Professional Documents
Culture Documents
Tapi River
Growth of Surat City
Year Area in Population
Historical Development Sq. Km
1951 8.18 223182
Of Surat Dates Back To
1961 8.18 288026
300 BC. 1971 33.85 471656
1981 55.56 776583
Municipality Established 1991 111.16 1498817
In 1852 AD. 2001 112.27 2433785
2001* 326.51 2877241
Municipal Corporation 2011 326.51 44.7 Lakhs
Formed In 1966.
Surat : City Expansion
Unprecedented
growth in last four
decades.
10-fold population
8 Municipality &
rise in last 4
27 Village
decades.
Panchayats
3-fold increase in
area in 2006
11
PAL W.D.S
10
VESU-2 W.D.S
13
12 VESU-1 W.D.S
Water Supply
Increase in water supply since year 1995
Area of city increased in year 2006 from 112.28 Sq.Km. to 326.51 Sq.km
780 domestic
2013
4 326.51 47.00 + 60 Industrial *94%
Present
= 840 MLD
* Remaining area to be covered by Dec., 2013
Water Supply Master Plan
Projected Water
1682.63 MLD 2331.67 MLD
demand
Water Supply:
Increase in water supply Infrastructure
Present Ongoing/ Ultimate
Year 2013 tender works capacity
Year2013 Master Plan
Water Supply Components Year 2041
Cumulative capacity Increase
WATER SUPPLY
REVENUE INCOME V/S EXPENDITURE
10000
9000
8000
Rs. in Lacs
7000
6000
5000
4000
3000
2000
1000
0
2005- 2006- 2007- 2008- 2009- 2010- 2011-
06 07 08 09 10 11 12
Revenue Income 0 3651.14 4388.58 4857.34 6109.16 6370.15 6906.67 9164.00
Revenue Expenditure 4330.39 5048.84 6302.59 6690.65 7105.16 7304.81 9016
YEAR
GRID System
All Water Works and Water Distribution Stations are
interlinked
Any water works can feed water to any water distribution
station
Helped to restore entire water supply system within 36 hours
during the floods of August 2006
Energy Efficiency and savings
measures
Installation of thyristor based APFC panels
800.00
789.10
744.53
710.46
689.81
700.00
655.31
(in Million Liters per Day)
596.94
600.00 567.09
Water Supply
514.33
500.00 478.58
454.60
406.13
400.00
300.00
355.99
349.08
343.98
334.81
200.00
316.95
316.03
305.04
291.78
285.07
280.43
279.88
279.17
100.00
0.00
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13
Energy Savings in Operation and Maintenance
Cost – Water Supply: FY 2011-12
NGOs
SLB – Water Supply
Target Vs. Achievement FY 2012-13 (Till Dec 2012)
Achievement Service
Target
Performance Indicator 2012-13 till Level
2012-13
Dec-2012 Benchmark
Per Capita Supply of Water 140 lpcd 140 lpcd 135 lpcd
60
PPP Initiatives
Common Effluent Treatment Plant (CETP)
• Effluent Pumping Station
61
Initiatives – Waste Water Recycling Project
Pandesara WDS
UGSR
Potable Use
Existing facility New Facility to be developed,
Rehabilitate, Maintain, Use maintained and used
Operation and Maintenance Cost – Sewerage System
FY 2011-12