Changes that need to be made for BB-02 10 Jan 2024

 Wall lights that need to be installed on 3 places. Check if the fixtures are already placed.
For the exact dimensions of the lights, refer to the “Elektra buiten keuken-palapa”
drawing. Carried out by “Probouw”.
 LED strips under the stair tiles by the outdoor kitchen need to be installed. The LED strip
profile should be installed as indicated on the photo. The choice of the profile has been
indicated by Andy. Carried out by “Probouw”.

 The duct in the master bedroom needs to be moved downward to make space available
for the LED strip profile. The detail and strip profile to be used is the same as the one for
the living room. Carried out by a Refrigeration technician.

 The duct pipe needs to be installed, so space must be created. As agreed with Henk on
10 Jan 2024. Carried out by “Probouw”.

 The cove in the ceiling by the master bathroom sink will remain. LED strips will be
installed there. The choice of profile is indicated by Andy. Carried out by “Probouw”.

 The LED strip profile needs to be installed in the niche in the bathrooms. The LED strip
profile should be glued or attached similarly to the marble tile. Remember to pull out
the electrical wires! Carried out by “Probouw”.

 The LED strip for the TV niche is the same as the one for the bathrooms. The LED strip
will be installed as indicated by Andy. Carried out by “Probouw”.