs rebar works
14 Concret pouring Beam, slab & Stairs
15 Column rebark Works
6 Column Form works
17 Column concrete pouring
18 Ground Masonry (Firewall) 2 2 2 2 2 2
19 1st Floor Masonry w/ elec coduit layout 4 4 4 4 4 4
20 Roof Beam rebar works
21 Roof Beam form works 6 6 6 2
22 Roof Beam Pouring
wall Demolition tiles removal &
23
embankment of extended area
4 6 6
24
Plumbing Layout & pressure & leak test
25 Slab Rebars works on extended area
6 6 6 2
26 concret pouring on extended area
27 1st Floor Plastering
4 6 6 6 6 6
28 ground floor plastering
29 Ground Roofing Works SUB SUB SUB SUB SUB SUB SUB SUB SUB
30 1st Roofing Works SUB SUB SUB SUB SUB SUB SUB SUB SUB
31 T&B, Balcony, fire wall proofing
2 2 2
32 Flood Test
33 1st floor tiling 4 4 4 2
34 ground floor tiling (slab roof part)
6 6 6 6 6 6
35 ground floor tiling (roof part)
36 Kitchen Cabinet fixing
37 Windows installation
38 1st floor ceiling
39 ground floor ceiling
40 electrical
41 doors, lights and fixtures
MAY
WEEK 10 WEEK 11 WEEK 12
MON TUE WED THUR FRI SAT SUN MON TUE WED THUR FRI SAT SUN
Activities 26 27 28 29 30 31 01 02 03 04 05 06 07 08
01 Material delivery
02 Area Clearing
03 Marking and Layout
04 Demolition of kitchen area
05 excavation
06 Footing & column rebar works
07 Footing rebar placement
08 Footing concrete pouring *
09 Column Form works
10 Column rebark Works
11 Column concrete pouring*
12 Beam, slab & Stairs form works
13 Beam, slab & Stairs rebar works
14 Concret pouring Beam, slab & Stairs
15 Column rebark Works
6 Column Form works
17 Column concrete pouring
18 Ground Masonry (Firewall)
19 1st Floor Masonry w/ elec coduit layout
20 Roof Beam rebar works
21 Roof Beam form works
22 Roof Beam Pouring
wall Demolition tiles removal &
23
embankment of extended area
24
Plumbing Layout & pressure & leak test
25 Slab Rebars works on extended area
26 concret pouring on extended area
27 1st Floor Plastering
28 ground floor plastering
29 Ground Roofing Works
30 1st Roofing Works
31 T&B, Balcony, fire wall proofing
32 Flood Test
33 1st floor tiling
34 ground floor tiling (slab roof part)
35 ground floor tiling (roof part)
36 Kitchen Cabinet fixing SUB SUB SUB SUB
37 Windows installation SUB SUB SUB SUB
38 1st floor ceiling
6 6 6 6 6 6 4 4
39 ground floor ceiling
40 electrical
2 2 2 2
41 doors, lights and fixtures

You might also like